Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00 WATT ROAD SUBSTATION POWER TRANSFORMER PROCUREMENT LENOIR CITY UTILITIES BOARD Lenoir City, Tennessee August 2017 P. Anthony Hanson TN PE License # 22642

WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

WATT ROAD SUBSTATION

POWER TRANSFORMER PROCUREMENT

LENOIR CITY UTILITIES BOARD Lenoir City, Tennessee

August 2017

P. Anthony Hanson TN PE License # 22642

Page 2: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

TABLE OF CONTENTS Page 1 of 1

TABLE OF CONTENTS Section 1 - Invitation to Bid

Section 2 - General Requirements

Section 3 - Bid Form

Section 4 - Summary of Work

Section 5 - Technical Specification – 161kV Power Transformer

Exhibit A – STD005 – Standard Transformer Information System STD009 – Power Transformer Communication Transformer Monitor Input Map Exhibit B – STD008 – Power Transformer Tank, Arrestor, and Neutral Grounding Details Exhibit C – Existing Nameplate Exhibit D – Substation General Arrangement REVISION HISTORY Rev. No. Date Description

00 08/28/2017 Draft issued for bid

Page 3: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

INVITATION TO BID Page 1 of 1

SECTION 1 - INVITATION TO BID 1.01 BID ITEMS Lenoir City Utilities Board (Buyer) invites Bidders (Seller) to submit quotations for furnishing one 161.7-13.2kV 20/26.6/33.3//37.5 MVA power transformer without LTC for Watt Road Substation (Goods). The contract generally consists of furnishing Goods with 5-year warranty, one set of spare parts, delivery to the Point of Destination, testing, offloading and assembling Goods, and certification that Goods are ready for energizing.

1.02 BID SUBMITTAL A. Bids will be accepted at the address below until 2:00 pm local time on September 21, 2017.

Patterson & Dewar Engineers 1531 Hunt Club Blvd, Suite 200, Gallatin, TN 37066

B. Proposals must be clearly marked as bids and include “Bid for Power Transformer for Watt Road Substation” on the exterior of the mailing package.

C. No bidder may withdraw a bid for a period of ninety (90) days after the date set for opening of bids.

1.03 INSTRUCTIONS TO BIDDERS A. The contract generally consists of furnishing and delivering Goods to Watt Road Substation. Goods

are to be delivered to the Point of Destination by March 15, 2018. Offloading and assembly shall be completed within 30 calendar days after Buyer’s written notice following acceptance of delivery of the Goods. Bids should include Seller's best delivery date that is as close as possible to the requested delivery time.

B. Quoted prices shall be FOB at the transformer pad at the substation site. Freight shall be allowed and pre-paid. Seller has the responsibility of Goods during shipment. Title to the Goods and risk of loss or damage shall remain with the Seller until the transformer is erected in acceptable condition at the substation site. Escalated prices are not acceptable.

C. No bid security will be required to accompany bids.

D. Buyer is tax-exempt and will provide certificate upon request.

E. This project shall be subject to a liquidated-damages clause.

F. Seller shall provide Certificate of Insurance that lists Buyer and Engineer as additional insureds.

G. Buyer reserves the right to reject any and all bids and to waive any informality in bids. Buyer reserves the right to award the bid to the lowest and best Bidder, as determined by the Buyer and Engineer.

H. The Bidder shall provide all information requested. The Bidder shall take care to complete all portions of the Bid documents and to provide all required submittals. Failure to comply may result in the rejection of the bid.

I. If Seller recommends any changes or deviations from the documents, Seller shall describe the change fully and furnish complete information so that Buyer can make a decision based upon the alternative information provided. If these specifications call for material, equipment or manufacturing procedures different from the manufacturer's standard, Seller shall clearly identify all deviations or substitutions in this bid.

Page 4: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

GENERAL REQUIREMENTS Page 1 of 6

SECTION 2 – GENERAL REQUIREMENTS 1.01 SUMMARY OF WORK Design, manufacture, assemble, and factory test Goods in accordance with attached technical specifications. Deliver Goods F.O.B. to Points of Destination, offload, assemble and test. Provide a manufacturer’s field service engineer to perform field services specified under the supervision and direction of Buyer’s construction contractor. Buyer will furnish a construction contractor under a separate contract to perform foundation and Sitework for which the Goods under this Contract are being furnished. 1.02 POINT OF DESTINATION The Goods shall be delivered to the Point of Destination located at:

A. Watt Road Substation: 14224 Hickory Creek Rd, Lenoir City, TN 37772

1.03 TESTS AND INSPECTION The Goods are to be tested in accordance with latest edition or revision of ANSI, IEEE, ASCE, ASTM, NFPA, and NEMA standards and applicable building codes. Prior to testing, Seller shall notify Buyer at least one week in advance so Buyer may have personnel at Seller’s factory during testing. Seller shall furnish the results of the tests to the Buyer. Inspection of material by Buyer’s representative will not relieve Seller from responsibility for furnishing material to conform to the Specifications.

1.04 WARRANTIES Seller warrants that all materials, equipment, and work furnished pursuant to this contract comply in all respects with the contract; that they are free from latent and patent defects in design, materials and workmanship; that they are suitable and adequate for the purposes for which they were designed and for such other purposes, if any, as are specified in the contract; and that they will give efficient and satisfactory service under such conditions as may be specified, for a period of five years after their first operation or use by the Buyer, in actual service, or, if the contract provides for an acceptance test, for a period of five years after they have passed such test.

Seller shall, at its own expense, repair, replace, transport, and install any materials, equipment, or work or parts thereof, which prove defective or deficient during the warranty period.

This means that Seller will be responsible during the warranty period for the direct cost of (A) removing Goods or parts from service; (B) transporting said Goods or parts from substation site to manufacturer or repair facility and back to the substation site; and (C) reinstalling Goods or parts for service after completing the required acceptance testing. If, however, it is impractical for Buyer to wait for the manufacturer, Buyer may perform such work at Seller's expense.

Any materials, equipment, work, or parts thereof, which fail to meet the guarantees or other requirements of the contract may be rejected; provided, however that if correction of the defects or deficiencies can be made through minor alterations or replacements of minor parts, and Seller proceeds immediately to complete such alterations, or to furnish and install such new parts as are necessary to meet the guarantees or other requirements of the contract, then the materials, equipment, or work shall not be rejected on account of defects or deficiencies so corrected. Any correction of a defect or deficiency will be guaranteed for a period of one year after such correction is effected. The correction of defects or deficiencies shall not operate to extend the time for performance of the contract as specified thereunder or to waive any claim for damages resulting from delay in performance or from any other cause.

