7
2020 43 rd annual edition Mechanical Costs with RSMeans data Copyright The Gordian Group, Inc. 2020

with RSMeans data · 2020. 7. 24. · distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: with RSMeans data · 2020. 7. 24. · distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission

202043rd annual edition

Mechanical Costs with RSMeans data

Copyright The Gordian Group, Inc. 2020

Page 2: with RSMeans data · 2020. 7. 24. · distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission

*Numbers in italics are the divisional responsibilities for each editor. Please contact the designated editor directly with any questions.

Mechanical Costs with RSMeans data 2020

43rd annual edition

$319.99 per copy (in United States)Price is subject to change without prior notice.

Joseph Kelble, Senior Editor

0020

RSMeans data from GordianConstruction Publishers & Consultants1099 Hingham Street, Suite 201Rockland, MA 02370United States of America1.800.448.8182RSMeans.com

Copyright 2019 by The Gordian Group Inc.All rights reserved.Cover photo © iStock.com/Freezingtime

Printed in the United States of AmericaISSN 1524-3702ISBN 978-1-950656-13-4

Gordian’s authors, editors, and engineers apply diligence and judgment in locating and using reliable sources for the information published. However, Gordian makes no express or implied warranty or guarantee in connection with the content of the information contained herein, including the accuracy, correctness, value, suffi ciency, or completeness of the data, methods, and other information contained herein. Gordian makes no express or implied warranty of merchantability or fi tness for a particular purpose. Gordian shall have no liability to any customer or third party for any loss, expense, or damage, including consequential, incidental, special, or punitive damage, including lost profi ts or lost revenue, caused directly or indirectly by any error or omission, or arising out of, or in connection with, the information contained herein. For the purposes of this paragraph, “Gordian” shall include The Gordian Group, Inc., and its divisions, subsidiaries, successors, parent companies, and their employees, partners, principals, agents and representatives, and any third-party providers or sources of information or data. Gordian grants the purchaser of this publication limited license to use the cost data

contained herein for purchaser’s internal business purposes in connection with construction estimating and related work. The publication, and all cost data contained herein, may not be reproduced, integrated into any software or computer program, developed into a database or other electronic compilation, stored in an information storage or retrieval system, or transmitted or distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission of Gordian. This publication is subject to protection under copyright law, trade secret law and other intellectual property laws of the United States, Canada and other jurisdictions. Gordian and its affi liates exclusively own and retain all rights, title and interest in and to this publication and the cost data contained herein including, without limitation, all copyright, patent, trademark and trade secret rights. Except for the limited license contained herein, your purchase of this publication does not grant you any intellectual property rights in the publication or the cost data.

Chief Data Offi cerNoam Reininger

Vice President, DataTim Duggan

Principal EngineerBob Mewis (1, 4)

Contributing EditorsBrian Adams (21, 22)Paul CowanChristopher BabbittSam BabbittStephen BellMichelle CurranAntonio D'Aulerio (26, 27, 28, 48)

Matthew Doheny (8, 9, 10)John Gomes (13, 41) Derrick Hale, PE (2, 31, 32, 33, 34, 35, 44, 46)Barry HutchinsonJoseph Kelble (14, 23, 25)Scott Keller (3, 5)Charles KibbeeGerard Lafond, PEThomas Lane (6, 7) Thomas LyonsJake MacDonald (11, 12)John Melin, P.E.Elisa MelloMatthew Sorrentino

Kevin SouzaDavid Yazbek

Production ManagerDebbie Panarelli

ProductionJonathan Forgit Sharon LarsenSheryl RoseJanice Thalin

Data Quality ManagerJoseph Ingargiola

InnovationRay DiwakarKedar GaikwadSrini Narla

Cover DesignBlaire Collins

Data AnalyticsDavid ByarsEllen D'amicoThomas HaugerCameron JagoeMatthew Kelliher-GibsonRenee Rudicil

