AIRAC AIP SUPPLEMENT
File No. AAI/ATM/AIS/09-09/2012
Following supplement is issued for information, guidance and necessary action.
Airports Authority of India AIP Supplement 07/2012 Page 1 of 18
V.P. AGRAWAL
CHAIRMAN AIRPORTS AUTHORITY OF INDIA
[EFFECTIVE DATE: 08 MARCH 2012]
WORK ACTIVITIES ON AIRCRAFT MOVEMENT AREAS CHHATRAPATI SHIVAJI INTERNATIONAL AIRPORT
MUMBAI (08 MAR 2012, 0330 UTC (0900 IST) TO 20 MAY 2012 1130 UTC (1700 IST)
1. INTRODUCTION
1.1 The purpose of this AIP Supplement is to:
1.1.1 Inform operators of the schedule of works, closure of Runways and Taxiways and the extent of facilities affected due to construction activities on the aircraft movement areas, with specific reference to RWY 09/27, TWYs N1, N3 and M4.
1.1.2 Redefine Hot Spots at Mumbai International Airport, during the time limited closure of RWY 09/27, when only RWY 14/32 is in operation. Please see Annexure C.
1.2 This AIP Supplement does not show changes due to ongoing works at Apron V development at CSI Airport.
1.3 The information detailed in this AIP Supplement is for the period 08 March 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST).
2. TEMPORARY CLOSURES OF RUNWAY AND TAXIWAYS
2.1 Refer Annexure B, for schedule of closure of affected runway and taxiways.
2.2 Refer Annexure B1 to B3 for Charts/ layout of affected runway and taxiways.
TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: [email protected]
INDIA AERONAUTICAL INFORMATION SERVICE
AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT
NEW DELHI – 110003
07/2012
25 JAN 2012
Airports Authority of India AIP Supplement 07/2012 Page 2 of 18
3. WORK ACTIVITIES FOR CONSTRUCTION OF RET N5 FOR RWY 09: (From 08 March 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST))
3.1 Construction in Zone II: (From 08 March 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST))
From 08 March 2012 to 20 May 2012 work will be undertaken within Zone II of RWY 09/27, north of runway at a distance of 75m from RWY Centre-line up to 47.5m south of TWY N1 Centre-line.
3.2 Time Limited Closure of Runway 09/27: (From 08 March 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST))
With effect from 08 March 2012 up to 20 May 2012, construction work will be undertaken in Zone I of the RWY 09/27. This work will require Time Limited Closure of RWY 09/27 resulting in the following major changes:
3.2.1 RWY 09/27: 3.2.1.1 RWY 09/27 will be closed for landing and takeoff 6 days a week, from Monday to
Saturday, between 0330 UTC (0900 IST) to 1130 UTC (1700 IST).
3.2.1.2 During this time RWY 14/32 will be available for operation.
3.2.1.3 RWY 09/27 restoration time will be 4 hrs.
3.2.1.4 Between 1130 UTC (1700 IST) to 0330 UTC (0900 IST) Daily, including Sunday, an area of approx 40m in length will have freshly paved, load bearing surface. This location will be at a distance of 22.5m north of Centre-line of RWY, 575m from threshold of RWY 27 and 2200m from threshold of RWY 09.
3.2.2 RWY 14/32: 3.2.2.1 TORA/TODA and ASDA available from different entry Taxiways of RWY 14/32
are given below:
RUNWAY DESIGNATIO
N
ENTRY TAXIWAY
TORA (M)
TODA (M)
ASDA (M)
14
E10 2871 2871 2871
E9 2774 2774 2774
K1 2409 2409 2409
K3 2311 2311 2311
W4 1794 1794 1794
32
E1 2871 2871 2871
W1 2823 2823 2823
S1 1869 1869 1869
S 1824 1824 1824
RWY Intersection 1559 1559 1559 Note: Graphic depiction of the above Table is given in Annexure D1 & D2.