Buyer shall give Seller prompt notice of any breach of this warranty. Operation or use by Buyer of the materials, equipment or work, or any part thereof shall not constitute a waiver of any of Buyer's rights under this contract.

Page 5: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

GENERAL REQUIREMENTS Page 2 of 6

Seller warrants that the materials, equipment or work furnished hereunder are free from any and all claims, demands, and encumbrances; and that Seller will defend the title thereto. The foregoing warranties or guarantees contained in this contract shall supersede any and all others.

1.05 LIQUIDATED DAMAGES If Seller fails to deliver the Goods on or before the respective delivery date specified herein, Buyer may choose to invoke a liquidated-damages charge of $500.00 for each calendar day that the Goods are delayed. Liquidated damages will be limited to ten percent of the amount of the contract. This charge will be assessed to the Seller when the delay is caused by any reason other than an act of God, purchaser, embargo or other governmental act or authority regulation or request, fire, theft, accident, strike, war, or riot. The time of delivery shall include the time for drawing approval. 1.06 TRANSFORMER LOSSES All bids will be evaluated on the same base as far as is possible. Losses will be capitalized. For bid comparison, losses will be evaluated on the following basis:

Load Losses $7,660 per kW No-Load Losses $13,505 per kW Auxiliary Losses $1,500 per kW

The total losses quoted (load + no load) shall be considered guaranteed maximum values. If the test values exceed those quoted, a penalty equal to the difference between the values times the applicable $ per kW capitalized costs given above shall be invoked. No adjustment shall be made for losses better than guaranteed maximums.

1.07 SUBMITTAL PROCEDURES A. Attach a completed Transmittal Form to each group of documents submitted, using a sufficient

number of transmittal forms so that:

1. Items on a single transmittal form pertain to the same section of the Contract Documents; and

2. Items on a single transmittal form are either original submittals or the same number resubmittal.

B. Schedule submittals to expedite furnishing the Goods and coordinate submission of related items. Submittals via email are preferred. Deliver each submittal to Engineer with copy to Buyer.

1. Address correspondence to Engineer as follows:

Patterson & Dewar Engineers, Inc. 1531 Hunt Club Blvd, Suite 200, Gallatin, TN 37066 Attention: Anthony Hanson Phone: (615) 838-4197 Email: [email protected]

2. Address correspondence to Buyer as follows:

Lenoir City Utilities Board 200 Depot Street, Lenoir City, TN 37771 Attention: Jeremy Walden Phone: (865) 988-0727 Email: [email protected]

C. Submit items on sheet size of not less than 8-1/2” by 11” and not more than 24” by 36”. Provide space for Seller and Engineer review stamps.

D. Number each submittal item consecutively and insert the number in the space provided on the transmittal form. Assign resubmitted items the same submittal item number as the original with a suffix of a sequential letter to indicate it is a resubmitted item. For example, the first resubmittal of submittal item 2 would be number 2A.

Page 6: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

GENERAL REQUIREMENTS Page 3 of 6

E. Submittals which are not transmitted using a fully completed transmittal form may be returned along with items not reviewed and will be counted as a submittal.

F. Revise and resubmit items as required. Identify changes made since previous submittal. Distribute copies of reviewed submittal items to concerned parties. Instruct parties to promptly report any inability to comply with provisions.

1.08 SHOP DRAWINGS AND SAMPLES Seller shall submit Shop Drawings and Samples to Buyer for Engineer’s review and approval as soon as possible after receipt of order.

A. Submit the following quantities:

1. Shop drawings - One electronic copy (in PDF format) including manufacturers' data, brochures, suppliers' information, testing reports, certifications, and manufacturer's installation and testing instructions

2. Samples – Two of each item required for evaluation

B. Identify variations from Contract Specification.

C. Engineer will complete review in a timely manner and will return reviewed items to Seller with the following provided for each item submitted:

SUBMITTAL REVIEW BY ENGINEER PROJECT SUBMITTAL NO. Review of this shop drawing/submittal by Engineer is for general conformance with the requirements specified and compatibility with the design concept of the completed project. This review does not extend to means, methods, sequences, or procedures of construction (except where specifically called for in the specified requirements) or to issues of safety incident thereto. This review shall not relieve the contractor from its responsibility for full compliance with the requirements specified and to determine and verify the information contained therein. Provide final disposition of the comments made prior to issuance for fabrication or construction. ACTION:

Approved Approved, but make corrections noted (no resubmittal required) Revise and Resubmit (see comments) None Not Required - Information Only

REVIEWED BY:

Date:

Where:

“Approved” indicates submittal has been reviewed and appears to be in conformance with requirements of the Contract Documents. Proceed as shown on the submittal.

“Approved, but make corrections noted” indicates submittal appears to be in conformance with requirements of the Contract Documents. Incorporate the corrections noted and proceed as shown on the submittal. No resubmittal is required.

“Revise and Resubmit” indicates submittal does not appear to be in conformance with the Contract Documents. Engineer's comments will be noted on the submittal or in a separate, cross-referenced document. Re-check, make necessary revisions and resubmit.

“None – Not Required or Information Only” indicates that the submittal is not called for by the Contract Documents and that Engineer has not reviewed the material.

Page 7: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

GENERAL REQUIREMENTS Page 4 of 6

1.09 OPERATION, MAINTENANCE AND INSTALLATION MANUAL(S) A. Submit to Engineer one draft copy of complete Operation, Maintenance and Installation Manuals

30 days prior to shipment of Goods, which will be reviewed and returned with Engineer comments. Revise as required and submit two sets of final Operation, Maintenance and Installation Manuals upon shipment of the Goods.

B. Prepare a Table of Contents for each volume, with material, equipment, or system description identified in three parts as follows:

Part 1: Directory, listing names, addresses, and telephone numbers of Engineer, Seller, subcontractors, and major component suppliers.

