Water Connection Fee Analysis. Elk Grove Water District January 22, 2013. What we’ll cover today. Project Overview What is a capacity fee? What does the capacity fee cover? Why the increase is needed? How are connection fees calculated? . Project Overview. Background. - PowerPoint PPT Presentation

Citation preview

Page 1: Water Connection Fee Analysis

Water Connection Fee Analysis

Elk Grove Water DistrictJanuary 22, 2013

Page 2: Water Connection Fee Analysis

Elk Grove Water District – Connection Fee Study | 2

• Project Overview• What is a capacity fee?• What does the capacity fee cover?• Why the increase is needed?• How are connection fees calculated?

What we’ll cover today

Page 3: Water Connection Fee Analysis

Elk Grove Water District – Connection Fee Study | 3

Project Overview

Background• Water capacity fee was originally

established in 2003• Fees have been updated periodically, but

have not been comprehensively updated to reflect additional capital needs

Purpose• To identify appropriate fee levels to

recuperate new development’s share of planned water facilities

Page 4: Water Connection Fee Analysis

Elk Grove Water District – Connection Fee Study | 4

• Cost to serve new development• Supply improvements• Distribution improvements• Information technology• Treatment improvements

What the Capacity Fee Cover?

Page 5: Water Connection Fee Analysis

Elk Grove Water District – Connection Fee Study | 5

• Current fees do not:– Reflect updated system demands – Cover needs for expanded or additional

facilities• Would prevent existing rate payers

from incurring entire cost• Prevents reduced levels of service

Why the Adjustment is Needed?

Page 6: Water Connection Fee Analysis

Elk Grove Water District – Connection Fee Study | 6

• To equitably and fairly allocate costs, one of two methodologies are used:1. Plan-Based Methodology – Allocates

future costs related to the District’s Capital Improvement Plan (CIP) via a growth and existing needs basis

2. Buy-In Methodology - used when existing components have excess capacity available 

How is the Capacity Fee calculated?

Page 7: Water Connection Fee Analysis

Elk Grove Water District – Connection Fee Study | 7

Questions & Answers