Document of The World Bank FOR OFFICIAL USE ONLY Report No: 111463 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING GRANT IN THE AMOUNT OF US$2 MILLION TO THE LEBANESE REPUBLIC FOR A NATIONAL VOLUNTEER SERVICE PROGRAM PROJECT December 29, 2016 Social Protection & Labor MIDDLE EAST AND NORTH AFRICA This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

Document of

The World Bank

FOR OFFICIAL USE ONLY

Report No: 111463

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

PROJECT PAPER

ON A

PROPOSED ADDITIONAL FINANCING GRANT

IN THE AMOUNT OF US$2 MILLION

TO THE

LEBANESE REPUBLIC

FOR A

NATIONAL VOLUNTEER SERVICE PROGRAM PROJECT

December 29, 2016

Social Protection & Labor

MIDDLE EAST AND NORTH AFRICA

This document has a restricted distribution and may be used by recipients only in the

performance of their official duties. Its contents may not otherwise be disclosed without

World Bank authorization.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-2-

CURRENCY EQUIVALENTS

(Exchange Rate Effective {November 30, 2016})

Currency Unit = LBP

1509 LBP = US$1

FISCAL YEAR

January 1 – December 31

ABBREVIATIONS AND ACRONYMS

AF Additional Financing

CPF Country Partnership Framework

EA Environmental Assessment

GRS Grievance Redress Service

LCRP Lebanon Crisis Response Program

MENA Middle East and North Africa

MOSA Ministry of Social Affairs

NGO Non-governmental Organization

NVSP National Volunteer Service Project

PDO Project Development Objective

PIU Project Implementation Unit

POM Project Operations Manual

RVP Regional Vice President

SGP Small Grants Program

SPF State and Peace Building Fund

UNHCR United Nations High Commissioner for Refugees

UNICEF United Nations Children’s Fund

USD United States Dollar

Vice President: Hafez Ghanem

Country Director: Ferid Belhaj

Global Practice Senior Director:

Global Practice Director:

Practice Manager:

Michal Rutkowski

Steen Jorgensen

Hana Brixi

Task Team Leader: Rene Leon Solano

Page 3: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-3-

LEBANON

NATIONAL VOLUNTEER SERVICE PROGRAM

CONTENTS

Project Paper Data Sheet 4

Project Paper

I. Introduction 8

II. Background and Rationale for Additional Financing 9

III. Summary of Proposed Changes 16

IV. Appraisal Summary 20

22 V. World Bank Grievance Redress

Annexes

Annex 1: Map of the Most Vulnerable Cadastral Zones

Annex 2: Revised Results Framework and Monitoring Indicators

23

24

Annex 3: Fiduciary Arrangements 33

Page 4: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-4-

ADDITIONAL FINANCING DATA SHEET

Lebanon

Additional Financing for National Volunteer Service Program ( P126734 )

MIDDLE EAST AND NORTH AFRICA

Social Protection and Labor Global Practice .

Basic Information – Parent

Parent Project ID: P126734 Original EA Category: C - Not Required

Current Closing Date: 31-Dec-2016

Basic Information – Additional Financing (AF)

Project ID: P126734 Additional Financing

Type (from AUS):

Scale Up, Level-1

Restructuring

Regional Vice President: Hafez M. H. Ghanem Proposed EA Category: C

Country Director: Ferid Belhaj Expected Effectiveness

Date: 30-Dec-2016

Senior Global Practice

Director

Global Practice Director:

Michal Rutkowski

Steen Jorgensen

Expected Closing Date: 31-Dec-2018

Practice

Manager/Manager: Hana Polackova Brixi Report No: 111463

Team Leader(s): Rene Leon Solano

PHApp

AuthTbl Approval Authority

Approval Authority

Regional Vice-President (RVP)

Please explain

The original project was approved by the RVP. In addition, the restructuring that is being sought is for a

small Recipient Executed Trust Fund grant and, therefore, the approval authority remains with the RVP.