Part 2: Operation, maintenance, and installation instructions, arranged by item and

subdivided by Specification section. For each category, identify names, addresses, and telephone numbers of subcontractors and suppliers. Identify the following: Significant design criteria List of equipment Parts list for each component Operating instructions Maintenance instructions Maintenance instructions for special finishes, including recommended cleaning methods

and materials, and special precautions identifying detrimental agents Installation instructions Material Safety Data Sheets

Part 3: Project documents and certificates, including the following:

Shop drawings, material and equipment data, manufacturer-prepared technical literature Certified factory test results Photocopies of warranties

C. Furnish duplicate copies of warranty documents which are executed and transferable from subcontractors, suppliers, and manufacturers.

1.10 PROJECT RECORD DOCUMENTS A. Maintain one set of the following documents for record purposes. Record actual revisions made to

the Goods.

1. Drawings

2. Specifications

3. Changes to the Contract Documents

4. Reviewed Shop Drawings and Samples

B. Legibly mark Specifications and record at each “Part 2 - Products” section of the description of actual equipment and material furnished, including the following:

1. Manufacturer's name and equipment and material model and number 2. Material and equipment substitutions or alternates utilized

Page 8: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

GENERAL REQUIREMENTS Page 5 of 6

3. Changes made to the Contract Documents

C. As-built drawings

1. Include as part of complete Operation, Maintenance and Installation Manuals

2. Electronic files in AutoCAD 2010 compatible format

D. After the equipment has been placed into satisfactory operation, revise drawings to reflect field changes, if any, made to the Goods and submit copies of revised drawings for the Operations and Maintenance Manual(s).

1. Submit full set of the project record documents to Engineer with claim for final Application for Payment.

1.11 ACCEPTABLE MATERIAL AND EQUIPMENT The Bid shall be based on new equipment and materials only. No used equipment or materials are permitted. Identify any alternate item by trade name and number to enable the Buyer to determine whether such alternate item is acceptable. Alternates must be approved in writing by the Buyer prior to contract placement.

1.12 SHIPMENT A. Ship the Goods only after receiving written acknowledgment by Buyer of receipt of certified test

reports.

B. Buyer will accept shipments between 8:00 a.m. and 3:00 p.m. local time Monday through Thursday excluding observed holidays.

C. Mark parts for ease of field assembly.

D. Give 48-hrs notice before shipment.

E. Accompany each shipment with a packing list of articles included in the shipment.

F. Attach impact recorder to the transformers during transportation periods. Unseal impact recorder only in presence of Buyer or Engineer.

G. Deliver transformer oil to Buyer’s site including all necessary equipment for the oil filling operation.

1.13 TRANSPORTATION, PROTECTION, AND HANDLING A. Store and protect Goods in accordance with manufacturer’s instructions, with seals and labels

intact and legible. Store sensitive Goods in weather-tight, climate controlled enclosures.

B. Furnish equipment and personnel to handle Goods by methods to prevent soiling, disfigurement, or damage.

C. Transport and handle Goods in accordance with manufacturer’s instructions.

D. Cover Goods subject to deterioration with impervious sheet covering. Furnish ventilation to avoid condensation or potential degradation of Goods.

E. Uncrate Goods and dispose of packing material properly.

Page 9: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

GENERAL REQUIREMENTS Page 6 of 6

F. Assume responsibility for loss and damage including but not limited to breakage, corrosion, weather damage, and distortion until delivered to Buyer.

G. Promptly inspect shipments to assure that Goods comply with requirements, quantities are correct, and Goods are undamaged.

H. Arrange storage of Goods to permit access for inspection. Periodically inspect to assure Goods is undamaged and is maintained in acceptable conditions.

1.14 PATENTS The Seller shall at its own expense defend any suit instituted by any party against the Buyer so far as it is based on the claim that any apparatus or part thereof furnished under this contract or the Buyer's use of such apparatus or part for the purpose for which it was designed or for such purposes, if any, specified in this contract constitutes infringement of any United States patent.

The Buyer shall give to the Seller immediate notice in writing of the institution of such suit, and shall permit the Seller, through its counsel, to defend the same, and shall give all requisite authority and all needed and available information and assistance to enable the Seller to do so. The Seller shall pay all damages and costs finally awarded therein against the Buyer by reason of such infringement, however the Seller shall not be liable under any compromise made without its consent.

If in any such suit said apparatus or part or such use thereof by the Buyer is held to constitute infringement and such use is enjoined, the Seller shall at its own expense procure for the Buyer forthwith the right to use or continue using the said apparatus or part; provided, however, that subject to the Buyer's approval the Seller may at its sole expense replace said apparatus or part with non-infringing apparatus or parts, or modify it so that it becomes non-infringing.

1.15 CLAIMS BY THIRD PARTIES The Seller shall, at its own expense, assure the defense of and save harmless the Buyer from all claims for materials furnished or work done; shall promptly discharge the same and not suffer any mechanics or other liens to remain outstanding against any of the property. Satisfactory evidence must be presented that all persons who have done work or furnished materials have been fully paid. If the Seller fails to comply with its obligations as above, the Buyer may take such steps as it may deem appropriate to discharge such liens or claims and may withhold from any moneys due the Seller such amount as may be necessary to satisfy and discharge the same and any expense incident thereto.

Page 10: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

BID FORM Page 1 of 4

SECTION 3 – BID FORM 1.01 BIDDER

A. This Bid is hereby submitted by: (Bidder)

1.02 BID PRICE A. Bidder shall perform Work for the following price(s):

Furnish one 161.7-13.2kV 20/26.6/33.3//37.5 MVA power transformer without LTC as specified, including 5-year warranty, testing, delivering to Watt Road Substation, offloading and assembling with provision of field services by manufacturer’s field service engineer and furnishing one set of spare parts.

LUMP SUM BID PRICE:

and ___/100 (Use Words)

and ___/100 (Use Figures)

Quoted prices shall be FOB to the Points of Destination and shall include offloading onto Buyer’s concrete foundation, assembly on pad, testing, and certification that Goods are ready for energizing. Seller has the responsibility of Goods during shipment. Freight shall be allowed and pre-paid.

1.03 DELIVERY

A. The time proposed for submittal of approval drawings (ARO) is

B. The proposed delivery time for Goods is .

1.04 WARRANTY

The proposed warranty period is .

1.05 ACKNOWLEDGEMENTS A. Bidder acknowledges receipt of addenda as follows:

B. Bidder acknowledges terms of liquidated damages as outlined in the General Requirements.

C. Bidder has inspected site and has developed offloading plan to accommodate existing structures and agrees to be responsible for offloading at the pad.

