490
Water and Envirionment MPS: Ministerial Policy Statement Water and Envirionment Table of Contents Executive Summary Foreword Abbreviations and Acronyms Structure of Report PRELIMINARY Vote: 019 Ministry of Water and Environment V1: Vote Overview V2: Past Vote Performance and Medium Term Plans V3: Proposed Budget Allocations for 2012/13 and the Medium Term V4: Vote Challenges and Unfunded Outputs for 2012/13 and the Medium Term V5: Vote Crosscutting Issues Annex 1: Vote function Profiles and Composition Annex 2: Draft Profiles and Annual Workplans for Projects and Programmes Annex 3: Staff Establishment Structures Vote: 150 National Environment Management Authority V1: Vote Overview V2: Past Vote Performance and Medium Term Plans V3: Proposed Budget Allocations for 2012/13 and the Medium Term V4: Vote Challenges and Unfunded Outputs for 2012/13 and the Medium Term V5: Vote Crosscutting Issues Annex 1: Vote function Profiles and Composition Annex 2: Draft Profiles and Annual Workplans for Projects and Programmes Annex 3: Staff Establishment Structures Vote: 157 National Forestry Authority V1: Vote Overview V2: Past Vote Performance and Medium Term Plans V3: Proposed Budget Allocations for 2012/13 and the Medium Term V4: Vote Challenges and Unfunded Outputs for 2012/13 and the Medium Term V5: Vote Crosscutting Issues Annex 1: Vote function Profiles and Composition Annex 2: Draft Profiles and Annual Workplans for Projects and Programmes Annex 3: Staff Establishment Structures Vote: 500 501-850 Local Governments V1: Vote Overview V2: Past Vote Performance and Medium Term Plans V3: Proposed Budget Allocations for 2012/13 and the Medium Term V4: Vote Challenges and Unfunded Outputs for 2012/13 and the Medium Term V5: Vote Crosscutting Issues Annex 1: Vote function Profiles and Composition Preliminary

Water and Envirionment Ministerial Policy Statement MPS: Water and Envirionment · MPS: Water and Envirionment Water and Envirionment Ministerial Policy Statement Executive Summary

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    Table of Contents

    Executive Summary

    Foreword

    Abbreviations and Acronyms

    Structure of Report

    PRELIMINARY

    Vote: 019 Ministry of Water and Environment

    V1: Vote Overview

    V2: Past Vote Performance and Medium Term Plans

    V3: Proposed Budget Allocations for 2012/13 and the Medium Term

    V4: Vote Challenges and Unfunded Outputs for 2012/13 and the Medium Term

    V5: Vote Crosscutting Issues

    Annex 1: Vote function Profiles and Composition

    Annex 2: Draft Profiles and Annual Workplans for Projects and Programmes

    Annex 3: Staff Establishment Structures

    Vote: 150 National Environment Management Authority

    V1: Vote Overview

    V2: Past Vote Performance and Medium Term Plans

    V3: Proposed Budget Allocations for 2012/13 and the Medium Term

    V4: Vote Challenges and Unfunded Outputs for 2012/13 and the Medium Term

    V5: Vote Crosscutting Issues

    Annex 1: Vote function Profiles and Composition

    Annex 2: Draft Profiles and Annual Workplans for Projects and Programmes

    Annex 3: Staff Establishment Structures

    Vote: 157 National Forestry Authority

    V1: Vote Overview

    V2: Past Vote Performance and Medium Term Plans

    V3: Proposed Budget Allocations for 2012/13 and the Medium Term

    V4: Vote Challenges and Unfunded Outputs for 2012/13 and the Medium Term

    V5: Vote Crosscutting Issues

    Annex 1: Vote function Profiles and Composition

    Annex 2: Draft Profiles and Annual Workplans for Projects and Programmes

    Annex 3: Staff Establishment Structures

    Vote: 500 501-850 Local Governments

    V1: Vote Overview

    V2: Past Vote Performance and Medium Term Plans

    V3: Proposed Budget Allocations for 2012/13 and the Medium Term

    V4: Vote Challenges and Unfunded Outputs for 2012/13 and the Medium Term

    V5: Vote Crosscutting Issues

    Annex 1: Vote function Profiles and Composition

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    Foreword

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    Foreword

    Abbreviations and Acronyms

    Rt. Honorable Speaker, I present to you the Ministerial Policy Statement (MPS) for the Financial Year

    2012/13, covering vote 019- Ministry of Water and Environment ( MWE) and its semi- autonomous

    agencies namely vote 150-National Environment Management Authority (NEMA) and vote 157-National

    Forestry Authority ( NFA).

    This Ministerial Policy Statement has been prepared and is being submitted to Parliament in accordance

    with Section 6(1) of the Budget Act 2001. Overall, during FY 2011/12 the sector continued to register

    remarkable tangible achievements despite the challenges encountered such as the high population growth,

    low functionality, high cost technology options, overwhelming demand for Water for Production facilities,

    the high rehabilitation costs for aged facilities, implications of adverse climate change and weak

    enforcement/compliance in the areas of environmental laws/regulations.

    Generally, this MPS upholds many of the good strategies and other initiatives introduced by Government

    over the past years. In the FY 2012/13, government will continue to improve access to and functionality of

    safe domestic water and sanitation facilities, increase storage capacity for water for production, safeguard

    quality and quantity for both the surface and underground water resources, continue to demarcate

    boundaries of wetlands, restore degraded ecosystems, focus on tree planting activities to enhance household

    income and soil fertility improvement as well as promoting integration of adaptation and mitigation in

    sector plans to address climate change effects. In addition, management of municipal solid waste will be

    scaled up for a clean, healthy and productive environment. In the FY 2012/13, the budget for the Water and

    Environment Sector is Ush 391.09bn. The figure includes Ushs 296.426bn for vote 019-Ministry of Water

    and Environment, Ushs 5.68bn for vote 150-NEMA, Ushs 20.16bn for vote 157-NFA and Ushs 68.83bn for

    vote 501-850 as Local Governments (LGs) Conditional Grants. While there is a slight nominal increase in

    the sector allocation this FY, compared to the FY 2011/12, there are still a number of unfunded priorities,

    especially with regard to the environment management and regulatory services for the oil and gas

    exploration industry in Uganda budgeted at Shs 4.0bn.

    I take this opportunity to register my appreciation to Parliament, the line Ministries, Local Governments,

    Development Partners, the Private Sector, Civil Society Organizations and Local Communities for their

    support which has been instrumental for all the achievements presented in this Ministerial Policy Statement.

    Accordingly, I would now like to seek approval of Ush. 391.09bn, in the FY 2012/13, as the budget for

    Vote 019 – MWE, vote 150-NEMA and vote 157-NFA The figure comprises of Ushs 9.75bn for wage,

    Ushs 12.427bn as non-wage, Ushs 12.199bn as Non Tax Revenue, Ushs 205.992bn and Ushs 150.721bn as

    domestic and donor capital development expenditures, respectively.

    On behalf of the Government of Uganda, I pledge our resolve to execute the planned activities and outputs

    for the FY 2012/13 and use the availed resources effectively to achieve the set objectives and goals

    Hon. Maria Mutagamba

    MINISTER OF WATER AND ENVIRONMENT

    OLEBound160:

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    Abbreviations and Acronyms

    Budget Framework PaperBFP

    Danish Development AgencyDANIDA

    District Environment OfficerDEO

    Department of Environment Support ServicesDESS

    Directorate of Public ProsecutionDPP

    Directorate of Water DevelopmentDWD

    District Water and Sanitation Conditional Development GrantDWSCDG

    Environment EducationEE

    Environment Impact AssessmentEIA

    Environment and Natural ResourcesENRS

    European UnionEU

    Financial YearFY

    Government of UgandaGoU

    Human Resource DevelopmentHRD

    Japanese International Cooperation AgencyJICA

    Local GovernmentLG

    Lake Victoria Environmental management ProjectLVEMP

    Millennium Development GoalsMDG

    Ministerial Policy StatementMPS

    Municipal Solid WasteMSW

    Medium TermMT

    Medium Term Expenditure FrameworkMTEF

    National Development PlanNDP

    National Environment ActNEA

    National Management Environment AuthorityNEMA

    National Forestry AuthorityNFA

    Non-Government OrganizationNGO

    Natural Resources BaseNRB

    National State of Environment ReportNSOER

    National Water and Sewerage CorporationNWSC

    Poverty Eradication Action PlanPEAP

    Prosperity For AllPFA

    Public Procurement and Disposal AuthorityPPDA

    Peace Recovery and Development ProgrammePRDP

    Sector-Wide Approach to PlanningSWAP

    World Environment DayWED

    Water for ProductionWfP

    World Metrological OrganisationWMO

    Water Resources ManagementWRM

    Water Supply and SanitationWSS

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    Structure of the Ministerial Policy Statement

    The Ministerial Policy Statement is structured by Vote, as follows:

    This section sets out past performance and future plans for Central and Local Government Votes in

    more detail. It is structured as follows for each Vote: A Vote Overview sets out key details of the

    vote, including past performance, future plans and key performance issues to be addressed including

    costing implications.

    Annex 1 provides profiles for Vote Functions, and their composition. Annex 2 provides detailed

    profiles and annual workplan of each project and programme under the vote. Annex 3 provides

    details of approved staff structure for each programme and project (including names of staff and

    vacant posts). This is clearly demonstrated in the form of an organogram Annexes 2 and 3 are not

    present for LGs as it forms part of the Local Government BFPs.

    • Vote Overview

    • Vote Annexes

    Vote Functions

    “Each Minister shall cause to be prepared and submitted to Parliament a Policy Statement of the relevant

    Ministry on the preliminary [budget] estimates .... by the 30th day of June in each year”. Budget Act 2001,

    Section 6 (1)

    Structure

    Since the FY2009/10 budget cycle, the preparation of sector BFPs, Ministerial Policy Statements and

    Budget Estimates centre around the notion of Vote Functions. A Vote Function is a set of programmes,

    projects, and Local Government Grants, defining the roles and responsibilities of a vote/institution, and

    contributing towards the attainment of vote and overall sector objectives.