Borrower

Organization Name Contact Title Telephone Email

Ministry of Finance Alain Bifani Director

General 9613-306935

[email protected]

b

Project Financing Data - Parent (National Volunteer Service Program - P126734) (in USD

Million)

Key Dates

Page 5: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-5-

Project Ln/Cr/TF Status Approval

Date Signing Date

Effectiveness

Date

Original

Closing Date

Revised

Closing Date

P126734 TF-10404 Effectiv

e 15-Feb-2011 25-Nov-2011 7-Feb-2013 31-Dec-2016 31-Dec-2018

Disbursements

Project Ln/Cr/TF Status Currency Original Revised Cancelled Disburse

d

Undisbu

rsed

%

Disburse

d

P126734 TF-10404 Effectiv

e USD 2.00 2.00 0.00 1.66 0.34 83

Project Financing Data - Additional Financing National Volunteer Service Program

(P126734)(in USD Million)

[ ] Loan [X] Grant [ ] IDA Grant

[ ] Credit [ ] Guarantee [ ] Other

Total Project Cost: 2.00 Total Bank Financing: 2.00

Financing Gap: 0.00

Financing Source – Additional Financing (AF) Amount

Borrower 0.00

State and Peace Building Fund 2.00

Total 2.00

Policy Waivers

Does the project depart from the CAS in content or in other significant

respects? No

Explanation

Does the project require any policy waiver(s)? No

Explanation

Team Composition

Bank Staff

Name Role Title Specialization Unit

Rene Leon Solano Team Leader

(ADM

Responsible)

Senior Social

Protection Specialist

GSP05

Lina Fares Procurement

Specialist

Senior Procurement

Specialist

GGO05

Page 6: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-6-

Rock Jabbour Financial

Management

Specialist

Financial

Management

Analyst

GGO23

Haneen Sayed Program Leader Program Leader MNC02

Aakanksha Pande Team Member Senior Health

Economist

GHN05

Mazhar Farid Team Member Legal Analyst LEGAM

Mei Wang Counsel Senior Counsel LEGAM

Jumana Jamal Subhi

Alaref

Team Member Research Analyst GSP05

Adriel Arenas Team Member Temporary GSP05

Mirvat Haddad Team Member Program Assistant MNC02

Extended Team

Name Title Location

Locations

Country First Administrative

Division

Location Planned Actual Comments

Lebanon Mont-Liban Mohafazat Mont-

Liban

X

Lebanon Beyrouth Beyrouth X

Lebanon Liban-Nord Mohafazat Liban-

Nord

X

Lebanon Liban-Sud Mohafazat Liban-

Sud

X

Lebanon Beqaa Mohafazat Beqaa X

Lebanon Nabatiye Mohafazat Nabatiye X

Lebanon Aakkar Mohafazat Aakkar X

Lebanon Baalbek-Hermel Mohafazat Baalbek-

Hermel

X

Institutional Data

Parent ( National Volunteer Service Program - P126734 )

Practice Area (Lead)

Social Protection & Labor

Cross Cutting Topics

Page 7: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-7-

[ ] Climate Change

[ X ] Fragile, Conflict & Violence

[ x ] Gender

[ ] Jobs

[ ] Public Private Partnership

Sectors / Climate Change

Sector (Maximum 5 and total % must equal 100)

Major Sector Sector % Adaptation

Co-benefits %

Mitigation Co-

benefits %

Health and other social services Other social services 100

Total 100

Themes

Theme (Maximum 5 and total % must equal 100)

Major theme Theme %

Social protection and risk management 100

Total 100

Additional Financing for National Volunteer Service Program ( P126734)

Practice Area (Lead)

Social Protection & Labor

Contributing Practice Areas

Cross Cutting Topics

[ ] Climate Change

[ X ] Fragile, Conflict & Violence

[ x ] Gender

[ ] Jobs

[ ] Public Private Partnership

Sectors / Climate Change

Sector (Maximum 5 and total % must equal 100)

Major Sector Sector % Adaptation

Co-benefits %

Mitigation Co-

benefits %

Page 8: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-8-

Health and other social services Other social services 100

Total 100

I certify that there is no Adaptation and Mitigation Climate Change Co-benefits information applicable

to this project.

