ptg3gry/hess cpp/weldmap nde plan/CPP vessel/excels/document.xls
Welding Map & NDE PlanDoc. No.
Revision : 05 Doc. Status : AFC
Discipline : Rev. Date : 18-Mar-10 25
WELDING MAP & NDE PLAN
05 18-Mar-10 Rev'd & Issued For Construction SBK FU ANO
REV. DATE DESCRIPTION BY CHK APPAPP DATE DISC PROJ DATE
Page : 1 of
APPLICABLE FOR DRAWINGS :-
ptg3gry/hess cpp/weldmap nde plan/CPP vessel/excels/document.xls
REV. DATE DESCRIPTION BY CHK APPGF APP. HI APP.
Welding Map & NDE Plan Doc. No.
00
0Revision : 05 Doc. Status :
Rev. Date : 18-Mar-10
WP Job No. : 402000-01302 HI Contract No. : 4600006940
II. TABULATION OF REVISED PAGES
SHEETREVISIONS
SHEETREVISIONS
C1 D1 01 02 03 04 05 C1 D1 01 02 03 04 05
1 X X X X X X X 50
2 X X X X X X X 51
3 X X X X X X X 52
4 X X X X X 53
5 X X X X X 54
6 X X X X X 55
7 X X X X X 56
8 X X X X X 57
9 X X X X X 58
10 X X X X X 59
11 X X X X X 60
12 X X X X X 61
13 X X X X X 62
14 X X X X X 63
15 X X X X X 64
16 X X X X X 65
17 X X X X X 66
18 X X X X X 67
19 X X X X X 68
20 X X X X X X 69
21 X X X X X X 70
22 X X X X X X 71
23 X X X X X 72
24 X X 73
25 X X X 74
26 75
27 76
28 77
29 78
30 79
31 80
32 81
33 82
34 83
35 84
36 85
37 86
38 87
39 88
40 89
41 90
42 91
43 92
44 93
45 94
46 95
47 96
Document type : PR Discipline : MS Page : 2 of
GF Job No. : 07012
48 97
49 98
Doc. No.
0
AFC
25
HI Contract No. : 4600006940
II. TABULATION OF REVISED PAGES
Welding Map & NDE Plan Doc. No.
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 25
III. TABLE OF CONTENTS
SHEET
I. COVER OF WELDING MAP & NDE PLAN 1
II. TABULATION OF REVISED PAGES 2
III. TABLE OF CONTENT 3
IV. JOINT NUMBER IDENTIFICATION METHOD 4
V. MATERIAL INDICATION 5
VI. JOINT PLAN 6 ~ 14
VII. EXTENT OF NDE 15 ~ 24
VIII. ATTACHMENT 25
VIII.1. REF. DWG NO. : UPD-W4-8989-312-0001 SHT.1 OF 1 REV. 03: UPD-W4-8989-312-0002 SHT.1 OF 1 REV. 03: UPD-W4-8989-312-0003 SHT.1 OF 2 REV. 03: UPD-W4-8989-312-0003 SHT.2 OF 2 REV. 03: UPD-W4-8989-312-0004 SHT.1 OF 2 REV. 03: UPD-W4-8989-312-0004 SHT.2 OF 2 REV. 03: UPD-W4-8989-312-0005 SHT.1 OF 1 REV. 03: UPD-W4-8989-312-0006 SHT.1 OF 1 REV. 03: UPD-W4-8989-312-0007 SHT.1 OF 1 REV. 03
REF. DOCUMENTS :
- ASME VIII DIV. 1 ( 2007 EDITION & ADDENDUM )
- VESSEL DATA SHEET HP FLARE KO DRUM ( 543-V-01 )
DOC. NO. : UPD-WP-W4-MS-DS-2209 REV. 01``
- WELDING BOOK FOR PRESSURE VESSEL
DOC. NO. : UPD-GF-G8-QC-PR-8018 REV. 01
- WELDING BOOK FOR PROCESS PIPING
DOC. NO. : UPD-GF-G8-QC-PR-8017 REV. 01
SHOP DRAWING : SDV-07012-CPP-543-V-01-001~007
Document type : PR Discipline : MS Page : 3 of
VIII.2. COVER REV. 04 OF THIS DOCUMENT WITH STATUS "A"
05 05
Welding Map & NDE Plan Doc. No.
0 0
0Revision : 05 Doc. Status :
Rev. Date : 18-Mar-10
WP Job No. : 402000-01302 HI Contract No. : 4600006940
IV. JOINT NUMBER IDENTIFICATION METHOD
VESSEL MEMBER JOINT No.
PL3 SA 516 GR 70N LSW 1
NOTE :
X : ALL NDE PERFORMED 100 % LENGTH OF 100 % JOINT.
(2) : INCLUDING OF ROOT AREA AFTER GRIND FLUSH.
(3) : DPT ON BEVEL FACE FINISHED AND HOLE OPENING ON SHEEL AT EACH NOZZLE LOCATION.