    As such, a Vote Function provides detailed information on centralised services, by capturing allocations to

    Central Ministries and Stand Alone Votes, and decentralised services funded via grants to Local

    Governments

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    Executive Summary

    The Ministerial Policy Statement (MPS) has been prepared in conformity with guidelines issued by the

    Ministry of Finance, Planning and Economic Development (MFPED), as the principal document for

    presenting details of the Ministry of Water and Environment, National Environment Management Authority

    and National Foresty Authority budgets estimates for FY 2012/13 to Parliament.

    This document entails the recommendations and responses on issues raised by Parliament during FY

    2011/12, past and future planned vote outputs, medium term plans, major capital investments, actions for

    improved sector performance, key expenditure allocations, unfunded outputs for FY 2012/13 and the

    medium term, expenditure plans by item of expenditure, an overview of Cross Cutting Issues, annual and

    quarterly work plans as well as procurement plans.

    The Water and Environment sector directly contributes to the National Development plan (NDP) priorities

    which include growth, employment and socio-economic development transformation. Proper management

    of Environment and Natural Resources is a critical area to sustainable economic development. The National

    Development Plan appreciates that the degraded environment and loss of vegetation cover grossly affects

    other primary sectors like agricultural production, water for production and water resources resulting into

    multiple effects of food security, people’s livelihoods and economic growth. Forest is equally critical

    because it sustains water catchments system and plays a key role in mitigation of climate change effects.

    In view of the above, the Ministry of Water and Environment (vote-019) will continue to play its role in

    implementation of various government programmes through its respective vote functions covering; Rural

    Water Supply and Sanitation, Urban Water Supply and Sewerage (Small and Large Towns), Water for

    Production, Water Resources Management, Natural Resources Management (Environment, Forestry,

    Wetlands) and Weather, Climate and Climate Change, Policy, Planning and Administration in order to

    contribute to the national development. Similar contribution is from other independent votes affiliated to

    the sector namely, National Environment Authority (NEMA)-vote 150 and National Forestry Authority -

    vote 157.

    Overall, the Water and Environment Sector budget provision for financial year 2012/13 is USh. 391.09bn

    covering Vote 019-Water and Environment, Vote 150-NEMA, Vote 157-NFA and Vote 501-850 for LGs

    Conditional Grants. This shows a nominal increase in the sector allocation as compared to approved budget

    for financial year 2011/12 which provided for USh 272.6bn. Out of the total budget allocated to the sector,

    UShs 296.426bn was allocated to Vote 019-Water and Environment, while UShs 5.68bn and UShs.

    20.157bn was allocated to vote 150-NEMA and Vote 157-NFA respectively. Out of the UShs 296.426bn

    allocated to vote 019, Shs. 68.827bn is allocated to Local Governments as Conditional Grant covering

    Water Development, Sanitation and Wetlands. It is important to note the conditional Grants for Water

    Development has been raised from Shs.54.583bn to Shs. 62.211bn while that of Wetlands has been raised

    from Shs 0.785bn to Shs. 3.116bn to cater for environmental concerns under PRDP.

    The allocations to vote functions (VFs) were made based on the sector priorities aimed at achieving the

    National Development Plan priorities, sector objectives as well as the Millennium Development Goals

    targets. The summary of critical sector achievements during FY 2011/12 and the planned outputs for FY

    2012/13 are as follows;

    Rural Water and Sanitation Vote function-During the FY 2011/12, several activities aimed at increasing

    safe water coverage and accessibility in rural areas were carried out. These included construction of

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    Tororo- Manafwa large gravity flow scheme, Jezza- Muduma, Katende Kamengo, and completing

    construction of piped water supply systems in Adwari, Madiopei and Orum. Completed the engineering

    designs for Bukwo, Ongino, Luanda and Kabumba. A total of 87 boreholes were constructed and 71 were

    rehabilitated. Support supervission and monitoring of implementation of the district water and Sanitation

    conditional grant and capacity building to Local Governments was provided by TSUs. In addition, the local

    governments were supported to improve sanitation and hygiene through a conditional grant for sanitation

    activities. To improve functionality of point water sources, hand pump mechanic associations were formed

    throughout the country.

    The planned outputs for FY 2012/13 are; completion of Tororo-Manafwa, Jjezza-Muduma, Katend-

    Kamengo and Luanda, construction of Bududa-Nabweya (30%), Lirima (30%), Kabumba (80%), Ongino

    (100%) and Kanyampanga (70%) water supply systems. Construct at least 100 boreholes in selected rural

    areas in response to emergencies and water stressed areas, construct two(2) solar powered water systems

    and setup management structures in Amuru district. Construct appropriate water systems in the Alwi dry

    water corridor in Nebbi district and Kahama GFS in Ntungamo district. Capacity building for the

    appropriate technologies especially domestic rain water harvesting will be provided. Support supervision

    and monitoring of implementation of the district water and Sanitation conditional grant and capacity

    building to Local Governments will be provided by Technical Support Units. To improve functionality of

    point water sources, hand pump mechanic associations will be operationalised throughout the country.

    Urban Water and Sanitation vote function:- During FY 2011/12 the major achievements were: Construction

    of Rwene, and Kagango water supply were completed. Construction continued in the 5 RGCs of Kazo

    (80%), Kiruhura (90%), Kakuto (30%), Kayanga (60%) and Lyantonde (30%). On sanitation, 9 ecological

    sanitation toilets were constructed. 2 public sanitation facilities were completed in Tirinyi and Kibuku.

    Functionality of major components of town piped water supply schemes was restored through supply of

    pumps in Kamuli, Kyenjojo, Butogota, Katwe - Kabatooro, and Nakasongola. Completed the designing of

    Kagaa water supply system. The construction works for Tirinyi-Kibuku (80%), Kaabong and Abim WSS

    are still ongoing while construction of 2 public sanitation facilities were completed in Trinyi-Kibuku.

    Constructions works at Adjumani (90%), Oyam (75%), Amolatar (60%) and Koboko extension is at full

    completion stage. The Kamdini, Kitgum and Pader are ongoing. Conducted 2 sanitation surveys in Kitgum

    and Pader, construction of public flush toilets in Adjumani, Amolata and Oyam is still on-going. Reservoir

    tanks and pipe-lines were secured for Omega and Agweng. Alebtong town council the former IDP camp

    water scheme was re-instated to functionality.

    Completed construction of Nakaseke Town Water Supply and Sanitation System. Completed designs for

    Zirobwe, Ntwetwe, Bweyale, Kasanje and Kako new water supply systems and additionally for

    rehabilitation works in Wakiso and Kakiri towns. Commenced construction works in Kako town (20%

    completion). Siting and drilling of 19 production wells in the towns of Kasanje, Ntwetwe, Bweyale,

    Kiganda, Zirobwe, Kanoni, Gombe, Nkoni, Kyamulibwa and Najjembe. With respect to National Water

    and Sewerage Corporation, (NWSC), substantive progress has been registered in cleaning and un-blocking

    of 11.5km gravity sewers and 10km of siphons on Jinja Road, Kitante and Dewinton Road. Structures for

    Rubigi WWTP and faecal plant wa s completed with laying of about 9km new sewers pipes.

    During the Financial Year 2012/13, the Urban Water Supply and Sewerage vote function- key planned

    outputs will include commencement of construction works of 5 water offices in the towns of Moyo,

    Kalongo, Ibuje, Purongo and Ovujo, complete construction of piped water systems in the 5 towns of

    Paidha, Patongo, Opit, Omugo and Agweng, commence construction of piped water systems in the 5 towns

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    of Moyo, Ibuje, Kalongo, Purongo and Ovujo, start construction of 35 household Ecosan toilets for

    demonstration in 5 in each towns of Kitgum, Pader, Paidha, Patongo, Opit, Omugo & Purongo and 2

    regional sludge beds completed in Agwata and Kitgum. Finalize construction of WSDFs headquarters and

    Urban water offices in the towns of Ntwentwe, Kasanje, and Zirobwe, drill 10 production boreholes and

    start construction of 3 town water supply systems in Ntwentwe (Kyankwanzi), Kasanje (Wakiso), and

    Zirobwe (Luwero).

    Complete construction of town water supply systems in Kaabong and Abim, construction of town water

    supply systems of Namalu, Tirinyi-Kibuku, Karenga Mbulamuti, Suam, Ochero, Kapelebyong, Buwuni and

    and Mayuge plus expansion of Katakwi town water supply systems. Construction of 25 house ecological

    sanitation toilets in 5 towns of Suam, Kapelebyong, Mbulamuti, Buwuni and Ochero, complete construction

    works in 6 RGCs, of Kyempene, Kikagati, Matete, Kahunge, Kabuga, Kinoni-Mbarara. Under NWSC,

    continue with construction of Lubigi Waste Water Treatment Plant (WWTP) and network under National

    Water and Sewerage Corporation, rehabilitation of Bugolobi and network systems and construction of

    Nakivubo and Kinawataka Waste Water Treatment Plant and expanding of Gaba water works and south-

    western parts of Kampala namely Namasuba and Buloba.

    Water for Production Vote Function:- During the FY 2011-12 achievements included construction of Rakai

    bulk water supply up to 30%, completed construction of Akwera dam in Lira district, Kobebe dam and

    Arechek dam in Moroto district, Longorimit dam in Kaabong district, Extension of a piped water scheme in

    Sembabule district, Lutunku and Kisozi valley tanks in Sembabule district. A total of 114 valley tanks using

    Government equipment were constructed in Moroto 6, Napak 4, and Kotido 6 (of capacity 10,000m3).

