Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If you have questions or comments, please ask one of our representatives or fill out a comment form and we’ll be in touch. ank you for attending! Welcome to our Open House!

Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Please sign in at the front desk and provide your contact

information if you would like to receive project updates.

We invite you to walk around and look at the displays.

If you have questions or comments, please ask one of our

representatives or fill out a comment form and we’ll be in touch.

Thank you for attending!

Welcome to our Open House!

Page 2: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Background

• BluEarth acquired the Hand Hills Wind Project from Joss Wind Power Inc. in the fall of 2012.

•On August 31, 2012 after several years of study, including wind resource analysis,

environmental and heritage studies and assessments, public and agency consultation

and turbine siting, the Hand Hills Wind Project received Alberta Utilities Commission

approval to construct and operate.

• Since receiving the approval, BluEarth has been consulting with stakeholders, meeting

with the involved municipalities and completing technical and environmental studies.

• Technical studies and major advancements in wind turbine technology have led us to

select a new turbine for the project.

• BluEarth will be filing an amendment to our approved Alberta Utilities Commission

application in June 2017 to reflect the changes to the turbines.

Development work on the Hand Hills Wind Project has been underway since 2007.

Hand Hills Wind Project

Page 3: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Delia

Township Road 304

Highway 9

Hanna

Starland County

Special AreasNo. 2

Township Road 300

High

way

851

Rang

e Ro

ad 16

4

Proposed TurbineProposed Project LandsRoadHighwayRailroadProperty LineMunicipal Boundary

LEGEND

Project Description • Facility size: up to 78.2 MW capacity of

renewable power

•Number of turbines: up to 34 turbines

• 34.5-kilovolt electrical collector system and

fibre-optic cable

•New ATCO transmission line will connect

the new Highland 572S substation to the

Alberta electricity grid at Coyote Lake 963S

substation, 13 km south of the project

• Access roads, temporary construction roads,

and an operations and maintenance building

Preliminary layout

Located approximately 28 km northeast of Drumheller, Alberta and 3 km south of Delia, Alberta

Hand Hills Wind Project

Page 4: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Hand Hills Wind Project

Environmental Considerations

Studies planned or underway during 2017 will assess:

• Spring and Fall Bird Migration

• Spring and Fall Bat Migration

• Breeding Birds

•Nesting Raptors

• Sensitive Species (e.g., Sharp-tailed Grouse,

Burrowing Owl and Amphibians)

•Wetlands

• Listed Plants

• Habitat Mapping

Results of the 2017 environmental surveys will be

provided to Alberta Environment and Parks for their

review and comment.

The AUC Power Plant application will also consist of:

• An Environmental Evaluation to outline the site

conditions and potential Project impacts on the

environment

• Environmental Protection Plan to provide

mitigations to reduce potential environmental

impacts

•Noise Impact Assessment to assess predicted

noise levels at residences to ensure that the

Project does not cause noise level limits to be

exceeded

As a condition of the Alberta Utilities Commission (AUC) permit, and to update our knowledge of the environmental conditions at the site, BluEarth has consulted with Alberta Environment and Parks and is conducting various environmental studies in 2017.

Page 5: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Hand Hills Wind Project

SoundWind energy projects must meet the detailed Alberta Utilities Commission (AUC) regulatory requirements for noise control

Detailed noise modelling

is undertaken to ensure

the AUC sound level

requirements of 40 dBA

(night time) are met at

all residences. The noise

modelling considers:

• Topography (hills and

slopes);

• Ground cover (trees, water,

grass); and

• Existing noise sources

(oil & gas infrastructure,

highways).

Studies of the noise

conditions within the Hand

Hills Wind Project area are an

important factor in selecting

the final turbines for the

Project.

* Permissible Sound Level (PSL) includes sound contribution from ambient (i.e., background) noise, other regulated facilities (e.g., oil

and gas infrastructure, power/utilities infrastructure), and any newly proposed regulated facilities (i.e., the Project). Nighttime PSL at

receptors in rural environments is 40 dBA (AUC – Rule 012 Noise Control)

Page 6: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Project Benefits

• Employment – temporary jobs during construction (approximately 100,000 person

hours) and permanent jobs associated with the operations and maintenance of the

Project (4 to 5 full-time positions).

•New Investment – in the form of local services and supplies such as infrastructure

improvements, fuel, accommodation, meals and supplies for employees, construction

personnel, and contractors who will spend time in the local communities.

• Landowners and Community – wind turbines are compatible with other land uses,

such as farming, and can serve as a financial boost for rural economic development.

•Municipal Tax Revenues – municipal taxes paid by wind companies to rural

communities can be important, and the project does not increase demand on municipal

services or public works such as sewer and water upgrades.