(4) : " UT " LAMINATION INSPECTION TO BE PERFORMED ON VESSEL, LIFTING LUG AND DOUBLER PLATE.
LEGENDS :
NDE PROJECT AREA
LSW = LONG SEAM WELD N14 = INLET FROM HP FUEL GAS SCRUBBER
CSW = CIRCUM SEAM WELD N15 = INLET FROM SEAL GAS PACKAGE
LL = LIFTING LUG M1 = MANWAY
NP = NAME PLATE
EP = EARTHING PLATE
LD = LADDER RUNG
HG = HAND GRIP
LEG = LEG SUPPORT
DV = DAVIT
N1 = INLET FROM HP FLARE HEADER
N2A/B = RADAR LEVEL TRANSMITER
N3 = UTILITY CONNECTION
N4 = SPARE DRAIN
N5A/B = RADARLEVEL TRANSMITER
N6A/B = RADARLEVEL TRANSMITER
N7 = LIQUID OUTLET
N8A/B = LEVEL BRIDEL
N9 = GAS OUTLET
N10 = PRESSURE GAUGE
N11 = INLET FROM FLARE LIQUID HEADER
N12 = HP FLARE PUMP RECYCLE
N13 = SPARE
NDE METHOD
PA / RT = PHASED ARRAY UT OR RADIOGRAPHIC TESTING
PA / UT = ULTRASONIC TESTING
MPI / DPI = MAGNETIC PARTICLE INSPECTION / DYE PENETRANT INSPECTION
R1, R2, R3 = REPORT FOR 1st REPAIR , 2nd REPAIR AND 3rd REPAIR
TYPE OF JOINT
B/W = BUTT WELD
F/W = FILLET WELD
T/J = T - JOINT FULL PENETRATION
Document type : PR Discipline : MS Page : 4 of
GF Job No. : 07012
MATERIAL TYPE
NDE PROJECT AREA (SEE THE LEGENDS)
JOINT NUMBER
TAG NO.
TOBE READ COMPLETELY : 07012-CPP-543.V.01-. . .
Doc. No.
0
AFC
25
HI Contract No. : 4600006940
IV. JOINT NUMBER IDENTIFICATION METHOD
Welding Map & NDE Plan Doc. No.
0 0
0 Revision : 05
Rev. Date : 18-Mar-10
WP Job No. : 402000-01302 HI Contract No. : 4600006940
V. MATERIAL INDICATION
ITEMDescription Technical Query No.
Material Spec THKManufacturer
NO. +Grade ( mm )ENG'G DWG : UPD-W4-8989-312-0003 SHT.1 OF 2
1 SEMI ELLIPSOIDAL HEAD 2 : 1 1800 ID x 12 mm THK MIN. SA 516 Gr. 70N 12
2 12 THK SHELL PLATE SA 516 Gr. 70N 12
3 12 THK SHELL PLATE SA 516 Gr. 70N 12
4 FLANGE 4"-150# RF WN SCH 120 (N2A/B,N3,N4,N5A/B,N6A/B,N7 SA 350 LF2 CL.1
N8A/B,N10,N11,N12,N13)
4A 12 THK PLATE FLANGE (N11,N12) SA 516 Gr. 70N 12
4B 12 THK PLATE FLANGE (N11,N12) SA 240 316 L 12
4C FLANGE 4"-600# RF WN SCH 60 (N11) SA 350 LF2 CL.1
4D FLANGE 4"-300# RF WN SCH 60 (N14) SA 350 LF2 CL.1
4F FLANGE 4"-900# RTJ WN SCH 60 (N15) SA 350 LF2 CL.1
5 FLANGE 12"-150# RF WN SCH 60 (N1,N9) SA 350 LF2 CL.1
7 PIPE 4" SCH 120 (N4) SA 333 GR.6 11
7A PIPE 4" SCH 120 (N7) SA 333 GR.6 11
7B PIPE 4" SCH 120 (N12) SA 333 GR.6 11
7C PIPE 4" SCH 120 (N11) SA 333 GR.6 11
7D PIPE 4" SCH 80S (N11,N12) SA 333 GR.6 11
8 PIPE 4" SCH 120 (N2A,N5A,N6) SA 333 GR.6 11
8A PIPE 4" SCH 120 (N8A) SA 333 GR.6 11
9 PIPE 4" SCH 120 (N3) SA 333 GR.6 11
9A PIPE 4" SCH 120 (N14) SA 333 GR.6 11
9B PIPE 4" SCH 120 (N14) SA 333 GR.6 11
10 PIPE 12" SCH 60 (N1,N9) SA 333 GR.6 14
10A PIPE 4" SCH 120 (N10,N13) SA 333 GR.6 11
11 20 THK PLATE SA 516 Gr. 70N 2012 10 THK PLATE SA 516 Gr. 70N 1013 10 THK PLATE SA 516 Gr. 70N 1013A 10 THK PLATE SA 516 Gr. 70N 1014 10 THK PLATE SA 516 Gr. 70N 10
14A 10 THK PLATE SA 516 Gr. 70N 1015 10 THK PLATE SA 516 Gr. 70N 1015A 10 THK PLATE SA 516 Gr. 70N 10
17 20 THK PLATE SA 516 Gr. 70N 2018 16 THK PLATE SA 516 Gr. 70N 16