    Lyantonde 61 and Kiruhura 37 (of the average capacity of 1,200m3). Other achievements include:

    commencement on construction completion of Kawomeri dam in Abim district created awareness for drip

    irrigation for the following dams: Longoromit in Kaboong District, Akwera in Lira District, Leye in Apac

    District, Kagango in Isingiro District and Kakinga in Sembabule District.

    Planned outputs during the period of 2012/13 WFP will continue with construction works for bulk water

    supply scheme in Rakai district, Kajodi valley tank in Mityana district, Nyamiringa and Nakakabala valley

    tanks in Kiboga district and rehabilitation of windmills in Karamoja region. Carry out construction of WfP

    facilities countrywide using WfP equipments in partnership with farmers. Commence on construction

    works of Nyakiharo multipurpose water supply system in Kabale district, Andibo dam in Nebbi district,

    Acanpii dam in Oyam district, and Namatata dam in Namalu subcounty, Nakapiripirit district. To ensure

    additional WfP coverage in the country, designs of various facilities will be made including, Kikatsi-Sanga-

    Kanyaryeru bulk water scheme, Nyakiharo multipurpose water supply system in Kabale district, Rwengaaju

    irrigation scheme in Kabarole district, Namatata dam in Namalu subcounty, Nakapiripirit district.

    Water Resources Management Vote Function:- By the end of the FY 2011-12, outputs that were realized

    included: flood management strategy developed for flood districts in eastern Uganda; 11 drilling permits

    renewed, 4 new drilling permits issued, 26 new water abstraction permit processed, 7 new effluent

    discharge permits processed, 13 environmental Impact Assessment reports reviewed and 5 applications for

    hydraulic works permit processed. Increased awareness on the trans-boundary aspects of water resources

    management between Uganda and Southern Sudan in Aswa River. Draft water quality maps produced for

    Amuru, Gulu, Pader, Kitgum, Lamwo, Nwoya, Otuke, Alebtong, Dokolo, Kaberamaido, Kasese,

    Kamwenge and Kabarole. Strategy for catchment based water resources management through WMZs

    completed and its full operationalisation started with opening of 4 WMZ offices in Mbale for Kyoga WMZ,

    Lira for Upper Nile WMZ, Mbarara for Upper Nile WMZ and Fort Portal for Albert WMZ. Regulation and

    regular safety inspections performed on 3 major dams (Owen, Nalubaale), Dam safety plans for the

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    development of unit 1 of Bujagali HEP facility finalized.

    The Planned outputs for FY 2012/13 are: upgrading of the Entebbe water quality laboratory to be

    recognized as a national reference laboratory, development of a water pollution management strategy for

    Murchison Bay and Albertine-Graben, development of new guidelines and standards to enable sustainable

    developments in the petroleum industry, including emergency procedures. Consolidating implementation of

    the catchment based water resources management through strengthening the four Water Management Zones

    (WMZs) supporting and up-scaling preparation of stakeholder-driven Catchment Management Plans in

    priority catchments in the country. Detailed catchment management and investment plans including

    strategies for adaptation to the impacts of climate change will be developed for 2 catchment areas. Continue

    representation in Nile basin and Lake Victoria basin trans-boundary water resources management

    programmes ensuring that Uganda’s interests are protected in accordance with international law and

    regional treaties and agreements. Continue discussion regarding ratification of the Cooperative Framework

    Agreement by the Nile basin riparians, and development of a new Lake Victoria release policy. Under Lake

    Victoria Environmental Management Project, Phase II, waste water treatment facilities in two selected sites

    rehabilitated while water shed management interventions in targeted sub-catchments enhanced. With

    respect to water regulation, the upper Katonga sub-catchment sustainably managed/rehabilitated by the

    communities. Lastly there will be Strengthening water resources regulatory framework through amendment

    of water policies and laws, developing a licensing system for hydrogeologists, establishing a reservoir

    regulation and dam safety management framework, mapping water users and waste water dischargers and

    improving compliance and enforcement of water laws and water permit conditions.

    Natural Resources Management Vote Function:- To ensure sustainable use of Natural Resources, clean,

    healthy and productive environment as well as increased productivity of the Natural Resources Base

    (NRB), the achievements realized under this VF by the end of the FY 2011- 12 included; 1011 ha of

    woodlots and plantations established outside watershed sites, 1,800 ha of degraded watersheds re-vegetated,

    135 ha of agro-forest and woodlots established, 2,510 ha of Agro-Forest fruit tress established, 2,647

    hedgerows established, 944 ha of LFR enriched in 5 districts, 339ha of 24 privately owned natural forests

    were enriched and 54 forest owners sensitized. 95.5 ha of eucalyptus, pine, oranges, mangoes and

    avocadoes and other avenue trees have been planted by schools, municipalities and or urban centres. Other

    achievements include 150 EPFs were provided for guarding and protecting surveying team during

    demarcation process. Gazette instruments for Kampala wetland demarcation provided and initiated

    processes to reactivate inter district wetland management committees for Okole wetland in the north and

    Rwizi wetland.

    Planned outputs for this Vote Function during the FY 2012/13 are; re-vegetation of 1,500 hectares of

    degraded watersheds 1,000 km of contour hedges established and planted 700,000 seedlings for woodlot

    and plantation establishment procured; complete construction of Doho, Mobuku and Agoro irrigation

    schemes. Carry out demarcation of 66 kms of the boundaries of Kalagala, Itanda falls buffer zone, river

    Nile banks, Namavundu CFR in Jinja and Buikwe including restoration of 20ha degraded sections. In

    addition, demarcation of 165 kms of 6 critical municipal wetlands in Jinja, Mbale, Gulu, Lira, Masaka,

    Wakiso and Bushenyi boundaries completed and degraded sections of 50 ha restored. 60kms boundaries of

    2 RAMSAR site wetlands of Nakuwa and Mabamba demarcated.

    Other outputs will include development of management plans for 3 critical wetlands for Nakivubo, Lubigi

    and Kansanga, 104 wetland compliance monitoring and enforcement conducted in Kampala, Wakiso,

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    Mukono and 22 municipalities, 112 LGs technically supervised for compliance to Wetland Management

    guidelines 50 Environment Protection Police Unit trained and facilitated to provide security during wetland

    compliance and boundary demarcations. Furthermore, the Wetland Resources Management Bill finalized.

    The 4 National tree planting days celebrated and seedlings planted on each day while 50 districts inspected

    and monitored for environmental management.

    Weather, Climate and Climate Change vote function:- During FY 2011/12 the recorded progress in various

    areas include 35827 Synops and Metars observed and transmitted on GTS. 3800 International Aviation

    Route Forecasts prepared and issued. 12 Synoptic, 8 Agro meteorological, 6 Hydro meteorological and 100

    rainfall stations maintained. All rainfall stations in districts of Kaberamaido, Apac, Amolatar, Lamwo,

    Agago, Kitgum, Pader, Amuru, Gulu, Nwoya, Iganga, Bugiri, Namutumba, Jinja and Mayuge were

    inspected and rehabilitated. Talk shows on Weather and Climate carried out on UBC radio during IPCC

    Session in Kampala; Sensitization on impacts of climate change, mitigations and adaptations carried out in

    media and in several districts. Agro meteorological data base updated by three months, conducted 20 Radio

    talk shows; 3 monthly agro-meteorological bulletins prepared and disseminated. Prepared and disseminated

    12 Dekadal updates through 20 Radio programs to end users. Others are; Regional Climate Change capacity

    building was undertaken for sector heads at district level in 10 districts. Climate Change Awareness was

    raised for various categories of people including district leaders, Agriculture service providers and

    Curriculum Development Centre. Climate change. Uganda delegation effectively participated in COP17.

    Planned output for FY 2012/13 are; Climate Change Policy and implementation strategy finalised, launched

    and popularized; continue with operationalisation of NAPAs; the national capacity for coordination and

    implementation of climate change adaptation and mitigation activities developed. Uganda’s interests

    incorporated into the international climate change policy frameworks ensured including domestication of

    the UNFCCC. Under Meteorology, 10 RANET centres maintained, four upgraded and 4 new ones

    established; 74,860 SYNOPS and METARS produced, and exchanged on the GTS (Global Telecom

    System), prepare 5,475 aviation forecasts and documents for international and national flights, 732 daily

    forecasts undertaken. Continue with effective participation in COPs.

    Policy, Planning and Administration vote function:- During FY 2011/12 the vote function prepared and

    submitted final accounts for 2010/11, prepared and submitted procurement report for 2010/11, prepared 03

    Cabinet Memoranda, finalized and launched the Client charter, prepared progressive quarterly performance

    reports; disseminated 2011/2012 MPS to stakeholders; drafted Terms of Reference for updating national

    water policy, laws and regulations developed and presented to the Water Policy Committee for their input;

    Cabinet memo for Uganda’s membership to INBAR initiated, and also prepared the JSR report as well as

    the joint sector review workshop.

    During FY 2012-13, the VF will continue with compilation of final accounts; continue with sector BFP and

    MPS preparations for MTEF period (2012/13-2014/15), conduct Joint Sector Monitoring and Sector

    Performance Reviews with donors, coordinated all departments in the ministry for compliance with Civil

    Service standing orders and regulations; 100% staff establishment attained and maintained, undertake

    baseline survey for ENR -KPIs, contribution to International Organizations and commence construction of

    new Ministry Block.