Airports Authority of India AIP Supplement 07/2012 Page 3 of 18
3.2.2.2 RWY 14/32 shall be closed for scheduled periodic maintenance every Sunday between 0615 UTC (1145 IST) to 0915 UTC (1445 IST).
3.2.2.3 RWY 14/32 restoration period, during maintenance closure, will be 30 minutes.
3.2.2.4 During closure of RWY 14/32, RWY 09/27 will be available for operation.
4. WORK ACTIVITIES FOR RECONSTRUCTION OF TWY N1
4.1 Full Time Closure of portion of TWY N1 from its Junction with TWY N3 to an Area upto 112.5m west of the Junction
(From 08 March 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST))
4.1.1 From 08 March 2012, 0330 UTC (0900 IST) till 20 May 2012, 1130 UTC (1700 IST) Taxiway N1 not available between Taxiways N4 and N3.
4.1.2 During the above times taxi routing will be M7 – H – M4 – N3 for departure from RWY 27.
4.2 Time Limited Closure of Junction of TWYs N1/M4/N3: (From 08 March 2012, 0330 UTC (0900 IST) to 19 March 2012, 1130 UTC (1700 IST))
Reconstruction work will be carried out on the west side of centre line of TWYs M4/N3 junction between 0330 UTC (0900 IST) to 1130 UTC (1700 IST) from Monday to Saturday.
4.2.1 Existing centre line at the junction of Taxiway M4-N3 will be diverted to the east 24x7
4.2.2 Restrictions on TWYs during time limited works:
4.2.2.1 TWY N3 not available.
4.2.2.2 TWY M4 not available.
4.2.3 A step down of up to 900mm present at a distance of 11.5m west of diverted C/L of TWY M4.
4.2.3.1 The step down demarcated with obstruction flags and red lights placed at every 3m.
4.3 Time Limited Closure of Portion of TWY N1 North of its C/L – East of TWY M7 up to west of junction of TWY N1/N3
(From 08 March 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST))
Construction of a new drain at a distance of 22m north of C/L of TWY N1 between east of TWY M7 and west of junction of TWY N1/N3 will be carried out between 0330 UTC (0900 IST) to 1130 UTC (1700 IST) Monday to Saturday.
4.3.1 Restrictions on TWY N1 between 0330 UTC (0900 IST) to 1130 UTC (1700 IST), Monday to Saturday:
4.3.1.1 Portion of TWY N1 between east of TWY M7 up to junction of TWY N1/N3 will not be available for taxiing without Follow-me service.
4.3.2 A step down of up to 5m will be present at a distance of 22m north of C/L of TWY N1.
4.3.2.1 Obstruction flags and red lights will be placed to demarcate step down.
Airports Authority of India AIP Supplement 07/2012 Page 4 of 18
4.4 Time Limited Closure of Junction of TWYs N1/M4/N3, (From 20 March 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST))
Reconstruction work will be carried out on the east side of centre line of TWYs M4/N3 junction between 0330 UTC (0900 IST) to 1130 UTC (1700 IST), Monday to Saturday.
4.4.1 Existing centre line at the junction of Taxiway M4-N3 will be diverted to the west
24x7.
4.4.2 Restrictions on TWYs during time limited work:
4.4.2.1 TWY N3 not available.
4.4.2.2 TWY M4 not available.
4.4.3 A step down of up to 900mm present at a distance of 11.5m west of diverted C/L of TWY M4.
4.4.3.1 The step down demarcated with obstruction flags and red lights placed at every 3m.
5. TIME LIMITED CLOSURE OF JUNCTION OF TWY N1 WITH RWY 27 EXTREMITY
(From 08 March 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST))
Reconstruction of junction of RWY 27 extremity & TWY N1 will be carried out between 0330 UTC (0900 IST) to 1130 UTC (1700 IST), Monday to Saturday.