Copyright The Gordian Group, Inc. 2020

Page 3: with RSMeans data · 2020. 7. 24. · distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission

iii

Foreword ivMasterFormat® Comparison Table vHow the Cost Data Is Built: An Overview viiEstimating with RSMeans data: Unit Prices ixHow to Use the Cost Data: The Details xiUnit Price Section 1RSMeans data: Unit Prices—How They Work 2Assemblies Section 493RSMeans data: Assemblies—How They Work 496Reference Section 605

Construction Equipment Rental Costs 607Crew Listings 619Historical Cost Indexes 656City Cost Indexes 657Location Factors 700Reference Tables 706Change Orders 742Project Costs 745Abbreviations 750

Index 754Other Data and Services 783Labor Trade Rates includingOverhead & Profit Inside Back Cover

Table of Contents

Copyright The Gordian Group, Inc. 2020

Page 4: with RSMeans data · 2020. 7. 24. · distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission

1

Unit Price Section

General Requirements01 11 Summary of Work .............................. 801 21 Allowances .......................................... 801 31 Project Management

and Coordination ................................ 1001 32 Construction Progress

Documentation ................................... 1101 41 Regulatory Requirements .................. 1201 45 Quality Control .................................. 1201 51 Temporary Utilities ............................ 1201 52 Construction Facilities ....................... 1201 54 Construction Aids .............................. 1301 55 Vehicular Access and Parking ........... 1601 56 Temporary Barriers and Enclosures .. 1601 58 Project Identification .......................... 1801 66 Product Storage and Handling

Requirements ...................................... 1801 74 Cleaning and Waste Management .... 1801 91 Commissioning ................................... 1801 93 Facility Maintenance .......................... 19

Existing Conditions02 41 Demolition .......................................... 2202 65 Underground Storage

Tank Removal ..................................... 2402 81 Transportation and Disposal of

Hazardous Materials ........................... 2402 82 Asbestos Remediation ........................ 2502 87 Biohazard Remediation ...................... 28

Concrete03 01 Maintenance of Concrete .................. 3203 11 Concrete Forming ............................... 3203 15 Concrete Accessories ......................... 3203 21 Reinforcement Bars ............................ 3603 22 Fabric and Grid Reinforcing .............. 3603 30 Cast-In-Place Concrete ....................... 3603 31 Structural Concrete ............................ 3703 35 Concrete Finishing ............................. 3803 54 Cast Underlayment ............................ 3903 63 Epoxy Grouting ................................... 3903 82 Concrete Boring .................................. 39

Masonry04 05 Common Work Results

for Masonry ......................................... 4204 21 Clay Unit Masonry ............................. 42

Metals05 05 Common Work Results for Metals ... 4405 12 Structural Steel Framing .................... 47

Wood, Plastics & Composites06 16 Sheathing ............................................. 50

Thermal & Moisture Protection07 65 Flexible Flashing ................................. 5207 71 Roof Specialties ................................... 5307 72 Roof Accessories ................................. 5307 76 Roof Pavers .......................................... 5307 84 Firestopping ......................................... 5407 91 Preformed Joint Seals ......................... 5507 92 Joint Sealants ...................................... 56

Openings08 34 Special Function Doors ...................... 6008 91 Louvers ................................................ 6008 95 Vents .................................................... 62

Finishes09 22 Supports for Plaster

and Gypsum Board ............................. 6409 69 Access Flooring ................................... 6409 91 Painting ................................................ 65

Specialties10 31 Manufactured Fireplaces .................... 6810 35 Stoves ................................................... 68

Equipment11 11 Vehicle Service Equipment ................ 7011 21 Retail and Service Equipment ........... 7011 30 Residential Equipment ....................... 7111 32 Unit Kitchens ...................................... 7211 41 Foodservice Storage Equipment ........ 7211 44 Food Cooking Equipment .................. 7311 46 Food Dispensing Equipment .............. 7311 48 Foodservice Cleaning and Disposal

