WORK No 1b M4 WESTBOUND CARRIAGEWAY WORK No 1a M4 EASTBOUND CARRIAGEWAY WORK No 6d JUNCTION 8/9 (HOLYPORT) WESTBOUND ON SLIP WORK No 6a JUNCTION 8/9 (HOLYPORT) EASTBOUND OFF SLIP WORK No 6b JUNCTION 8/9 (HOLYPORT) EASTBOUND ON SLIP WORK No 6c JUNCTION 8/9 (HOLYPORT) WESTBOUND OFF SLIP GANTRY TYPE 5 GANTRY TYPE 5 GANTRY TYPE 5 GANTRY TYPE 3 GANTRY TYPE 1 DEMOLISH GANTRY JUNCTION 8/9 (HOLYPORT) Drawing Number Drawing Title Scale at A1 Highways Agency Alliance Document Reference Rev NOTES Job Title This map is reproduced from Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright. Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Highways Agency 100030649 2015 TR010019 - 2.3 1:2500 The Cube 199 Wharfside Street Birmingham B1 1RN 514451-MUH-ML-ZZ-DR-WP-301304 2F M4 JUNCTIONS 3 TO 12 SMART MOTORWAY WORKS PLAN REGULATIONS 5(2)(j) &5(2)(p) SHEET 17 OF 31 HOLYPORT Rev # Revision Details Revision Date Drawn Check Review Appr'd 0 100 200 Metres SCALE 1:2500 D ORIGINAL 29/01/2015 LE RR GM 1R ISSUED FOR REVIEW 04/03/2015 LE RR GM BW 2F SUBMITTED WITH DCO APPLICATION 20/03/2015 LE RR GM BW CONSTRUCTION COMPOUND No 5 KEY PLAN READING WOKINGHAM BRACKNELL MAIDENHEAD SLOUGH WINDSOR J12 J10 J11 J8/9 J7 J6 J4b J5 J4 J3 1. Works are described within Schedule 1 of the Development Consent Order 2. Engineering Sections are included on drawing TR010019 - 2.5 LEGEND: Order limits Parish boundary Local authority boundary Linear Work Item Centreline Non-linear Work Boundary Limit Of Scheduled Work Construction Compounds Items Included In Numbered Work Items Proposed New Gantry Area Proposed New Gantry Super-span Portal Single Carriageway Portal Super-span Cantilever Sign only Cantilever Signal Cantilever MS4 Signal Cantilever MS3 Existing Gantry to be demolished Re-used Gantry Portal Type Gantry Signal Cantilever GANTRY TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 TYPE 6 DEMOLISH GANTRY Proposed Emergency Refuge Area (ERA) Proposed ERA with Police Observation Platform (POP) Proposed new CCTV Camera Post Mounted Sign in verge Engineering Section (arrows indicate direction of view - refer to Note 2) RE-USED GANTRY TYPE 7 TYPE 8 ERA ERA/POP SIGN JUNCTION 8/9 WESTBOUND ON SLIP & EASTBOUND OFF SLIP CHAINAGE 34800 JUNCTION 8/9 WESTBOUND OFF SLIP & EASTBOUND ON SLIP CHAINAGE 33600

Work Plans Binder - Abode Group

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Work Plans Binder - Abode Group

WORK No 1bM4 WESTBOUND

CARRIAGEWAY

WORK No 1aM4 EASTBOUND

CARRIAGEWAY

WORK No 6dJUNCTION 8/9 (HOLYPORT)

WESTBOUND

ON SLIP

WORK No 6aJUNCTION 8/9 (HOLYPORT)

EASTBOUND

OFF SLIP

WORK No 6bJUNCTION 8/9 (HOLYPORT)

EASTBOUND

ON SLIP

WORK No 6cJUNCTION 8/9 (HOLYPORT)

WESTBOUND

OFF SLIP

GANTRY TYPE 5

GANTRY TYPE 5

GANTRY TYPE 5

GANTRY TYPE 3

GANTRY TYPE 1

DEMOLISH GANTRY

JUNCTION 8/9

(HOLYPORT)

Drawing Number

Drawing Title

Scale at A1

Highways Agency

Alliance Document Reference Rev

NOTESJob Title

This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.

Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil

proceedings. Highways Agency 100030649 2015

TR010019 - 2.31:2500

The Cube

199 Wharfside Street

Birmingham

B1 1RN

514451-MUH-ML-ZZ-DR-WP-301304 2F

M4 JUNCTIONS 3 TO 12

SMART MOTORWAY

WORKS PLAN

REGULATIONS 5(2)(j) &5(2)(p)SHEET 17 OF 31

HOLYPORT

Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

0 100 200MetresSCALE 1:2500

D ORIGINAL29/01/2015 LE RR GM

1R ISSUED FOR REVIEW04/03/2015 LE RR GM BW

2F SUBMITTED WITH DCO APPLICATION20/03/2015 LE RR GM BW

CONSTRUCTION

COMPOUND No 5

KEY PLAN

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

J12

J10

J11

J8/9

J7

J6

J4bJ5 J4 J3

1. Works are described within Schedule 1 of the Development Consent Order

2. Engineering Sections are included on drawing TR010019 - 2.5

LEGEND:Order limits

Parish boundary

Local authority boundary

Linear Work Item Centreline

Non-linear Work Boundary

Limit Of Scheduled Work

Construction Compounds

Items Included In Numbered Work Items

Proposed New Gantry Area

Proposed New Gantry

Super-span Portal

Single Carriageway Portal

Super-span Cantilever

Sign only Cantilever

Signal Cantilever MS4

Signal Cantilever MS3

Existing Gantry to be demolished

Re-used Gantry

Portal Type Gantry

Signal Cantilever

GANTRY

TYPE 1

TYPE 2

TYPE 3

TYPE 4

TYPE 5

TYPE 6

DEMOLISH GANTRY

Proposed Emergency Refuge Area

(ERA)

Proposed ERA with Police Observation

Platform (POP)

Proposed new CCTV Camera

Post Mounted Sign in verge

Engineering Section (arrows indicate

direction of view - refer to Note 2)

RE-USED GANTRY

TYPE 7

TYPE 8

ERA

ERA/POP

SIGN

JUNCTION 8/9

WESTBOUND ON SLIP

& EASTBOUND OFF SLIP

CHAINAGE 34800

JUNCTION 8/9

WESTBOUND OFF SLIP

& EASTBOUND ON SLIP

CHAINAGE 33600

Page 2: Work Plans Binder - Abode Group

WORK No 1bM4 WESTBOUND

CARRIAGEWAY

WORK No 1aM4 EASTBOUND

CARRIAGEWAY

WORK No 6bJUNCTION 8/9 (HOLYPORT)

EASTBOUND

ON SLIP

WORK No 7aASCOT ROAD AND ASCOT

ROAD

OVERBRIDGE

WORK No 6cJUNCTION 8/9 (HOLYPORT)

WESTBOUND

OFF SLIP

GANTRY TYPE 3

GANTRY TYPE 5GANTRY TYPE 4

REMOVE POP

GANTRY TYPE 5

GANTRY TYPE 6

SIGN

SIGN

ERA

GANTRY TYPE 5

GANTRY TYPE 3

WORK No 8aM4 WIDENING

DEMOLISH GANTRY

Drawing Number

Drawing Title

Scale at A1

Highways Agency

Alliance Document Reference Rev

NOTESJob Title

This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.

Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil

proceedings. Highways Agency 100030649 2015

TR010019 - 2.31:2500

The Cube199 Wharfside Street

Birmingham

B1 1RN

514451-MUH-ML-ZZ-DR-WP-301305 2F

M4 JUNCTIONS 3 TO 12

SMART MOTORWAY

WORKS PLAN

REGULATIONS 5(2)(j) &5(2)(p)SHEET 18 OF 31

BRAY

Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

0 100 200MetresSCALE 1:2500

D ORIGINAL29/01/2015 LE RR GM

1R ISSUED FOR REVIEW06/03/2015 LE RR GM BW

2F SUBMITTED WITH DCO APPLICATION20/03/2015 LE RR GM BW

CONSTRUCTION

COMPOUND No 5

WORK No 7bASCOT ROAD RETAINING

WALL

KEY PLAN

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

J12

J10

J11

J8/9

J7

J6

J4bJ5 J4 J3

1. Works are described within Schedule 1 of the Development Consent Order

2. Engineering Sections are included on drawing TR010019 - 2.5

LEGEND:Order limits

Parish boundary

Local authority boundary

Linear Work Item Centreline

Non-linear Work Boundary

Limit Of Scheduled Work

Construction Compounds

Items Included In Numbered Work Items

Proposed New Gantry Area

Proposed New Gantry

Super-span Portal

Single Carriageway Portal

Super-span Cantilever

Sign only Cantilever

Signal Cantilever MS4

Signal Cantilever MS3

Existing Gantry to be demolished

Re-used Gantry

Portal Type Gantry

Signal Cantilever

GANTRY

TYPE 1

TYPE 2

TYPE 3

TYPE 4

TYPE 5

TYPE 6

DEMOLISH GANTRY

Proposed Emergency Refuge Area

(ERA)

Proposed ERA with Police Observation

Platform (POP)

Proposed new CCTV Camera

Post Mounted Sign in verge

Engineering Section (arrows indicate

direction of view - refer to Note 2)

RE-USED GANTRY

TYPE 7

TYPE 8

ERA

ERA/POP

SIGN

Page 3: Work Plans Binder - Abode Group

WORK No 1bM4 WESTBOUND

CARRIAGEWAY

WORK No 1aM4 EASTBOUND

CARRIAGEWAY

GANTRY TYPE 3

GANTRY TYPE 5

GANTRY TYPE 6

GANTRY TYPE 4

ERA

GANTRY TYPE 4

GANTRY TYPE 4

GANTRY TYPE 5

GANTRY TYPE 4

GANTRY TYPE 5

ERA

WORK No 10bM4 WIDENING

WORK No 10cMARSH LANE AND MARSH

LANE

OVERBRIDGE

WORK No 10aM4 WIDENING

WORK No 9aM4 WIDENING

WORK No 9bTHAMES BRAY

UNDERBRIDGE

WORK No 8bM4 WIDENING

WORK No 8aM4 WIDENING

WORK No 8cMONKEY ISLAND LANE

AND OVERBRIDGE

DEMOLISH

GANTRY

Drawing Number

Drawing Title

Scale at A1

Highways Agency

Alliance Document Reference Rev

NOTESJob Title

This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.

Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil

proceedings. Highways Agency 100030649 2015

TR010019 - 2.31:2500

The Cube

199 Wharfside StreetBirminghamB1 1RN

514451-MUH-ML-ZZ-DR-WP-301306 2F

M4 JUNCTIONS 3 TO 12

SMART MOTORWAY

WORKS PLAN

REGULATIONS 5(2)(j) &5(2)(p)SHEET 19 OF 31

DORNEY REACH

Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

0 100 200MetresSCALE 1:2500

D ORIGINAL29/01/2015 LE RR GM

1R ISSUED FOR REVIEW06/03/2015 LE RR GM BW

2F SUBMITTED WITH DCO APPLICATION20/03/2015 LE RR GM BW

EXTENSION OF

FLOOD CHANNEL

CULVERT

KEY PLAN

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

J12

J10

J11

J8/9

J7

J6

J4bJ5 J4 J3

EXTENSION OF

FLOOD CHANNEL

CULVERT

1. Works are described within Schedule 1 of the Development Consent Order

2. Engineering Sections are included on drawing TR010019 - 2.5

LEGEND:Order limits

Parish boundary

Local authority boundary

Linear Work Item Centreline

Non-linear Work Boundary

Limit Of Scheduled Work

Construction Compounds

Items Included In Numbered Work Items

Proposed New Gantry Area

Proposed New Gantry

Super-span Portal

Single Carriageway Portal

Super-span Cantilever

Sign only Cantilever

Signal Cantilever MS4

Signal Cantilever MS3

Existing Gantry to be demolished

Re-used Gantry

Portal Type Gantry

Signal Cantilever

GANTRY

TYPE 1

TYPE 2

TYPE 3

TYPE 4

TYPE 5

TYPE 6

DEMOLISH GANTRY

Proposed Emergency Refuge Area

(ERA)

