Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans for redevelopment of the site currently occupied by the Tinbergen Building. The Tinbergen Building is located in a prominent position in the Science Area on the junction of St Cross Road and South Parks Road. It was the University’s largest teaching and research building, accommodating the Departments of Zoology and Experimental Psychology and also teaching laboratories for the Department of Biochemistry. The building had to be closed in early 2017 due to the discovery of asbestos throughout the structure and in inaccessible areas. It was not possible to remove this while the building was occupied. A decision has been taken to demolish the existing building and the University intends to create a new, world-class centre for life and mind sciences. The provisionally- named Life and Mind Building will be the largest building project the University has ever undertaken and will significantly improve the way psychological and biological science is undertaken in Oxford, helping scientists to solve some of our major global challenges. The new building will be home to the Department of Experimental Psychology and a new Department of Biology, combining the existing departments of Plant Sciences and Zoology. The event today will show you: • The background to the project The planning application for various enabling works required, including demolition • The constraints and opportunities of the site The vision for the new building The design process being undertaken for the new building and evolving concepts • The proposed timeline We are inviting you to view the proposals and talk with members of the University and project team, who are available to answer any queries you might have. Your views The design process is very much ongoing and we welcome your comments and feedback on our emerging thoughts and designs. Please submit any comments to us either in hard copy today or by post, or online via our website: www.ox.ac.uk/lifeandmind Thank you for attending and for your input today. Aerial view of the Tinbergen Building within the Oxford University Science Area Plan of Oxford University’s Science Area and the Keble Triangle, highlighting the Tinbergen site KEBLE TRIANGLE SCIENCE AREA Tinbergen Site Tinbergen Building 2017 A new home for two University departments: Experimental Psychology and a new department of Biology combining Zoology and Plant Sciences. South Parks Road St Cross Road EXPERIMENTAL PSYCHOLOGY PLANT SCIENCES ZOOLOGY BIOLOGY LIFE & MIND

Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

Welcome 1

Tinbergen Building Redevelopment

Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans for redevelopment of the site currently occupied by the Tinbergen Building.

The Tinbergen Building is located in a prominent position in the Science Area on the junction of St Cross Road and South Parks Road. It was the University’s largest teaching and research building, accommodating the Departments of Zoology and Experimental Psychology and also teaching laboratories for the Department of Biochemistry.

The building had to be closed in early 2017 due to the discovery of asbestos throughout the structure and in inaccessible areas. It was not possible to remove this while the building was occupied. A decision has been taken to demolish the existing building and the University intends to create a new, world-class centre for life and mind sciences. The provisionally-named Life and Mind Building will be the largest building project the University has ever undertaken and will significantly improve the way psychological and biological science is undertaken in Oxford, helping scientists to solve some of our major global challenges. The new building will be home to the Department of Experimental Psychology and a new Department of Biology, combining the existing departments of Plant Sciences and Zoology.

The event today will show you:

• The background to the project• The planning application for various enabling works required, including demolition• The constraints and opportunities of the site • The vision for the new building • The design process being undertaken for the new building and evolving concepts • The proposed timeline

We are inviting you to view the proposals and talk with members of the University and project team, who are available to answer any queries you might have.

Your viewsThe design process is very much ongoing and we welcome your comments and feedback on our emerging thoughts and designs.

Please submit any comments to us either in hard copy today or by post, or online via our website: www.ox.ac.uk/lifeandmind

Thank you for attending and for your input today.

Aerial view of the Tinbergen Building within the Oxford University Science AreaPlan of Oxford University’s Science Area and the Keble Triangle, highlighting the Tinbergen site

KEBLE TRIANGLE

SCIENCE AREA

Tinbergen Site

Tinbergen Building 2017

A new home for two University departments: Experimental Psychology and a new department of Biology combining Zoology and Plant Sciences.

South Parks Road St Cross Road

EXPERIMENTAL PSYCHOLOGY

PLANT SCIENCES

ZOOLOGY

BIOLOGY

LIFE &

MIND

Page 2: Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

Project Background

Tinbergen Building Redevelopment

The construction of the Chemistry Teaching Laboratories (CTL) as an extension to the Tinbergen Building was approved in 2016 as part of a wider planning permission for refurbishment and alterations.

In February 2017, during this refurbishment works, the University reluctantly, at short notice, closed the Tinbergen Building due to the discovery of asbestos-containing materials (ACM) throughout the structure and in inaccessible areas. It was not possible to remove this while the building was occupied.