    Vote-150: National Environment Management Authority:- Under this Vote the planned outputs during FY

    2012/13 include; 422 environmental inspections and audits conducted, 800 EIA reports reviewed and

    approved, decentralization of environment management and ENR integration into Local Development Plans

    and BFPs mentored and supervision in all the 120 LGs, 1,200 environment inspections and audits carried

    Preliminary

  • Water and EnvirionmentMPS:

    Ministerial Policy StatementWater and Envirionment

    out, focusing more on the increased environmental inspections in oil/gas region, and urban land

    use/inspections/surveillances on wetlands. The 150 Environment Protection Force personnel (EPF) trained

    and equipped, enforcement on endangered biodiversity (shea nut tree in Northern Uganda) enhanced,

    regulations on oil/gas waste management developed and regulatory framework for the establishment of

    central oil/gas waste management facility promoted (i.e. EIA for the central waste management facility

    approved and permits to transport and manage oil/gas wastes), public education programs produced and

    disseminated on oil/gas, wetland degradation, electronic wastes and loss of biodiversity, education for

    Sustainable Development (ESD) strategy promoted in schools/institutions. The 2012 National State of

    Environment Report (NSOER) produced while 40 Districts supported to produce District State of

    Environment Reports.

    3 Municipal Solid Waste Composting (MSW) supported, MSW composting plants established and

    equipped in 8 towns of Arua, Gulu, Tororo, Busia, Entebbe, Mityana, Hoima and Masindi;, NEMA and

    Lead Agencies equipped to manage oil/gas, the Minimum National Standards of Service Delivery for ENR

    Sub Sector developed, the annual National Forum on Sustainable Development organized and the Think

    Tank on Sustainable Development developed and participation in regional and international for a on

    environment management and sustainable development ensured.

    Vote 157-National Forestry Authority:- Under Vote the planned outputs for FY 2012-13 are: Under

    management of CFRs, a total of 365km of roads will be maintained and 30km of new roads constructed in

    all CFRs, 10 km forest boundaries surveyed with pillars, 353 km of forest boundaries re-opened, 14 km of

    forest trails maintained in ecotourism sites. In addition, a total of 1,386 ha of new plantations will be

    established. With respect to plantation management, 10,287 ha of crop below 3-years will be weeded by

    slashing, 110 ha weeded by spot hoeing, 1,500ha by spraying while 2,437ha pruned and thinned. In

    addition, 484 km of fire breaks maintained to protect the young plantations from fires.

    Under forestry licensing, 1,900 m3 of sawn timber will be produced by NFA own sawmills while 4,000m3

    of round wood sold to private sector for sawing into timber. Licenses for 44 Telecommunications masts

    renewed, 1,500 Utility poles sold. Certified Emission Rights (CERs) for 15,000 tonnes received from

    World Bank Biocarbon fund sequestered in Rwoho plantation and, 10,000 ha of newly established private

    plantations on CFRs under license surveyed and mapped. Lastly, 1,3549kg of tree seeds collected/ procured

    of which 270kg are of imported pine, 480kg are of local Exotic seed and 12,799kg are of indigenous seeds.

    It is also planned that a total of 9,981,705 tree and fruit seedlings will be raised and sold of which 6,374,199

    seedlings

    Preliminary

  • Water and EnvirionmentMPS:

    AnnexWater and Envirionment

    Ministry of Water and Environment (MWE)

    1. The committee recommends that the Ministry of Water and Environment develops a more sustainable

    institutional framework for the operation and maintenance of water systems/facilities in the country.

    Answer: The Ministry continues to strengthen the Community Based Maintenance System (CBMS) for

    enhanced Operation and Maintenance (O&M) of rural water supply facilities. Support structures such as

    Hand Pump Mechanics Associations (HPMA) have been formed in 70% of the districts and by the end of

    the year over 80% of the districts will have been covered.

    In addition, the Ministry has established de-concentrated structures at regional level to support Local

    Governments in the sector operations including O&M.

    A plan for phased Procurement of specialized equipment for major repairs that are beyond the capacity of

    communities has been prepared and will be implemented (once funds are obtained) through the regionally

    de-concentrated structures.

    2. The committee recommends that a value for money audit be instituted in the Water for Production Vote

    Function for the Period 2008/09-2010/11.

    Answer: The value for money audit for the FY 2006/07 – 2010/11 was undertaken by the Performance

    Audit Unit of Ministry of Finance, Planning and Economic Development. A draft management letter has

    been prepared and the final report is expected in June 2012.

    3. The Committee recommends that government prioritizes and allocates more resources to bulk water

    supply systems in rural areas especially water stressed areas as well as revamp the Community Based

    Maintenance System (CBMS) countrywide.

    Answer: Government has embarked on implementation of bulk water supply schemes within the limited

    available resources including Tororo gravity flow scheme, Kanyampanga Gravity scheme and Rakai Bulk

    water supply scheme. However effective implementation of identified bulk water supply schemes would

    require additional resources beyond the current budget ceiling. The Ministry has initiated discussions with

    potential donors including African Development Bank (AfDB), French Development Agency (AFD),

    European Union and the World Bank for possible funding of bulk water supply schemes.

    With respect to revamping the Community Based maintenance System (CBMS), the Ministry adopted

    recommendations of the final study report on review of CBMS. Implementation is ongoing that entails

    among others establishment of Handpump Mechanics Associations (HPMA) and refresher training for

    Water User Committees, and re-establishment of spare parts supply chain.

    4. The Committee recommends that government VAT exempts water effective FY2011/12.

    Answer: Value Added tax (VAT) was removed from the structure of the water tariff with effect from

    October 2011. However the increasing cost of production resulting from higher costs of inputs such as

    electricity and chemicals continues to affect the tariff.

    5. The committee recommends that the Minister of Water and Environment urgently puts in place

    regulations for enforcing the ban on polythene material by December 2011.

    Answer: The necessary regulations were already in place by the date of this recommendation and the

    Recommendations from Parliament for FY2011/12

  • Water and EnvirionmentMPS:

    AnnexWater and Envirionment

    ministry deemed it not necessary to develop new regulations. There are however emerging issues with the

    list of exemptions which seem to defeat the purpose of the regulations in the first place.

    6. The committee recommends that Ushs 1.2billion that had been earmarked by the Ministry for the

    purchase of vehicles be reallocated to the Rural Water Vote Function to cater for some of the unfunded

    priorities.

    Answer: The procurement was deemed necessary including procurement of a Bus for Nyabyeya Forestry

    College which had been transporting students for field work on a lorry against the Law. Others were

    motorcycles for sub-county forest staff under the FIEFOC and the specialized equipment for the Mobile

    Water Quality Laboratory. The procurements were approved by the Office of Prime Minister as a

    precondition.

    7. The committee recommends that as a matter of urgency, government provides resources for the

    procurement of radar in FY 2011/12.

    Answer: The matter was taken up with MFPED and tripartite arrangements are being worked out with

    Ministry of Defence, Ministry of Works and Transport and the Ministry of Water and Environment to

    harmonize the procurement of a multi-purpose radar. The MFPED is pursuing acquisition of a loan from

    Spain for this purpose and this Ministry requests the Committee’s support in this endeavor.

    National Environment Management Authority (NEMA)

    8. The committee recommends that NEMA expedites the process of physical demarcation of wetlands

    throughout the country and steps up its efforts to protect lake shores and river banks.

    Answer: The Ministry has developed a strategy for demarcation of all wetlands and commenced

    sensitization of the communities in and around Kampala in collaboration with Kampala Capital City

    Authority (KCCA). The actual demarcation exercise for Kampala and Jinja wetlands is expected to be

    launched early June 2012. Sensitization will commence for Mable and Lira urban wetlands before end of

    this Financial Year. The successful implementation of this undertaking requires full political support.

    9. The committee recommends that government establishes the Environmental Court to adjudicate

    environmental degradation cases and related matters.

    Answer: The Ministry is in consultation with the Judiciary for guidance on the matter since it calls for

    major establishments and financial requirements.

    10. The committee undertakes to carry out a comprehensive investigation into the rampant encroachment

    on wetlands in Uganda especially in Kampala and the surrounding districts and report back to the House.

    Answer: This is for the Committee and the MWE fully supports the intervention

    11 .The Committee recommends that government expedites the establishment and operationalisation of the

    Environment Protection Force with the Command and Control Structure similar to that of the Uganda

    Wildlife Authority.

    Answer: The Ministry jointly with the Inspector General of Police (Ministry of Internal Affairs) established

  • Water and EnvirionmentMPS:

    AnnexWater and Envirionment

    the Environmental Protection Force (EPF) that was launched December 22, 2011. Since then the EPF has

    been trained to be able to enforce environmental laws but requires full political support.

    12. The committee recommends that the Minister of Finance complies with NEMA Act on remittance of

    environmental Levy to the National Environment Fund

    Answer: This matter is pursued by the Ministry with MFPED and the Ministry request the Committee’s

    support in the endeavor.

    13. The committee recommends NEMA to step up its efforts on the enforcement of the law on

    environmental pollution.

    National Forestry Authority (NFA)

    Answer: The establishment of the EPF will go a long way to support NEMA in this endeveour.

    14. The committee recommends that when appointing members to the NFA Board of Directors the

    Minister complies with the law.

    Answer: This has been complied with and the Ministry request for the Committee support

    15. The committee recommends that the Minister of Water and Environment appoints the Executive

    Director to NFA without further delay. The recruitment and appointment exercise must be done in

    accordance with the law.

    Answer: This has been complied with and the Executive Director is in place and assumed duties at the NFA.

    16. Committee recommends that the vacant senior management positions in NFA indicated above be

    urgently filled in FY 2011/12.

    Answer: The staffing position at NFA has improved since then and the position is indicated in annex

    attached hereto.

    17. The Committee recommends that government takes up the NFA wage bill amounting to Ushs 6.2

    billion, with effect from FY 2011/12.

    Answer: This Ministry has since pursued this matter with the MFPED and Ministry of Public Service and

    received Ushs 5.2bn as a supplementary in FY 2011/12. The Ministry is preparing a Cabinet Memo to this

    effect so that the wage bill for NFA is regularized in the budget process.

    18. The Committee recommends that the funds for the implementation of the Sawlog Production Grant

    Scheme be transferred from Vote 157(NFA) to Vote 019 (Ministry of Water and Environment) with effect

    from FY 2011/12.

