1
Weldiya Debra Tabor Axum Adigrat Sodo Negele Mega Imi Dolo Odo Degeh Bur Aware Warder Domo Ferfer Moyale Yavello Wendo Shashemene Nazret Welkite Hosaina Bonga Gimbi Awash Dodola Humera Kebri Dehar Gonder Dese Debre Markos Asela Goba Gore Nekemte Jima Harer Dire Dawa Bahir Dar Mekele Gambela Awasa Asosa Asayita Jijiga ADDIS ABABA INDIAN OCEAN G u l f o f A d e n R e d S e a Lake Tana Lake Turkana Weldiya Debra Tabor Axum Adigrat Sodo Negele Mega Imi Dolo Odo Degeh Bur Aware Warder Domo Ferfer Moyale Yavello Wendo Shashemene Nazret Welkite Hosaina Bonga Gimbi Awash Dodola Humera Kebri Dehar Gonder Dese Debre Markos Asela Goba Gore Nekemte Jima Harer Dire Dawa Bahir Dar Mekele Gambela Awasa Asosa Asayita Jijiga ADDIS ABABA Gulf of Aden R e d S e a Lake Tana Lake Turkana 100 50 150 200 Miles 0 100 50 150 200 Kilometers 0 Scale accurate at 10° N Coordinate System: GCS WGS 1984 World Mercator, Datum: WGS 1984, Units: Meter Weldiya Nefas Mewcha Wereta Dangla Pawe Mendi Gashen Lalibela Sekota Dabat Metema Maychew Alamata Mehoni Substation Adwa Enda Silassie Adigrat Wukro Mesobo Welaita Sodo Negele Borena Shakiso Mega Imi Gode Ramo Fik Babile Chelenko Alemaya Dolo Odo Degeh Bur Aware Warder Domo Ferfer Moyale Boku Luguma (Mega) Yirgalem Dilla Agere Mariam Arba Minch KeyAfer Sawla Shashamene Wonji Wolkite Butajira Geda Metehara Adami Tulu Woliso Gedja Addis Alem Muger Hosaina Bonga Mizan Tepi Aba Gimbi Awash Sululta Chancho Melka Wakana Humera Kebri Dehar Gonder Dessie Kemise Semera Decioto Combolcha-II Combolcha-I Shoa Robit Aksta Alem Ketema Amibara Nuraera Hurso Adigala Bedessa Asebe Teferi Bitchena Mota Finote Selam Debre Markos Asela Robe Gobesa Yadot Gore Nekemte Dedessa Gehedo Finchaa II Guder Gida Ayana Jimma Harer Dire Dawa Bahir Dar Mekele Gambela Awasa Asosa Asayita Jijiga SUDAN SOUTH SUDAN ERITREA SOMALIA UGANDA KENYA DJIBOUTI REPUBLIC OF YEMEN HARAR I & III MU DIESEL DIRE DAWA DIESEL 40MW AWASH 7 KILO DIRE DAWA III AYSHA WIND PARK TENDAHO GEOTHERMAL ASHEGODA WIND PARK TEKEZE III BIOMASS-2 ( Welkayit) BIOMASS-1 (Grand Renaissance) BIOMASS-3 (Omo) BIOMASS-4 (Dedessa) GRAND RENAISSANCE UPPER MENDAIA BECO ABO CHEMOGA YEDA II TIS ABAY II TIS ABAY I BELES ALELTU HALELE WERABESA GEBA II GEBA I SCS SOR I SCS SOR II BARO I GENJI DIVERSION BARO II CHEMOGA YEDA I AMERTO NESHE MESSOBO WIND PARK DEBRE BERHAN WIND WEPP ALEMAYA DIESEL TEKEZE I GOJEB G. GIBE III ABAYA GENALE 3 GENALE 6 CORBETTI TULLU MOYE ALUTO GEOTHERMAL II ALUTO GEOTHERMAL I KOKA KALITI DIESEL AWASH III AWASH II MELKA WAKANA G. GIBE IV G. GIBE I G. GIBE II FINCHAA To South Sudan (2nd phase) To South Sudan (1st phase) To Somalia To Eritrea Debre Berhan Akaki Dukem I & II Yesu Factory Debre Zeit-I, -II& -III ADAMA I & II Gebre Guracha Fitche-1 Fitche-2 Weldiya Nefas Mewcha Wereta Dangla Pawe Mendi Gashen Lalibela Sekota Dabat Metema Maychew Alamata Mehoni Substation Adwa Enda Silassie Adigrat Wukro Mesobo Welaita Sodo Negele Borena Shakiso Mega Imi Gode Ramo Fik Babile Chelenko Alemaya Dolo Odo Degeh Bur Aware Warder Domo Ferfer Moyale Boku Luguma (Mega) Yirgalem Dilla Agere Mariam Arba Minch KeyAfer Sawla Shashamene Wonji Wolkite Butajira Geda Metehara Adami Tulu Woliso Gedja Addis Alem Muger Debre Berhan Hosaina Bonga Buno Bedele Mizan Tepi Aba Gimbi Awash Akaki Gebre Guracha Fitche-1 Fitche-2 Dukem I & II Yesu Factory Debre Zeit-I, -II& -III Sululta Chancho Melka Wakana Humera Kebri Dehar Gonder Dessie Kemise Semera Decioto Combolcha-II Combolcha-I Shoa Robit Aksta Alem Ketema Amibara Nuraera Hurso Adigala Bedessa Asebe Teferi Bitchena Mota Finote Selam Debre Markos Asela Robe Gobesa Yadot Gore Nekemte Dedessa Gehedo Finchaa II Guder Gida Ayana Jimma G. Gibe Old S/S Harer Dire Dawa Bahir Dar Mekele Gambela Awasa Asosa Asayita Jijiga HARAR I & III MU DIESEL DIRE DAWA DIESEL 40MW AWASH 7 KILO DIRE DAWA III AYSHA WIND PARK TENDAHO GEOTHERMAL ASHEGODA WIND PARK TEKEZE III BIOMASS-2 ( Welkayit) BIOMASS-1 (Grand Renaissance) BIOMASS-3 (Omo) BIOMASS-4 (Dedessa) GRAND RENAISSANCE UPPER MENDAIA BECO ABO CHEMOGA YEDA II TIS ABAY II TIS