Construction of the CTL extension was completed in 2018 and it will be retained as part of the redevelopment of the site.

Following the discovery of asbestos, two pieces of work were undertaken:

1. Temporary buildingsThe Tinbergen Building accommodated nearly 2000 academic staff, postgraduate students, undergraduates and administrative staff. There was a quick response to find short-term solutions for teaching and research and now medium-term solutions are in place in the form of modular buildings at the Radcliffe Observatory Quarter site on Walton Street and at the University Club behind the Tinbergen Building. These temporary buildings will be in place while the University develops plans for and constructs a new building on the site.

2

Zoology modular building opened 2018

Chemistry Teaching Laboratories

2. Asbestos removal worksThe University appointed Erith in Summer 2018 to commence asbestos-containing materials (ACM) removal works within the Tinbergen Building. The ACMs exist within the internal fabric of the building as well as being captured within the concrete frame and the fixings between the cladding panels and the frame itself. Whilst safe for occupants during use, due to the ACMs being encapsulated inside linings and other exposed finishes of the room surfaces, the asbestos needs to be removed to cleanse the site and enable the redevelopment to progress.

Phase 1 of the ACM removal works is ongoing and includes a strip-out of the internal elements of the building and removal of ACMs within these areas. Some ACMs will remain within the structure and complete removal will require demolition, which will be phase 2.

Erith removing ACMs under controlled conditions

DemolitionAfter very detailed consideration of all options for the building’s future, the University concluded that its design and layout no longer accommodated the needs of modern teaching and research. On that basis, demolition and rebuilding offers the best outcome for our students and staff. It also enables the continuation of the important international research that has taken place over many decades in the Tinbergen Building, and represents the best possible value for money.

Site inspection under controlled conditions

Page 3: Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

Planning Application

Tinbergen Building Redevelopment

The project is running to tight timescales due to the need to re-accommodate the Departments of Zoology and Experimental Psychology in a permanent building. In order to deliver the new building as quickly as possible, an initial planning application is required, to be submitted in June 2019, for a series of enabling works as detailed below.

These will enable the demolition works to be completed in around 12 months and reduce any delays to the start of construction. The works are also required to safeguard surrounding buildings.

The planning application will also seek consent for the demolition of the Tinbergen Building.

3

Location of temporary electrical substation Top: current setting Bottom: with temporary substation shown

Area of Tinbergen to be demolished

1. Electricity substationThe current electricity substation for the site lies beneath the existing building. This will need to be temporarily relocated for the demolition and redevelopment works. The substation will be temporarily located on the area of lawn to the east of the Biomedical Services Building.

2. New entrance to Peter Medawar Building

Proposed First Floor: demolition of link to Tinbergen building

Link to Tinbergen building demolished

Peter

Tinbergen Building

South Parks Road St Cross Road

Medawar Building

UPUP

Entrance Lobby

Office

Stairs

Corridor

Lift Lobby

Lobby

Lift

Store

Room

WC

Plant Room

WCStore

Riser

Plant RoomStair

Goods Entrance

C190 SR3GLAZED CYLINDRICAL PORTAL

EXTERNAL RENDER SYSTEM TO MATCH EXISTING ON BLOCK CAVITY WALL

EXTERNAL RENDER SYSTEM TO MATCH EXISTING ON BLOCK CAVITY WALL

Entrance Lobby

MAIN ENTRANCE

C190 SR3GLAZED CYLINDRICAL PORTAL

EXTERNAL RENDER SYSTEM TO MATCH EXISTING ON BLOCK CAVITY WALL

Office

Room

Stair

Plant Room

Room

Lift Lobby

New Entrance Lobby

Lift

3412

NEW FIRE DOOR TO REVISED LOBBY STAIR & OFFICE ARRANGEMENT

EXTERNAL CCTV

EXTERNAL CCTV

StoreWC

StoreWC

NEW ELECTRICAL SOCKET TO SOFFITABOVE

KEY

ALL DIMENSIONS INDICATIVE ONLYSITE SURVEY REQUIRED ALL DIMENSIONS IN MM UNLESS OTHERWISE STATEDDO NOT SCALE OFF DRAWINGPRINT IN COLOUR

INDICATIVE HOARDING LINE BY OTHERS

SCOPE OF WORKS

NOTE

COMPONENTS DEMOLISHED AS PART OF TINBERGEN DEMOLITION (outside of scope)

