Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL Acknowledgement: Mark Clark, Research Assistant Professor Soil and Water Science Department

Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

  • Upload
    tierra

  • View
    26

  • Download
    0

Embed Size (px)

DESCRIPTION

Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL. Acknowledgement: Mark Clark, Research Assistant Professor Soil and Water Science Department. The road will traverse a recharge area. - PowerPoint PPT Presentation

Citation preview

Page 1: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Water Quantity and Quality Considerations

of the Extension of SW 24th Avenue through NATL

Acknowledgement:

Mark Clark,

Research Assistant Professor

Soil and Water Science Department

Page 2: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

The road will traverse a recharge area

• Most of the proposed roadway East of 34th Street is through a “closed basin” that has no surface outlet.

• The paved 24th Avenue extension will significantly reduce the area where storm water now collects and eventually seeps into the ground.

Page 3: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Car Wash

Sinkhole Pond

Archer WoodsRegency Oaks

Collapsed Sink Hole

Stormwater Pond

Page 4: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Regency Oaks Archer Woods

Page 5: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL
Page 6: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Areas of flooding with moderate rainfall events

Page 7: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Collapsed Sinkhole…behind Regency Oaks (moderate rainfall)

Page 8: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Flooding into NATL from collapsed sinkhole

Page 9: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Sinkhole Pond…Normal conditions

Page 10: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Sinkhole Pond…Moderate rainfall

Page 11: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Flooding from Sinkhole Pond after heavy rainfall

Page 12: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL
Page 13: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

CLOSED BASIN...

Any runoff within proposed right of way will have to be stored in a retention basin until the water volume infiltrates into the ground or is lost to evapotranspiration.

Page 14: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

100 year storm

25 year storm

5 year storm1 year storm

In addition to the roadway... retention ponds may be necessary within the NATL

Page 15: Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

In closed basins water quality entering the Floridan Aquifer is a concern...