14
Well Engineering Partners An Overview Prepared by: Henny Cornelissen – June 2013

Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

Well Engineering Partners

An Overview

Prepared by: Henny Cornelissen – June 2013

Page 2: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

WEP Company information

• Founded in 1996 • Offices in Hoogeveen, Den

Haag and Muscat • Merged with PGMi in January

2011 to become the largest independent WE consultancy in the NL & Mainland Europe

• > 35 employees: 1-40 yrs experience, BsC/MsC/PhD

• Large network of specialists • ISO certified

Amsterdam

Hoogeveen

Page 3: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

WEP Company information

Owner of: • Rig Rider – Human process control 100% • SOGOS Consultants – Training & manpower 50% • HWT – Rig & drilling innovation 25%

Page 4: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

Our business

Core Activities & area’s of expertise – Drilling engineering & well design – Integrated project management – Drilling management – QHSE – Solution (salt) mining – Geothermal well engineering – CO2 and gas storage – New technology: casing drilling,

composite casing – Post Macondo operating procedures – Human Process Control

Page 5: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

1-7-2013

5

Expert associates

Extensive Network of experts – Mud and cement engineering – Production Technology / Chemistry – Facilities Engineering – Completion design – Reservoir engineering – Prototyping – Corrosion

Page 6: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

1-7-2013

6

Some of our Documentation & Software

• Well Design Manual • Casing Design Manual • Mud & cementing manual • Well control manual • Corrosion manual

• Wellplan and Stress Check • Safeti.nl for Quantitative Risk Assessment • Virtue Well, production software • Solidworks, engineering software

Page 7: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

1-7-2013

7

Engineered approach to well construction in order to reduce well costs:

• Performance drilling • Industrialise well construction process • Training & awareness • Standardisation of materials & services

Our Philosophy

Page 8: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

1-7-2013

8

Performance Drilling Performance Drilling • Team working, Suppliers Alliance • State of the art rigs • Advanced muds • PDC bits, high Rate of Penetration • Downhole motor plus string rotation • Shoe to shoe drilling, limited bit changes • Fast rig ups, BOP pre-tested • Performance coaching

Page 9: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

Drilling Projects Oil and Gas

2009 campaign (4 wells) 2012 campaign (2-3 wells)

F17-9 exploration well, Q1 2012

DKK, Q2 2012

Very experienced in oil & gas well drilling projects

Page 10: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

Salt Drilling Projects

2012: PA32/33,PA31ST 2012: BAS 3ST 2011 Q4: TR-9

Large experience in salt well drilling projects

Page 11: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

Geothermal Drilling Projects Carried out many geothermal drilling projects

Page 12: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

Some of our Customers

MAGHREB Petroleum Exploration S.A

Page 13: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

New Technology

• Huisman WEP Joint Venture

• Enhanced Casing Installation

• Composite Pipe • Shale Fraccing • Rig Automation • Geothermal solutions

Page 14: Well Engineering Partners An Overview - ftp.itc.nlftp.itc.nl/pub/hecker/NGCBP/Inception_WS1_PPT_WEP.pdf · 1-7-2013 8 Performance Drilling Performance Drilling • Team working, Suppliers

Well Engineering Partners

Your partners in value creation

www.wellengineering.nl