TINBERGEN REDEVELOPMENT SITE (outside of scope)

NEW CARPET FLOOR FINISH

RENDER PANEL TO MATCH EXISTING

1. CCTV LOCATIONS TBC BY SPECIALIST2. EXTERNAL PAVING AND DRAINAGE AMENDMENTS TBC BY DRAINAGE ENGINEERTO NEW AND EXISTING ENTRANCES 3. ALL STRUCTURAL OPENINGS AND INTERNAL WALLRELOCATIONS TO BE CONFIRMED BY SE PRIOR TO CONSTRUCTION4. BEFORE REMOVING EXISTING VENTILATION TO SOUTH ENTRANCE LOBBY REQUIREMENTS TO BE CONFIRMED BY SPECIALIST 5. BUILDING FIRE STRATEGY TBC BY UNIVERSITY FIRE OFFICER & BUILDING CONTROL

DRAWING TITLE:

Cantay HousePark End Street Oxford OX1 1JDT +44 (0) 1865 248045E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.adp-architecture.com

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

As indicated

2S2 P

UPPER GF (20)GENERAL ARRANGEMENTEXISTING & PROPOSED PLANS

PETER MEDAWAR BUILDINGTEMPORARY ENTRANCE WORKSJOB NAME LINE 3

CD03519 0001

DRAFT

CRD-00-GF-DR-A-1020

REVISION DATE DESCRIPTION ARCHITECT PARTNER

S2 P 1 07.05.19 FOR COMMENT GM ADPS2 P 2 08.05.19 FOR INFORMATION GM ADP

1 : 100Existing upper Ground1 1 : 100

Proposed Upper Ground2

New front entrance

Existing entrance to be blocked off

Proposed Upper Ground Floor: changes to front entrance

The Peter Medawar Building is located to the west of the Tinbergen Building, as identified on the plan above. As its current entrance faces directly onto the Tinbergen Building, this needs to be relocated to the northern elevation of the building to safeguard pedestrian access.

In addition to this an existing link between the Peter Medawar Building and the Tinbergen building at first floor level needs to be demolished as shown on the adjacent plan.

To retain a ramped access to the Peter Medawar Building, the existing stairs will need to be temporarily adjusted to accommodate the loss of the existing ramp adjacent to the redevelopment works.

1:100 @ A1, 1:200 @ A3EAST ELEVATION1

1010

CLIENT

ISSUE DATE DRAWN CHECKED DESCRIPTION

PROJECT

DRAWING TITLE

DRAWING NO.

JOB NUMBER

SIZE & SCALE

REVISIONDRAWING STATUS

Notes:

Drawings are based on survey data and may not accurately represent whatis physically present.

Do not scale from this drawing. All dimensions are to be verified on sitebefore proceeding with the work.

All dimensions are in millimeters unless noted otherwise.

Purcell shall be notified in writing of any discrepancies.

First Issue

239887-PUR-00-ZZ-DR-A-1010

© PURCELL 2019. PURCELL ® IS THE TRADING NAME OF PURCELL ARCHITECTURE LTD.104 Gloucester Green, Oxford, OX1 2BU

239887

1010

P01.01

University of Oxford

Life and Mind Building - Chemistry Interface

East ElevationAs Existing

A1L

08-05-19 RO

S0 - Work In Progress

2 m0 1 m 4 m3 m 5 m 10 m

Existing Tinbergen buildingto be demolished Indicative demolition

cut line

Page 4: Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

Planning Application

Tinbergen Building Redevelopment

4

Existing chemistry extension onto sports pitch

3. Access to Chemistry Teaching LaboratoriesThe current pedestrian access to the CTL is located on the western side of the Tinbergen Building and will share a border with the redevelopment site. It is therefore necessary to relocate the entrance whilst the site is being redeveloped.

The proposal is to enter the building via the sports pitch, using existing steps. A footpath is therefore proposed along the front of the CTL to accommodate pedestrian access from St Cross Road. A ramp is proposed to accommodate wheelchair access as shown in the diagrams below.