Equipment ........................................... 7311 53 Laboratory Equipment ....................... 7311 71 Medical Sterilizing Equipment .......... 7411 73 Patient Care Equipment .................... 7511 74 Dental Equipment .............................. 7511 78 Mortuary Equipment .......................... 7511 81 Facility Maintenance Equipment ...... 7611 82 Facility Solid Waste

Handling Equipment .......................... 76Special Construction

13 11 Swimming Pools ................................. 7813 18 Ice Rinks .............................................. 7913 21 Controlled Environment Rooms ....... 7913 24 Special Activity Rooms ...................... 8013 34 Fabricated Engineered Structures ...... 8113 47 Facility Protection .............................. 81

Conveying Equipment14 91 Facility Chutes .................................... 8414 92 Pneumatic Tube Systems .................. 84

Plumbing22 01 Operation and Maintenance

of Plumbing ......................................... 8622 05 Common Work Results

for Plumbing ....................................... 8722 07 Plumbing Insulation ........................... 10722 11 Facility Water Distribution ............... 12622 12 Facility Potable-Water

Storage Tanks ...................................... 23922 13 Facility Sanitary Sewerage ................. 24022 14 Facility Storm Drainage ..................... 24422 15 General Service

Compressed-Air Systems ................... 24522 31 Domestic Water Softeners ................. 24722 35 Domestic Water Heat Exchangers .... 24722 41 Residential Plumbing Fixtures .......... 24722 51 Swimming Pool Plumbing Systems .. 24822 52 Fountain Plumbing Systems .............. 24822 62 Vacuum Systems for Laboratory and

Healthcare Facilities ........................... 24822 63 Gas Systems for Laboratory and

Healthcare Facilities ........................... 249Heating Ventilation Air Conditioning

23 05 Common Work Results for HVAC ... 25223 07 HVAC Insulation ................................ 26523 09 Instrumentation and

Control for HVAC .............................. 26723 11 Facility Fuel Piping ............................. 27523 12 Facility Fuel Pumps ............................ 27823 13 Facility Fuel-Storage Tanks ............... 27923 21 Hydronic Piping and Pumps .............. 28223 22 Steam and Condensate

Piping and Pumps ............................... 30023 23 Refrigerant Piping ............................... 30023 31 HVAC Ducts and Casings ................. 30323 33 Air Duct Accessories .......................... 31923 34 HVAC Fans .......................................... 32823 35 Special Exhaust Systems .................... 33523 36 Air Terminal Units ............................. 33723 37 Air Outlets and Inlets ........................ 33823 38 Ventilation Hoods ............................... 34823 41 Particulate Air Filtration ................... 34823 42 Gas-Phase Air Filtration .................... 35023 43 Electronic Air Cleaners ...................... 35023 51 Breechings, Chimneys, and Stacks ... 35023 52 Heating Boilers .................................... 358

23 53 Heating BoilerFeedwater Equipment ......................... 366

23 54 Furnaces ............................................... 36723 55 Fuel-Fired Heaters .............................. 37023 56 Solar Energy Heating Equipment ...... 37323 57 Heat Exchangers for HVAC ............... 37523 61 Refrigerant Compressors .................... 37623 62 Packaged Compressor

and Condenser Units .......................... 37823 63 Refrigerant Condensers ...................... 37823 64 Packaged Water Chillers .................... 38023 65 Cooling Towers ................................... 38423 72 Air-to-Air Energy

Recovery Equipment .......................... 38623 73 Indoor Central-Station

Air-Handling Units ............................. 38623 74 Packaged Outdoor

HVAC Equipment ............................... 38823 76 Evaporative Air-Cooling Equipment . 39123 81 Decentralized Unitary

HVAC Equipment ............................... 39323 82 Convection Heating

and Cooling Units .............................. 39823 83 Radiant Heating Units ....................... 41023 84 Humidity Control Equipment ........... 41623 91 Prefabricated Equipment Supports .... 417