19 16 THK PLATE SA 516 Gr. 70N 16
ENG'G DWG : UPD-W4-8989-312-0003 SHT.2 OF 2
20 EARTHING BOSS 30 MM x Ø40 SS 316 L 15
21 12 THK PLATE SA 516 Gr. 70N 1222 20 THK PLATE SA 516 Gr. 70N 2023 20 ROUND BAR∅ SA 36 2024 20 ROUND BAR∅ SA 36 2025 10 THK PLATE x 60 DIA SA 516 Gr. 70N 1026 12 THK REPAD PLATE (N2A/B,N3,N4,N5A/B,N6A/B,N7 SA 516 Gr. 70N 12
N8A/B,N10,N11,N12,N13,N14,N15)27 12 THK REPAD PLATE (N1,N9) SA 516 Gr. 70N 1228 10 THK PLATE (VORTEX BREAKER) SS 316 L 1029 10 THK PLATE (VORTEX BREAKER) SS 316 L 1030 PIPE 4" SCH 120 (N2B,N5B,N6B,N8B) SA 333 GR.6 1131 PIPE 4" SCH 120 (N2B,N5B,N6B,N8B) SA 333 GR.6 1132 ELBOW 4" SCH 120 LR (N2B,N5B,N6B,N8B) SA 333 GR.6 1133 SUPPORT CLEATS 12 mm THK SA 516 Gr. 70N 1233A PIPE 4" SCH 160 SA 106 Gr. B 1334 10 THK SUPPORT (N2B,N5B,N6B,N8B) SA 516 Gr. 70N 1035 10 THK PLATE (N2B,N5B,N6B,N8B) SA 516 Gr. 70N 10
ENG'G DWG : UPD-W4-8989-312-0005 SHT.1 OF 1
1 24" - 150# BLIND FLANGE RF SA 350 LF2 CL1
2 2" PIPE SCH 80 ∅ SA 106 Gr. B 6
3 2 1/2" PIPE SCH 40 ∅ SA 106 Gr. B 5
4 20 ROUND BAR∅ SA 36 20
5 20 ROUND BAR∅ SA 36 20
9 PLATE 63 x 12 mm THK∅ SA 516 Gr. 70N 12
10 PLATE 45 x 15 x 12 mm THK SA 516 Gr. 70N 12
11 PLATE 80 x 110 x 20 mm THK SA 516 Gr. 70N 20
ENG'G DWG : UPD-W4-8989-312-0006 SHT.1 OF 1
2 10 THK PLATE SA 516 Gr. 70N 10
3 10 THK PLATE SA 516 Gr. 70N 10
WPS USED UNDER THIS DOCUMENTMAIN WPS NO REPAIR WPS NO
134V/WP/ASME/09 137V/WP/ASME/09 64V-G/WP/ASME/09 64V-G/WP/ASME/09
175P/WP/ASME/09 175P/WP/ASME/0933/WP/ASME/09 33/WP/ASME/09
Doc. Status : AFC
Document type : PR Discipline : MS Page : 5 of
GF Job No. : 07012
Doc. No.
0
25
HI Contract No. : 4600006940
V. MATERIAL INDICATION
Doc. Status : AFC
15 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
LSW-1 B/W to P.1/Gr.2 to P.1/Gr.2 12 134V/WP/ASME/09 137V/WP/ASME/09 (3) X X X NO 2,062
LSW-2 B/W to P.1/Gr.2 to P.1/Gr.2 12 134V/WP/ASME/09 137V/WP/ASME/09 (3) X X X NO 2,338
CSW-1 B/W to P.1/Gr.2 to P.1/Gr.2 12 134V/WP/ASME/09 137V/WP/ASME/09 (3) X X X NO 5,727
CSW-2 B/W to P.1/Gr.2 to P.1/Gr.2 12 134V/WP/ASME/09 137V/WP/ASME/09 (3) X X X NO 5,727
CSW-3 B/W to P.1/Gr.2 to P.1/Gr.2 12 134V/WP/ASME/09 137V/WP/ASME/09 (3) X X X NO 5,727
LL1-1 T/J to P.1/Gr.2 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 200
LL1-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (4) X X NO 1,300
LL2-1 T/J to P.1/Gr.2 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 200
LL2-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (4) X X NO 1,300
LL3-1 T/J to P.1/Gr.2 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 200
LL3-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (4) X X NO 1,300
LL4-1 T/J to P.1/Gr.2 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 200
LL4-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (4) X X NO 1,300
NP-1 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
NP-2 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
PL3 SA 516 Gr. 70N
PL3 SA 516 Gr. 70N
PL2 SA 516 Gr.