Themes

Theme (Maximum 5 and total % must equal 100)

Major theme Theme %

Social protection and risk management 100

Total 100

Consultants (Will be disclosed in the Monthly Operational Summary)

Consultants Required? Consulting services to be determined

I. Introduction

1. This Project Paper seeks the approval of the Regional Vice-President (RVP) of an additional

financing (AF) grant in an amount of US$2 million as well as a restructuring to the Lebanon

National Volunteer Service Program (P126734). The proposed AF would be provided from the

State and Peace-Building Fund (SPF).

2. The Ministry of Social Affairs (MoSA) requested the World Bank to scale-up the

successful National Volunteer Service Program (NVSP). The scale-up, which will leverage the

robust operational and institutional mechanisms established at MoSA for the implementation of

NVSP, will seek to address: (i) the unmet social service delivery needs in some of the most

vulnerable Lebanese communities hosting Syrian refugees, as well as; (ii) the fragile inter-

communal relations and social tensions between Lebanese citizens and Syrian refugees living in

the selected host communities.

3. Specifically, the proposed AF will be used to enable the Government of Lebanon (GoL) to

complement its work and that of other donors in those communities that have the highest numbers

of Syrian refugees and of poorest Lebanese households, by providing Lebanese youth aged 15 to

24: (i) volunteering opportunities; and (ii) soft skills training as well as psychosocial awareness

and community-building activities. Through the scale-up, Syrian refugee youth in the targeted

communities will now be able to participate in the project activities. The scale-up is envisaged to

contribute to improved social stability and service delivery.

4. The proposed restructuring of the project is being sought to: (i) revise the Project

Development Objective (PDO) to reflect changes in the scope of project activities; (ii) revise the

Page 9: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-9-

Results Framework (RF) to be in line with the modified PDO; and (iii) extend the parent project’s

closing date by 24 months (from December 31, 2016 to December 31, 2018) to fully implement

the project activities and to align it with the closing date of the proposed AF.

5. The current PDO of the NVSP is “to increase youth civic engagement which in the medium

term will contribute to improved social cohesion across communities and regions by: (i) expanding

youth volunteerism and particularly in communities other than the communities from which the

volunteers come; and (ii) improving the employability of youth through enhanced (soft) skills.”

The proposed revised PDO will be “to improve social stability and service delivery in the most

vulnerable Lebanese communities hosting Syrian refugees through youth volunteering, soft skills

development, and psychosocial awareness activities.”

6. The revised PDO does not include “improving the employability of youth” in the project

development objective. However, the civic engagement and soft skills training activities, -- critical

components of the proposed new phase of NVSP – are expected to increase youth employability.

II. Background and Rationale for Additional Financing in the Amount of US$2.0

million

A. BACKGROUND

7. The on-going crisis in Syria has taken a toll on millions of lives, with an estimated 11

million Syrians having fled their homes since the outbreak of the civil war in March 2011.

According to the United Nations High Commissioner for Refugees (UNHCR), 4.8 million Syrians

fled to neighboring countries, and 6.6 million became internally displaced within Syria.

Meanwhile, about one million Syrians have requested asylum in Europe (UNCHR, 2016). In

Lebanon alone, the number of registered Syrian refugees has reached 1,033,513 as of June 2016.

8. The large influx of Syrian refugees in Lebanon has worsened poverty levels among the

Lebanese population. Poverty in Lebanon is significant and regional disparities in living conditions

are acute. The most recent Household Budget Survey (HBS 2011-12) shows that poverty in

Lebanon is 27 percent (pre-Syrian crisis). This means that about one million people in Lebanon

have levels of consumption below the annual poverty line set at 4,729 thousand LBP per capita

per year (or $3,150). Significant regional differences exist. Poverty is the lowest in Beirut (16

percent), followed by Mount Lebanon (22 percent) and Nabatieh (25 percent). The poorest regions

are North Lebanon (36 percent) and Bekaa (38 percent). The Syrian conflict is estimated to have

increased poverty among the Lebanese population by an additional 170,000 people in 2014, with

the existing poor pushed deeper into poverty.

