38
Why Stabilize the Bluff? April 29, 2014

Why Stabilize the Bluff?

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Why Stabilize the Bluff?

Why Stabilize the Bluff?

April 29, 2014

Page 2: Why Stabilize the Bluff?

2

Prior Conditions

• Bluff failure

• Erosion causing severe undermining of sidewalks impacting public access

• Public safety hazard from potential collapse above and below bluff

• Dying and sparse vegetation

• Future seismic activity may hasten slumping and bluff recession

Page 3: Why Stabilize the Bluff?

3

Prior Conditions

Page 4: Why Stabilize the Bluff?

4

Prior Conditions

Page 5: Why Stabilize the Bluff?

5

Prior Conditions

Page 6: Why Stabilize the Bluff?

6

Prior Conditions

Page 7: Why Stabilize the Bluff?

7

Prior Conditions

Page 8: Why Stabilize the Bluff?

8

Geotechnical Studies

• 2000 Final – Plan of Development Bluff Erosion & Enhancement Project

• 2000 and Revised 2003 Preliminary Geotechnical Investigation Proposed Belmont Shore Bluff Restoration

• 2009 Draft Possible Slope Improvement Options for Project Cost Estimating

• 2010 Geotechnical Study Proposed Slope Improvements

Page 9: Why Stabilize the Bluff?

9

Community Consultations

• Historical Society of Long Beach

• Long Beach Museum of Art

• Alamitos Beach Association

• Bluff Park Association

• Model Plane Glider Group

• Bluff Park Front Runners

• Bixby Park Users

• Feral Cats Protectors

• Surfrider Foundation

Page 10: Why Stabilize the Bluff?

10

Project Boundaries

36th Pl.

Alamitos Ave.

Page 11: Why Stabilize the Bluff?

11

Stabilization Options

• Re-grading

• New VegetationIrrigationDrainageNetting

• Slope ReinforcementRetaining WallsGabions (No Longer Recommended)Soil Nailing

Shotcrete

Page 12: Why Stabilize the Bluff?

12

Non-Soil Nailing Examples

5th Place 12th Place

Page 13: Why Stabilize the Bluff?

13

Options Evaluated for Bluff Park

Fill into the Beach

10-30 ft.

Page 14: Why Stabilize the Bluff?

14

Options Evaluated for Bluff Park

Cutting the Park Back

Page 15: Why Stabilize the Bluff?

15

Adopted Solution

• Soil Nails

• Shotcrete

• Landscaping

Page 16: Why Stabilize the Bluff?

16

Council Action

Sept. 4, 2007 Specs Adopted for 12th Place Erosion Control

Nov. 16, 2010 Specs Adopted for Phase 1 of Bluff Erosion and Enhancement Project (Redondo Ave. to 36th Place)

Dec. 14, 2010 Specs Adopted for 5th Place and 7th Place Erosion Control

Jul. 9, 2013 Specs Adopted for Phase 2 of Bluff Erosion and Enhancement Project (20th Place to Redondo Ave.)

Page 17: Why Stabilize the Bluff?

17

Bluff Park Area

20th Pl.

36th Pl.

Redondo Ave.

Orizaba Ave.

Page 18: Why Stabilize the Bluff?

18

Phase 1

• Redondo Ave. to 36th Pl.

• Council approval November 16, 2010

• Work begins December 2010

• Work completed December 2011

• Irrigation and landscaping determined to be inadequate

Page 19: Why Stabilize the Bluff?

19

Phase 1

Prior Condition

Page 20: Why Stabilize the Bluff?

20

Phase 1

Shotcrete Application

Page 21: Why Stabilize the Bluff?

21

Phase 1

Shotcrete Before Staining

Page 22: Why Stabilize the Bluff?

22

Phase 1

Shotcrete After Staining

Page 23: Why Stabilize the Bluff?

23

Phase 2

• 20th Pl. to 36th Pl.

• Council approval July 9, 2013

• Work begins October 21, 2013

• Major construction complete May 31, 2014

• Landscaping complete Fall/Winter 2014

Page 24: Why Stabilize the Bluff?

24

Phase 2

Prior Condition

Page 25: Why Stabilize the Bluff?

25

Phase 2

Soil Nailing

Page 26: Why Stabilize the Bluff?

26

Phase 2

Rebar and Landscape Wells

Page 27: Why Stabilize the Bluff?

27

Phase 2

Shotcrete Before Staining

Page 28: Why Stabilize the Bluff?

28

Phase 2Section 1 – Park View

Page 29: Why Stabilize the Bluff?

29

Phase 2Section 1 – Beach View

Page 30: Why Stabilize the Bluff?

30

Phase 2Section 2 – Park View

Page 31: Why Stabilize the Bluff?

31

Phase 2Section 2 – Beach View

Page 32: Why Stabilize the Bluff?

32

Phase 2Section 3 – Park View

Page 33: Why Stabilize the Bluff?

33

Phase 2Section 3 – Beach View

Page 34: Why Stabilize the Bluff?

34

Bixby Park Annex (Cherry Park)

Grading, Landscaping and Pathways

Page 35: Why Stabilize the Bluff?

35

Bixby Park Annex (Cherry Park)

Prior Condition Current

Page 36: Why Stabilize the Bluff?

36

Future Stabilization

• Museum of Art slope revegetation

• Gabion wall revegetation

• Rebuild historic access pathways and install new landscaping

Page 37: Why Stabilize the Bluff?

37

Impacts of Delayed Construction

• Push completion into busy summer months

• Potential demobilization of contractor

• Potential re-engineering and/or new specifications

• Additional project costs

Page 38: Why Stabilize the Bluff?

Why Stabilize the Bluff?

April 29, 2014