70N
PL2 SA 516 Gr. 70N
PL3 SA 516 Gr. 70N
HEAD SA 516 Gr.
70N
PL3 SA 516 Gr.
70N
PL2 SA 516 Gr. 70N
PL2 SA 516 Gr.
70N
HEAD SA 516 Gr.
70N
PL22 SA 516 Gr. 70N
PL21 SA 516 Gr.
70N
PL21 SA 516 Gr. 70N
PL3 SA 516 Gr. 70N
PL22 SA 516 Gr. 70N
PL21 SA 516 Gr.
70N
PL21 SA 516 Gr.
70N
PL3 SA 516 Gr.
70N
PL22 SA 516 Gr. 70N
PL21 SA 516 Gr.
70N
PL21 SA 516 Gr. 70N
PL2 SA 516 Gr.
70N
PL22 SA 516 Gr. 70N
PL21 SA 516 Gr.
70N
PL21 SA 516 Gr.
70N
PL2 SA 516 Gr.
70N
PL3A SA 516 Gr.
70N
PL2 SA 516 Gr.
70N
PL3A SA 516 Gr. 70N
PL2 SA 516 Gr.
70N
16 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
NP-3 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 245
EB-1 F/W to P.8/Gr.1 to P.1/Gr.2 15 175P/WP/ASME/09 175P/WP/ASME/09 X X NO 126
EB-2 F/W to P.8/Gr.1 to P.1/Gr.2 15 175P/WP/ASME/09 175P/WP/ASME/09 X X NO 126
LD-1 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 63
LD-2 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 188
LD-3 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 63
LD-4 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 188
HG-1 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 188
HG-2 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 63
HG-3 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 188
HG-4 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 63
VB-1 F/W to P.8/Gr.1 to P.8/Gr.1 10 33/WP/ASME/09 33/WP/ASME/09 X X NO 150
VB-2 F/W to P.8/Gr.1 to P.8/Gr.1 10 33/WP/ASME/09 33/WP/ASME/09 X X NO 150
VB-3 F/W to P.8/Gr.1 to P.1/Gr.1 10 175P/WP/ASME/09 175P/WP/ASME/09 X X NO 42
VB-4 F/W to P.8/Gr.1 to P.1/Gr.1 10 175P/WP/ASME/09 175P/WP/ASME/09 X X NO 42
VB-5 F/W to P.8/Gr.1 to P.1/Gr.1 10 175P/WP/ASME/09 175P/WP/ASME/09 X X NO 42
VB-6 F/W to P.8/Gr.1 to P.1/Gr.1 10 175P/WP/ASME/09 175P/WP/ASME/09 X X NO 42
PL3A SA 516 Gr. 70N
PL2A SA 516 Gr.
70N
P20 SS 316 L
PL13A SA 516 Gr.
70N
P20 SS 316 L
PL13 SA 516 Gr. 70N
RB23 SA 36
PL25 SA 516 Gr. 70N
PL25 SA 516 Gr. 70N
HEAD SA 516 Gr.
70N
RB23 SA 36
PL25 SA 516 Gr. 70N
PL25 SA 516 Gr. 70N
HEAD SA 516 Gr.
70N
PL25 SA 516 Gr.
70N
HEAD SA 516 Gr.
70N
RB24 SA 36
PL25 SA 516 Gr.
70N
PL25 SA 516 Gr.
70N
HEAD SA 516 Gr.
70N
RB24 SA 36
PL25 SA 516 Gr.
70N
PL29 SS 316 L
PL28 SS 316 L
PL29 SS 316 L
PL28 SS 316 L
PL28 SS 316 L
P7A SA 333 Gr.6
PL29 SS 316 L
P7A SA 333 Gr.6
PL28 SS 316 L
P7A SA 333 Gr.6
PL29 SS 316 L
P7A SA 333 Gr.6
DPT
DPI
17 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
LEG1-1 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 2,252
LEG1-2 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 1,931
LEG1-3 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-4 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-5 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-6 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-7 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 765
LEG1-8 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 625
LEG1-9 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 765
LEG1-10 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 625
LEG1-11 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-12 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-13 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-14 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-15 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 765
LEG1-16 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 625
LEG1-17 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 765
LEG1-18 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 625
LEG1-19 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 1,597
LEG1-20 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-21 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
PL12 SA 516 Gr. 70N
PL3 SA 516 Gr.
70N
PL13A SA 516 Gr.
70N
PL12 SA 516 Gr.
70N
PL14A SA 516 Gr.
70N
PL12 SA 516 Gr.
70N
PL15A SA 516 Gr. 70N
PL12 SA 516 Gr.
70N
PL15A SA 516 Gr. 70N
PL12 SA 516 Gr.