    Answer: A new project (code 1189) was created in the Ministry – Vote 019, with effect from FY 2011/12

    under the direct supervision of the Directorate of Environment Affairs.

    19. The committee recommends that NFA be allowed to execute its mandate with out undue interference.

    Answer: The NFA is fully operating in accordance with the Law establishment it.

  • Water and EnvirionmentMPS:

    AnnexWater and Envirionment

    20. The Committee further recommends that National Forestry Authority prioritizes the demarcation and

    marking of all Central Forest Reserves boundaries with concrete pillars with effect from FY 2011/12.

    Answer: This is on-going but is constrained by limited funding.

    21. The committee undertakes to inquire into the rampant encroachment on Forest Reserves in the country

    and will report back to the House.

    Answer: This is for the Committee and the MWE fully supports the intervention.

    22. The Committee undertakes to comprehensively inquire into the issuance of land titles in CFRs by

    Uganda Land Commission with the view of having them cancelled.

    Answer: This is for the Committee and the MWE fully supports the intervention

    23. The committee recommends that Government considers the recruitment and operationalisation the

    Environment Protection Force as a matter of urgency and provide resources for this activity.

    Answer: The Ministry jointly with the Inspector General of Police (Ministry of Internal Affairs) established

    the Environmental Protection Force (EPF) that was launched December 22, 2011. Since then the EPF has

    been trained to be able to enforce environmental laws but requires full political support.

    Responses by MDA

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    The chart below shows total funding allocations to the Vote by Vote Function over the medium term:

    Table V1.1: Overview of Vote Expenditures (UShs Billion)

    This section sets out the Vote Mission, Strategic Objectives, and provides a description of the vote's services

    (i) Snapshot of Medium Term Budget Allocations

    Table V1 below summarises the Medium Term Budget allocations for the Vote:

    0

    20

    40

    60

    80

    100

    120

    140

    160

    Nat

    ura

    l

    Res

    ou

    rces

    Man

    agem

    ent

    Po

    licy

    , P

    lan

    nin

    g

    and

    Su

    pp

    ort

    Ser

    vic

    es

    Ru

    ral

    Wat

    er

    Su

    pp

    ly a

    nd

    San

    itat

    ion

    Urb

    an W

    ater

    Su

    pp

    ly a

    nd

    San

    itat

    ion

    Wat

    er f

    or

    Pro

    du

    ctio

    n

    Wat

    er R

    eso

    urc

    es

    Man

    agem

    ent

    Wea

    ther

    ,

    Cli

    mat

    e an

    d

    Cli

    mat

    e C

    han

    ge

    2011/12 Approved Budget Estimates 2012/13 Budget Projections

    2013/14 Budget Projections 2014/15 Budget Projections

    Chart V1.1: Medium Term Budget Projections by Vote Function (UShs Bn, Excluding Taxes, Arrears

    V1: Vote Overview

    ** Non VAT taxes on capital expenditure

    Wage

    Non Wage

    GoU

    Donor

    GoU Total

    Total GoU + Donor (MTEF)

    Development

    Recurrent

    Taxes** 6.5284.230 4.352 12.200

    Total Budget 199.878115.055 91.729 308.984

    (ii) Arrears

    and Taxes

    Arrears 0.0000.000 0.000 0.359 N/A

    N/A

    N/A

    N/A

    N/A N/A

    (i) Excluding Arrears, Taxes

    4.7253.2283.079 2.486 3.732 4.018

    3.8673.9572.509 2.440 3.351 3.453

    180.29465.43461.339 54.908 141.811 160.977

    4.971120.73248.128 27.542 147.531 63.440

    188.88672.61962.698 59.835 148.895 168.448

    193.857193.350110.825 87.377 296.426 231.888

    2014/152010/11

    Outturn

    ReleasesApproved

    Budget 2012/13 2013/14

    MTEF Budget Projections2011/12

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Promote and ensure rational and sustainable utilization, development, effective management and safe-

    guard of Water and Environment resources for social welfare and economic development.

    (ii) Vote Mission Statement

    The Vote's Mission Statement is:

    (iii) Key Sector Outputs which Contribute to Sector Outcomes

    The table below sets out the vote functions and outputs delivered by the vote which the sector considers as

    contributing most to priority sector outcomes.

    Table V1.2: Sector Outcomes, Vote Functions and Key Outputs

    Sector Outcome 1: Sector Outcome 2: Sector Outcome 3:

    Increased access to quality safe water

    and sanitation facilities for rural, urban

    and water for production uses

    Improved Water Resources Assessment,

    Monitoring, Planning, Regulation and

    Quality Management

    Improved Weather, Climate and Climate

    Change Management, Protection and

    Restoration of Environment and Natural

    Resources

    01 Rural Water Supply and Sanitation09Vote Function:

    Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:

    None NoneOutputs Provided

    Promotion of sanitation and

    hygiene education

    0109 03

    Capital Purchases

    Construction of Piped Water

    Supply Systems (Rural)

    0109 80

    Construction of Point Water

    Sources

    0109 81

    Construction of Sanitation

    Facilities (Rural)

    0109 82

    02 Urban Water Supply and Sanitation09Vote Function:

    Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:

    None NoneOutputs Provided

    Backup support for Operation and

    Maintainance

    0209 04

    Improved sanitation services and

    hygiene

    0209 05

    Monitoring, Supervision,

    Capacity building for Urban

    Authorities and Private Operators

    0209 06

    Capital Purchases

    Construction of Piped Water

    Supply Systems (Urban)

    0209 80

    Energy installation for pumped

    water supply schemes

    0209 81

    Construction of Sanitation

    Facilities (Urban)

    0209 82

    03 Water for Production09Vote Function:

    Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    V2: Past Vote Performance and Medium Term Plans

    (i) Past and Future Planned Vote Outputs

    This section describes past and future vote performance, in terms of key vote outputs and plans to address

    sector policy implementation issues.

    Rural Water Supply and Sanitation- During the FY 2010-11 construction of 8 piped water schemes was

    undertaken in the following Rural Growth Centres (RGC) ; Anyara (Apac), Adwari (Lira), Lugore (Gulu),

    Madi-Opei (Kitgum), Magoro (Katakwi), Minakulu (Oyam), Orum (Lira) and Gulu Youth Centre (Gulu).

    Rehabilitation and extension of Bunyaruguru large Gravity Flow Scheme in Bushenyi district was

    completed, management arrangements under the Public Private Partnerships model was put in place.

    Coordination and support to NGOs, CBOs and other stakeholders was undertaken with focus on

    promotional training for community mobilization, hygiene promotion and rain water harvesting. In addition

    335 Ferro cement rainwater tanks were constructed in Rakai and Isingiro districts. Urban Water Supply and

    Sanitation:

    Urban Water and Sanitation- The following were achieved under the Urban water supply and Sanitation in

    2010/11 Performance

    Sector Outcome 1: Sector Outcome 2: Sector Outcome 3:

    Increased access to quality safe water

    and sanitation facilities for rural, urban

    and water for production uses

    Improved Water Resources Assessment,

    Monitoring, Planning, Regulation and

    Quality Management

    Improved Weather, Climate and Climate

    Change Management, Protection and

    Restoration of Environment and Natural

    Resources

    None NoneOutputs Provided

    Suatainable Water for Production

    management systems established

    0309 06

    Capital Purchases

    Construction of Bulk Water

    Supply Schemes

    0309 80

    Construction of Water Surface

    Reservoirs

    0309 81

    04 Water Resources Management09Vote Function:

    Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:

    None NoneOutputs Provided

    Water resources availability

    regularly monitored and assessed

    0409 03

    The quality of water resources

    regularly monitored and assessed

    0409 04

    Water resources rationally

    planned, allocated and regulated

    0409 05

    05 Natural Resources Management09Vote Function:

    Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:

    None None Outputs Provided

    Promotion of Knowledge of

    Enviroment and Natural Resources

    0509 01

    Restoration of degraded and

    Protection of ecosystems

    0509 02

    06 Weather, Climate and Climate Change09Vote Function:

    Outputs Contributing to Outcome 1: Outputs Contributing to Outcome 2: Outputs Contributing to Outcome 3:

    None None Outputs Provided

    Weather and Climate services0609 01

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    the FY 2010 -11: Designs for the water supply systems to serve Kabuga in Kamwenge, Kakuto in Rakai and

    Kagongo in Ibanda district. Construction work for 10 new piped water supply systems in the small towns

    of: Kyabugimbi, Kamwenge, Kitagata, Kyotera, Mutara/Kyeibare, Bikurungu, Rugaaga, Omugyenyi,

    Kabira and Kibale was completed creating new service facilities for over 100,000 people with a combined

    istribution/service pipe length of 186.7km, 45 public stand posts and at least 1,151 new household

    connections. Expansions, rehabilitation and extension works were done for systems in the towns of

    Kapchorwa, Kalaki, Atiriri and Otuboi resulting in addition of 40.7km of new pipe length and 2,447 new

    connections.

    Under NWSC, major achievements included the upgrading of the mains outlet from Naguru reservoir to

    Ntinda Trading centre and installation of an online booster system as well as expansion of the water supply

    mains at Gayaza road/northern by-pass round-about areas. A high level reinforcement main along Jinja

    Road from Lugogo to Kireka was added to boost supply to the areas that had no service in Kireka,

    Namugongo and Bweyogerere. The initiatives for pro-poor interventions resulted in construction of 9kms of

    mains, 25 prepaid metres and 10 public toilets constructed in Kagugube zone, installation of 390 prepaid

    metres, 13 public toilets with shower bathing facilities and 1,200 connections in Ndeeba-Kisenyi areas and

    additional 35 household toilets and 2,500 connections made in other poorer communities/areas in Kampala.