Electrical26 01 Operation and Maintenance

of Electrical Systems .......................... 42026 05 Common Work Results

for Electrical ........................................ 42126 24 Switchboards and Panelboards .......... 42926 29 Low-Voltage Controllers .................... 430

Electronic Safety & Security28 18 Security Access

Detection Equipment ......................... 43428 23 Video Management System ............... 43428 31 Intrusion Detection ............................ 43428 42 Gas Detection and Alarm .................. 43528 46 Fire Detection and Alarm .................. 435

Earthwork31 05 Common Work Results

for Earthwork ...................................... 43831 23 Excavation and Fill ............................. 43831 41 Shoring ................................................. 45231 52 Cofferdams .......................................... 453

Exterior Improvements32 12 Flexible Paving .................................... 45632 84 Planting Irrigation .............................. 457

Utilities33 01 Operation and Maintenance

of Utilities ........................................... 46033 05 Common Work Results

for Utilities .......................................... 46433 11 Groundwater Sources ......................... 46633 14 Water Utility Transmission and

Distribution ......................................... 46733 16 Water Utility Storage Tanks .............. 47433 31 Sanitary Sewerage Piping ................... 47533 41 Subdrainage ......................................... 47633 42 Stormwater Conveyance .................... 47633 52 Hydrocarbon Transmission and

Distribution ......................................... 47933 61 Hydronic Energy Distribution ........... 48133 63 Steam Energy Distribution ................ 482

Pollution Control Equipment44 11 Particulate Control Equipment ......... 488

Water and Wastewater Equipment46 23 Grit Removal And

Handling Equipment .......................... 49246 25 Oil and Grease Separation

and Removal Equipment ................... 492

Sect. No. Page Sect. No. Page Sect. No. PageTable of Contents

Copyright The Gordian Group, Inc. 2020

Page 5: with RSMeans data · 2020. 7. 24. · distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission

Assemblies Section

493

A SUBSTRUCTURE

A2020 Basement WallsA2020 220 Subdrainage Piping .................................................................... 502

D SERVICES

D2020 Domestic Water DistributionD2020 265 Solar, Closed Loop, Add-On Hot Water Systems ................... 505D2020 270 Solar, Drainback, Hot Water Systems ..................................... 507D2020 275 Solar, Draindown, Hot Water Systems .................................... 509D2020 280 Solar, Recirculation, Domestic Hot Water Systems .............. 511D2020 285 Thermosyphon, Hot Water ....................................................... 513D2020 290 Solar, Hot Water, Air To Water Heat Exchange ..................... 515D2020 295 Solar, Closed Loop, Hot Water Systems .................................. 517

D3010 Energy SupplyD3010 510 Apartment Building Heating - Fin Tube Radiation ................ 518D3010 520 Commercial Building Heating - Fin Tube Radiation ............. 519D3010 530 Commercial Bldg. Heating - Terminal Unit Heaters ............. 520D3010 650 Solar, Closed Loop, Space/Hot Water Systems ....................... 523D3010 660 Solar Swimming Pool Heater Systems .................................... 525D3010 675 Air To Water Heat Exchange .................................................... 527

D3020 Heat Generating SystemsD3020 102 Small Heating Systems, Hydronic, Electric Boilers ............... 528D3020 104 Large Heating Systems, Hydronic, Electric Boilers ................ 529D3020 108 Heating Systems, Unit Heaters ................................................ 530D3020 110 Heating System, Fin Tube Radiation ....................................... 531D3020 126 Electric Boiler, Hot Water ......................................................... 532D3020 128 Electric Boiler, Steam ................................................................ 533D3020 130 Boiler, Cast Iron, Hot Water, Gas ............................................ 534D3020 134 Boiler, Cast Iron, Steam, Gas ................................................... 535D3020 136 Boiler, Cast Iron, Hot Water, Gas/Oil ..................................... 535D3020 138 Boiler, Cast Iron, Steam, Gas/Oil ............................................. 535D3020 330 Circulating Pump Systems, End Suction ................................ 536D3020 340 Circulating Pump Systems, Double Suction .......................... 536