1.06 LIST OF EXCEPTIONS AND CLARIFICATIONS

(Attach additional sheets as necessary)

Page 11: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

BID FORM Page 2 of 4

1.07 PROPOSAL INFORMATION – 161.7-13.2KV POWER TRANSFORMER WITHOUT LTC

A. Name of manufacturer:

B. Parts removed for shipment:

C. Method of shipment:

D. Total Weight:

E. Shipping Weight:

F. Location of manufacturing facility:

G. Approval drawings (ARO):

H. Ship oil, nitrogen, or dry air filled:

I. Detail of Warranty: (Attach)

J. List spare parts, with net prices shown FOB site, recommended by manufacturer.

(Attach additional sheets as necessary)

1.08 GUARANTEES: TRANSFORMER GUARANTEED PERFORMANCE A. Maximum losses when each transformer is operated at rated voltage and frequency and at 20° C

ambient temperature. Losses shall be identical for each transformer:

• No load losses:_________________________________ (kW)

• Load losses (at base MVA rating) __________________(kW)

o Rated average winding temperature rise by resistance, plus 20° C

• Auxiliary Load: ___________________________ (kW)

1.09 ATTACHMENTS TO BID A. Provide outline drawing of transformers.

B. Provide certification of insurance with proposed limits.

C. Complete attached ANSI Transformer Specification Form.

D. Provide proposed offloading plan.

Page 12: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

BID FORM Page 3 of 4

1.10 BIDDER (SELLER) INFORMATION Provide the contact information and details to where a purchase order should be issued:

Company

Contact

Address

Phone/Email

Issue PO to

Page 13: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

ANSI TRANSFORMER SPECIFICATION FORM

RATING

Type Class H Winding X Winding Y Winding

Phase V V V

Hertz kVA kVA kVA

Temp Rise kVA kVA kVA

Insul Liquid kVA kVA kVA

ADDITIONAL TAP VOLTAGES

H Winding

X Winding

CONNECTIONS FOR OPERATION

Transformers in Bank To Transformer From Phase Connected To Transformer From Phase Connected

PERFORMANCE BASED ON A LOADING OF

DIELECTRIC TESTS

INSULATION LEVELS

ITEMS

Basic Lightning Impulse Insulation Level

Low Frequency Voltage Insulation Level

H Winding Applied Voltage

(To other windings and ground)

H Winding kV H Line

X Winding X Winding kV H neutral

Y Winding kV kVA Y Winding kV X line

Induced Voltage Line to Line kV X neutral

Line to Ground kV Y line

PERFORMANCE DATA, Based on degrees C reference temperature

Losses and Exciting Current Regulation*

Excitation % Ex. 1 No Load Total Loss Power Factor % Regulation

100 % 1.0

110 % 0.8

AUXILIARY LOSSES* MECHANICAL DATA

Transformer kVA Class Watts Aux Loss Outline Dwg No.

W Dimensions (Approximate) Ft (m)

W Height

W Width

Average Sound Level Depth

PERCENT IMPEDANCE VOLTS Height over Cover

% IZ B/W Windings At kVA % IZ B/W Windings At kVA Untanking (plus slings)

H-X Masses (Approximate) pound (kg)

H-Y Core and Coils

X-Y Tank and Fittings

EFFICIENCIES* Liquid Gallons (m3)

Load Full Load 3/4 Load 1/2 Load 1/4 Load Total Mass

% Shipping Mass lb (kg)

Shipped lb (kg)

Page 14: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

SUMMARY OF WORK Page 1 of 1

SECTION 4 – SUMMARY OF WORK

1.01 GOODS A. Design, manufacture, and factory test one 161.7-13.2kV Power Transformer without LTC, as

specified herein.

B. Deliver Goods F.O.B. to Points of Destination, assemble, test, and certify ready for energizing on Buyer-furnished pad.

1. Seller is responsible for visiting project site to confirm accessibility prior to delivery of Goods.

1.02 WORK BY BUYER A. Buyer will furnish a construction contractor under a separate contract to perform the installation or

construction for which the Goods under this Contract are being furnished and to supervise and direct the field services being furnished under this Contract for the following: 1. Site preparation

2. Foundation construction

3. Substation erection

4. Substation final testing and cutover

Page 15: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 1 of 14

SECTION 5 – SPECIFICATION FOR 161kV POWER TRANSFORMER

1.01 DESIGN OVERVIEW A. Furnish oil-immersed, 3-phase power transformer(s) applied as distribution substation step-down

and step-up transformers with load tap changer on high voltage windings. Design equipment, accessories, and supporting structures to meet requirements of project site conditions. Design transformer(s) to operate in parallel under normal conditions with second transformer of like rating.

B. Performance Requirements

1. Loss Evaluation: As stated in the General Requirements

2. Audible Sound Level: Average A-weighted, measured in accordance with ANSI C57.12.90, not to exceed:

a. 20 MVA: 73 db

b. 26.6 MVA: 76 db

c. 33.3 MVA: 77 db

d. 37.5 MVA: 77 db

3. Measurements with all cooling equipment in operation for appropriate ratings.

4. Overload Capabilities: In accordance with ANSI/IEEE C57.91

a. Design bushings, connectors, leads, and all auxiliary equipment for continuous full load duty and for emergency service at 1.4 times the transformer full load current at the ONAF, ONAF rating for a period of eight hours.

5. All electrical characteristics and mechanical features not herein specified shall be in accordance with applicable ANSI and NEMA standards.

C. Seismic Performance

1. The transformer(s) shall be seismically qualified per IEEE 693-2005.

2. Transformer(s) shall be designed so there will be neither structural damage nor loss of function immediately after an earthquake when subject to design seismic loads occurring simultaneously with dead and normal operation loads.