70N
PL14A SA 516 Gr.
70N
PL12 SA 516 Gr.
70N
PL14A SA 516 Gr.
70N
PL13A SA 516 Gr.
70N
PL15A SA 516 Gr. 70N
PL13A SA 516 Gr.
70N
PL15A SA 516 Gr. 70N
PL13A SA 516 Gr.
70N
PL14A SA 516 Gr.
70N
PL13A SA 516 Gr.
70N
PL14A SA 516 Gr.
70N
PL12 SA 516 Gr. 70N
PL15A SA 516 Gr.
70N
PL12 SA 516 Gr. 70N
PL15A SA 516 Gr.
70N
PL12 SA 516 Gr. 70N
PL14A SA 516 Gr.
70N
PL12 SA 516 Gr. 70N
PL14A SA 516 Gr.
70N
PL13A SA 516 Gr.
70N
PL15A SA 516 Gr.
70N
PL13A SA 516 Gr.
70N
PL15A SA 516 Gr.
70N
PL13A SA 516 Gr.
70N
PL14A SA 516 Gr.
70N
PL13A SA 516 Gr.
70N
PL13A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
PL14A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
PL15A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
18 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
LEG1-22 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-23 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-24 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-25 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-26 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-27 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG1-28 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 370
LEG1-29 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 100
LEG1-30 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 100
LEG1-31 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 100
LEG1-32 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
LEG1-33 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
LEG1-34 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
LEG1-35 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 370
LEG1-36 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 100
LEG1-37 F/W to P.1/Gr.2 to P.1/Gr.2 16 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 100
LEG1-38 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 100
LEG1-39 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
LEG1-40 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
LEG1-41 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
LEG2-1 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 2,252
PL15A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
PL14A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
PL14A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
PL15A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
PL15A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
PL14A SA 516 Gr.
70N
PL11 SA 516 Gr. 70N
PL18 SA 516 Gr. 70N
PL17 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL18 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL18 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL18 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL17 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL17 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL17 SA 516 Gr.
70N
PL18 SA 516 Gr. 70N
PL17 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL18 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL18 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL18 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL17 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL17 SA 516 Gr.
70N
PL19 SA 516 Gr. 70N
PL17 SA 516 Gr.
70N
PL12 SA 516 Gr. 70N
PL2 SA 516 Gr. 70N
19 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
LEG2-2 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 1,931
LEG2-3 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-4 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-5 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-6 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-7 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 765
LEG2-8 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 625
LEG2-9 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 765
LEG2-10 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 625
LEG2-11 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-12 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-13 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-14 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-15 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 765
LEG2-16 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 625
LEG2-17 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 765
LEG2-18 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 625
LEG2-19 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 1,597
LEG2-20 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-21 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
PL13 SA 516 Gr. 70N
PL12 SA 516 Gr.
70N
PL14 SA 516 Gr. 70N
PL12 SA 516 Gr.
70N
PL15 SA 516 Gr.
70N
PL12 SA 516 Gr.
70N
PL15 SA 516 Gr.
70N
PL12 SA 516 Gr.
70N
PL14 SA 516 Gr. 70N
PL12 SA 516 Gr.
70N
PL14 SA 516 Gr. 70N
PL13 SA 516 Gr. 70N
PL15 SA 516 Gr.
70N
PL13 SA 516 Gr. 70N
PL15 SA 516 Gr.
70N
PL13 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL13 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL12 SA 516 Gr. 70N
PL15 SA 516 Gr. 70N
PL12 SA 516 Gr. 70N
PL15 SA 516 Gr. 70N
PL12 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL12 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL13 SA 516 Gr. 70N
PL15 SA 516 Gr. 70N
PL13 SA 516 Gr. 70N
PL15 SA 516 Gr.