    Water for Production- The major achievements during 2010/11FY included: Completion of Rubaare

    Valley Tank in Ntungamo district, Leye Dam (Apac), Bwanalaki Dam (Sembabule) and Mayikalo Dam

    (Sembabule) creating at least 2.1 Million Cubic Metres (MCM) of new/additional storage capacity. Other

    facilities that were near completion during FY 2010-11 included: Construction of Kagango dam at 95%,

    Kagamba Valley Tank and Obwengerero in Isingiro district, Kawomeri dam in Abim district at 95%,

    Olelpec and Olamia at 98% progress.

    Water Resources Management- Negotiations with other riparian countries on the sharing of the Nile

    resources were pursued and 5 Nile basin initiative trans-boundary projects were supported. Assessment of

    issues relating to decentralized catchment based water resources management were carried out and 2 lake

    cruises were undertaken for awareness raising on the deteriorating quality of the lake water. Other

    achievements include 85% completion of the strategy for management and maintenance of water bodies.

    Regarding monitoring compliance to permit conditions, a total of 265 different permit holders (representing

    36%) were inspected (compared to 188 - representing 26% in the previous year). Compliance, as revealed

    in the results of the inspections increased during the 2009/10 FY but overall is still very low with many

    permit holders still lacking the necessary equipment and facilities for use as required by Law.

    Natural Resources Management-Overall under the Natural resources management vote function, during FY

    2010-11, 372 Community Action Plans were developed and 1,487 farmers were trained under the

    community watershed and tree planting project component. In addition, 44.5 km of hedgegrows and 50.6ha

    of forest plantation were established in selected districts. Technical officers from the district Natural

    Resources Departments and Directorate of Community Development at district and sub-county levels were

    trained and technical guidance and manuals prepared to support implementation of environmental

    interventions and programmes

    Weather, Climate and Climate Change- Under the Weather, Climate and Climate Change vote function in

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    the FY 2010-11 new and modern meteorological equipments were procured while some of the computers at

    the national Meteorological centre in Entebbe and Kampala were upgraded. The 2 RANET centers were

    maintained. Transmission of SYNOPs and METARs on the GTS was undertaken and the required

    International folders to pilots were issued. Daily weather forecasts were constantly sent to the media for

    public information. Field inspection and weather station rehabilitation made was also done where needed.

    Regular inspection and monitoring of activities done and 6 automatic weather stations were installed. The

    Climate Change Unit in the Ministry of Water and Environment was established.

    Policy, Planning and Support Services-The sector Budget Framework Paper and Ministerial Policy

    Statement FY 2010/11 were duly prepared and submitted in accordance with the requirements. In addition,

    the Sector Performance Report 2011, Quarterly progress/performance reports, final Accounts 2009/10,

    procurement report and Audit report were all prepared and submitted to relevant authorities in time.

    Monitoring visits to districts were carried out and Cabinet Memos prepared and submitted for

    consideration. Ministers and Top Managers of the Ministry were facilitated to represent the sector and the

    country in various local and international meetings. Other outputs included conducting a Joint Sector

    Review and Joint Technical Review involving development partners and other stakeholders for the entire

    Water and Environment sector. Trained 30 personnel of the private water operators and members of water

    Boards. Fresh graduates were recruited in addition to capacity building for TSUs.

    Rural Water and Sanitation Vote function-During the FY 2011/12, several activities aimed at increasing

    safe water coverage and accessibility in rural areas were carried out. These included setting up management

    structures in the RGCs of Jezza and Muduma; completed the construction of piped water supply systems in

    Adwari, Madiopei and Orum and they are now waiting for commissioning. Ayara and Magoro are also in

    their final stages and only awaiting commissioning while construction of Lugore is still on-going.

    Constructed bore holes various districts namely Nakaseke (4), Mukono (3) , Wakiso (3), Manafwa (1), Lira

    (2), Masindi (1), and Mityana (1) while 12 were installed 12 in the Kyoga basin. With respect to sanitation,

    home improvement campaigns were carried out on the Tororo/Manafwa project, Jezza/Muduma project and

    Katende/Kamengo projects. District technical staff from Technical Support Unit 7 were trained in

    appropriate sanitation promotion approaches (Community Led Total Sanitation – CLTS). There was also

    capacity building of 30 local masons in sanitation social marketing and entrepreneurship skills. Local

    Government staff from Technical Support Units 1, 6, and 4 were trained in establishment/enhancement of

    sanitation promotion enabling environment. There were also ecological sanitation promotion activities

    within the project areas. The detailed engineering designs for Ongino, Luanda and Kabamba were

    completed and submitted. TheBukwo design is at a stage where the topographic surveys along the proposed

    pipeline routes were done. The proposals for consultancy services (feasibility and engineering designs) for

    Bwambara, Rwebisengo and Ngoma were received, evaluated and report submitted for approval.

    Under Urban Water and Sanitation vote function - The technical commissioning of the Lefori water supply

    scheme and trainings were held in Nakasongola, Kigorobya, Kangulumira, Bombo, Nkokonjeru, Nakifuma,

    Kibibi, Buikwe, Buliisa, Semuto, Bweyale, Migeera and Nakawuka. At least 151 Technical Operators were

    trained for 16 ERTI schemes. Construction of Rwene, and Kagango water supply were completed.

    Construction continued in the 5 RGCs of Kazo (80%), Kiruhura (90%), Kakuto (30%), Kayanga (60%) and

    Lyantonde (30%). On sanitation, 9 ecological sanitation toilets were constructed while 03 communities

    training were conducted in sanitation and hygiene. Other 2 public sanitation facilities were completed in

    Tirinyi and Kibuku. Functionality of major components of town piped water supply schemes was restored

    through supply of pumps in Kamuli, Kyenjojo, Butogota, Katwe - Kabatooro, and Nakasongola. 366 Water

    Meters supplied to all 3 Umbrella organisations. 2 new Water Boards trained in Tirinyi and Kubuku and the

    existing Water Boards trained for 11 towns. Replacement of submersible pumps was carried out in Busia,

    Preliminary 2011/12 Performance

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Ngongera, Kinoni, Lubirizi, Kamulu (2), Kyenjojo (3), Katwe Kabatooro (2), Busolwe, Nkokonjeru and

    Kaliro.

    Under WSDF-E, the construction of 8 ecosan toilets is ongoing in Karenga (2), Luuka (2) and Bukedea,

    Bugadde, and Nakapelimoru (2). Completed design of Kagaa water supply while designs of Kapelebyong,

    Suam, Irundu, Kadungulu water supply systems are on-going. The construction works for Tirinyi-Kibuku

    (80%), Kaabong and Abim WSS are still ongoing and at the same time construction of 2 public sanitation

    facilities were completed in Trinyi-Kibuku. In addition, 11 hygiene and sanitation trainings were also held

    in Kaabong (2), Abim (2), Namalu (2), Buwuni, Nakipelimoru, Mbulamuti, Kapelebyong and Kaaga. Under

    WSDF-SW, 02 demonstration ecosan toilets in Kikagati (Isingiro) and Gasiza (Kisoro) were constructed

    while 3 sanitation trainings in Kakyanga, Kiruhura, Kakuto were undertaken. Under WSDF-N,

    constructions works at Adjumani (90%), Oyam (75%), Amolatar (60%) and Koboko extension is at full

    completion stage. The Kamdini, Kitgum and Pader are on going. Construction of the regional office block

    at Lira has reached 30% completion level. Carried out hygiene and sanitation promotions in Adjumani town

    council conducted 2 sanitation surveys in Kitgum and Pader, construction of public flush toilets in

    Adjumani, Amolata and Oyam is still on-going. Reservoir tanks and pipe-lines were secured for Omega and

    Agweng. Alebtong town council the former IDP camp water scheme was re-instated to functionality.

    Under WSDF-C, the facility completed construction of Nakaseke Town Water Supply and Sanitation

    System , construction of 4 Demonstration household ecosan toilets in Nakaseke and 3 public ecosan toilets.

    General sanitation workshops and baseline studies conducted in Kasanje, Zirobwe, Bweyale and Ntwentwe.

    Completed 16dDemonstration household ecosan units in Kasanje (7), Ntwetwe (3), Zirobwe (3) and

    Bweyale (3). Completed designs for Zirobwe, Ntwetwe, Bweyale, Kasanje and Kako new water supply

    systems and additionally for rehabilitation works in Wakiso and Kakiri towns. The facility also commenced

    construction works in Kako town (20% completion). Siting and drilling of 19 production wells in the towns

    of Kasanje (2), Ntwetwe (3), Bweyale (2), Kiganda (2), Zirobwe (2), Kanoni (3), Gombe (2), Nkoni (1),

    Kyamulibwa (2) and Najjembe (2). With respect to National Water and Sewerage Corporation, (NWSC),

    substantive progress has been registered in cleaning and un-blocking of 11.5km gravity sewers and 10km of

    siphons on Jinja Road, Kitante and Dewinton Road. Structures for Rubigi WWTP and faecal plant wa s

    completed with laying of about 9km new sewers pipes.

    Water for Production Vote Function - During the FY 2011-12 the following were achieved: Construction of

    Rakai bulk water supply up to 30%, completed construction of Akwera dam in Lira district, Kobebe dam

    and Arechek dam in Moroto district, Longorimit dam in Kaabong district, Extension of a piped water

    scheme in Sembabule district, Lutunku & Kisozi valley tanks in Sembabule district. A total of 114 valley

    tanks using Government equipment (force account) as follows: Moroto 6, Napak 4, and Kotido 6 (of

    capacity 10,000m3). Lyantonde 61 and Kiruhura 37 (of the average capacity of 1,200m3). Other

    achievements include: commencement on construction completion of Kawomeri dam in Abim district,

    Preparatory activities including procurement documentation undertaken for consultancy services for

    Detailed designs for rehabilitation of old dams in Isingiro, Kiruhura, Lyantonde, Rakai and Mbarara, A

    complementary feasibility study including an Environmental and Social Impact assessment for Kikatsi,

    Sanga, Kanyaryeru bulk water scheme was initiated, Re-established, trained and created awareness at 28

    facilities for Nshenyi valley tank in Ntungamo District, Betelehem in Rakai District, Olamia valley tank in

    Apac District, Loptuk, Nawanatau, Rupa, Lopey and Lokopo dams in Moroto District, Nabilatuk, Mamalu,

    Amudat, Nakobekobe windmill, Kalengengopoch windmills in Nakapiripiriti and Lokali and Lodoi

    windmill committees in Mororo District, Kopopwa and Angaro windmills in Napak District.