Proposed ERA with Police Observation

Platform (POP)

Proposed new CCTV Camera

Post Mounted Sign in verge

Engineering Section (arrows indicate

direction of view - refer to Note 2)

RE-USED GANTRY

TYPE 7

TYPE 8

ERA

ERA/POP

SIGN

THAMES BRAY

REALIGNMENT

CHAINAGE 31400

THAMES BRAY

REALIGNMENT

CHAINAGE 31100

Page 4: Work Plans Binder - Abode Group

WORK No 1b

M4 WESTBOUND

CARRIAGEWAY

WORK No 1a

M4 EASTBOUND

CARRIAGEWAY

GANTRY TYPE 5

WORK No 11c

LAKE END ROAD

OVERBRIDGE AND

LAKE END ROAD

WORK No 11b

M4 WIDENING

WORK No 12d

JUNCTION 7

(HUNTERCOMBE)

WESTBOUND

ON SLIP

WORK No 12e

JUNCTION 7 LINK ROAD

(HUNTERCOME SPUR)

AND HUNTERCOMBE SPUR

OVERBRIDGE

WORK No 12c

JUNCTION 7

(HUNTERCOMBE)

WESTBOUND

OFF SLIP

WORK No 12a

JUNCTION 7

(HUNTERCOMBE)

EASTBOUND

OFF SLIP

WORK No 12b

JUNCTION 7

(HUNTERCOMBE)

EASTBOUND

ON SLIP

WORK No 13c

OLDWAY LANE

AND OLDWAY LANE

OVERBRIDGE

WORK No 13b

M4

WIDENING

WORK No 13a

M4 WIDENING

GANTRY TYPE 3

GANTRY TYPE 5

GANTRY TYPE 3

GANTRY TYPE 4

GANTRY TYPE 1

WORK No 11a

M4 WIDENING

GANTRY TYPE 3

JUNCTION 7

(HUNTERCOMBE)

Drawing Number

Drawing Title

Scale at A1

Highways Agency

Alliance Document Reference Rev

NOTES

Job Title

This map is reproduced from Ordnance Survey material with permission of Ordnance Surveyon behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015

TR010019 - 2.3

1:2500

The Cube199 Wharfside StreetBirminghamB1 1RN

514451-MUH-ML-ZZ-DR-WP-301307 2F

M4 JUNCTIONS 3 TO 12

SMART MOTORWAY

WORKS PLAN

REGULATIONS 5(2)(j) &5(2)(p)

SHEET 20 OF 31

CIPPENHAM

Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

0 100 200

MetresSCALE 1:2500

D ORIGINAL29/01/2015 LE RR GM

1R ISSUED FOR REVIEW06/03/2015 LE RR GM BW

2F SUBMITTED WITH DCO APPLICATION20/03/2015 LE RR GM BW

WORK No 12f

HUNTERCOMBE SPUR

RETAINING WALL

CONSTRUCTION

COMPOUND No 6

KEY PLAN

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD

SLOUGH

WINDSOR

J12

J10

J11

J8/9

J7

J6

J4b

J5

J4

J3

1. Works are described within Schedule 1 of the Development Consent Order

2. Engineering Sections are included on drawing TR010019 - 2.5

LEGEND:

Order limits

Parish boundary

Local authority boundary

Linear Work Item Centreline

Non-linear Work Boundary

Limit Of Scheduled Work

Construction Compounds

Items Included In Numbered Work Items

Proposed New Gantry Area

Proposed New Gantry

Super-span Portal

Single Carriageway Portal

Super-span Cantilever

Sign only Cantilever

Signal Cantilever MS4

Signal Cantilever MS3

Existing Gantry to be demolished

Re-used Gantry

Portal Type Gantry

Signal Cantilever

GANTRY

TYPE 1

TYPE 2

TYPE 3

TYPE 4

TYPE 5

TYPE 6

DEMOLISH GANTRY

Proposed Emergency Refuge Area

(ERA)

Proposed ERA with Police Observation

Platform (POP)