1.02 REQUIRED SUBMITTALS A. Product Data, catalogs and cut sheets

B. Shop Drawings:

1. Electronic file, containing a 3D model, suitable for opening or importing into AutoCAD 2014 or later version. Suitable file types are (but not limited to): AutoCAD (.dwg, .dxf), STEP (.stp, .ste, .step), ACIS (.sat)

2. Outline showing general arrangement, legend, plan, elevation, base details, weights, dimensions, and gallons of oil with location of center of gravity with and without oil on outline

3. Connection, alarm, control, current, voltage, and auxiliary schematic diagrams

Page 16: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 2 of 14

4. Internal wiring and connection diagrams (tabular format is not acceptable)

5. Bushing current transformers:

a. Excitation and ratio correction factor curves for each secondary ratio

b. Actual current ratio and turn ratio for each tap

c. Mechanical and thermal short time (one-second) rating

6. Nameplate data, including all current transformer taps. Resubmit nameplate drawing after factory tests with all test data completed.

7. Physical drawings showing equipment arrangement, terminal block locations, cable entrance, and panel layout

8. Terminal block connections

9. Bushing lifting accessories and ground pad outlines

10. Notes and symbols

11. Bill of material

12. Detailed description of procedure for vacuum filling of transformers with insulating oil

D. Quality Assurance/Control Submittals

1. Design Data:

a. Certified seismic qualification tests and analyses, in accordance with IEEE Std. 693-2005.

b. Certified short circuit withstand test results on units of comparable rating and design.

2. Test Reports, Manufacturer’s instructions, and Manufacturer’s field reports

1.03 PROJECT/SITE CONDITIONS

A. Keraunic level: 60 thunderstorm days per year

B. Combined ice and wind loading district: NESC Medium

C. Elevation above sea level: Less than 3,300 feet, National Geodetic Vertical Datum

1.04 MAINTENANCE MATERIALS

A. Make interchangeable with, and same material and workmanship as, corresponding original parts.

B. Furnish and deliver with units to project storage facilities.

C. Required Materials or Parts

1. Touch up paint: ANSI No. 70 (Light Gray), three 1 quart containers

2. High voltage bushings: one with associated gaskets

3. Low voltage bushings: one with associated gaskets

4. Gaskets for cover, case, manhole and handhole: one set

Page 17: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 3 of 14

5. Contacts and coils for each type of relay furnished: one complete set

6. Pressure gauge of each type furnished: one set

7. Indicators for all temperature devices: one set

D. Other parts recommended: at Buyer’s option

1.05 WARRANTY

A. Provide five-year manufacturer’s warranty on Goods and Services provided.

1.06 POWER TRANSFORMER DETAILS

A. Principal ratings and electrical characteristics:

1. Overload capabilities: In accordance with ANSI C57.91 and the requirements specified herein.

a. Continuous Ratings:

Bid Item 1:

1) ONAN, 55º Celsius rise: 20 MVA 2) ONAF, 55º Celsius rise, first stage forced cooling: 26.6 MVA 3) ONAF, 55º Celsius rise, second stage, forced cooling: 33.3 MVA 4) ONAF, 65º Celsius rise, second stage, forced cooling: 37.5 MVA

2. Number of phases: 3

3. Frequency: 60 Hz

4. Cooling class: ONAN, ONAF, ONAF

5. Primary to secondary impedance: Match existing unit at 9.8% (See Exhibit C for nameplate)

6. Primary winding:

a. Voltage: 161.7-kV

b. Connection: Delta

c. No-load tap changer: ± 5-percent in four 2.5-percent steps

d. Tap Voltages: 153,615/157,657/161,700/165,742/169,785 volts +/- 5.0%

7. Secondary winding:

a. Rated voltage: 13.2-kV

b. Connection: Wye with neutral brought out

8. Basic Impulse Level (BIL)

a. H winding: 750-kV

b. X winding: 110-kV

Page 18: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 4 of 14

9. Maximum Temperature Rise

a. By resistance: 65º Celsius

b. By hot spot: 80º Celsius

c. The hottest spot temperature rise for the 55º C average temperature rise ratings shall not exceed 65º C. The hottest spot temperature rise for the 65º C average temperature rise ratings shall not exceed 80º C.

10. Duty: Continuous

11. Angular phase displacement: per ANSI C57.12.00-2000, Primary to Secondary: 30º lagging

1.07 TRANSFORMER COMPONENTS

A. Transformer Tank:

1. Construction: Welded steel plate, liquid tight, with bolted and gasketed manhole on top of tank, mounted on steel skid base, and suitable for skidding in any direction.

2. Provide with jacking lugs and pulling eyes for lifting or moving along either axis when completely assembled and oil filled.

3. Mount a fall control ring on the top of each transformer tank to accommodate worker safety device attachment. Form 4-inch rings from ½ inch diameter rod. Locate so that a worker wearing a 6.5-foot safety tether can work anywhere on top of the transformer, including the bushings, while hooked into the fall control ring.

4. Provide with two copper faced ground pads at diagonal corners near base, with two bolt terminal connectors.

5. Mount separate blocks on both corners of the tank on the high voltage and low voltage sides, in a vertical line spaced no more than 3-feet apart to support the ground cable loop when connected to the high voltage surge arresters. See Exhibit B for grounding details.

6. Maintain positive pressure continually to prevent ingress of moisture during shipping. 7. Transformer shall have skid-proof top. 8. Transformer concrete pad is existing. Transformer shall be sized to utilize existing pad with

dimensions of 15’6” x 12’.

B. Core:

1. Material: Highest quality, non-aging, cold rolled, grain oriented, stress free, thin silicon steel laminations, with high permeability and low hysteresis loss.

2. Properly anneal with smooth surfaces at edges.

3. Provide each sheet with an insulated surface treatment impervious to hot transformer oil.

4. Carefully assemble, rigidly clamp, and block to prevent deteriorating vibrations, interference with oil circulation, objectionable noise conditions, and distortions due to short circuit and shipment.

5. Securely ground to the tank at the top of each transformer in a location accessible from

Page 19: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 5 of 14

manhole so grounding device can be unbolted without lowering transformer oil level or losing nitrogen pressure.

6. Provide with means for properly lifting and moving core assembly when untanked.

C. Windings:

1. Material: Electrolytic copper with high conductivity characteristics, conforming to ASTM B3-74 or B48-68.

2. Provide with thermally upgraded paper insulation system of high dielectric and mechanical strength, arranged to permit free circulation of oil.

3. Make up, shape, and brace to provide for expansion and contraction due to temperature changes and to avoid abrasion of insulation.

4. Adequately clamp and brace to prevent distortion or increase in noise above specified limits due to aging in continuous service at rated operating conditions.