• Clean Energy – wind energy provides societal benefits by offsetting harmful emissions

such as carbon dioxide, oxides of nitrogen, and sulphur dioxides that are created

through conventional, thermal power generation.

What are the benefits of wind development?

Hand Hills Wind Project

Page 7: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Hand Hills Wind Project

Project Schedule

Application for Amendment Approval to Alberta

Utilities Commission (AUC)June 2017

AUC & Municipal Development Permit Approvals September 2017

Alberta Electric System Operator Renewable

Energy Program Contract AwardedDecember 2017

Project Financing & Procurement Commencement January 2018

Earliest Start of Project Construction June 2018

Expected Commercial Operation December 2019

Hand Hills Wind Project

Page 8: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Headquartered in Calgary, BluEarth Renewables is a private independent renewable

power producer, focused on the acquisition, development, construction and

operation of wind, water, and solar projects. BluEarth’s mission is to be the Canadian

renewable energy leader by developing, building, and operating a portfolio that

optimizes people, planet, and profit. BluEarth believes it has the power to change the futureTM by demonstrating how to be sustainable and profitable, leaving the world a

better place. For more information, visit bluearth.ca.

BluEarth Renewables

234

6

Bull Creek Wind FacilityNE of Provost, AlbertaConstructed in 2015

Bow Lake Wind FacilityNW of Sault Ste Marie, OntarioOperational in 2015

Solar

Hydro

Development

Pending Acquisition

Wind

BluEarth has 18 operating power generation facilities

Page 9: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Alberta Climate Leadership PlanElectricity generation is the second

largest source of emissions in

Alberta, responsible for 17%, or

45 megatonnes of greenhouse

gas emissions in 2014. Coal fired

generation represents 85% of

total emissions from the electricity

sector.

The Alberta government is

currently looking for opportunities

to reduce emissions. They

have committed to increasing

renewable energy generation to

30% by 2030 through investments

in wind, solar and hydroelectric

technologies.

BluEarth intends to bid the project

into the Renewable Energy

Program (REP) process, which

would award long-term generation

contracts for wind energy projects.

The REP is a competitive process

based on power price, so it will

encourage competition among

developers that will ultimately

result in lower power prices from

renewable energy projects.

Hand Hills Wind Project

Page 10: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

!b

Township Road 304

Township Road 300

Highway 9

Hig

hway

851

Map17-0242 - Hand Hills - Vantage Point 1 V2

0 2 4 6Kilometres

±

±

Original Photograph

Photomontage

Delia

Hand HillsWind Project

Note: This photomontage is a general visualsimulation of the proposed wind turbines. Thefinal layout and design is subject to change.Date: May 31, 2017Photo Taken: May 25, 2017Projection: NAD 1983 UTM Zone 12NSources: AltaLIS, Natural Resources Canada.

Photograph and Site Location

Index Map

0 500 1,000 1,500Metres

PHOTOMONTAGE OFPROPOSED

WIND TURBINES FROMVANTAGE POINT 1

SOUTHEAST OF SITE

Distance to NearestInfrastructure: 3.8km

Township Road 300

Ran

ge R

oad

164

Close-up of Turbine Location

Legend

Wooded Area

Waterbody

Road

Project Location

Photograph Viewshed

Proposed Wind Turbine

b Camera Location

Page 11: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

!b

Hig

hway

851

Highway 9

Township Road 300

Township Road 304

Map17-0242 - Hand Hills - Vantage Point 2 V2

0 2 4 6Kilometres

±

±

Original Photograph

Photomontage

Delia

Hand HillsWind Project

Note: This photomontage is a general visualsimulation of the proposed wind turbines. Thefinal layout and design is subject to change.Date: May 31, 2017Photo Taken: May 25, 2017Projection: NAD 1983 UTM Zone 12NSources: AltaLIS, Natural Resources Canada.

Photograph and Site Location

Index Map

0 500 1,000 1,500Metres

PHOTOMONTAGE OFPROPOSED

WIND TURBINES FROMVANTAGE POINT 2

NORTHEAST OF SITE

Distance to NearestInfrastructure: 3.7km

Craigmyle

Close-up of Turbine Location

Highway 9

Ran

ge R

oad

164

Legend

Wooded Area

Waterbody

Road

Project Location

Photograph Viewshed

Proposed Wind Turbine

b Camera Location

Page 12: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

!b

Township Road 300

Township Road 304

Highway 9

Hig

hway

851

Map17-0242 - Hand Hills - Vantage Point 3 V2

0 2 4 6Kilometres

±

±

Original Photograph

Photomontage

Delia

Hand HillsWind Project

Note: This photomontage is a general visualsimulation of the proposed wind turbines. Thefinal layout and design is subject to change.Date: May 31, 2017Photo Taken: May 25, 2017Projection: NAD 1983 UTM Zone 12NSources: AltaLIS, Natural Resources Canada.