70N
PL13 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL13 SA 516 Gr. 70N
PL13 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
PL15 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
20 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
LEG2-22 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-23 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-24 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-25 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-26 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
LEG2-27 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 93
DV-1 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 200
DV-2 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 200
DV-3 F/W to P.1/Gr.2 to P.1/Gr.1 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 56
DV-4 F/W to P.1/Gr.2 to P.1/Gr.1 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 56
DV-5 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 49
DV-6 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 49
DV-7 F/W to P.1/Gr.2 to P.1/Gr.1 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 30
DV-8 F/W to P.1/Gr.2 to P.1/Gr.1 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 30
DV-9 F/W to P.1/Gr.1 to P.1/Gr.2 5 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
DV-10 F/W to P.1/Gr.2 to P.1/Gr.1 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 198
DV-11 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 63
DV-12 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 63
DV-13 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 63
DV-14 F/W to P.1/Gr.1 to P.1/Gr.2 20 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 63
PL15 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
PL15 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
PL15 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
PL14 SA 516 Gr. 70N
PL11 SA 516 Gr. 70N
RB5 SA36
FLANGE SA 350
LF2 CL1
RB5 SA36
FLANGE SA 350
LF2 CL1
PL10 SA 516 Gr.70N
P2 SA 106 Gr.B
PL10 SA 516 Gr.70N
P2 SA 106 Gr.B
PL10 SA 516 Gr.70N
PL11 SA 516 Gr.70N
PL10 SA 516 Gr.70N
PL11 SA 516 Gr.70N
PL11 SA 516 Gr.70N
P2 SA 106 Gr.B
PL11 SA 516 Gr.70N
P2 SA 106 Gr.B
P3 SA 106 Gr.B
FLANGE SA 350
LF2 CL1
PL9 SA 516 Gr.70N
P3 SA 106 Gr.B
RB4 SA36
FLANGE SA 350
LF2 CL1
RB4 SA36
FLANGE SA 350
LF2 CL1
RB4 SA36
FLANGE SA 350
LF2 CL1
RB4 SA36
FLANGE SA 350
LF2 CL1
21 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
N1-1 B/W to P.1/Gr.1 to P.1/Gr.2 12 14 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 1,017
N1-2 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 1,017
N1-3 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 1,017
N1-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 1,646
N2A-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N2A-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N2A-3 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N2A-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N2B-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N2B-2 B/W to P.1/Gr.1 to P.8/Gr.1 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N2B-3 B/W to P.1/Gr.1 to P.8/Gr.1 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N2B-4 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N2B-5 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N2B-6 F/W to P.1/Gr.2 to P.1/Gr.1 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N2B-7 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 52
N2B-8 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
N2B-9 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 500
N3-1 F/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N3-2 F/W to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N3-3 F/W to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N3-4 F/W to P.1/Gr.2 to P.1/Gr.1 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
P10 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL3 SA 516 Gr.70N
P10 SA 333 Gr.6
PL27 SA 516 Gr.70N
P10 SA 333 Gr.6
PL27 SA 516 Gr.70N
PL3 SA 516 Gr. 70N
P8 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL3 SA 516 Gr.70N
P8 SA 333 Gr.6
PL26 SA 516 Gr.70N
P8 SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr.
70N
P30 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
P30 SA 333 Gr.6
ELBOW SA 333
Gr.6
P31 SA 333 Gr.6
ELBOW SA 333
Gr.6
PL3 SA 516 Gr.70N
P31 SA 333 Gr.6
PL26 SA 516 Gr.70N
P31 SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr.
70N
PL34 SA 516 Gr.70N
P30 SA 333 Gr.6
PL34 SA 516 Gr.70N
PL35 SA 516 Gr.70N
PL35 SA 516 Gr.70N
PL3 SA 516 Gr.70N
P9 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
HEAD SA 516 Gr.70N
P9 SA 333 Gr.6
PL26 SA 516 Gr.70N
P9 SA 333 Gr.6
PL26 SA 516 Gr.70N
HEAD SA 516 Gr.
70N
05
05
05
05
05
05
22 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
N4-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N4-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N4-3 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N4-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N5A-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N5A-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N5A-3 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N5A-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N5B-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N5B-2 B/W to P.1/Gr.1 to P.8/Gr.1 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N5B-3 B/W to P.1/Gr.1 to P.8/Gr.1 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N5B-4 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N5B-5 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N5B-6 F/W to P.1/Gr.2 to P.1/Gr.1 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N5B-7 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 52
N5B-8 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
N5B-9 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 500
N6A-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N6A-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N6A-3 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N6A-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N6B-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
P7 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL3 SA 516
Gr.70N
P7 SA 333 Gr.6
PL26 SA 516 Gr.70N
P7 SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr. 70N
P8 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL3 SA 516 Gr.70N
P8 SA 333 Gr.6
PL26 SA 516 Gr.70N
P8 SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr. 70N
P30 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
P30 SA 333 Gr.6
ELBOW SA 333
Gr.6
P31 SA 333 Gr.6
ELBOW SA 333
Gr.6
PL3 SA 516 Gr.70N
P31 SA 333 Gr.6
PL26 SA 516 Gr.70N
P31 SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr.
70N
PL34 SA 516 Gr.70N
P30 SA 333 Gr.6
PL34 SA 516 Gr.70N
PL35 SA 516 Gr.70N
PL35 SA 516 Gr.70N
PL3 SA 516 Gr.70N
P8 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL2 SA 516 Gr.70N
P8 SA 333 Gr.6
PL26 SA 516 Gr.70N
P8 SA 333 Gr.6
PL26 SA 516 Gr.70N
PL2 SA 516 Gr.