5. The transformer shall be constructed using only power transformer class construction practices and materials. Only copper, circular windings of disk and/or helical construction are acceptable. Rectangular windings, oval windings or layered windings are not acceptable. The core shall be of circular, multistep, cruciform construction.

D. Cooling Equipment:

1. Type: Two stage ONAF/ONAF, conforming to ratings previously specified.

2. Radiators:

a. Nominal dimensions and interchangeable

b. Welded construction, with flanged connections and provisions for draining and venting

c. Provided with lifting eyes or lugs

d. Furnished with oil tight valves at all connections to main tank that will allow removal of radiators without taking transformers out of service

3. Fans:

a. Power supply volts: 240 VAC, single-phase, 60 Hz.

b. Provide magnetic motor starter, and protective devices and manual/automatic selector switch.

c. Provide individual thermal protection for each fan motor.

d. Provide individual disconnecting means for each fan motor in the form of a weatherproof, locking plug for each.

e. Fan impellers one-piece construction

f. Fan meets OSHA safety requirements

g. Automatic and manual switch

Page 20: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 6 of 14

4. Controls:

a. Automatically controlled by the winding temperature device, provided with air circuit breaker of suitable rating, automatic starting switches, auxiliary relays, alarm contacts, select switch for AUTOMATIC/OFF/MANUAL operation and any other necessary devices.

b. Include provisions for SCADA control and status indication of all stages of cooling equipment by tap changer control and/or transformer monitors.

c. Mounted in main transformer control cabinet

d. Designed so either stage of cooling equipment can be selected for operation with first stage

forced cooling.

e. Control power transformer, if required, shall have a minimum of 20-percent spare capacity.

E. Transformer Oil:

1. Pure mineral oil obtained by fractional distillation, unmixed with other substances, meeting the requirements of ASTM D3487

2. Prepared and refined especially for transformer use; free of moisture, acid, alkali, PCBs, and injurious sulfur compounds

3. Free of deposit formation under normal operating temperatures

4. Dielectric strength: Not less than 26,000 volts between 1” discs spaced 1/10” apart

5. Oil shall be tested for corrosive sulphur according to ASTM D1275 extended test

F. Oil Preservation System: Positive pressure nitrogen:

1. Include adequate amount of bottled nitrogen to place transformers in service.

2. Nitrogen control equipment: Mounted in easily accessible, weatherproof, lockable enclosure with adequate space for nitrogen bottles mounted on the transformer tank. Enclosure shall include stainless steel, 3-point latching system.

3. Nitrogen leads: Soft drawn copper tubing

4. Provide a certificate of ownership with nitrogen tank. 5. Oil shall be protected by: Sealed Tank

X Automatic Nitrogen System

6. A bleed tube for gas blanket dew point measurement shall be provided from the gas space to an elevation of six feet above the base of the transformer.

7. Suitable valves shall be provided to permit purging the gas space and testing the seal on the tank by admitting dry nitrogen under pressure.

8. Pressure relief device shall be of the mechanical automatic resealing type with alarm contacts.

Page 21: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 7 of 14

9. The system should also include the following:

X 200 cubic foot Nitrogen cylinder mounted less than 2 feet above base. X Pressure Regulator X Cylinder Pressure Gauge (w/alarm contacts - 10% volume remaining. X Transformer Pressure Gauge (with alarm contacts - High & Low wired to main

control cabinet). Other:

10. The normal transformer tank pressure is to be between plus (+) 1/2 and plus (+) 8 psig.

11. The system gauges, valves, regulators, etc., shall be contained within a separate steel housing with single handed, lockable access door.

G. Bushings:

1. Bushing studs: Threaded, stud type, silver plated

2. Porcelain: Manufactured by the wet process

3. Glazing: Free of imperfections

4. Color: ANSI No. 70, Light Gray

5. High Voltage Bushings:

a. Type: Interchangeable

b. BIL rating: 750-kV

c. Creepage distance: Standard

d. Mounting: On tank cover Segment 3

e. Tap: Capacitive, for bushing potential device

f. Connectors: Stud to flat, tinned NEMA 4-hole pad

g. Material: Porcelain manufactured by Wet Process

6. Low Voltage Bushings:

a. BIL rating: 110-kV

b. Creepage distance: Standard

c. Mounting: On tank cover Segment 1

d. Connectors: Stud to flat, tinned NEMA 4-hole pad 7. Neutral Bushing:

a. BIL rating: 110-kV b. Creepage distance: Standard

Page 22: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 8 of 14

c. Mounting: On tank cover Segment 1 d. Connectors: Stud to flat, tinned NEMA 4-hole pad

H. Bushing Current Transformers (BCT):

1. Windings: Fully distributed

2. Leads:

a. Terminate at 6-point short-circuiting type terminal blocks in control housing.

b. Terminate each BCT on separate block.

c. Mark leads with permanent sleeve markers to indicate taps and polarity.

d. Use No. 10 AWG stranded copper with oil proof insulation.

3. Relaying Current Transformers:

a. Type: Multi ratio, 5 lead, bushing type

b. Accuracy Class: C400

c. Rating Factor: 2

d. Number and Ratio:

1) Three 600:5 on each high voltage bushing 2) Three 2000:5 on each low voltage bushing 3) Two 600:5 on neutral bushing

I. No Load Tap Changer (NLTC):

1. Provide for external operation when transformers are de energized.

2. Provide with indicating pointer, dial, and means for locking in any position.

3. Mount on sidewall approximately 5’ above the base of the transformer.

4. Provide for capability of withstanding full transformer short circuit current without damage.

5. Configure to prevent leaving a winding open or short circuited when operating handle is in

locked position.

6. Provide with two 2½-percent taps above and two 2½-percent taps below rated voltage.

J. Surge Arresters:

1. Polymer, station class, metal oxide type, Ohio Brass Dynavar PVN or approved equal

2. Rating:

a. Primary voltage: 132kV duty cycle (106kV MCOV)

Page 23: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 9 of 14

b. Secondary voltage: 10kV duty cycle (8.4kV MCOV)

3. Mount 3 arresters on the high voltage side of the tank and 3 arresters on the low voltage side of the tank in side of LV cabinet.