    Re-fresher trainings were carried out for Leye and Akwera dams, Olelpec and Olamia Valley tanks in Apac

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    District. Established bye-laws for Kagango dam, Obwengyerero and Kagamba valley tanks. Created

    awareness for drip irrigation for the following dams: Longoromit in Kaboong District, Akwera in Lira

    District, Leye in Apac District, Kagango in Isingiro District and Kakinga in Sembabule District.

    Under Water Resources Management vote function- By the end of the FY 2011-12, a number of outputs

    were realized that include flood management strategy developed for flood districts in eastern Uganda; 11

    drilling permits renewed, 4 new drilling permits issued, 26 new water abstraction permit processed, 7 new

    effluent discharge permits processed, 13 environmental Impact Assessment reports reviewed and 5

    applications for hydraulic works permit processed; Identified Littoral zone hotspots sustainably and was

    managed and rehabilitated by communities; One quality assurance trip to the Sio-Malaba-Malakisi

    transboundary project was undertaken with an objective of coming up with issues in the hotspot areas for

    inclusion in the catchment management plan. 4 Trans-boundary water resources monitoring networks

    operated and 2 supervision trips were taken to Upper Nile and Kyoga Water Management zones. Data from

    104 surface water monitoring stations operated and maintained. 4 monitoring and quality assurance trips on

    both surface and ground water stations carried out. 3 databases for surface water, ground water and GIS

    operated and maintained, Data was collected from 75 surface water stations and 28 ground water stations 3

    quality assurance and supervision trips were taken in Albertine region, Mbale region and Eastern region;

    662 water samples were received and analysed. Strategy for catchment based water resources management

    through WMZs completed and its full operationalisation started with opening of 4 WMZ offices in Mbale

    for Kyoga WMZ, Lira for Upper Nile WMZ, Mbarara for Upper Nile WMZ and Fort Portal for Albert

    WMZ. Regulation and regular safety inspections performed on 3 major dams (Owen, Nalubaale), Dam

    safety plans for the development of unit 1 of Bujagali HEP facility finalized. Regulation and regular safety

    inspections performed on 4 existing small hydropower dams of Mpanga, Bugoye, Kilembe and KCCL.

    Compiled data from 8 dams in preparation for dam safety regulations development and 60% Dam safety

    framework developed. Water resources information properly stored and managed on 3 databases (surface

    water, groundwater and GIS). 438 monthly charts for groundwater and rainfall data collected. Draft water

    quality maps produced for Amuru, Gulu, Pader, Kitgum, Lamwo, Nwoya, Otuke, Alebtong, Dokolo,

    Kaberamaido, Kasese, Kamwenge and Kabarole.

    Under Natural Resources Management Vote Function, the achievements realized by the end of the FY

    2011- 12 include; 42 demos supported, 1011 ha of woodlots and plantations established outside watershed

    sites ; 8,320 farmers trained, 1 guideline on plantation establishment and management translated into 3

    dialects; 1,800 ha f degraded watersheds revegetated; 135 ha of AF and woodlots established ; 2,510 ha of

    AFG and fruit tress established ; 2,647 hedgerows, trashlines, etc established ; 944 ha of LFR enriched in 5

    districts ; 222 DFOs, FRs, ADFOs, SFTOs, trained in extension methods, GIS, nursery management and

    Forest Plantation management ; ESMPs for irriagtion schemes rolled out and Districts supported to

    participate in schemes' rehabilitation; 9.650 million seedlings paid for and delivered to all project districts

    15 agro-forestry demonstrations were established in the district of 5 districts of soroti, Jinja, Kaliro,

    Masaka, and Iganga and 245.3 Ha of the existing demonstration sites maintained by 32 districts. 5,285

    farmers out were trained on plantation tree pruning practices, plantation establishment (lining out,

    pitting/staking, planting), disease and pest control, fanya juu & fanya chini, contour design and alignment

    and hedgerow planting. 339Ha of 24 privately owned natural forests were enriched and 54 forest owners in

    other districts sensitized. 95.5 Ha of eucalyptus, pine, oranges, mangoes & avocadoes and other avenue

    trees have been planted by schools, municipalities and or urban centres.

    Other achievements include 198ha of LFRs comprising 277,196 seedlings used in the districts of Soroti,

    Arua, Mbale, Adjumani, and Ibanda 5 PPAPS review was reported in Mbarara and Ibanda 16 KMS of

    avenues planted in Arua and Kasese districts planted with 6300 seedlings. Buffer zone for Kalagala Offset

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Table V2.1: Past and 2012/13 Key Vote Outputs*

    conducted in Kayunga, Buikwe and Jinja, 150 EPFs have been provided for guarding and protecting

    surveying team during demarcation process. Gazette instruments for Kampala wetland demarcation

    provided and draft L. George Ramsar site wetland management plan developed. Initiated processes to

    reactivate inter district wetland management committees for Okole wetland in the north and Rwizi wetland.

    The Weather, Climate and Climate Change vote function recorded progress in various areas which include

    35827 Synops and Metars observed and transmitted on GTS. 3800 International Aviation Route Forecasts

    prepared and issued. 12 Synoptic, 8 Agro meteorological, 6 Hydro meteorological and 100 rainfall stations

    maintained. All rainfall stations in districts of Kaberamaido, Apac, Amolatar, Lamwo, Agago, Kitgum,

    Pader, Amuru, Gulu, Nwoya, Iganga, Bugiri, Namutumba, Jinja and Mayuge were inspected and

    rehabilitated. Talk shows on Weather and Climate carried out on UBC radio during IPCC Session in

    Kampala; Sensitization on impacts of climate change, mitigations and adaptations carried out in media and

    in several districts. Agro meteorological data base updated by three months, conducted 20 Radio talk

    shows; 3 monthly agro-meteorological bulletins prepared and disseminated. Prepared and disseminated 12

    Dekadal updates through 20 Radio programs to end users.

    Regional Climate Change capacity building was undertaken for Sector heads at district level

    (Production/Agriculture, Environment, Community Development, Information, Planning and Education in

    10 districts in Busoga region sensitized to integrate NAPA implementation. Climate Change Awareness

    was raised for Bundibugyo Sub-county chiefs and Agriculture service providers; Curriculum Development

    centre (NCDC) Primary level subject panelists; and National level stakeholders on climate change

    negotiations. Climate change Adaptation and Mitigation options identified by Subject specialists at

    National curriculum development Centre, Ministry of Sports and Education. Uganda delegation effectively

    participated in COP17.

    The Policy, Planning and support Services vote function: The vote function achieved the following outputs

    were recorded; prepared and submitted final accounts for 2010/11, prepared and submitted procurement

    report for 2010/11, prepared 9 cabinet information papers and 5 Cabinet Memoranda, finalized and

    launched the Client charter, prepared progressive quarterly performance reports; disseminated 2011/2012

    MPS to stakeholders; drafted Terms of Reference for updating national water policy, laws and regulations

    developed and presented to the Water Policy Committee for their input; Cabinet memo for Uganda’s

    membership to INBAR initiated, carried out a gender capacity building and gender strategy dissemination

    workshop in the districts of Masaka, Lyantonde, Sembabule, Rakai, Lwengo, Bukomansimbi, Kalungu and

    Kalangala, prepared the JSR report as well as the joint sector review workshop.

    Releases and Preliminary

    Achievements

    Approved Budget and

    Planned outputs

    Proposed Budget and

    Planned Outputs

    2011/12Vote, Vote Function Key Output

    2012/13

    Vote: 019 Ministry of Water and Environment

    Vote Function: 0901 Rural Water Supply and Sanitation

    Promotion of sanitation and hygiene education090103Output:

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Releases and Preliminary

    Achievements

    Approved Budget and

    Planned outputs

    Proposed Budget and

    Planned Outputs

    2011/12Vote, Vote Function Key Output

    2012/13

    Construction of eco-san

    facilities and promotion at

    institution level in 50 districts

    3 promotion and hygiene

    campaigns

    Promotion of sanitation and

    hygiene activities was carried

    out in the

    districts of Gulu, Amuru, Pader

    and Kitgum, Mukono, Kayunga,

    Kumi, Kiryandoongo, Lira and

    kaberamaido

    There was also a home

    improvement campaign carried

    out in the

    RGCs of Katende, Kamengo

    and Jezza/Muduma,

    Tororo/Manafwa project.