ABAY I BELES ALELTU HALELE WERABESA GEBA II GEBA I SCS SOR I SCS SOR II BARO I GENJI DIVERSION BARO II CHEMOGA YEDA I AMERTO NESHE MESSOBO WIND PARK DEBRE BERHAN WIND WEPP DOFAN ALEMAYA DIESEL TEKEZE I GOJEB G. GIBE III ABAYA GENALE 3 GENALE 6 CORBETTI TULLU MOYE ALUTO GEOTHERMAL II ADAMA I & II ALUTO GEOTHERMAL I KOKA KALITI DIESEL AWASH III AWASH II MELKA WAKANA G. GIBE IV G. GIBE I G. GIBE II FINCHAA SUDAN SOUTH SUDAN ERITREA SOMALIA UGANDA KENYA DJIBOUTI REPUBLIC OF YEMEN Gulf of Aden R e d S e a Lake Tana Lake Turkana To South Sudan (2nd phase) To South Sudan (1st phase) To Somalia To Eritrea 100 50 150 200 Miles 0 100 50 150 200 Kilometers 0 Scale accurate at 10° N Coordinate System: GCS WGS 1984 World Mercator, Datum: WGS 1984, Units: Meter HYDRO POWER PLANTS (HEEP) ICS DIESEL POWER PLANTS GAS POWER PLANTS (BIOMASS) GEOTHERMAL POWER PLANTS WIND POWER PLANTS 500 kV TRANSMISSION LINES 400 kV TRANSMISSION LINES 230 kV TRANSMISSION LINES 132 kV TRANSMISSION LINES 66 kV TRANSMISSION LINES 45 kV TRANSMISSION LINES EXISTING PROPOSED Source: Ethiopian Power System Expansion Master Plan Study, EEPC 2014 WIND RESOURCE Ethiopia 45°E 15°N 0 75 150 Kilometers 0 75 150 Miles Scale accurate at 10°N 3,048 2,000 1,750 1,500 1,250 1,000 750 500 250 100 ELEVATION (m) ELEVATION Source: Shuttle Radar Topography Mission (SRTM) 30 Sources: 3E and DTU Wind for ESMAP. Copyright © April 2016 The International Bank for Reconstruction and Development / THE WORLD BANK 1818 H Street, NW | Washington DC 20433 | USA The World Bank, ESMAP and the authoring firm(s) do not guar- antee the accuracy of this data and accept no responsibility whatsoever for any consequence of their use. The boundaries, colors, denominations, and other information shown on any map in this volume do not imply on the part of The World Bank any judgment on the legal status of any territory or the endorsement of acceptance of such boundaries. This dataset is licensed by The World Bank under a Creative Commons Attribution license (CC BY 3.0 IGO). Users should cite The World Bank as the data provider, and make reference to the Energy Sector Management Assistance Program (ESMAP) as the provider of funding for this work.The ESMAP Manager would appreciate receiving a copy of the publication that uses this data for its source sent via email to [email protected] or to the address above. IBRD 42155 | APRIL 2016 High 12.4 Low 2.0 5.49 7.03 3.94 Selected cities and towns Region capitals National capital International boundaries Simulated mean wind speed at 100 m height above ground level m/s SUMMARY This map of simulated wind speed in Ethiopia was prepared by The World Bank’s cartographic unit using mapping outputs provided by 3E and DTU Wind under contract to The World Bank. It is one of several outputs from the wind resource mapping component of the activity Renewable Energy Resource Mapping and Geospatial Planning – Ethiopia [Project ID: P151309]. This activity is funded and supported by the Energy Sector Management Assistance Program (ESMAP), a multi-donor trust fund administered by The World Bank, under a global initiative on Renewable Energy Resource Mapping. Further details on the initiative can be obtained from the ESMAP website. The maps presented are based on interim outputs from the associated project, and are therefore preliminary and unvalidated. Users are strongly advised to exercise caution when utilizing the information presented, and should familiarize themselves with the accompanying reports from this project, and other relevant outputs, to fully understand the context, methodology and constraints. These can be downloaded from the ESMAP website listed above – please refer to the corresponding country project page. During the next phase (2) of this project, measurements will be collected from a number of specially- commissioned meteorological stations throughout the country over a 24 month period, and these will be used in the final phase (3) to develop a final, validated Ethiopia Wind Atlas, which will be made publicly available.