5.1 Restrictions on TWY N1:
5.1.1 Portion of TWY N1 east of its junction with TWY N3 will not be available 24x7
Note: Portion of TWY N1 east of its junction with TWY N3 up to holding point of RWY 27 is closed for operations, 24x7, for Mithi River works.
6. TIME LIMITED CLOSURE OF PORTION OF TWY E BETWEEN ITS JUNCTION WITH TWY N1 AND HOLDING POINT ON RWY 09/27:
(From 08 March 2012, 0330 UTC (0900 IST) to 20 MAY 2012, 1130 UTC (1700 IST) Monday to Saturday)
Construction of pavement east of portion of TWY E between RWY 09/27 and TWY N1 for RET N5 will be carried out.
Work will be taken up from Monday to Saturday, subject to No work on southern shoulder of TWY N1 for RET N5 and North of TWY N1 for drain works.
6.1 During work Portion of TWY E between north of RWY 09/27 and south of TWY N1 will not be available for taxiing.
7. TIME LIMITED CLOSURE OF TWY M4 (From 08 March 2012, 0330 UTC (0900 IST) to 01 May 2012, 1130 UTC (1700 IST))
Reconstruction work will be carried out on the west side of TWY M4 centre line between 0330 UTC to 1130 UTC, Monday to Saturday.
7.1 Restrictions on TWYs during time limited work:
7.1.1 TWY M4 not available.
7.2 A step down of up to 900mm present at a distance of 11.5m west of C/L of TWY M4.
Airports Authority of India AIP Supplement 07/2012 Page 5 of 18
7.2.1 The step down demarcated with obstruction flags and red lights placed at every 3m.
8. CONSTRUCTION OF NEW TAXI LANE F NORTH OF TWY N1 (From 08 March 2012, 0330 UTC (0900 IST) to 01 May 2012, 1130 UTC (1700 IST))
Construction for New Code E taxiway, TAXI LANE F, parallel to existing TWY N1 on the North, will be carried out between 0330 UTC (0900 IST) to 1130 UTC (1700 IST).
8.1 Taxi lane F will be located at a distance of 194m north of TWY N1.
9. CONSTRUCTION OF APRON R NORTH OF TWY N1 (From 08 March 2012, 0330 (0900 IST) UTC to 20 May 2012, 1130 UTC (1700 IST))
Apron R will be constructed at a location north of TWY N1, east of TWY M7, west of TWY M4 and south of Taxi lane F.
10. CLOSURE OF PORTION OF TWY M4 NORTH OF ITS JUNCTION WITH TAXI LANE F (NEW TAXI LANE)
(From 01 May 2012, 0330 UTC (0900 IST) to 20 May 2012, 1130 UTC (1700 IST))
10.1 Construction of drain to connect the new apron drains with Mithi River.
11. SCHEDULED RUNWAY 09/27 AND 14/32 MAINTENANCE CLOSURES 11.1 Runway 09/27 will be closed for RET N5 works daily, Monday to Saturday
between 0330 UTC (0900 IST) to 1130 UTC (1700 IST) from 08 March 2012 to 20 May 2012.
11.2 Closure of the runway will be indicated with white crosses placed at both ends of the runway.
11.3 There will be construction equipment and vehicles working on runway at specific areas during time limited closure of RWY.
11.4 During runway 09/27 closure, Runway 14/32 will be available for operation.
11.5 In the event of an emergency or totally unfavourable weather conditions between 0330 UTC (0900 IST) to 1130 UTC (1700 IST) when Runway 09/27 is closed for RET N5 works, Runway 09/27 can be reopened within 4 hours from the time of notification by ATC.
11.6 Runway 14/32 scheduled weekly maintenance shall be on every Sunday between 0615 UTC (1145 IST) to 0915 UTC (1445 IST). Parts of RWY 14/32 available for taxiing will be confirmed by Apron Control on the day of closure.