4. Diversion of the CTL flues

Existing Proposed

Existing CTL flues Plan showing the temporary location of the CTL flues (aerial photo taken while CTL was in construction)

Elevation drawing from St Cross Rd illustrating temporary relocation of CTL flues at the front of the CTL building

Chemistry Teaching

Laboratories

CTL flues

Access from St Cross Rd

Area shown in diagrams below

SOCIAL HUB

EXISTING CCTV POLE RELOCATED. INDICATIVELOCATION ONLY

EXISTING LOW LEVEL PLANTINGEXISTING LOW LEVEL PLANTING GRAVEL

EXTERNALTERRACE

EXISTINGSTEPPED SEATING

EXISTING STEPPED SEATINGEXISTING GLAZED BOX

SPORTS FIELD

----

EXISTING FLUES

DRAWING TITLE:

Cantay HousePark End Street Oxford OX1 1JDT +44 (0) 1865 248045E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.corde.co.uk

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

1 : 100

1S2 P

SOUTH ELEVATIONAS EXISTING

CHEMISTRY TEACHING LABTEMPORARY ENTRANCE & RAMP ACCESS

CD0319 A-1010

FOR COMMENT

CRD-00-ZZ-DR-

REVISION DATE DESCRIPTION DRAWN CHECKED

S2 P 1 08.05.19 For Comment CRD

1 : 100SOUTH ELEVATION AS EXISTING1

0 5 m

1 : 100GROUND FLOOR PLAN - AS EXISTING2

NOTE:

ALL DIMENSIONS INDICATIVE ONLYSITE SURVEY REQUIREDALL DIMENSIONS IN MM UNLESS OTHERWISE STATEDDO NOT SCALE OFF DRAWINGPRINT IN COLOUR

FIRE STRATEGY IN DEMOLITION AND PERMENANT COMPETITION TBC BY UNIVERSITY FIRE OFFICER AND BUILDING CONTROL.

PLANNING BOUNDARY LINE TBC.

DESIGN PROGRESSED INDEPENDENTLY OF THE TIMBERGEN REDEVELOPMENT PROJECT

SOCIAL HUB

EXISTING CCTV POLE RELOCATED. INDICATIVELOCATION ONLY

EXISTING LOW LEVEL PLANTINGEXISTING LOW LEVEL PLANTING GRAVEL

EXTERNALTERRACE

EXISTINGSTEPPED SEATING

EXISTING STEPPED SEATINGEXISTING GLAZED BOX

SPORTS FIELD

----

EXISTING FLUES

DRAWING TITLE:

Cantay HousePark End Street Oxford OX1 1JDT +44 (0) 1865 248045E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.corde.co.uk

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

1 : 100

1S2 P

SOUTH ELEVATIONAS EXISTING

CHEMISTRY TEACHING LABTEMPORARY ENTRANCE & RAMP ACCESS

CD0319 A-1010

FOR COMMENT

CRD-00-ZZ-DR-

REVISION DATE DESCRIPTION DRAWN CHECKED

S2 P 1 08.05.19 For Comment CRD

1 : 100SOUTH ELEVATION AS EXISTING1

0 5 m

1 : 100GROUND FLOOR PLAN - AS EXISTING2

NOTE:

ALL DIMENSIONS INDICATIVE ONLYSITE SURVEY REQUIREDALL DIMENSIONS IN MM UNLESS OTHERWISE STATEDDO NOT SCALE OFF DRAWINGPRINT IN COLOUR

FIRE STRATEGY IN DEMOLITION AND PERMENANT COMPETITION TBC BY UNIVERSITY FIRE OFFICER AND BUILDING CONTROL.

PLANNING BOUNDARY LINE TBC.

DESIGN PROGRESSED INDEPENDENTLY OF THE TIMBERGEN REDEVELOPMENT PROJECT

SOCIAL HUB

EXISTING CCTV POLE RELOCATED. INDICATIVELOCATION ONLY

EXISTING LOW LEVEL PLANTINGEXISTING LOW LEVEL PLANTING GRAVEL

EXTERNALTERRACE

EXISTINGSTEPPED SEATING

EXISTING STEPPED SEATINGEXISTING GLAZED BOX

SPORTS FIELD

----

EXISTING FLUES

DRAWING TITLE:

Cantay HousePark End Street Oxford OX1 1JDT +44 (0) 1865 248045E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.corde.co.uk

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

1 : 100

1S2 P

SOUTH ELEVATIONAS EXISTING

CHEMISTRY TEACHING LABTEMPORARY ENTRANCE & RAMP ACCESS

CD0319 A-1010

FOR COMMENT

CRD-00-ZZ-DR-

REVISION DATE DESCRIPTION DRAWN CHECKED

S2 P 1 08.05.19 For Comment CRD

1 : 100SOUTH ELEVATION AS EXISTING1

0 5 m

1 : 100GROUND FLOOR PLAN - AS EXISTING2

NOTE:

ALL DIMENSIONS INDICATIVE ONLYSITE SURVEY REQUIREDALL DIMENSIONS IN MM UNLESS OTHERWISE STATEDDO NOT SCALE OFF DRAWINGPRINT IN COLOUR

FIRE STRATEGY IN DEMOLITION AND PERMENANT COMPETITION TBC BY UNIVERSITY FIRE OFFICER AND BUILDING CONTROL.