9. Syrian refugees in Lebanon also face significant poverty challenges, and while spread

throughout the country, are primarily concentrated in certain geographic areas. Based on the

UNHCR poverty line of PPP US$5.25 per capita per day, 64 percent of refugees in Lebanon are

considered poor (World Bank, 2016). There are currently around 1,623 cadastral zones in the

country,1 which have been assigned a vulnerability-ranking index by the Government of Lebanon

1 Cadastral zones are below the level of districts/cazas. They are not administrative divisions, and are used solely by

humanitarian practitioners in Lebanon.

Page 10: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-10-

(GoL) and the United Nations Children’s Fund (UNICEF)2. The majority of Syrian refugees live

in communities located within 251 cadastral zones, which are considered the most vulnerable.

These 251 most vulnerable cadastral zones are home to 67 percent of deprived Lebanese and 87

percent of Syrian refugees. They are concentrated primarily in the North and the Beeka regions

(particularly in the Bekaa, Tripoli, and Akkar areas), but can also be found across all Governorates

in Lebanon (Annex 1).

10. Host communities across Lebanon, but in particular those located in the most vulnerable

251 cadastral zones, are struggling to meet basic needs, and face rising and deteriorating intra-

communal social tensions. A 2014 community-level vulnerability assessment3 of the 251 most

vulnerable cadastral zones shows that Lebanese citizens and Syrian refugees reported difficulties

in accessing shelter, water, education and health services. Syrian refugees reported difficulties to

access food and shelter, while host communities identified access to electricity supply and drinking

water as key challenges. In addition, the assessment revealed that lack of employment

opportunities is a key concern for both groups. Recent assessments have also found that Lebanese

households in these cadastral zones are facing higher expenditures, as the cost of goods and

services are rising, particularly food items. Economic hardship has accentuated the already fragile

inter-communal relations and social tensions in host communities, as Lebanese citizens attribute

the decline in their own living standards to presence of Syrian refugees.

11. With support from the international community, the GoL is trying to address the many

challenges afflicting the most vulnerable Lebanese citizens and Syrian refugees. Indeed, the GoL,

led by the MoSA, launched the 2015-2016 Lebanon Crisis Response Plan (LCRP), which identifies

priority areas and needs as well as coordinates the delivery of humanitarian and stabilization

programs among all partners. The LCRP seeks to deliver humanitarian assistance and protection

for the most vulnerable Lebanese citizens and Syrian refugees, strengthen the capacity of national

and local service delivery systems, and reinforce Lebanon’s economic, social, and institutional

stability. Moreover, under the National Plan to Safeguard Children and Women in Lebanon, MoSA

and UNICEF are working together to strengthen the capacity of 57 Social Development Centers

(SDCs), which are mostly located within the 251 most vulnerable cadastral zones, in order to

enable them to deliver sufficient and effective services to refugees and host communities.4 As part

of this capacity-building support, frontline workers, service providers, and community members

at these 57 SDCs are trained on the provision of family support services, psychosocial support,

identification, referral and treatment for survivors of violence, hygiene promotion, as well as

primary health services.

12. The international donor community as well as international and national NGOs are actively

involved in the delivery of humanitarian and development interventions, which span: basic

assistance, child protection, information management, education, energy, water, food security,

health, social stability, sexual and gender-based violence, shelter, and livelihood support.

However, the scale as well as the high variability of needs across geographic areas pose a continued

2 The ranking at the cadastral level takes into account two factors: the number of Lebanese living on less than US$4

a day, and the geographic distribution of registered Syrian refugees by cadastre. 3 The assessment was published in 2014 by the REACH initiative, the United Nations Office for the Coordination of

Humanitarian Affairs (OCHA), and UNICEF. 4 There currently exists a community-based network of 222 SDCs affiliated with MoSA that are mandated as the

primary point in the provision of social development services, and in building resilience within communities.