11.7 Intersection of RWYs 09/27 and 14/32 shall be closed every night for RWY Friction test between 08 March 2012 to 20 May 2012, from 2200 UTC (0330 IST) to 2230 UTC (0400 IST).
Airports Authority of India AIP Supplement 07/2012 Page 6 of 18
12. MARKING AND LIGHTING OF UNSERVICEABLE AREAS 12.1 All unserviceable areas on taxiways or aprons will be demarcated by water filled
yellow barricades. 12.2 Obstruction lights will available at night as omni-directional fixed red lights at
every 3m interval. 12.3 Taxiways or section of taxiways which are under construction and closed for
traffic will also be marked by yellow crosses at each end of the taxiway or portion thereof.
13. PRECAUTIONS 13.1 During Runway 09/27 Closure
During the construction periods, pilots are advised to take note of the following precautions when operating on RWY 09/27. i. Presence of construction equipment up to 7 metres above ground beyond 180
metres east of Intersection of RWYs. 14. General
During the construction periods, pilots are advised to take note of the following precautions when taxiing near the work areas as shown in Annexure B1 to B3.
14.1 Presence of construction equipment up to 7 metres above ground beyond 47.5 metres from the taxiway centreline.
14.2 Movements of construction equipment and vehicles across taxiways in the vicinity of the work areas as given in Para 12 are controlled by work personnel stationed on site. Priority is always given to aircraft for the use of taxiways except when they are closed.
14.3 Presence of open excavation demarcated by water filled yellow colour barriers or red/white flags, and lighted at night by omni-directional fixed red lights along sections of taxiways. Pilots should exercise caution when taxiing aircraft along these sections of taxiways. Flags will be provided in grass areas.
14.4 Presence of spotlights or obstruction lights at the work areas, which should not be confused with airfield lighting.
15. NOTE: Any change to the contents of this AIP Supplement will be notified through NOTAM.
ANNEXURE - A CLOSURE AND / OR CHANGES TO TAXIWAYS AND APRON
Airports Authority of India AIP Supplement 07/2012 Page 7 of 18
Sl. No. Taxiways Period of Closure Area of Work/Closure Remarks Taxi Routing during RWY 14 or RWY 32
in use
1. TWY E 08 Mar 12, (0330 UTC)
to
20 May 12, (1130 UTC)
Portion between RWY27 & TWY N1
- Construction of TWY N5 in Zone-I of RWY 27
Note: Work will be taken up subject to No work at following locations:
- southern shoulder of TWY N1 for RET N5
- North of TWY N1 between East of TWY M7 and west of junction of TWY M4/N1/N3, for construction of drain.
This is to ensure availability of one taxi route to/from International Aprons.
Landing on RWY 14: Domestic Apron:
- B/B1 →S1→cross RWY14 (with permission from TWR) →S →Q → RWY 27 → N6/ N7/ N8/ N9
International Apron:
- TWY B/B1 → E1 → RWY09 → N4 → N1→M7
OR, if TWY E is available:
- TWY B/B1/E1 → Cross RWY27 → E →P→H
Landing on RWY 32: Domestic Apron:
- TWYs K1/K3
International Apron:
- TWY E5 →TAXI LANE P/H
OR,
- TWY E5 →E →N1→M7
Airports Authority of India AIP Supplement 07/2012 Page 8 of 18
Departure from RWY 14: Domestic Apron:
- TWYs K1/K3
International Apron:
- Taxi lane H → P → TWY→ E5
Departure from RWY 32:
Domestic Apron:
- N →N9/N7/W → RWY 27 →Q →S→ Cross RWY32 (with permission from TWR) →S1 →E1
International Apron:
- If TWY E is available:
- TAXI LANE P → E →RWY 27 →E1
OR
- TAXI LANE H →M7 →N1→N4 →RWY 27 →E1
2. Junction of TWY N1 & N3
08 Mar 12, (0330 UTC)
to 19 Mar 12
(1130 UTC)
West side to Junction of TWY N1 & N3
Reconstruction of Taxi Lane For aircraft code F standard
- TWY M4 & N3 not available during closure period.