PLANNING BOUNDARY LINE TBC.

DESIGN PROGRESSED INDEPENDENTLY OF THE TIMBERGEN REDEVELOPMENT PROJECT

Existing stepped seating

Existing glazed box

Key clamp balustrade

Cladding to match existing grey tile

Temporary ramp

New canopy

New signage zone

2no. sections of curtain walling removed and replaced with automated double doors

The existing flues for the CTL create a major constraint for the redevelopment of the site. The flues currently pass over the existing Tinbergen building and need to be diverted to safeguard the demolition works and avoid any disturbance to the CTL. It is proposed that they are temporarily located at the front of the CTL. They will then be permanently designed into the new building.

Temporary CTL flues

Existing CTL flues

CTL building

St Cross Rd

Page 5: Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

Redeveloping the site

Tinbergen Building Redevelopment

5

Links to Science Area

South Parks Road

St C

ross

Roa

d

Access to nature

Currently ablind corner

Main arrival (Northside)

SitePotential arrival

Panoramic views to College grounds

Panoramic views to University Parks

New cycle &

pedestrian route

Approach from Station

Service Access

Service Entry

Panoramic views to Oxford’s spires and Radcliffe Camera

Re-located CTL building entry

Approach to Botanic Garden

Site location

Opportunities and constraints

1. Conservation Areas

Area map showing the Tinbergen site location in relation to Oxford city centre

3. Green Belt 4. Flood Risk

2. Grade II Listed (University Parks)

An initial analysis was undertaken to review the site in context with the wider city and surrounding areas. This includes surveying potential risks that might impact the building, as well as the opportunities that the redevelopment of the site offers.

The site is situated adjacent to the Central Oxford Conservation Area and is in close proximity to the green belt, Grade II Listed University Parks and the River Cherwell. These constraints are shown in the diagrams 1 to 4 below.

The new building will be designed to respect the setting of the Conservation Area and University Parks so that it makes a positive contribution to the streetscape of South Parks Road and St Cross Road.

Opportunities to improve the site include:

• Access to nature• Key views from the site• Cycle and pedestrian routes• Access to / from the site• Sun exposure and shading• Links to Science Area

We have identified the following planning constraints for the site:

• Proximity of the Conservation Area • Proximity of University Parks • Building heights and protected

Oxford view cones• Relationship with existing roads

and buildings

Tinbergen site

Page 6: Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

Vision for the New Building

Tinbergen Building Redevelopment

6The Life and Mind Building will become the new home for two University departments: Experimental Psychology and a new department of Biology, combining Zoology and Plant Sciences.

The new Life and Mind Building will provide the opportunity to:

• transform the way psychological and biological science is done in Oxford

• enable more multidisciplinary collaboration and sharing of knowledge and ideas to happen than ever before

• help scientists to solve some of our major global challenges through a greater understanding of biology and human behaviour

• transform the education experience for students at Oxford in terms of teaching and research facilities and provide new courses and study options

• enable the University to attract and retain the most talented academics and researchers and the funding to support their work in a competitive global market

• significantly expand the University’s outreach to schools and the public, providing opportunities for art, exhibitions, lectures and conferences and for public participation in our important research.

Exploration and engagementInitial concepts were developed using both physical and computer models to assess the benefits of each configuration and identify the most suitable options.

Concepts were tested with stakeholders for their advantages and disadvantages in relation to the aspirations for the new building. They were further assessed through daylight simulation for their impact on public space and internal comfort.

Throughout the process the building’s impact on its unique setting as well as the ability to generate public space and engagement were important considerations.

Each department has identified their requirements for the new building. They would like to share some spaces, invite the public into the building and create zones for separate research groups and teaching.

Through a series of workshops with all three departments, we have identified the areas they require and how much space this will take up within the building.

In total the University requires an internal area of 26,000 sqm. This will provide space for a mix of science areas, office accommodation as well as teaching and public space.