WIND RESOURCE - World Bankpubdocs.worldbank.org/pubdocs/publicdoc/2016/4/...HYDRO POWER PLANTS (HEEP) S e a Lake Tana Lake Turkana To South Sudan (2nd phase) To South Sudan (1st phase)

  • Upload
    lythuan

  • View
    218

  • Download
    1

Embed Size (px)

Citation preview

Page 1: WIND RESOURCE - World Bankpubdocs.worldbank.org/pubdocs/publicdoc/2016/4/...HYDRO POWER PLANTS (HEEP) S e a Lake Tana Lake Turkana To South Sudan (2nd phase) To South Sudan (1st phase)

Weldiya

DebraTabor

Axum

Adigrat

Sodo

Negele

Mega

Imi

DoloOdo

Degeh BurAware

Warder

Domo

Ferfer

Moyale

Yavello

Wendo

Shashemene

Nazret

Welkite

Hosaina

Bonga

Gimbi

Awash

Dodola

Humera

Kebri Dehar

Gonder

Dese

DebreMarkos

Asela

Goba

Gore

Nekemte

Jima

HarerDire Dawa

Bahir Dar

Mekele

Gambela

Awasa

Asosa

Asayita

JijigaADDIS ABABA

INDIAN

OCEAN

Gulf of Aden

Red Sea

LakeTana

LakeTurkana

Weldiya

DebraTabor

Axum

Adigrat

Sodo

Negele

Mega

Imi

DoloOdo

Degeh BurAware

Warder

Domo

Ferfer

Moyale

Yavello

Wendo

Shashemene

Nazret

Welkite

Hosaina

Bonga

Gimbi

Awash

Dodola

Humera

Kebri Dehar

Gonder

Dese

DebreMarkos

Asela

Goba

Gore

Nekemte

Jima

HarerDire Dawa

Bahir Dar

Mekele

Gambela

Awasa

Asosa

Asayita

JijigaADDIS ABABA

Gulf of Aden

Red Sea

LakeTana

LakeTurkana

10050 150 200 Miles0

10050 150 200 Kilometers0

Scale accurate at 10° N

Coordinate System: GCS WGS 1984 World Mercator, Datum: WGS 1984, Units: Meter

Weldiya

NefasMewchaWereta

Dangla

Pawe

Mendi

Gashen

Lalibela

Sekota

DabatMetema

Maychew

Alamata

Mehoni Substation

Adwa

EndaSilassie

Adigrat

WukroMesobo

WelaitaSodo

NegeleBorena

Shakiso

Mega

Imi

Gode

Ramo

Fik

Babile

Chelenko

Alemaya

DoloOdo

Degeh Bur Aware

Warder

Domo

Ferfer

Moyale

Boku Luguma(Mega)