- TWY M4 & N3 available after closure period along diverted centerline.
3. TWY N1 08 Mar 12, (0330 UTC)
to 20 May 12, (1130 UTC)
Junction of TWY N1/N3/ M4 up to Junction of TWY N4.
Reconstruction of TWY N1/N3/M4 Intersection
Realigning TWY N1 to 190m from RWY 27 Centre Line
08 Mar to 01 May: TWY M7 → H → M4 → N3
01 May to 20 May: TWY M7 → F → M4 → N3
Airports Authority of India AIP Supplement 07/2012 Page 9 of 18
4. TWY N1 08 Mar 12, (0330 UTC)
to 20 May 12, (1130 UTC)
Portion of TWY N1 between east of TWY M7 and west of junction of TWY N1/N3
Construction of major drain north of TWY N1
Portion of TWY N1 between east of TWY M7 up to junction of TWY N1/N3 will not be available for taxiing without Follow-me service during work period.
5. TWY N1 20 Mar 12, (0330 UTC)
to 20 May 12, (1130 UTC)
Junction of TWY N1 & N3 on the East Side
Reconstruction of Taxi Lane For aircraft code F standard
TWY M4 & N3 not available during closure period.
TWY M4 & N3 available after closure period along diverted centerline.
6. TWY M4 08 Mar 12, (0330 UTC)
to 01 May 12, (1130 UTC)
Western shoulder of TWY M4
Construction of Junction between New Taxi lane F and TWY M4.
TWY M4 not available during closure period.
7. TWY M4 01May12, (0330 UTC)
to 20 May 12, (1130 UTC)
Portion of TWY M4 between Taxi lane H and New Taxi lane F
Construction of new drain from Apron
New Taxi lane F available for all movement
Airports Authority of India AIP Supplement 07/2012 Page 10 of 18
Annexure B SCHEDULE OF CLOSURES OF RUNWAY AND TAXIWAYS (From 08 March 2012, 0330 UTC (0900 IST) to 20 may 2012, 1130 UTC (1700 IST))
Chart No.
Period
Impact on Runways Impact on Taxiways Impact on Aircraft Stands
B1 08 March 12, 0330 UTC (0900 IST)
to
20 March 12, 0330 UTC (0900 IST)
Closure of RWY 09/27 from 0330 UTC to 1130 UTC on daily basis, Monday to Saturday.
Intersection of RWYs with RWY 14/32 is available
- Temporary closure of portion of TWY E between North of RWY 09/27 and South of TWY N1, subject to availability of alternate taxi route
- Temporary diversion of TWY C/L towards east at the junction of TWYs N1/M4/N3
- Temporary closure of portion of TWY N1 east of TWY N4 and west of junction of TWYs N1/M4/N3, subject to availability of alternate taxi route.
- Temporary closure of portion of TWY N1 from east of TWY N3 up to Holding point of RWY 27.
- Time limited works in Zone-I of RWY 27 for construction of RET N5.
- Time limited works on southern shoulder of TWY N1 for construction of RET N5, subject to availability of alternate taxi route.
- Time limited works in Zone-I of RWY 27 on TWY N1 at the extremity of RWY.
- Time limited work on western shoulder of TWY M4.
- Time limited work on west of TWYs N1/M4/N3 junction
- Time limited work on northern shoulder of TWY N1 between east of TWY M7 and west of N1/N3/M4 junction.
Nil
Airports Authority of India AIP Supplement 07/2012 Page 11 of 18
B2 20 March 2012, 0330 UTC (0900 IST)
to
01 May 2012, 0330 UTC (0900 IST)
Continuation of Closure of RWY 09/27 from 0330 UTC to 1130 UTC on daily basis, Monday to Saturday.