D3030 Cooling Generating SystemsD3030 110 Chilled Water, Air Cooled Condenser Systems ...................... 537D3030 115 Chilled Water, Cooling Tower Systems .................................. 539D3030 130 Reciprocating Chiller, Water Cooled ....................................... 541D3030 135 Reciprocating Chiller, Air Cooled ............................................ 541D3030 140 Centrifugal Chiller, Water Cooled ........................................... 542D3030 145 Gas Absorption Chiller, Water Cooled .................................... 543D3030 150 Steam Absorption Chiller, Water Cooled ................................ 543D3030 310 Galvanized Draw Through Cooling Tower ............................. 544D3030 320 Fiberglass Draw Through Cooling Tower ............................... 544D3030 330 Stainless Steel Draw Through Cooling Tower ....................... 544

D3040 Distribution SystemsD3040 106 Field Fabricated Air Handling Unit ......................................... 545D3040 108 Field Fabricated VAV Air Handling Unit ................................. 546D3040 110 Central Station Air Handling Unit .......................................... 547

D3040 112 Central Station Air Handling Unit, VAV ................................ 548D3040 114 Rooftop Air Handling Unit ....................................................... 549D3040 116 Rooftop Air Handling Unit, VAV ............................................. 550D3040 118 Fan Coil A/C Unit, Two Pipe ................................................... 551D3040 120 Fan Coil A/C Unit, Two Pipe, Electric Heat .......................... 551D3040 122 Fan Coil A/C Unit, Four Pipe .................................................. 552D3040 124 Fan Coil A/C, Horizontal, Duct Mount, 2 Pipe ..................... 552D3040 126 Fan Coil A/C, Horiz., Duct Mount, 2 Pipe, Elec. Ht. ............ 552D3040 128 Fan Coil A/C, Horizontal, Duct Mount, 4 Pipe ..................... 552D3040 132 VAV Terminal, Cooling Only ................................................... 553D3040 134 VAV Terminal, Hot Water Reheat ............................................ 553D3040 136 Fan Powered VAV Terminal, Cooling Only ............................ 553D3040 138 Fan Powered VAV Terminal, Hot Water Reheat ..................... 554D3040 220 Centrifugal In Line Fan Systems .............................................. 555D3040 230 Utility Set Fan Systems ............................................................ 555D3040 240 Roof Exhaust Fan Systems ........................................................ 556D3040 250 Commercial/Industrial Vacuum Dust Collection .................. 557D3040 260 Kitchen Exhaust/Make-Up Air ................................................. 558D3040 610 Heat Exchanger, Plate Type ...................................................... 559D3040 620 Heat Exchanger, Shell & Tube ................................................. 559