70N
P30 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
05
05
05
05
05
05
23 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
N6B-2 B/W to P.1/Gr.1 to P.8/Gr.1 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N6B-3 B/W to P.1/Gr.1 to P.8/Gr.1 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N6B-4 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N6B-5 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N6B-6 F/W to P.1/Gr.2 to P.1/Gr.1 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N6B-7 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 52
N6B-8 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
N6B-9 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 500
N7-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N7-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N7-3 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N7-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N8A-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N8A-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N8A-3 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N8A-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N8B-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N8B-2 B/W to P.1/Gr.1 to P.8/Gr.1 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N8B-3 B/W to P.1/Gr.1 to P.8/Gr.1 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N8B-4 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N8B-5 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N8B-6 F/W to P.1/Gr.2 to P.1/Gr.1 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N8B-7 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 52
P30 SA 333 Gr.6
ELBOW SA 333
Gr.6
P31 SA 333 Gr.6
ELBOW SA 333
Gr.6
PL2 SA 516 Gr.70N
P31 SA 333 Gr.6
PL26 SA 516 Gr.70N
P31 SA 333 Gr.6
PL26 SA 516 Gr.70N
PL2 SA 516 Gr.
70N
PL34 SA 516 Gr.70N
P30 SA 333 Gr.6
PL34 SA 516 Gr.70N
PL35 SA 516 Gr.70N
PL35 SA 516 Gr.70N
PL2 SA 516 Gr.
70N
P7A SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL2 SA 516 Gr.70N
P7A SA 333 Gr.6
PL26 SA 516 Gr.70N
P7A SA 333 Gr.6
PL26 SA 516 Gr.70N
PL2 SA 516 Gr. 70N
P8A SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL2 SA 516 Gr.70N
P8A SA 333 Gr.6
PL26 SA 516 Gr.70N
P8A SA 333 Gr.6
PL26 SA 516 Gr.70N
PL2 SA 516 Gr. 70N
P30 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
P30 SA 333 Gr.6
ELBOW SA 333
Gr.6
P31 SA 333 Gr.6
ELBOW SA 333
Gr.6
PL2 SA 516 Gr.70N
P31 SA 333 Gr.6
PL26 SA 516 Gr.70N
P31 SA 333 Gr.6
PL26 SA 516 Gr.70N
PL2 SA 516 Gr.
70N
PL34 SA 516 Gr.70N
P30 SA 333 Gr.6
05
05
05
05
24 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
N8B-8 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 50
N8B-9 F/W to P.1/Gr.2 to P.1/Gr.1 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 500
N9-1 B/W to P.1/Gr.1 to P.1/Gr.2 12 14 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N9-2 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N9-3 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N9-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N10-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 11 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N10-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N10-3 T/J to P.1/Gr.2 to P.1/Gr.1 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N10-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N11-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N11-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N11-3 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N11-4 T/J to P.1/Gr.2 to P.1/Gr.1 4 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N11-5 F/W to P.1/Gr.1 to P.1/Gr.2 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N11-6 F/W to P.8/Gr.1 to P.8/Gr.1 4 12 33/WP/ASME/09 33/WP/ASME/09 X X NO 359
N12-1 B/W to P.1/Gr.1 to P.1/Gr.2 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N12-2 T/J to P.1/Gr.2 to P.1/Gr.1 4 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N12-3 F/W to P.1/Gr.2 to P.1/Gr.2 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
PL34 SA 516 Gr.70N
PL35 SA 516 Gr.70N
PL35 SA 516 Gr.70N
PL2 SA 516 Gr.
70N
P10 SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL2 SA 516
Gr.70N
P10 SA 333 Gr.6
PL27 SA 516 Gr.70N
P10 SA 333 Gr.6
PL27 SA 516 Gr.70N
PL2 SA 516 Gr.
70N
P10A SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL2 SA 516 Gr.70N
P10A SA 333 Gr.6
PL26 SA 516 Gr.70N
P10A SA 333 Gr.6
PL26 SA 516 Gr.70N
PL2 SA 516 Gr. 70N
P7C SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL26 SA 516 Gr.70N
P7C SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr.70N
PL3 SA 516 Gr.70N
P7C SA 333 Gr.6
P7C SA 333 Gr.6
FLANGE SA 516
Gr.70N
P7D SA 312 TP
316L
FLANGE SA 240
316L
P7B SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL26 SA 516 Gr.70N
P7B SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr.70N
DPT
05
05
25 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
N12-4 T/J to P.1/Gr.2 to P.1/Gr.1 4 10 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N12-5 F/W to P.1/Gr.1 to P.1/Gr.2 4 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N12-6 F/W to P.8/Gr.1 to P.8/Gr.1 4 12 33/WP/ASME/09 33/WP/ASME/09 X X NO 359
M1-1 T/J to P.1/Gr.2 to P.1/Gr.2 24 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 1,914
N13-1 B/W to P.1/Gr.1 to P.1/Gr.2 12 14 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N13-2 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N13-3 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N13-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N14-1 B/W to P.1/Gr.1 to P.1/Gr.2 12 14 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N14-2 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N14-3 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N14-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
N15-1 B/W to P.1/Gr.1 to P.1/Gr.2 12 14 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N15-2 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 (3) X X X NO 359
N15-3 T/J to P.1/Gr.2 to P.1/Gr.1 12 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
N15-4 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 672
SC1-1 F/W to P.1/Gr.1 to P.1/Gr.2 4 13 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
SC1-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 800
SC2-1 F/W to P.1/Gr.1 to P.1/Gr.2 4 13 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
SC2-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 800
SC3-1 F/W to P.1/Gr.1 to P.1/Gr.2 4 13 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
PL3 SA 516 Gr.70N
P7B SA 333 Gr.6
P7B SA 333 Gr.6
FLANGE SA 516
Gr.70N
P7D SA 312 TP
316L
FLANGE SA 240
316L
HEAD SA 516 Gr.70N
FLANGE SA 350
LF2 CL1
P10A SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL2 SA 516
Gr.70N
P10A SA 333 Gr.6
PL26 SA 516 Gr.70N
P10A SA 333 Gr.6
PL26 SA 516 Gr.70N
PL2 SA 516 Gr.