Intersection of RWYs with RWY 14/32 is available
- Temporary closure of portion of TWY E between North of RWY 09/27 and South of TWY N1, subject to availability of alternate taxi route
- Temporary diversion of TWY C/L towards west at the junction of TWYs N1/M4/N3
- Temporary closure of portion of TWY N1 from east of TWY N3 up to Holding point of RWY 27.
- Time limited works in Zone-I of RWY 27 for construction of RET N5.
- Time limited works on southern shoulder of TWY N1 for construction of RET N5, subject to availability of alternate taxi route.
- Time limited works in Zone-I of RWY 27 on TWY N1 at the extremity of RWY.
- Time limited work on western shoulder of TWY M4.
- Time limited work on east of TWYs N1/M4/N3 junction
- Time limited work on northern shoulder of TWY N1 between east of TWY M7 and East of junction of TWYs N4.
Nil
B3 01 May 2012, 0330 UTC (0900 IST)
to
20 May 2012, 1130 UTC (1700 IST)
Continuation of Closure of RWY 09/27 from 0330 UTC to 1130 UTC on daily basis, Monday to Saturday.
Intersection of RWYs with RWY 14/32 is available
- Temporary closure of portion of TWY E between North of RWY 09/27 and South of TWY N1, subject to availability of alternate taxi route.
- Temporary diversion of TWY C/L towards west at the junction of TWYs N1/M4/N3
- Temporary closure of portion of TWY N1 from east of TWY N3 up to Holding Point of RWY 27.
Nil
Airports Authority of India AIP Supplement 07/2012 Page 12 of 18
- Time limited works in Zone-I of RWY 27 for construction of RET N5.
- Time limited works on southern shoulder of TWY N1 for construction of RET N5.
- Time limited works in Zone-I of RWY 27 on TWY N1 at the extremity of RWY.
- Time limited work on east of TWYs N1/M4/N3 junction
- Time limited work on northern shoulder of TWY N1 between east of TWY M7 and east of junction of TWY N4.
- Full time closure of portion of TWY M4 from its junction with Taxi lane H up to New Taxi lane F.
0 310 620 930 1,240155Meters
µ
N10 N9 N8 N7
L1 L3 L4
L L
NN
K1
K1
K3
K3U
N
W4
E9 E10
E8
E7
E5
P
P
E
E
N1N1
N1N3N4
E1
S1
E1
E1
W1
B1
M4
H
H
H
N6
S7R
NEW FACILITY UNDER CONSTRUCTION
Term
inal
1B
Terminal 1CTerminal 1A
Terminal 2B
Terminal 2C
RWY 09/27
RWY 14/32
ATC
CARGO TERMINAL
S
Q
W
R
LAYOUT OF WORK AREAS AT CSI AIRPORT, MUMBAI 08 MARCH 2012 0330 UTC (0900 IST) TO 20 MARCH 2012 0330UTC (0900 IST) Annexure B1
E10
N
1112
SW PIER
A2 A1A4 A3A6 A5A8 A7A9A10A11A12
9
10
87
65
43
21
26
25
28
27
29