Concept A (preferred) Concept B Concept C

Aspirations for the new Life and Mind Building

Offices

Academics

Support

Lecture

Meeting

Seminar

Computer

Imaging

Herbarium

Greenhouses

Workshops

Arrival, Cafe & Restaurant, Hubs,

Library, Study

General Laboratories

Teaching Labs

EP research

Research Support & Shared Specialist

Teach & Meet

Social & Study

Laboratories (incl. Teaching)

Support & Specialist

Structure, Circulation & Plant

Offices & Write-up

Functional components of the new building and their relative size

Page 7: Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

Tinbergen Building Redevelopment

Emerging Ideas 7

Elsfield

Crescent Road

Boar’s Hill

Port Meadow

Jack Straws Lane

Oxford Brookes

South Park

Rose Hill

Raleigh Park

A34 Hinksey Hill

Elsfield

Extending public space into the site allows the building to be entered at its centre, with sunlight reaching the approach.

Setting back from South Parks Road allows daylight to the centre of the compact building form. New views are created from the Science Area to College grounds.

The design reduces the bulk of the building that faces towards the University Parks and allows daylight into the lower floor. The roof scape design responds to the spires of Oxford.

Site plan showing access, views and potential use of a public plaza.

Openings and stairs to the lower ground floor provide access to the outside, views and light. Terraces within the atrium maximise its use for study, work and social engagement, and support way-finding.

Life and Mind Building

We have assessed all Oxford View Cones views with the existing building (outline black lines shown above) and the proposed building (highlighted in blue). This illustration shows the view from Elsfield.

St Cross Rd

Sou

th P

arks

Rd

Oxford View ConesOxford has a Views Policy that was first introduced in 1962. This is important because it is there to protect the character of the city’s skyline not only within the city itself, but from surrounding viewpoints, villages and towns.

Across the region these points are known as the Oxford View Cones. When a new building is designed, city planners review the impact it may have on the view cones, assessing the benefits that the building may bring to the city, the local community, as well as Oxford’s skyline. By using computer generated models, we can look at how the existing building sits within the city skyline from a variety of viewing points. Oxford View Cones

Elsfield

Crescent Road

Boar’s Hill

Port Meadow

Jack Straws Lane

Oxford Brookes

South Park

Rose Hill

Raleigh Park

A34 Hinksey Hill

Port Meadow

Raleigh Park

A34 Hinksey Hill

Rose Hill

Crescent Road

South Park

Oxford Brookes

Jack Straw Lane

Elsfield

Elsfield

Crescent Road

Boar’s Hill

Port Meadow

Jack Straws Lane

Oxford Brookes

South Park

Rose Hill

Raleigh Park

A34 Hinksey Hill

Elsfield

Crescent Road

Boar’s Hill

Port Meadow

Jack Straws Lane

Oxford Brookes

South Park

Rose Hill

Raleigh Park

A34 Hinksey Hill

Elsfield

Crescent Road

Boar’s Hill

Port Meadow

Jack Straws Lane

Oxford Brookes

South Park

Rose Hill

Raleigh Park

A34 Hinksey Hill

Elsfield

Crescent Road

Boar’s Hill

Port Meadow

Jack Straws Lane

Oxford Brookes

South Park

Rose Hill

Raleigh Park

A34 Hinksey HillCarfax TowerTinbergen site

Page 8: Welcome 1 [] Public... · Welcome 1 Tinbergen Building Redevelopment Welcome Thank you for attending today’s exhibition. This is the first in a series of two events on the plans

Next Steps

Tinbergen Building Redevelopment

April

The timeline below sets out the next steps for the project.

A further public consultation event will take place in October 2019 and will concentrate on the proposed designs and technical considerations of the new building.

May

June

September

October

November

JanuaryWorkshop with Oxford Design Review Panel (ODRP)Review of ODRP feedback

First Public Consultation 17/18 May

Review Public Consultation feedback

Decision on enabling works planning application expected

Second Public Consultation

Complete phase 1 internal asbestos removal works

Proposed start of demolition works

Second workshop with ODRP

Review ODRP feedback

Review Public Consultation feedback

Enabling works begin on site

Submit full planning application for enabling works application (including demolition)

Submit full planning application for new building

20202019

8

June

December

February

May

Decision on new building planning application expected

Proposed completion of demolition works

Proposed commencement of above ground construction works on new building

Expected completion of new building

2021

2024

Complete

Complete