70N
P9A SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL3 SA 516
Gr.70N
P9A SA 333 Gr.6
PL26 SA 516 Gr.70N
P9A SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr.
70N
P9B SA 333 Gr.6
FLANGE SA 350
LF2 CL1
PL3 SA 516
Gr.70N
P9B SA 333 Gr.6
PL26 SA 516 Gr.70N
P9B SA 333 Gr.6
PL26 SA 516 Gr.70N
PL3 SA 516 Gr.
70N
P33A SA 106 Gr.B
PL33 SA 516 Gr.70N
PL33 SA 516 Gr.70N
PL3 SA 516 Gr.70N
P33A SA 106 Gr.B
PL33 SA 516 Gr.70N
PL33 SA 516 Gr.70N
PL3 SA 516 Gr.70N
P33A SA 106 Gr.B
PL33 SA 516 Gr.70N
DPT
26 Welding Map & NDE Plan Doc. No.
00
0
Revision : 05 Doc. Status : AFC
Rev. Date : 18-Mar-10 Page : of 25
VII. EXTENT OF NDE
JOINT JOINT Ø WT WPSNDE BEFORE PWHT
PW
HT
NO TYPE INCH (mm)
MAIN REPAIR REQ'D
REPORT
V
ISU
AL
PA/RT UT MPI
VIS
UA
L
PA/RT UT MPINO.
TAG NO. & MATERIAL GRADE
MATERIAL GROUPING
SURFACE & EDGE
PREPARATION
NDE REPORT BEFORE PWHT
WELDING LENGTH
(mm)
SC3-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 800
SC4-1 F/W to P.1/Gr.1 to P.1/Gr.2 4 13 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
SC4-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 800
SC5-1 F/W to P.1/Gr.1 to P.1/Gr.2 4 13 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
SC5-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 800
SC6-1 F/W to P.1/Gr.1 to P.1/Gr.2 4 13 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 359
SC6-2 F/W to P.1/Gr.2 to P.1/Gr.2 12 64V-G/WP/ASME/09 64V-G/WP/ASME/09 X X NO 800
109,878
PL33 SA 516 Gr.70N
PL2 SA 516 Gr.70N
P33A SA 106 Gr.B
PL33 SA 516 Gr.70N
PL33 SA 516 Gr.70N
PL2 SA 516 Gr.70N
P33A SA 106 Gr.B
PL33 SA 516 Gr.70N
PL33 SA 516 Gr.70N
PL2 SA 516 Gr.70N
P33A SA 106 Gr.B
PL33 SA 516 Gr.70N
PL33 SA 516 Gr.70N
PL2 SA 516 Gr.70N
Welding Map & NDE Plan Doc. No.
0 0
0Revision : 05 Doc. Status : AFC
Discipline : 0 Rev. Date : 18-Mar-10 of
WP Job No. : 402000-01302 HI Contract No. : 4600006940
VIII. ATTACHMENT
VIII.1. REF. DWG NO. : UPD-W4-8989-312-0001 SHT.1 OF 1 REV. 03: UPD-W4-8989-312-0002 SHT.1 OF 1 REV. 03: UPD-W4-8989-312-0003 SHT.1 OF 2 REV. 03: UPD-W4-8989-312-0003 SHT.2 OF 2 REV. 03: UPD-W4-8989-312-0004 SHT.1 OF 2 REV. 03: UPD-W4-8989-312-0004 SHT.2 OF 2 REV. 03: UPD-W4-8989-312-0005 SHT.1 OF 1 REV. 03: UPD-W4-8989-312-0006 SHT.1 OF 1 REV. 03: UPD-W4-8989-312-0007 SHT.1 OF 1 REV. 03
VIII.2. COVER REV. 04 OF THIS DOCUMENT WITH STATUS "A"
Document type : PR Page : 25
GF Job No. : 07012
05 05
Doc. No.
0
AFC
25
HI Contract No. : 4600006940
VIII. ATTACHMENT