Page 11: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-11-

challenge in addressing the gaps in essential service delivery needs and in alleviating social

tensions and incidents of violence within these communities.

B. HIGHER LEVEL OBJECTIVES TO WHICH THE PROJECT CONTRIBUTES

13. In such a fragile and conflict-prone environment, the new Lebanon Country Partnership

Framework - CPF (FY17-FY22), seeks to mitigate the immediate and potentially long-lasting

impact of the Syria crisis on Lebanon, while strengthening state institutions, addressing existing

vulnerabilities, and bolstering efforts on longer term development challenges.

14. Accordingly, the proposed AF i aligned with the CPF insofar as it seeks to meet the most

immediate needs of Lebanese citizens and Syrian refugees living in the most vulnerable host

communities, as well build the capacity of the GoL and other relevant actors to meet short and

medium term development goals. While addressing an immediate and urgent crisis, the AF also

contributes to the strategic objectives of the World Bank Group of “ending extreme poverty and

promoting shared prosperity”, particularly through targeting the most vulnerable host communities

in Lebanon.

15. The AF is also consistent with the overarching objective of the WBG’s Regional Strategy

for the Middle East and North Africa (MENA), which aims at contributing to promoting peace and

stability in the region through economic and social inclusion. Specifically, and given its goal and

target population, the AF is aligned to the Strategy’s “renewing the social contract” and “resilience

to refugee’s shocks” pillars.

C. RATIONALE FOR ADDITIONAL FINANCING

16. NVSP, which addresses one of the most important challenges afflicting Lebanon and the

Middle East and North Africa Region (MENA), (the economic and social inclusion of youth), is

showing concrete results on the ground. The original Grant, in the amount of US$2 million, was

approved by the Peace-Building Fund Secretariat on February 15, 2011, and became effective on

February 7, 2013. Project implementation has been underway for almost three years, with a total

disbursed amount of US$1.66 million (83 percent disbursed). To date, around 6,500 Lebanese

youth aged 15-24 and close to 150 NGOs, universities, schools and municipalities have been

directly involved in the project’s activities. This includes more than 3,300 youth who have

participated in the implementation of 51 volunteering projects throughout Lebanon. In addition,

and thanks largely to a US$320,000 Technical Assistance Program (“Lebanon Youth - National

Volunteer Service Program Strengthening and Sustainability”), the NVSP has developed

important public goods, which includes: (i) an online portal that enables interested youth to apply

for volunteering opportunities posted by eligible NGOs, universities, schools, municipalities and

the private sector, thereby effectively serving as a matching platform; and (ii) a 20-hour soft-skills

training curriculum that was developed specifically for Lebanon, and which is available for both

in-class training and online training through the online portal.

17. Given NVSP’s concrete results to-date, and its proven success in mobilizing youth from

communities other than their own to volunteer for improved social service delivery and social

cohesion, as well as in working in partnership with a wide range of partners, MoSA requested the

Page 12: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-12-

World Bank to provide additional financing to scale-up NVSP in Lebanese communities hosting

Syrian refugees. MoSA is interested in mainstreaming volunteerism across all sectors of the LCRP.

18. The on-going conflict in Syria has shifted the refugee situation from initial emergency to

protracted conflict. Despite the coordinated multi-sectoral response by many partners and donors

on the ground, the high variability of needs, compounded with existing structural problems

prevalent in service delivery as well as limited resources, remain a continued challenge in

addressing the gaps in essential service delivery. Volunteerism presents a real opportunity to

alleviate some of the increasing and unmet needs facing both the Syrian refugees and their

Lebanese host communities. The proposed AF will enable NGOs operating in selected host

communities to mobilize volunteers and implement service delivery projects in key priority areas

and sectors.

