PENNDOT PROJECT INFORMATION West Carson Street Betterment SR 0837, Section A48 City of Pittsburgh, Allegheny County

West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

PENNDOT PROJECT INFORMATION

West Carson Street

BettermentSR 0837, Section A48

City of Pittsburgh, Allegheny County

Page 2: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

PROJECT TEAM

Design Division

Direct questions to:

Anthony C. Annett, P.E. - Project Manager at 412.429.5030 or [email protected].

Mark J. Young - District Environmental Manager

Todd C. Crouch - Assistant District Environmental Manager

Press Office

Steve Cowan - District Press Officer

Please complete survey at end of presentation

Page 3: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

PURPOSE OF PRESENTATION & PROJECT INTRODUCTION

SR 0837, Section A48 (West Carson Street) Project

The purpose of this presentation is to introduce the project to the public, gather feedback, and present the construction staging

The purpose of the project is to rehabilitate the existing deteriorated roadway surface and extend the usable life of the pavement

Page 4: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

PROJECT LOCATION

Start Work

Stop Work

Page 5: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

PROPOSED PROJECT IMPROVEMENTS

Roadway Rehabilitation from Smithfield Street to the West End Bridge

Concrete Reconstruction from Smithfield Street to Station Square Drive

Milling and Resurfacing from Station Square Drive to the West End Bridge

Curb repairs, drainage improvements, updates to Department signs and pavement markings, Traffic Signals, ADA Curb Ramps and ITS equipment.

Work will occur during both daylight and nighttime hours

All work will be done within existing Legal Right-of-Way.

Construction anticipated to begin 2019

Page 6: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

PROPOSED TRAFFIC CONTROL

Long-term Lane Restrictions

SR 837 West Carson Street Concrete Reconstruction through Station Square

Short-term Lane Restrictions

SR 837 West Carson Street Milling and Resurfacing

Traffic Signals, Curb repairs, Drainage Improvements, ADA Curb Ramps.

Overnight detours

SR 8039 (Ft. Pitt Bridge Ramps to/from SR 837 West Carson Street)

SR 3106 (Ramps to/from SR 51 West Carson Street)

Example short-term restriction

Page 7: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

SR 3106 SB (Ramp from SR 51)DETOUR PLAN

SR 3106 Eastbound Workzone

SR 3106 Eastbound Detour RouteDetour Length – 0.3 miles

SR 3106 SB

Traffic Flow

Page 8: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

SR 3106 NB (Ramp to SR 51)DETOUR PLAN

SR 3106 Westbound Workzone

SR 3106 Westbound Detour RouteDetour Length – 0.3 miles

SR 3106 NB

Traffic Flow

Page 9: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

SR 8039 (Ramp from SR 376 WB Ft Pitt Bridge to SR 837 NB) DETOUR PLAN

SR 8039 Workzone

SR 8039 to SR 837 NB Detour RouteDetour Length – 3.3 miles

SR 8039

Traffic Flow

Page 10: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

SR 8039 (Ramp to SR 376 EB Ft Pitt Bridge from SR 837 SB) DETOUR PLAN

SR 8039 Workzone

SR 8039 to Ft. Pitt Bridge Detour RouteDetour Length – 3.2 miles

SR 8039

Traffic Flow

Page 11: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

NATIONAL ENVIRONMENTAL POLICY ACT (NEPA)

Public outreach begins with PennDOT Connects and extends into the NEPA (National Environmental Policy Act) process:

NEPA requires agencies to integrate environmental values into their decision-making processes by considering the environmental impacts of their proposed actions and reasonable alternatives to those actions

NEPA also includes public involvement activities and gathering feedback from the public

Image courtesy of MDOT

Page 12: West Carson Street Betterment · PURPOSE OF PRESENTATION & PROJECT INTRODUCTION SR 0837, Section A48 (West Carson Street) Project The purpose of this presentation is to introduce

PROJECT SURVEY

https://www.surveymonkey.com/r/XVDYHZF