30
31
3435
3637
3839
40
8584
8382
81
8086
8788
L1L2
L3L4
L5L6
L9
L7L8
L10
H
H
M7
G1G2
G3
G4
G5
G5L
G5R
G4LG4R
G3LG3R
S1S1L
S1R
S2R
S2
V1148 49
5051
52
53
54
55
55A
K8
K7
K6K5
V12
V10
V9P1
P1Link1G8
H
V13 V14V15
Y2Y1
Y3 Y4Y3L
Y3R
TIME LIMITED WORK
FLEXIBLE
RIGID
RUNWAY PAVEMENT
S3S3R
S3LV16
V17V17
LV17
R
B
Airports Authority of India AIP Supplement 07/2012 Page 13 of 18
0 320 640 960 1,280160Meters
µ
N10 N9 N8 N7
L1 L3 L4
L L
NN
K1
K1
K3
K3U
N
W4
E9 E10
E8
E7
E5
P
P
E
E
N1N1
N1N3N4
E1
S1
E1
E1
W1
B1
M4
H
H
H
N6
S7R
NEW FACILITY UNDER CONSTRUCTION
Term
inal
1B
Terminal 1CTerminal 1A
Terminal 2B
Terminal 2C
RWY 09/27
RWY 14/32
ATC
CARGO TERMINAL
S
Q
W
R
LAYOUT OF WORK AREAS AT CSI AIRPORT, MUMBAI 20 MARCH 2012 0331 UTC (0901 IST) TO 01 MAY 2012 0330UTC (0900 IST) Annexure B2
E10
N
1112
SW PIER
A2 A1A4 A3A6 A5A8 A7A9A10A11A12
9
10
87
65
43
21
26
25
28
27
29
30
31
3435
3637
3839
40
8584
8382
81
8086
8788
L1L2
L3L4
L5L6
L9
L7L8
L10
H
H
M7
G1G2
G3
G4
G5
G5L
G5R
G4LG4R
G3LG3R
S1S1L
S1R
S2R
S2
V1148 49
5051
52
53
54
55
55A
K8
K7
K6K5
V12
V10
V9P1
P1Link1G8
H
V13 V14V15
Y2Y1
Y3 Y4Y3L
Y3R
TIME LIMITED WORK
FLEXIBLE
RIGID
RUNWAY PAVEMENT
S3S3R
S3LV16
V17V17
LV17
R
B
Airports Authority of India AIP Supplement 07/2012 Page 14 of 18
0 310 620 930 1,240155Meters
µ
N10 N9 N8 N7
L1 L3 L4
L L
NN
K1
K1
K3
K3U
N
W4
E9 E10
E8
E7
E5
P
P
E
E
N1N1
N1N3N4
E1
S1
E1
E1
W1
B1
F
H
H
H
N6
S7R
NEW FACILITY UNDER CONSTRUCTION
Term
inal
1B
Terminal 1CTerminal 1A
Terminal 2B
Terminal 2C
RWY 09/27
RWY 14/32
ATC
CARGO TERMINAL
S
Q
W
R
LAYOUT OF WORK AREAS AT CSI AIRPORT, MUMBAI 01 MAY 2012 0331 UTC (0901 IST) TO 20 MAY 2012 1130UTC (1700 IST) Annexure B3
E10
N
1112
SW PIER
A2 A1A4 A3A6 A5A8 A7A9A10A11A12
9
10
87
65
43
21
26
25
28
27
29
30
31
3435
3637
3839
40
8584
8382
81
8086
8788
L1L2
L3L4
L5L6
L9
L7L8
L10
H
H
M7
G1G2
G3
G4
G5
G5L
G5R
G4LG4R
G3LG3R
S1S1L
S1R
S2R
S2
V1148 49
5051
52
53
54
55
55A
K8
K7
K6K5
V12
V10
V9P1
P1Link1G8
H
V13 V14V15
Y2Y1
Y3 Y4Y3L
Y3R
TIME LIMITED WORK
FLEXIBLE
RIGID
RUNWAY PAVEMENT
S3S3R
S3LV16
V17V17
LV17
R
M4
B
Airports Authority of India AIP Supplement 07/2012 Page 15 of 18
0 400 800 1,200 1,600200Meters
MUMBAI, INDIA
CHHATRAPATI SHIVAJI INTL. AIRPORTARP ELEV. 23 ft ARP: 19° 05' 30" N 072° 51' 58'' E
AERODROME CHART - HOT SPOT
MARKING AIDS RWY 09/27
NOTE: AERONAUTICAL GROUND LIGHTS ARE NOT SHOWN ON THIS CHART
PAPIPAPI
PAPI
END ELE
V. 25
.6
END ELE
V. 39
.1
EN
D E
LEV.
15.
7
EN
D E
LEV.