19. The Syrian refugee crisis has also had significant social consequences, as it has led to

increasingly fragile inter-communal relations and social tensions between Lebanese and Syrian

refugees living in host communities. Volunteering is seen as a promising pathway to the social

integration of youth, by enabling them to interact with and work together for a common cause, to

develop their soft skills, and to expand their overall social networks. The proposed AF will enable

Lebanese youth to volunteer for improved social service delivery in targeted host communities,

thereby contributing to mitigate some of the social consequences of the Syrian refugee crisis.

20. The prevalent challenges and violence that have been brought about by the Syrian conflict

have had extensive effects on the mental health and psychosocial wellbeing of Syrian refugees.

The traumatic experiences related to the conflict are worsened by the everyday struggles of being

displaced, which include: destitution, lack of resources and services to meet basic needs, dangers

of violence and abuse, discrimination and being ostracized5. The proposed AF will promote

awareness among participating youth of the mental health and psychosocial wellbeing challenges

afflicting Syrian refugees, and will provide opportunities for interaction between participating

youth and Lebanese citizens and Syrian refugees living in the targeted host communities through

psychosocial and community building activities. This will contribute to further easing some of the

social tensions in the targeted host communities, and will therefore contribute to the social

stabilization of host communities.

21. The provision of civic engagement opportunities as well as life skills and psychosocial

training have been identified by refugee youth themselves as critical for their positive

development. A recent UNHCR study that surveyed over 1,300 refugee youth aged 15 to 24 from

34 different nationalities identified the ten main challenges preventing their overall social and

economic inclusion in society. These included: lack of empowerment and engagement

opportunities, poor access to youth-sensitive healthcare, including psychosocial support, and

limited skills building opportunities. The proposed AF will address these challenges.6

D. ACTIVITIES TO BE FINANCED THROUGH THE PROPOSED ADDITIONAL FINANCING

22. NVSP has three main components: (i) institution building and capacity development for

volunteer civic engagement; (ii) Small Grants Program (SGP) for NGOs, universities and schools

5 Hassan et al, 2015 6 UNHCR, September 2016. “We Believe in Youth.” Global Refugee Youth Consultations.

Page 13: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-13-

as well as weekend volunteering programs and summer camps for expanding volunteer

opportunities and building employability skills; and (iii) Monitoring and Evaluation (M&E) of

civic engagement. While most of the activities included under each of the three components will

continue to be financed through the AF, the name of the three components will be slightly revised

to reflect minor adjustments to the project’s design.

23. The proposed new project components are as follows: (i) capacity development,

communications and outreach; (ii) youth volunteering for social stability and service delivery; (iii)

M&E and program management.

24. Component 1: Capacity development, communications and outreach (US$300,000). This

component will finance the development of marketing materials (flyers, brochures, banners,

posters, etc.) to be used through various means of communication (social media, TV, radio,

newspapers, SMS outreach, email, etc.) as well as in national volunteering events to be financed

under this component. These communication and outreach activities will seek to promote overall

awareness on the importance of volunteerism as well as on NVSP activities and results among key

project stakeholders. The component will also finance minor adjustments and overall maintenance

to the NVSP online portal7.

25. In partnership with selected specialized agencies and in collaboration with MoSA, this

component will also finance the design and delivery of capacity building activities for participating

NGOs and youth volunteers as well as staff from NGOs and municipalities. Representatives from

eligible NGOs under the Small Grants Program –SGP (see Component 2.2) will undergo training

on proposal design and management specifically for NVSP, which will include inter alia support

for: (i) identifying the proposed target host community and its social service needs, in close

coordination with SDCs and using the UNHCR database that includes both data on the most

vulnerable host communities as well as ongoing/planned related interventions by partners in the

social stability and service delivery sectors; (ii) developing project proposals, with realistic and

measurable objectives, activities, budget and implementation plan; and (iii) planning the delivery

of the required soft skills training and the psychosocial awareness and community building

activities for participating youth volunteers (see paragraph 24). Beyond capacity building, this

training will ensure that all proposals that are submitted for NVSP funding are relevant for the

targeted host community, and will indirectly promote coordination between the proposed projects

and other relevant Government and donor activities at the local level.