K. Wire and Terminal Blocks:

1. Wiring:

a. 600 volt insulated copper, Class B stranding, 90º Celsius rating

b. No. 12 AWG minimum for current transformer and branch circuits

c. No. 14 AWG minimum for control

d. All external wiring shall be run in rigid galvanized steel conduits painted to match the

transformer tank.

e. Terminated with crimp type, ring tongue connectors with non-insulated short shanks; maximum of two terminations per terminal point

f. Connected to separate power terminal blocks for power circuits

g. Clearly identified with permanent sleeve markers at all terminations

h. All wiring originating within transformer shall be color-coded

i. Internal device and terminal block identification shall be based on the functional device code and not the physical location of the device. Both may be used, but functional identification must be present.

2. Terminal Blocks:

a. Provided with bases and barriers molded integrally with brass inserts

b. Rated at 600 volts

c. Able to accommodate up to two No. 10 AWG wires per terminal

d. Provided with marking strips

e. Installed in sufficient quantity to provide 20-percent minimum spares for each type block

f. Short circuiting type for current transformers

g. Marked to identify source and function

h. Manufacturer: General Electric Type EB25 and EB27

L. Control Cabinet:

1. Provide weatherproof cabinet with minimum depth of 24”

2. Mount on sidewall of Segment 1.

Page 24: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 10 of 14

3. Fasten securely to each transformer tank. Stand control cabinet 18” off tank.

4. Doors: Vertically hinged with locking provisions, stainless steel, single-handle, 3-point latching system (if center support section is utilized, it must be removable for access during wiring.

5. All external hardware and fasteners shall be stainless steel

6. Conduit entrance: Removable, gasketed bottom plate, field drilled

7. Mount terminal blocks and equipment at least 6” above bottom plate.

8. Provide space heaters, partly or totally controlled by thermostat. 9. Provide a copper ground bus inside the cabinet suitable for connecting a 2/0 copper cable to

external ground. Ground bus shall be accessible from the front door without disassembly of components. All connections to ground shall be through the ground bus.

M. Nitrogen Cabinet:

1. Provide weatherproof cabinet.

2. Fasten securely to each transformer tank.

3. Doors: Vertically hinged with locking provisions and single-handle, 3-point latching system.

4. All external hardware and fasteners shall be stainless steel.

N. Auxiliary and Control Power:

1. 120/240 VAC single phase for fans, space heaters, and other accessories

2. 125 VDC for control functions

1.08 ACCESSORIES

A. Provide power transformer(s) with the following accessories:

1. Sudden pressure relay device 63 Qualitrol model 900 wired to a Qualitrol model 909 seal-in relay (Device 63x): Main tank 125 VDC control voltage, with separate, isolated alarm and trip contacts. All items needed for testing the relay mechanism shall be provided with the unit. Provide two (2) alarm contacts and two (2) trip contacts.

2. Oil level indicator: Magnetic type with low level nonadjustable two (2) 125 VDC alarm contacts

3. Oil temperature indicator: Main tank dial type with adjustable, separate, two (2) 125 VDC isolated alarm and trip contacts

4. Winding temperature indicator: Four sequential operating contacts, operating from a current transformer in one phase of the low voltage winding (two contacts for the operation of cooling equipment, two (2) contacts for alarm, and two (2) contacts for tripping). Indicator shall be located not less than 5’ or more than 6’ above the base of the transformer, and shall not be obstructed. Provide RTD input of all three phases to SEL-2414.

5. Cover-mounted, automatic reseal, shielded pressure relief valve device with spring loaded visual signal flag and two (2) 125 VDC alarm contacts, Qualitrol XPRD. Pipe discharge to level

Page 25: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 11 of 14

of transformer base

6. High inert gas-pressure and vacuum gauge with two (2) alarm contacts 7. Low inert gas pressure gauge: Two (2) alarm contacts for nitrogen supply cylinder with contacts

set to activate when cylinder pressure drops below 200 psi

8. Furnish a 120 volt, 100 watt incandescent light fixture with SPST switch and a 120 volt, 20 ampere single phase duplex GFI type receptacle, complete with protective circuit breaker.

9. Other standard accessories: Per ANSI C57.12.10.

10. All indicators shall be located not less than 5’ or more than 6’ above the base of the transformer, and shall not be obstructed. Liquid temperature and winding temperature indicators shall be mounted within 1’ of each other.

B. Transformer Alarm Monitor

1. Wire alarms and analog data to SEL transformer monitor.

2. See Exhibit A (Dwg STD0009) for communication equipment to be provided by Seller.

3. See Exhibit A (Transformer Monitor Input map) for I/O usage

4. Manufacturer: Schweitzer Engineering Laboratories (SEL)

5. Model: SEL 2414

6. Part Number: 241421A3A9X3A3A1830

7. Features:

a. Three Phase Winding Temp Monitors

i. RTD

b. Temperature monitoring of oil in main tank

i. RTD

8. Provide sensors to accomplish monitoring

a. Sensors: Install according to manufacturer’s recommendations

9. Provide interconnection of IED according to transformer information system, as shown in Exhibit A (Dwg STD0005).

10. Seller shall program monitors prior to delivery to Buyer.

1.09 FINISHES

A. All external hardware shall be stainless steel. B. Clean and treat tank interior and exterior surfaces according to manufacturer’s standards. C. Apply one prime coat to the exterior surface.

Page 26: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 12 of 14

D. Apply two finish coats, ANSI Color No. 70, Light Gray, to the exterior surface. Minimum paint thickness: 6 mils.

E. Apply non-skid coating to top of transformer tank. F. Paint interior of cabinets white. G. Paint interior of transformer tank white.

1.10 SOURCE QUALITY CONTROL

A. Assemble, adjust, and complete manufacturer’s standard production tests in accordance with Table 14 of ANSI C57.12.00, C57.12.90; NEMA TR 1 and the following:

1. Impulse Test:

a. Perform on terminals of high voltage winding as specified ANSI C57.12.90.

b. Use voltage oscillograms and ground current oscillograms taken simultaneously as specified in ANSI C57.12.90.

c. Do not perform additional impulse tests after the tests have been accepted.

d. After impulse tests are completed, use the average absolute voltage voltmeter method to measure excitation loss.

2. Winding Impedance

a. Provide impedance test results for positive and zero sequence values of Zps.

3. Induced Voltage Test

a. Use test equipment and general method in accordance with IEEE C57.12.90.

b. Test at full induced-test voltage level.

c. Include results of corona test and measured apparent charge level in certified test report.