26 .
2
14/32
09/27
0 1,300 2,600 3,900 5,200650Feet
N10
N N
H
RWY 14/32 : 2871x45K
N8 N7 N6
W4
S7
K1
K3
S1
C
MARKING AIDS RWY 14/32
N3
L
ARPE
S
N4
M4
E1
B1
E5
N1 N1
N1E
H
H
U
L1 L3
E7
E8
PAPI
E10
P
E1
E9
YA D
D
G
L
L
W1
R
C
C
K1
K3
WINDSOCKWINDSOCK
WINDSOCK
WINDSOCK
N9
G
L4
FLEXIBLE
RIGID
RUNWAY PAVEMENT
ILS/LLZISCZ 110.3
GP/DME332.6993/1056
GP/DME334.4 BBY 1062/999
ILS/LLZIBOM 109.5
GP/DME335.0ISCZ 1001/1064
ILS/LLZIBBY 110.1
DVOR/DMEBBB 116.61200/1137
2765/2766 (MHz)2795/2796 (MHz)
MSSR 1030/1090 (MHz)
ASR/MSSR
ASR
Q
TWR 118.1GND 121.9
E10
M7
N
E1
¢N(mag) N(True)
Var : 0°40' W 2009
Annual rate of
change : 2' E
DATUM: WGS 84ELEVATIONS ARE IN FEET DIMENSIONS ARE IN METERSBEARINGS ARE MAGNETIC
W
VS
H
R
P1
Y
H
RWY 27 : 3448x60
09 91° 19° 05' 18.42" N 072° 50' 57.30" E
15.7 101/F/B/W/T
14 136° 19° 05' 45.62" N 072° 51' 35.70" E
39.1 89/F/C/W/T
32 316° 19° 04' 54.18" N 072° 52' 31.54" E
25.3 89/F/C/W/T 110/R/C/W/T (Concrete Threshold)
RWY DIRECTION THR. COORDINATES
THR. ELEV.
BEARING STRENGTH
27 271° 19° 05' 19.80" N 072° 52' 33.85" E
23 101/F/B/W/T
RWY : 3190x60
(Effective only when RWY 14 is in USE)
Annexure C
B
HS 4
HS 2
HS 3
HS 1
HS 5
HS 6
HS 1HS 2HS 3HS 4HS 5HS 6
TWY K1 and E7 intersection TWY W4 and E5 intersection TWY N and N1 intersection
Intersection of RWYs 14/32 and 09/27 TWY S and S1 intersection
TWY W1 and E1 intersection
N
Link 1
Airports Authority of India AIP Supplement 07/2012 Page 16 of 18
DEPARTURE RUNWAY 14 TAKE-OFF RUN AVAILABLE FROM DIFFERENT ENTRY TAXIWAYS
2871
2774
2409
S
Q
RWY 2871M x 45M
Annexure D1
E1
E1EE E1E10
E10 E9 E8 E7
K1 K3
E5
W4 N
N1
W
S1
W1
B1
2311
N1M7
1794
RUNWAY 14
ENTRY TWY E10 E9 K1 K3 W4
TORA (M) 2871 2774 2409 2311 1794
14 3
2
B
Airports Authority of India AIP Supplement 07/2012 Page 17 of 18
DEPARTURE RUNWAY 32 TAKE-OFF RUN AVAILABLE FROM DIFFERENT ENTRY TAXIWAYS
28231869
1824
S
Q
RWY 2871M x 45M
Annexure- D2
E1EE E1E10
E10 E9 E8 E7
K1 K3
E5
W4 N
N1
W
S1
W1
B1
1559N1M7
RWY INTERSECTION
RUNWAY 32
ENTRY TWY E1 W1 S1 S RWY INTERSECTION
TORA (M) 2871 2823 1869 1824 1559
2871
14 3
2
E1B
Airports Authority of India AIP Supplement 07/2012 Page 18 of 18