26. Leveraging the 20-hour soft skills training curriculum that was developed specifically for

NVSP, this component will also finance the delivery of a Training of Trainers (ToT) on soft skills

for the representatives from those NGOs whose proposals are selected for funding under the SGP.8

The ToT will enable the trained NGO staff to subsequently deliver the soft skills training to

participating youth volunteers. The soft skills training that will be offered to those youth who

7 The NVSP has developed an online portal that inter alia enables relevant project stakeholders – municipalities,

schools, universities, NGOs and private sector companies - to post volunteering opportunities and eligible youth to

apply for them, thus effectively serving as a matching platform. 8 NVSP has created a soft-skills training curriculum tailored specifically for Lebanon, which is available in the online

portal and enables all interested youth to improve their conflict-management, life and career planning, business, and

entrepreneurship skills. The NVSP team will be in charge of providing the introductory 1h soft skills training for all

participating youth under the volunteering weekend activities.

Page 14: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-14-

participate in the weekend activities under component 2 will be provided directly by MoSA staff,

who have already participated in a soft skills ToT. In addition, and building on the soft-skills

training to be delivered through NVSP as well as on MoSA ongoing related efforts (see paragraph

11), this component will finance the design and delivery of psychosocial awareness and

community building training activities, which will be sensitive to the specific mental health issues

afflicting female members of the targeted host communities. MoSA staff, representatives from the

NGOs and municipalities whose projects are selected for funding under Component 2, as well as

all participating youth volunteers will be trained on basic psychosocial principles to increase their

awareness of psychosocial issues affecting Lebanese and Syrian refugees living in the targeted

host community.9 The training will be critical in the implementation of volunteering projects, to

ensure proper interaction among all project participants. In addition, this component will finance

the design and delivery of psychosocial and community-building activities, to further promote

communication, understanding and respect and thus minimize conflict and overall social tension

among members of the targeted host community (see Component 2).

27. Component 2: Youth volunteering for social stability and service delivery (US$1.2

million). This component seeks to provide volunteering opportunities to Lebanese youth aged 15

to 24, in order to address both the unmet social service delivery needs as well as the social tensions

in communities hosting Syrian refugees. This component will finance the delivery of 60

volunteering projects in the 251 most vulnerable cadastral zones. The participating youth will

benefit from soft skills and psychosocial awareness training, as well as from daily meals and

transportation to/from the project sites. They will receive a certificate of participation from MoSA

and any other relevant project partner. The participation of female youth will be highly encouraged

through the projects’ selection criteria. Syrian refugee youth in the targeted communities will be

able to participate in the project activities. NGOs and municipalities will be in charge of

implementing the volunteering projects financed under this component. The component has the

following two sub-components:

28. Sub-component 2.1: Volunteering weekend activities. This sub-component will finance

30 volunteering weekend activities to be implemented primarily during the first year of the AF, in

order to have a demonstration effect and lay the ground for the implementation of the small grants

(see Sub-component 2.2 below). NGOs and municipalities interested in participating in the

volunteering weekend activities will be able to submit their project proposals to MoSA on an

ongoing basis. The SDC at the target host community will have to endorse the proposed weekend

activity, to ensure its relevance as well as overall coordination at the local level. Each volunteering

weekend activity will have a maximum budget of US$10,000, and will benefit a minimum of 20

youth volunteers. Volunteering weekend activities will provide participating youth at least 8 hours

of volunteering, as well as a 2 hour introduction to soft skills and psychosocial awareness (see

Component 1).

29. Sub-component 2.2: Small Grants Program (SGP). NGOs interested in participating in

the SGP will be required to first respond to an Expression of Interest (EoI), following which

selection will be based on pre-identified eligibility criteria, to undergo the capacity building

training on proposal design and management (see Component 1). Eligible NGOs will then be able

9 The training will focus on the main mental health and psychosocial concepts and frameworks, mental health and

psychosocial consequences of displacement and conflict, psychosocial support and dialogue and mainstreaming

mental health and psychosocial support within volunteer services

Page 15: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-15-

to submit their project proposals following a Call for Proposals (CfP) issued by MoSA.10 This sub-

component will finance 30 small grants, with an average duration of 2 months. Each small grant

will have a maximum budget of US$30,000, and will benefit a minimum of 40 youth volunteers.