Proposed new CCTV Camera

Post Mounted Sign in verge

Engineering Section (arrows indicate

direction of view - refer to Note 2)

RE-USED GANTRY

TYPE 7

TYPE 8

ERA

ERA/POP

SIGN

JUNCTION 7

WESTBOUND ON SLIP

CHAINAGE 29400

JUNCTION 7

EASTBOUND ON SLIP

CHAINAGE 28600

Page 5: Work Plans Binder - Abode Group

WORK No 1bM4 WESTBOUND

CARRIAGEWAY

WORK No 1aM4 EASTBOUND

CARRIAGEWAY

WORK No 14bM4 WIDENING

WORK No 14aM4 WIDENING

WORK No 14cWOOD LANE AND WOOD

LANE OVERBRIDGE

WORK No 16dJUNCTION 6 (CHALVEY)

WESTBOUND

ON SLIP

WORK No 16aJUNCTION 6 (CHALVEY)

EASTBOUND

OFF SLIP

ERA GANTRY TYPE 4 GANTRY TYPE 5 GANTRY TYPE 3 GANTRY TYPE 5

GANTRY TYPE 3

GANTRY TYPE 4 ERA

WORK No 15CHALVEY CULVERT

GANTRY TYPE 1

Drawing Number

Drawing Title

Scale at A1

Highways Agency

Alliance Document Reference Rev

NOTESJob Title

This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.

Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil

proceedings. Highways Agency 100030649 2015

TR010019 - 2.31:2500

The Cube

199 Wharfside Street

BirminghamB1 1RN

514451-MUH-ML-ZZ-DR-WP-301308 2F

M4 JUNCTIONS 3 TO 12

SMART MOTORWAY

WORKS PLAN

REGULATIONS 5(2)(j) &5(2)(p)SHEET 21 OF 31

SLOUGH SOUTH

Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

0 100 200MetresSCALE 1:2500

D ORIGINAL29/01/2015 LE RR GM

1R ISSUED FOR REVIEW06/03/2015 LE RR GM BW

2F SUBMITTED WITH DCO APPLICATION20/03/2015 LE RR GM BW

KEY PLAN

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

J12

J10

J11

J8/9

J7

J6

J4bJ5 J4 J3

1. Works are described within Schedule 1 of the Development Consent Order

2. Engineering Sections are included on drawing TR010019 - 2.5

LEGEND:Order limits

Parish boundary

Local authority boundary

Linear Work Item Centreline

Non-linear Work Boundary

Limit Of Scheduled Work

Construction Compounds

Items Included In Numbered Work Items

Proposed New Gantry Area

Proposed New Gantry

Super-span Portal

Single Carriageway Portal

Super-span Cantilever

Sign only Cantilever

Signal Cantilever MS4

Signal Cantilever MS3

Existing Gantry to be demolished

Re-used Gantry

Portal Type Gantry

Signal Cantilever

GANTRY

TYPE 1

TYPE 2

TYPE 3

TYPE 4

TYPE 5

TYPE 6

DEMOLISH GANTRY

Proposed Emergency Refuge Area

(ERA)

Proposed ERA with Police Observation

Platform (POP)

Proposed new CCTV Camera

Post Mounted Sign in verge

Engineering Section (arrows indicate

direction of view - refer to Note 2)

RE-USED GANTRY

TYPE 7

TYPE 8

ERA

ERA/POP

SIGN

JUNCTION 6 EASTBOUND

OFF SLIP & WESTBOUND

ON SLIP

CHAINAGE 26600

Page 6: Work Plans Binder - Abode Group

WORK No 1bM4 WESTBOUND

CARRIAGEWAY

WORK No 1aM4 EASTBOUND

CARRIAGEWAY

GANTRY TYPE 5

GANTRY TYPE 3

GANTRY TYPE 1

WORK No 16cJUNCTION 6 (CHALVEY)

WESTBOUND

OFF SLIP

WORK No 16bJUNCTION 6 (CHALVEY)

EASTBOUND

ON SLIP

CONSTRUCTION

COMPOUND No 7

WORK No 17WINDSOR BRANCH

RAILWAY UNDERBRIDGE

JUNCTION 6

(CHALVEY)

Drawing Number

Drawing Title

Scale at A1

Highways Agency

Alliance Document Reference Rev

NOTESJob Title

This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.

Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil

proceedings. Highways Agency 100030649 2015

TR010019 - 2.31:2500

The Cube

199 Wharfside Street

Birmingham

B1 1RN

514451-MUH-ML-ZZ-DR-WP-301309 2F

M4 JUNCTIONS 3 TO 12

SMART MOTORWAY

WORKS PLAN

REGULATIONS 5(2)(j) &5(2)(p)SHEET 22 OF 31

CHALVEY

Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

0 100 200MetresSCALE 1:2500

D ORIGINAL29/01/2015 LE RR GM

1R ISSUED FOR REVIEW06/03/2015 LE RR GM BW

2F SUBMITTED WITH DCO APPLICATION20/03/2015 LE RR GM BW

KEY PLAN

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

J12

J10

J11

J8/9

J7

J6

J4bJ5 J4 J3

1. Works are described within Schedule 1 of the Development Consent Order

2. Engineering Sections are included on drawing TR010019 - 2.5

LEGEND:Order limits

Parish boundary

Local authority boundary

Linear Work Item Centreline

Non-linear Work Boundary

Limit Of Scheduled Work

Construction Compounds

Items Included In Numbered Work Items

Proposed New Gantry Area

Proposed New Gantry

Super-span Portal

Single Carriageway Portal

Super-span Cantilever

Sign only Cantilever

Signal Cantilever MS4

Signal Cantilever MS3

Existing Gantry to be demolished

Re-used Gantry

Portal Type Gantry

Signal Cantilever

GANTRY

TYPE 1

TYPE 2

TYPE 3

TYPE 4

TYPE 5

TYPE 6

DEMOLISH GANTRY

Proposed Emergency Refuge Area

(ERA)

Proposed ERA with Police Observation

Platform (POP)

Proposed new CCTV Camera

Post Mounted Sign in verge

Engineering Section (arrows indicate

direction of view - refer to Note 2)

RE-USED GANTRY

TYPE 7

TYPE 8

ERA

ERA/POP

SIGN

JUNCTION 6 WESTBOUND

OFF SLIP & EASTBOUND

ON SLIP CHAINAGE 25500

JUNCTION 6 WESTBOUND

OFF SLIP & EASTBOUND

ON SLIP CHAINAGE 25700

Page 7: Work Plans Binder - Abode Group

This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.

Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil

proceedings. Highways Agency 100018928 2015

WORK No 19cDATCHET ROAD AND DATCHET

ROAD OVERBRIDGE

WORK No 19aM4 WIDENING

WORK No 19bM4 WIDENING

WORK No 18WATER AND GAS MAIN

SUBWAY

WORK No 21WATER MAIN SUBWAY

WORK No 20bM4 WIDENING

WORK No 20aM4 WIDENING

WORK No 20cRECREATION GROUND

ROAD AND RECREATION

GROUND OVERBRIDGE

WORK No 1aM4 EASTBOUND

WORK No 1bM4 WESTBOUND

REMOVE

POP DEMOLISH

GANTRY GANTRY

TYPE 5

GANTRY

TYPE 5

ERA GANTRY

TYPE 5

GANTRY

TYPE 4 GANTRY

TYPE 5

GANTRY

TYPE 5

ERA/POP

CONSTRUCTION

COMPOUND No 8

Drawing Number

Drawing Title

Scale at A1

Highways Agency

Alliance Document Reference Rev

NOTESJob Title

This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.

Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil

proceedings. Highways Agency 100030649 2015

TR010019 - 2.31:2500

The Cube199 Wharfside Street

Birmingham

B1 1RN

514451-MUH-ML-ZZ-DR-WP-301310 2F

M4 JUNCTIONS 3 TO 12

SMART MOTORWAY

WORKS PLAN

REGULATIONS 5(2)(j) &5(2)(p)SHEET 23 OF 31

MYRKE

Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

0 100 200MetresSCALE 1:2500

D ORIGINAL29/01/2015 LE RR GM

1R ISSUED FOR REVIEW06/03/2015 LE RR GM BW

2F SUBMITTED WITH DCO APPLICATION20/03/2015 LE RR GM BW

KEY PLAN

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

J12

J10

J11

J8/9

J7

J6

J4bJ5 J4 J3

1. Works are described within Schedule 1 of the Development Consent Order

2. Engineering Sections are included on drawing TR010019 - 2.5

LEGEND:Order limits

Parish boundary

Local authority boundary

Linear Work Item Centreline

Non-linear Work Boundary

Limit Of Scheduled Work

Construction Compounds

Items Included In Numbered Work Items

Proposed New Gantry Area

Proposed New Gantry

Super-span Portal

Single Carriageway Portal

Super-span Cantilever

Sign only Cantilever

Signal Cantilever MS4

Signal Cantilever MS3

Existing Gantry to be demolished

Re-used Gantry

Portal Type Gantry

Signal Cantilever

GANTRY

TYPE 1

TYPE 2

TYPE 3

TYPE 4

TYPE 5

TYPE 6

DEMOLISH GANTRY

Proposed Emergency Refuge Area

(ERA)

Proposed ERA with Police Observation

Platform (POP)

Proposed new CCTV Camera

Post Mounted Sign in verge

Engineering Section (arrows indicate

direction of view - refer to Note 2)

RE-USED GANTRY

TYPE 7

TYPE 8

ERA

ERA/POP

SIGN

Page 8: Work Plans Binder - Abode Group

ERA

ERA

GANTRY TYPE 4

GANTRY TYPE 5

GANTRY TYPE 4

GANTRY TYPE 1

GANTRY TYPE 5

GANTRY TYPE 5WORK No 1b

M4 WESTBOUND

CARRIAGEWAY

WORK No 1aM4 EASTBOUND

CARRIAGEWAY

WORK No 22cRIDING COURT ROAD

AND RIDING COURT ROAD

OVERBRIDGE

WORK No 22bM4 WIDENING

WORK No 22aM4 WIDENING

WORK No 23bASHLEYS ARCH CULVERTWORK No 23a

M4 WIDENING

Drawing Number

Drawing Title

Scale at A1

Highways Agency

Alliance Document Reference Rev

NOTESJob Title

This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright.

Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil

proceedings. Highways Agency 100030649 2015

TR010019 - 2.31:2500

The Cube

199 Wharfside Street

Birmingham

B1 1RN

514451-MUH-ML-ZZ-DR-WP-301311 2F

M4 JUNCTIONS 3 TO 12

SMART MOTORWAY

WORKS PLAN

REGULATIONS 5(2)(j) &5(2)(p)SHEET 24 OF 31

DATCHET

Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

0 100 200MetresSCALE 1:2500

D ORIGINAL29/01/2015 LE RR GM

1R ISSUED FOR REVIEW06/03/2015 LE RR GM BW

2F SUBMITTED WITH DCO APPLICATION20/03/2015 LE RR GM BW

KEY PLAN

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

J12

J10

J11

J8/9

J7

J6

J4bJ5 J4 J3

1. Works are described within Schedule 1 of the Development Consent Order

2. Engineering Sections are included on drawing TR010019 - 2.5

LEGEND:Order limits

Parish boundary

Local authority boundary

Linear Work Item Centreline

Non-linear Work Boundary

Limit Of Scheduled Work

Construction Compounds

Items Included In Numbered Work Items

Proposed New Gantry Area

Proposed New Gantry

Super-span Portal

Single Carriageway Portal

Super-span Cantilever

Sign only Cantilever

Signal Cantilever MS4

Signal Cantilever MS3

Existing Gantry to be demolished

Re-used Gantry

Portal Type Gantry

Signal Cantilever

GANTRY

TYPE 1

TYPE 2

TYPE 3

TYPE 4

TYPE 5

TYPE 6

DEMOLISH GANTRY

Proposed Emergency Refuge Area

(ERA)

Proposed ERA with Police Observation

Platform (POP)

Proposed new CCTV Camera

Post Mounted Sign in verge

Engineering Section (arrows indicate

direction of view - refer to Note 2)

RE-USED GANTRY

TYPE 7

TYPE 8

ERA

ERA/POP

SIGN