D3050 Terminal & Package UnitsD3050 120 Unit Heaters, Gas ...................................................................... 560D3050 130 Unit Heaters, Hydronic ............................................................. 560D3050 140 Cabinet Unit Heaters, Hydronic .............................................. 561D3050 150 Rooftop Single Zone Unit Systems .......................................... 562D3050 155 Rooftop Multizone Unit Systems ............................................ 564D3050 160 Self-contained, Water Cooled Unit Systems ........................... 566D3050 165 Self-contained, Air Cooled Unit Systems ............................... 568D3050 170 Split Systems With Air Cooled Condensing Units ................ 570D3050 175 Rooftop Air Conditioner, Const. Volume ............................... 572D3050 180 Rooftop Air Conditioner, Variable Air Volume ...................... 572D3050 185 Computer Room Cooling Units ............................................... 573D3050 201 Packaged A/C, Elec. Ht., Const. Volume ................................ 573D3050 202 Packaged Air Conditioner, Elect. Heat, VAV .......................... 574D3050 203 Packaged A/C, Hot Wtr. Heat, Const. Volume ...................... 574D3050 204 Packaged A/C, Hot Wtr. Heat, VAV ........................................ 574D3050 210 AC Unit, Package, Elec. Ht., Water Cooled ............................ 575D3050 215 AC Unit, Package, Elec. Ht., Water Cooled, VAV .................. 575D3050 220 AC Unit, Package, Hot Water Coil, Water Cooled ................ 576D3050 225 AC Unit, Package, HW Coil, Water Cooled, VAV .................. 576D3050 230 Heat Pump, Water Source, Central Station ............................ 577D3050 235 Heat Pump, Water Source, Console ......................................... 577D3050 240 Heat Pump, Horizontal, Duct Mounted .................................. 577D3050 245 Heat Pump, Rooftop, Air/Air ................................................... 578D3050 255 Thru-Wall A/C Unit .................................................................. 579D3050 260 Thru-Wall Heat Pump ............................................................... 579

D3090 Other HVAC Systems/EquipD3090 310 Fume Hood Exhaust Systems ................................................... 580D3090 320 Garage Exhaust Systems ........................................................... 581D3090 750 Seismic Concrete Equipment Pads .......................................... 582

Table of ContentsTable No. Page Table No. Page

Copyright The Gordian Group, Inc. 2020

Page 6: with RSMeans data · 2020. 7. 24. · distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission

495

G BUILDING SITEWORK

G1030 Site EarthworkG1030 805 Trenching Common Earth ........................................................ 586G1030 806 Trenching Loam & Sandy Clay ................................................ 588G1030 807 Trenching Sand & Gravel ......................................................... 590G1030 815 Pipe Bedding ............................................................................... 592

G3010 Water SupplyG3010 110 Water Distribution Piping ......................................................... 594

G3020 Sanitary SewerG3020 110 Drainage & Sewage Piping ........................................................ 595

G3030 Storm SewerG3030 210 Manholes & Catch Basins ........................................................ 597

G3060 Fuel DistributionG3060 110 Gas Service Piping ..................................................................... 599G3060 310 Fiberglass Fuel Tank, Double Wall .......................................... 600G3060 320 Steel Fuel Tank, Double Wall ................................................... 602G3060 325 Steel Tank, Above Ground, Single Wall .................................. 603G3060 330 Steel Tank, Above Ground, Double Wall ................................ 603

Table of ContentsTable No. Page Table No. Page

Copyright The Gordian Group, Inc. 2020

Page 7: with RSMeans data · 2020. 7. 24. · distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission

605

All the reference information is in one section,making it easy to find what you need to knowand easy to use the data set on a daily basis. Thissection is visually identified by a vertical blackbar on the page edges.In this Reference Section, we’ve includedEquipment Rental Costs, a listing of rental andoperating costs; Crew Listings, a full listingof all crews and equipment and their costs;Historical Cost Indexes for cost comparisonsover time; City Cost Indexes and LocationFactors for adjusting costs to the region youare in; Reference Tables, where you will findexplanations, estimating information andprocedures, and technical data; Change Orders,information on pricing changes to contractdocuments; and an explanation of all theAbbreviations in the data set.

Table of ContentsConstruction EquipmentRental Costs 607

Crew Listings 619

Historical Cost Indexes 656

City Cost Indexes 657

Location Factors 700

Reference Tables 706R01 General Requirements.......................... 706R02 Existing Conditions .............................. 720R07 Thermal & Moisture Protection ......... 721R09 Finishes .................................................. 722R22 Plumbing ............................................... 722R23 Heating, Ventilating &

Air Conditioning................................... 728R26 Electrical ................................................ 739R31 Earthwork .............................................. 740R33 Utilities.................................................. 741

Change Orders 742

Project Costs 745

Abbreviations 750

ReferenceSection

Copyright The Gordian Group, Inc. 2020