4. Insulation Resistance Test

5. Insulation Power Factor Test a. Use test procedure in accordance with ANSI C57.12.90.

b. Include results of insulation power factor test in certified test report.

6. Short-circuit capability: Warrant that the transformers will meet requirements of ANSI

C57.12.00.

7. Pressure test tank with nitrogen tubing installed

8. Noise tests for each stage of cooling

9. Temperature rise test for ONAN and maximum load. (Test results from identical unit maybe accepted by Buyer if adequate documentation is submitted.)

10. Dielectric tests on control devices and wiring per NEMA ICS-1.

Page 27: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 13 of 14

11. Current Transformer

a. Low frequency, one minute 2,500 volts to ground dielectric test on secondaries.

b. Proper nameplate and polarity markings check.

c. Polarity and ammeter ratio check after installation of bushing.

12. Core ground megger test

13. Sweep Frequency Analysis

a. Perform Sweep Frequency test on unit(s) at factory.

b. Provide electronic and printed copies of the results to Buyer and Engineer.

c. Provide info on state of transformers during testing. 1.11 SPECIAL SERVICES (FIELD ASSEMBLY AND TESTING)

A. Visually inspect Goods upon delivery. Prior to Buyer accepting delivery, provide a written report to Buyer and Engineer itemizing any damage incurred.

B. Unseal impact recorders and inspect impact recorder tapes in the presence of Buyer and Engineer

immediately upon delivery. Ensure that impact recorders are reinstalled prior to placement on foundations by Buyer or Buyer’s construction contractor.

C. Seller shall perform the following:

1. Perform unloading and re-inspect each impact recorder readings after placement onto

foundations by Buyer’s construction contractor.

2. Perform transformer field assembly. Record shipping gas pressure prior to assembly.

3. Thoroughly inspect all visible assembled parts and connections.

4. Check all gages and relays to ensure proper working condition.

5. Check and operate all cooling equipment. 6. Thoroughly search for leaks.

7. Test oil prior to filling and prior to energizing to determine if the dielectric strength is acceptable.

Filter the oil, if necessary. Testing shall be done by an Independent Testing Laboratory. Results shall be immediately sent to Buyer and Engineer for approval.

8. Visually inspect and operate tap changers to verify satisfactory operation.

9. Test all wiring and components for continuity and megger for insulation resistance.

10. Verify operation of heater, auxiliary, convenience outlet, and light circuits.

11. Provide equipment for and perform vacuum filling of transformer with insulating oil in accordance with ANSI C57.12.11.

12. Disconnect the main core ground and megger the core insulation resistance. Reconnect the

Page 28: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

161kV POWER TRANSFORMER Page 14 of 14

ground upon completion of the test.

13. Perform manufacturer’s standard and optional field tests and field test in accordance with ANSI C57 12.11.8-1980, and submit written results of tests performed, including the following:

a. Insulation power factor test on all windings and bushings.

b. Turn ratio test.

c. Insulation and winding resistance test.

d. Dielectric absorption test.

e. Megger, Ratio, and Polarity test all CT’s.

f. Additional tests as determined by the manufacturer.

14. Perform Sweep Frequency test on unit(s) after assembly and compare to factory results.

15. After field installation is complete, provide certification that transformer(s) ready to be energized.

Page 29: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

EXHIBIT A

Standard Transformer Information System

Power Transformer

Communication

Transformer Monitor Input Map

Page 30: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated
Page 31: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated
Page 32: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

TRANSFORMER MONITORS

INPUT MAP

OIL LEVEL MAIN TANK TM-1 SEL-2414 IN301

PRESSURE RELIEF DEVICE MAIN TM-1 SEL-2414 IN302

INERT-AIR SYSTEM HP TM-1 SEL-2414 IN303

INERT-AIR SYSTEM LP TM-1 SEL-2414 IN304

INERT-AIR SYSTEM EC TM-1 SEL-2414 IN305

63 SEAL IN RELAY MAIN TANK TM-1 SEL-2414 IN306

LIQUID TEMP. MAIN TANK 95°C TM-1 SEL-2414 IN307

WINDING TEMP. ALARM 105°C TM-1 SEL-2414 IN308

FAN BANK STATUS #1 TM-1 SEL-2414 IN601

FAN BANK STATUS #2 TM-1 SEL-2414 IN602

FAN STAGE #1 OVERLOAD STATUS TM-1 SEL-2414 IN603

FAN STAGE #2 OVERLOAD STATUS TM-1 SEL-2414 IN604

43-1 AUTO STAGE 1 COOLING TM-1 SEL-2414 IN605

43-1 MANUAL STAGE 1 COOLING TM-1 SEL-2414 IN606

43-2 AUTO STAGE 2 COOLING TM-1 SEL-2414 IN607

43-2 MANUAL STAGE 2 COOLING TM-1 SEL-2414 IN608

LOSS AC TM-2 SEL-2414 IN501

LOSS OF POWER IN STAGE #1 TM-2 SEL-2414 IN502

LOSS OF POWER IN STAGE #2 TM-2 SEL-2414 IN503

LOSS OF POWER IN COOLING CONTROL TM-2 SEL-2414 IN504

LOSS OF DC TM-2 SEL-2414 IN505

A PH WINDING TEMP (IF RTD) or ANALOG IN TM-1 SEL-2414 INTRTD01

B PH WINDING TEMP (IF RTD) or ANALOG IN TM-1 SEL-2414 INTRTD02

C PH WINDING TEMP (IF RTD) or ANALOG IN TM-1 SEL-2414 INTRTD03

MAIN TANK OIL TEMP TM-1 SEL-2414 INTRTD04

TRANSFORMER MONITOR #1

ANALOG

INPUTS / RTD

STATUS

INPUTS

Page 33: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

EXHIBIT B

Power Transformer Tank, Arrestor, and Neutral

Grounding Details

Page 34: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated
Page 35: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

EXHIBIT C

Existing Nameplate

Page 36: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated
Page 37: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated

Power Transformer Procurement Contract No: 6457-P1 Lenoir City Utilities Board Date: August 28, 2017 Watt Road Substation Rev.: 00

EXHIBIT D

Substation General Arrangement

Page 38: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated
Page 39: WATT ROAD SUBSTATION POWER TRANSFORMER … · loss or damage shall remain with the Se ller until the transformer is erected in acceptable condition at the substation site. Escalated