Yirgalem

Dilla

AgereMariam

ArbaMinch

KeyAfer

Sawla

Shashamene

WonjiWolkite

Butajira

Geda

Metehara

Adami Tulu

WolisoGedja

AddisAlem

Muger

Hosaina

Bonga

Mizan

Tepi Aba

GimbiAwash

SulultaChancho

MelkaWakana

Humera

Kebri Dehar

Gonder

Dessie

Kemise

Semera

Decioto

Combolcha-IICombolcha-I

Shoa Robit

Aksta

Alem Ketema

AmibaraNuraera

Hurso

Adigala

Bedessa

AsebeTeferi

BitchenaMota

Finote SelamDebreMarkos

Asela

Robe

Gobesa

Yadot

Gore

NekemteDedessa

Gehedo

Finchaa II

Guder

Gida Ayana

Jimma

HarerDire Dawa

Bahir Dar

Mekele

Gambela

Awasa

Asosa

Asayita

Jijiga

S U D A N

S O U T H

S U D A N

E R I T R E A

S O M A L I A

U G A N D A K E N Y A

D J I B O U T I

R E P U B L I C O FY E M E N

HARAR I & III

MU DIESEL

DIRE DAWADIESEL40MW

AWASH7 KILO

DIRE DAWA III

AYSHA WIND PARK

TENDAHOGEOTHERMAL

ASHEGODA WIND PARKTEKEZE III

BIOMASS-2(Welkayit)

BIOMASS-1(Grand Renaissance)

BIOMASS-3(Omo)

BIOMASS-4(Dedessa)

GRAND RENAISSANCE

UPPERMENDAIA BECO ABO CHEMOGA YEDA II

TIS ABAY IITIS ABAY I

BELES

ALELTU

HALELE

WERABESA

GEBA II

GEBA ISCS SOR I

SCS SOR II

BARO I

GENJI DIVERSIONBARO II

CHEMOGA YEDA I

AMERTONESHE

MESSOBO WIND PARK

DEBRE BERHANWIND WEPP

ALEMAYA DIESEL

TEKEZE I

GOJEB

G. GIBE IIIABAYA

GENALE 3

GENALE 6

CORBETTI

TULLU MOYE

ALUTO GEOTHERMAL II

ALUTO GEOTHERMAL I

KOKA

KALITI DIESEL

AWASH III

AWASH II

MELKAWAKANA

G. GIBE IV

G. GIBE IG. GIBE II

FINCHAA

ToSouth Sudan(2nd phase)

ToSouth Sudan

(1st phase)

To Somalia

To Eritrea

DebreBerhan

AkakiDukem I & IIYesu FactoryDebre

Zeit-I, -II& -III

ADAMA I & II

GebreGuracha

Fitche-1

Fitche-2

Weldiya

NefasMewchaWereta

Dangla

Pawe

Mendi

Gashen

Lalibela

Sekota

DabatMetema

Maychew

Alamata

Mehoni Substation

Adwa

EndaSilassie

Adigrat

WukroMesobo

WelaitaSodo

NegeleBorena

Shakiso

Mega

Imi

Gode

Ramo

Fik

Babile

Chelenko

Alemaya

DoloOdo

Degeh Bur Aware

Warder

Domo

Ferfer

Moyale

Boku Luguma(Mega)

Yirgalem

Dilla

AgereMariam

ArbaMinch

KeyAfer

Sawla

Shashamene

WonjiWolkite

Butajira

Geda

Metehara

Adami Tulu

WolisoGedja

AddisAlem

Muger

DebreBerhan

Hosaina

Bonga

BunoBedele

Mizan

Tepi Aba

GimbiAwash

Akaki

GebreGuracha

Fitche-1

Fitche-2

Dukem I & IIYesu FactoryDebre

Zeit-I, -II& -III

SulultaChancho

MelkaWakana

Humera

Kebri Dehar

Gonder

Dessie

Kemise

Semera

Decioto

Combolcha-IICombolcha-I

Shoa Robit

Aksta

Alem Ketema

AmibaraNuraera

Hurso

Adigala

Bedessa

AsebeTeferi

BitchenaMota

Finote SelamDebreMarkos

Asela

Robe

Gobesa

Yadot

Gore

NekemteDedessa

Gehedo

Finchaa II

Guder

Gida Ayana

JimmaG. GibeOld S/S

HarerDire Dawa

Bahir Dar

Mekele

Gambela

Awasa

Asosa

Asayita

Jijiga

HARAR I & III

MU DIESEL

DIRE DAWADIESEL40MW

AWASH7 KILO

DIRE DAWA III

AYSHA WIND PARK

TENDAHOGEOTHERMAL

ASHEGODA WIND PARKTEKEZE III

BIOMASS-2(Welkayit)

BIOMASS-1(Grand Renaissance)

BIOMASS-3(Omo)

BIOMASS-4(Dedessa)

