Presented by: Dan Coyne, CHBWV January 23, 2013 West Valley Demonstration Project Phase I Decommissioning Project Status One Project. One Team. One Goal.

West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Presented by: Dan Coyne, CHBWV

January 23, 2013

West Valley Demonstration Project Phase I Decommissioning

Project Status

One Project. One Team. One Goal.

Page 2: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Safety Performance

•  CHBWV has worked 514 days without a lost-time work accident or illness

•  WVDP has worked more than 4.8 Million hours without a lost-time work accident or illness

•  Conducted annual block training for 105 employees (January 7-8) –  Respiratory Training, Ladder Safety, Rad

Worker Refresher, Waste Generator Training, Hearing Conservation, Lock Out/Tag Out (LO/TO)

2

LO/TO  Training  Skid

Page 3: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Work continues on the High Level Waste Canister project : • 50% Design Review completed for HLW Storage System – 100% design review in progress • Design for Storage Pad in progress • Issued Canister Decon Test Plan

Milestone 1 Accomplishments

3

Future Cask Storage Pad Location

Page 4: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

•  Waste removal activities for Equipment Decontamination room (EDR) and Chemical Process Cell (CPC): –  Size reduced/removed Tipping

Fixture and Submerged Bed Scrubber (SBS) Platform

–  Predator Arm’s hydraulic fluid was drained and arm packaged/removed

Milestone 1 Accomplishments

Tipping Fixture & SBS Platform

4

Page 5: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Milestone 2 Accomplishments Cumulative Planned

Legacy Waste Shipments Actual Cumulative Legacy Waste Shipments

as of January 10, 2013 Jan. FY2013

Legacy Waste Shipments

Waste stream

No. of Shipments

Volume (ft3)

No. of Shipments

Volume (ft3)

% Complete

No. of Shipments

Volume (ft3)

LLW 157 132,636 40 44,793 34 0 0

MLLW 9 6,344 4 1,607 25 0 0

Industrial 3 1,391 On site through interceptor + 3

shipments 976* 100

Hazardous 2 120 1 120 100 0 0

Total 171 140,491 48 47,496 34

*Monthly volumes are approximates until end of the month; this table will be updated once the actual Waste Disposition Plan numbers are computed. * Reduction in total number of cubic feet from the planned volume is due to repackaging operations.

5

Page 6: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Milestone 2 Accomplishments •  Completed 5 low level waste and 2

mixed low level waste milestones •  Continue Processing the 3C-2

Dissolver in RHWF •  Initiated planning for the

processing of the 3C-1 Dissolver •  Initiate container sampling and

repackaging of low level waste in the Waste Processing Area in Lag Storage Area (LSA 4)

•  Evaluating disposition path for waste containers stored outside

•  Completes shipping of all legacy hazardous and industrial waste

Demolition of Warehouse Pad

LLW Shipment to NNSS

6

Page 7: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Milestone 3 Accomplishments

Preparations of Main Process Plant Building and Vitrification Facility to a demolition-ready state are continuing: •  Drained and removed process chemical piping systems in the Lower

Extraction Aisle (LXA) and Chemical Operating Aisle (COA); 80% complete •  Removed ceiling grid, overhead interferences, and lighting from the Radio &

Analytical Chemistry lab and bathrooms in preparation for Asbestos-Containing Material (ACM) removal

•  Isolated and air-gapped out-of-service utility lines on instrument racks and cell wall in the Vitrification Facility Aisles (Upper and Middle West Operating Aisle)

•  Commenced overhead interference removal in support of accessing the Liquid Waste Cell (LWC)

•  Commenced preparations for size reduction of down draft table in the Vit Cell

7

Page 8: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

01/14 Demolition Northwest Corner

Original Construction After Phase 1 After Phase 2

8

Page 9: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Milestone 4 Accomplishments 01-14 Building Demolition •  Continued demolition on the north side

of the facility around the off-gas pipe gallery and the pipe bridge between Utility Room and the 01-14 Building

•  Continued waste load out of demolition debris

•  Expect to complete demolition of 01-14 Building by the end of April 2013

Balance of Site Facilities • Waste Load Out – Old Warehouse, Count Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013

9

Demolition of North Side of 01-14 Building

Page 10: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Regulatory Compliance

10

•  Final NYSDEC approval received on November 29 for RCRA closure of Hazardous Waste Storage Lockers

•  Designing a solar-powered sampler for the runoff diversion channel at the NRC Licensed Disposal Area (NDA)

•  Petroleum Spill Report was submitted to NYSDEC on January 3

–  No reportable spills this past quarter •  Regulatory Roundtable conducted on November 15

attended by Regulatory Stakeholders – NRC, EPA, NYSDEC, NYSDOH

•  Continuing to operate ambient air monitoring network in support of 01-14 demolition

Page 11: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

•  Performance based contract, incentivized for safe, cost effective completion of the 4 major milestones

•  DOE defines the scope through the contract and CHBWV executes within the contract specified requirements

•  DOE provides oversight of CHBWV, but execution strategy is established by CHBWV

CHBWV Contract

11

Page 12: West Valley Demonstration Project Phase I Decommissioning ......Jan 23, 2013  · Lab, Vitrification Fab Shop, and WTF Test Tower – Completion date set for January 31, 2013 9 Demolition

Questions?