Photograph and Site Location

Index Map

0 500 1,000 1,500Metres

PHOTOMONTAGE OFPROPOSED

WIND TURBINES FROMVANTAGE POINT 3

NORTHWEST OF SITE

Distance to NearestInfrastructure: 3.9km

Craigmyle

Close-up of Turbine Location

Hig

hway

851

Township Road 310Mai

n St

S

Legend

Wooded Area

Waterbody

Road

Project Location

Photograph Viewshed

Proposed Wind Turbine

b Camera Location

Page 13: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

!b

Township Road 300

Township Road 304

Highway 9

Hig

hway

851

Map17-0242 - Hand Hills - Vantage Point 4 V2

0 2 4 6Kilometres

±

±

Original Photograph

Photomontage

Delia

Hand HillsWind Project

Note: This photomontage is a general visualsimulation of the proposed wind turbines. Thefinal layout and design is subject to change.Date: May 31, 2017Photo Taken: May 25, 2017Projection: NAD 1983 UTM Zone 12NSources: AltaLIS, Natural Resources Canada.

Photograph and Site Location

Index Map

0 500 1,000 1,500Metres

PHOTOMONTAGE OFPROPOSED

WIND TURBINES FROMVANTAGE POINT 4

WEST OF SITE

Distance to NearestInfrastructure: 2.2km

Craigmyle

Ran

ge R

oad

172

Township Road 304

Legend

Wooded Area

Waterbody

Road

Project Location

Photograph Viewshed

Proposed Wind Turbine

b Camera Location

Page 14: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

!b

Township Road 304

Township Road 300

Highway 9

Hig

hway

851

Map17-0242 - Hand Hills - Vantage Point 5 V2

0 2 4 6Kilometres

±

±

Original Photograph

Photomontage

Delia

Hand HillsWind Project

Note: This photomontage is a general visualsimulation of the proposed wind turbines. Thefinal layout and design is subject to change.Date: May 31, 2017Photo Taken: May 25, 2017Projection: NAD 1983 UTM Zone 12NSources: AltaLIS, Natural Resources Canada.

Photograph and Site Location

Index Map

0 500 1,000 1,500Metres

PHOTOMONTAGE OFPROPOSED

WIND TURBINES FROMVANTAGE POINT 5

WEST OF SITE

Distance to NearestInfrastructure: 367 m

Craigmyle

Ran

ge R

oad

173

Township Road 304

Legend

Wooded Area

Waterbody

Road

Project Location

Photograph Viewshed

Proposed Wind Turbine

b Camera Location

Page 15: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

!b

Township Road 304

Township Road 300

Highway 9

Hig

hway

851

Map17-0242 - Hand Hills - Vantage Point 6 V2

0 2 4 6Kilometres

±

±

Original Photograph

Photomontage

Delia

Hand HillsWind Project

Note: This photomontage is a general visualsimulation of the proposed wind turbines. Thefinal layout and design is subject to change.Date: May 31, 2017Photo Taken: May 25, 2017Projection: NAD 1983 UTM Zone 12NSources: AltaLIS, Natural Resources Canada.

Photograph and Site Location

Index Map

0 500 1,000 1,500Metres

PHOTOMONTAGE OFPROPOSED

WIND TURBINES FROMVANTAGE POINT 6

EAST OF SITE

Distance to nearestinfrastructure in FOV: 2.7km

Craigmyle

Close-up of Turbine Location

Township Road 304

Ran

ge R

oad

162

Legend

Wooded Area

Waterbody

Road

Project Location

Photograph Viewshed

Proposed Wind Turbine

b Camera Location

Page 16: Welcome to our Open House! - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Hand... · 2018. 12. 5. · information if you would like to receive project updates

Hand Hills Wind Project

Thank you for attending!Please take the time to fill out a comment form and tell us what you think about

the project changes.

If you have any additional questions that were not answered, or if you have

further comments or feedback, please include it on the comment form and

provide us with your name and contact information.

Questions and comments can also be sent to the contact information provided

on the comment form.

Comments must be received by June 16, 2017 for consideration in our decision-

making process and for inclusion in any amendments filed with the Alberta

Utilities Commission.

For more information on BluEarth and the Hand Hills Wind Project, visit:

www.bluearth.ca/handhills

[email protected]

1-844-214-2578