    85 LG staff trained in sanitation

    and hygiene, 12 National

    sanitation

    and hygiene campaigns

    undertaken

    Conduct sanitation promotion

    and hygiene improvement

    campaigns in Tororo-Manafwa

    GFS supply area, Jezza-

    Muduma and Katende gravity

    flow schemes and Bududa,

    Ongino, Luanda,

    Kabumba,Kanyampanga and

    Lirima GFSs. Nabweya gravity

    flow scheme

    1.396UShs Bn: UShs Bn: UShs Bn:Output Cost: 0.284 0.400

    0.284 0.210Output Cost Excluding Donor UShs Bn: UShs Bn:

    Description of Outputs:

    Performance Indicators:

    No. of national sanitation

    and hygiene campaigns

    undertaken**

    15 12 9

    No. of LG staff trained in

    Sanitation and Hygiene

    120 85 120

    Construction of Piped Water Supply Systems (Rural)090180Output:

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Releases and Preliminary

    Achievements

    Approved Budget and

    Planned outputs

    Proposed Budget and

    Planned Outputs

    2011/12Vote, Vote Function Key Output

    2012/13

    Continuation of construction in

    06 former IDPs/RGCs

    (Ayara,adwari, orum, magoro,

    Madiopei and

    Lugore)Construction of piped

    water

    scheme in Nayabihoko

    subcounty, Kabumba and

    Ntungamo

    Completed the construction of

    Ayara, Lugore, Adwari, Orum,

    Magoro and Nadiopei. The

    Bukwo design is at a level of

    topographic survey along the

    proposed pipeline. Achieved

    90% of Tororo- Manafwa

    Gravity of the physical progress

    river were completed, intake

    structure, raw water main,

    treated

    water main and Soono treatment

    works completed.

    The final design for the Lirima

    gravity flow scheme has been

    finished

    and submitted. Ongino and

    Kabumba are at the final design

    stage where as Luanda has been

    tendered out. The schemes of

    Bwambara, Rwebisego, and

    Ngoma are still at

    evaluation stage.

    Engineering designs for

    Large Gravity Flow scheme

    developed

    in water stressed areas of

    ;Isingiro, Bukonzo Lwamata in

    Kiboga.

    20% Bududa-Nabweya,

    Lirima, 50% Luanda, 100% of

    Kabumba, 50% of Ongino and

    Kanyampanga Gravity flow

    schemes

    31.221UShs Bn: UShs Bn: UShs Bn:Output Cost: 7.503 10.928

    25.2457.227 9.896Output Cost Excluding Donor UShs Bn: UShs Bn: UShs Bn:

    Description of Outputs:

    Performance Indicators:

    No. of piped water

    systems/GFS constructed in

    rural areas**

    3 7 6

    No. of piped water supply

    systems designed in

    preparation for

    commencement of

    construction**

    5 6 5

    Construction of Point Water Sources090181Output:

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Releases and Preliminary

    Achievements

    Approved Budget and

    Planned outputs

    Proposed Budget and

    Planned Outputs

    2011/12Vote, Vote Function Key Output

    2012/13

    UShs Bn: 37.86117.211 16.610UShs Bn: UShs Bn:Vote Function Cost

    Construction of boreholes in

    selected rural areas in response

    to emergencies and water

    stressed areas.

    Construction of domestic

    rainwater harvesting tanks

    33 Boreholes Drilled in 13

    districts including;

    Amuru(3),Jinja(1), Kamuli,(1)

    Kayunga(9)Kilyandongo(2)Kum

    i(1)

    Luwero(4)Mpigi(1),

    Nakasongola(2), Rakai(2),

    Sheema(1), Tororo(3),

    wakiso(3). 4 BHs in Nakaseke,

    3 in Mukono, 3 Wakiso, 1 in

    Manafwa, 2 in Lira,

    1 in Masindi, 1 Mityana; more

    44 boreholes have been

    constructed in 24 districts of

    Kampala, Jinja, Kamuli, Luuka,

    Mpigi, Mukono, Buikwe, Kumi,

    Soroti,

    Kaberamaido, Yumbe,

    Luweero, Rukungiri, Nakaseke,

    Kayunga,

    Kyankwanzi, Hoima, Ntoroko,

    Nakasongola, Bushyenyi, Otuke,

    Mbarara, Gulu, Kyenjojo

    10 production wells (Large

    diameter wells) at selected RGC

    locations

    including;Koch Goma - Nwoya

    District (2 wells), Unyama –

    Gulu (2 wells),Awere – Gulu

    district (1 well), Adilang –

    Agago District (2 wells),

    Kitgum Matidi – Kitgum

    District (2 wells) and Corner

    Kilak – Pader

    (1 well) There was also

    installation of 12 boreholes in

    the Kyoga basin

    Construction of Water piped

    systems and management

    structures in the 4 RGCs of

    Lamwo, Pader, Agago and

    Nwoya. Construction of

    boreholes in

    selected rural areas in response

    to emergencies and water

    stressed areas.

    1.194UShs Bn: UShs Bn: UShs Bn:Output Cost: 1.855 1.528

    1.0791.740 1.528Output Cost Excluding Donor UShs Bn: UShs Bn: UShs Bn:

    Description of Outputs:

    Performance Indicators:

    No. of LG staff trained on

    Operations and Maintenance

    0 60

    No. Boreholes constructed 100 77 100

    Construction of Sanitation Facilities (Rural)090182Output:

    Construction of 30 ecosan

    facilities in various districts.

    Rehabilitation of 20 ecosan

    units in various districts.

    started on the construction of

    30ecosan

    facilities in various districts

    UShs Bn: UShs Bn: UShs Bn:Output Cost: 0.850 0.721

    0.0000.600 0.491Output Cost Excluding Donor UShs Bn: UShs Bn: UShs Bn:

    Description of Outputs:

    Performance Indicators:

    No.masons constructed 150 13

    No. of eco-san toilets

    constructed

    30 30

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Releases and Preliminary

    Achievements

    Approved Budget and

    Planned outputs

    Proposed Budget and

    Planned Outputs

    2011/12Vote, Vote Function Key Output

    2012/13

    UShs Bn

    UShs Bn: 37.86117.211 16.610UShs Bn: UShs Bn:Vote Function Cost

    28.86113.411 14.599UShs BnUShs BnVF Cost Excluding Donor

    Vote Function: 0902 Urban Water Supply and Sanitation

    Backup support for Operation and Maintainance090204Output:

    Technical Operators trained in

    renewable energy stations

    maintenance in Ciforo,

    Mahyolo, Nakiperemoro &

    Katakwi, Functionality of major

    components of town piped

    water supply schemes restored

    151 Technical Operators were

    trained for 16 ERTI Schemes

    and for future Operations of

    ERTII schemes; Functionality

    restored through supply of

    pumps in Kamuli,

    Kyenjojo,Butogota, Katwe,

    Kabatooro, Nakasongola,

    Kibibi, Buwenge, Minakulu and

    Wobulenzi; 366 Water Meters

    supplied to all 3 Umbrella

    organizations; Replacement of

    pumps in Busia(1),

    Nagongera(1), Kyenjojo(1),

    Kinoni(1), Lubirizi(1) and

    Katwe Kabatoro(1) done; 1

    generator Supplied and

    Installed in Yumbe; 1No.

    Scheme Operator and WSSB

    trained in Water Services

    Management in Nakaseke;

    WSSB board formed and

    trained in management of urban

    water supply systems

    Establishment of central

    umbrella organization;

    Water operators in Central

    region trained in water services

    management, 10No.

    promotional campaigns

    for effective O&M conducted

    6 Water supply systems

    commissioned

    1.120UShs Bn: UShs Bn: UShs Bn:Output Cost: 1.039 0.809

    0.5440.583 0.406Output Cost Excluding Donor UShs Bn: UShs Bn: UShs Bn:

    Description of Outputs:

    Performance Indicators:

    Length of water supply

    pipeline extensions made

    Improved sanitation services and hygiene090205Output:

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Releases and Preliminary

    Achievements

    Approved Budget and

    Planned outputs

    Proposed Budget and

    Planned Outputs

    2011/12Vote, Vote Function Key Output

    2012/13

    Operation and maintenance of

    sanitation facilities, 21

    demonstration ecosan toilets

    constructed , 2 community level

    trainings

    covering sanitation related

    issues will be undertaken

    14 ecological sanitation toilets

    were constructed in Kikagati

    (Isingiro),

    and Gasiza (Kisoro),

    Nakapelemoru, Luuka and 4

    ecosan toilets ongoing in

    Karenga, Bukedea and

    Bugadde; 13 Masons were

    trained

    17 Sanitation and hygiene

    trainings were held in Kakuto,

    Kiruhura, Kakyanga, Kaabong,

    Abim, Namalu , Buwuni,

    Nakipelimoru, Kitgum , Pader,

    Mbulamuti, Kapelebyong and

    Kaaga; 2 public sanitation

    facilities completed in Tirinyi

    and Kibuku and 44 Sanitation

    promotion campaign held

    01 group was identified and

    trained to promote personal

    hygiene and sanitation in

    Adjumani town council.

    Hygiene and sanitation

    promotion improved in 07

    towns: Opit, Omugo, Agweng,

    Paidha, Kitgum &

    Pader.Support LGs in

    Construction of

    25 house ecological sanitation

    toilets in 5 towns

    1.573UShs Bn: UShs Bn: UShs Bn:Output Cost: 1.303 1.399

    0.4890.602 0.424Output Cost Excluding Donor UShs Bn: UShs Bn: UShs Bn:

    Description of Outputs:

    Performance Indicators:

    No. of masons trained to

    construct toilet facilities

    90 13 105

    No. of hygiene promotion

    campaigns (Urban)

    170 44 190

    Monitoring, Supervision, Capacity building for Urban Authorities and Private Operators090206Output:

    Section A - Vote Overview

  • Ministry of Water and EnvironmentVote:

    Ministerial Policy StatementMinistry of Water and Environment

    Vote Summary

    019

    Releases and Preliminary

    Achievements

    Approved Budget and

    Planned outputs

    Proposed Budget and

    Planned Outputs

    2011/12Vote, Vote Function Key Output

    2012/13

    4 quarterly monitoring reports,

    train 89 existing gazetted Water

    Board Form and train additional

    7 No. Town Water Boards,

    support ,operations of 4

    Umbrella organisations, New

    Water Board Members and

    Urban Water Officer trained

    3 quarterly monitoring reports

    compiled for the 4 WSDFs,

    Umbrella

    Organisations and the Water

    Authorities section

    55 water boards were trained, 3

    Umbrella organizations

    supported and trained for

    MWUWS, SWUWS and

    EUWS,

    Pe