GRAND RENAISSANCE

UPPERMENDAIA BECO ABO CHEMOGA YEDA II

TIS ABAY IITIS ABAY I

BELES

ALELTU

HALELE

WERABESA

GEBA II

GEBA ISCS SOR I

SCS SOR II

BARO I

GENJI DIVERSIONBARO II

CHEMOGA YEDA I

AMERTONESHE

MESSOBO WIND PARK

DEBRE BERHANWIND WEPP

DOFAN

ALEMAYA DIESEL

TEKEZE I

GOJEB

G. GIBE IIIABAYA

GENALE 3

GENALE 6

CORBETTI

TULLU MOYE

ALUTO GEOTHERMAL II

ADAMA I & II

ALUTO GEOTHERMAL I

KOKA

KALITI DIESEL

AWASH III

AWASH II

MELKAWAKANA

G. GIBE IV

G. GIBE IG. GIBE II

FINCHAA

S U D A N

S O U T H

S U D A N

E R I T R E A

S O M A L I A

U G A N D A K E N Y A

D J I B O U T I

R E P U B L I C O FY E M E N

Gulf of Aden

Red Sea

LakeTana

LakeTurkana

ToSouth Sudan(2nd phase)

ToSouth Sudan

(1st phase)

To Somalia

To Eritrea

10050 150 200 Miles0

10050 150 200 Kilometers0

Scale accurate at 10° N

Coordinate System: GCS WGS 1984 World Mercator, Datum: WGS 1984, Units: Meter

HYDRO POWER PLANTS (HEEP)

ICS DIESEL POWER PLANTS

GAS POWER PLANTS (BIOMASS)

GEOTHERMAL POWER PLANTS

WIND POWER PLANTS

500 kV TRANSMISSION LINES

400 kV TRANSMISSION LINES

230 kV TRANSMISSION LINES

132 kV TRANSMISSION LINES

66 kV TRANSMISSION LINES

45 kV TRANSMISSION LINES

EXISTINGPROPOSED

Source: Ethiopian Power System Expansion Master Plan Study, EEPC 2014

WIND RESOURCEEthiopia

45°E

15°N

0 75 150 Kilometers

0 75 150 MilesScale accurate at 10°N

3,0482,0001,7501,5001,2501,000750500250100

ELEVATION (m)

ELEVATIONSource: Shuttle RadarTopography Mission(SRTM) 30

Sources: 3E and DTU Wind for ESMAP.

Copyright © April 2016The International Bank for Reconstruction and Development / THE WORLD BANK1818 H Street, NW | Washington DC 20433 | USA

The World Bank, ESMAP and the authoring firm(s) do not guar-antee the accuracy of this data and accept no responsibility whatsoever for any consequence of their use. The boundaries, colors, denominations, and other information shown on any map in this volume do not imply on the part of The World Bank any judgment on the legal status of any territory or the endorsement of acceptance of such boundaries.

This dataset is licensed by The World Bank under a Creative Commons Attribution license (CC BY 3.0 IGO). Users should cite The World Bank as the data provider, and make reference to the Energy Sector Management Assistance Program (ESMAP) as the provider of funding for this work.The ESMAP Manager would appreciate receiving a copy of the publication that uses this data for its source sent via email to [email protected] or to the address above.

IBRD 42155 | APRIL 2016

High 12.4

Low 2.0

5.49

7.03

3.94

Selected cities and towns

Region capitals

National capital

International boundaries

Simulated mean wind speed at100 m height above ground level m/s

SUMMARYThis map of simulated wind speed in Ethiopia was prepared by The World Bank’s cartographic unit using mapping outputs provided by 3E and DTU Wind under contract to The World Bank.

It is one of several outputs from the wind resource mapping component of the activity Renewable Energy Resource Mapping and Geospatial Planning – Ethiopia [Project ID: P151309]. This activity is funded and supported by the Energy Sector Management Assistance Program (ESMAP), a multi-donor trust fund administered by The World Bank, under a global initiative on Renewable Energy Resource Mapping. Further details on the initiative can be obtained from the ESMAP website.

The maps presented are based on interim outputs from the associated project, and are therefore preliminary and unvalidated. Users are strongly advised to exercise caution when utilizing the information presented, and should familiarize themselves with the accompanying reports from this project, and other relevant outputs, to fully understand the context, methodology and constraints. These can be downloaded from the ESMAP website listed above – please refer to the corresponding country project page. During the next phase (2) of this project, measurements will be collected from a number of specially-commissioned meteorological stations throughout the country over a 24 month period, and these will be used in the final phase (3) to develop a final, validated Ethiopia Wind Atlas, which will be made publicly available.