Small grants will provide participating youth volunteers at least 40 hours of volunteering, as well

24 hours of soft skills and psychosocial awareness training (see Component 1). In addition, and

in order to complement their volunteering experience, youth volunteers will participate in

psychosocial and community-building activities, which is hoped to further contribute to improve

intra-communal relations and social tension.

30. Component 3: M&E and program management (US$500,000). In order to monitor

progress and evaluate the results achieved under the proposed AF, the AF will benefit from the

existing project results-based M&E system. In particular: (i) all members of the NVSP team have

been trained and are familiar with results-based management and M&E concepts, tools, and

practices; (ii) a results-based M&E plan was produced and is being implemented by the team; (iii)

a rigorous impact evaluation was designed and is currently being conducted to assess whether

volunteerism and soft skills training have an impact on youth employability and social cohesion;

and (iv) a process evaluation, focusing on the relevance, efficiency, and effectiveness the NVSP

processes and procedures. While the impact and process evaluations have yet to be completed,

data from the baseline survey of the impact evaluation as well as early results from the process

evaluations influenced AF design changes, including: (i) increased focus on capacity development,

communications and outreach; (ii) adjustments to contractual arrangements between MoSA and

selected NGOs; and (iii) increased focus on monitoring of project activities. It is expected that the

results of both impact and process evaluations will support MoSA to further fine tune some of

these design features of the project.

31. This component seeks to finance the management, monitoring, and evaluation of the

activities to be implemented under the AF. In particular, this component will support: (i) data

collection - from participating youth, municipalities and NGOs - analysis, and reporting; (ii)

drafting of the final impact evaluation report11; (iii) design and implementation of a program

evaluation by an external evaluator; and (iv) staff /consultants’ time for program management,

monitoring, and evaluation activities. Annex 2 includes the revised project RF.

32. A Project Operations Manual (POM) will be prepared and will include detailed information

about the processes and procedures related to the implementation of the proposed activities.

10 Projects that could be financed under the AF include: distribution of meals, clothes, and blankets; organization of

educational, cultural and recreational activities; cleaning and minor repairs of education and health centers; caring for

the elderly, etc. 11 NVSP impact evaluation report will be produced in January-March 2017. The report will focus on the effects of

program participation on employability/soft skills and social cohesion values among those youth who participated in

volunteering projects implemented in 2015 under the first CfP of the SGP. The final impact evaluation report will

include the results of program participation on employability/soft skills and social cohesion values among those youth

who participated in volunteering projects implemented in 2016 under the second CfP of the SGP. NVSP impact

evaluation report(s) will be produced by the NVSP/WBG team in collaboration with impact evaluation expert(s) as

needed.

Page 16: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-16-

E. IMPLEMENTATION ARRANGEMENTS

33. The parent project has established effective and efficient operational procedures with

satisfactory management, and this arrangement will be maintained for the AF. Program

implementation will therefore, remain the responsibility of the NVSP Project Implementation Unit

(PIU) at MoSA, with strong collaboration with the MoSA Volunteering Administrative

Committee.

34. No changes in financial management or procurement arrangements are envisaged for the

AF and will follow those of the parent project.

III. Summary of Proposed Changes

The AF of US$2 million to the National Volunteer Service Program (NVSP) is being sought as a

scale-up to address: (i) the unmet social service delivery needs in some of the most vulnerable

Lebanese communities hosting Syrian refugees, as well as (ii) the fragile inter-communal relations

and social tensions between Lebanese citizens and Syrian refugees living in the selected host

communities.

In light of the AF, a Level-1 restructuring is also being sought to introduce the following changes

to the parent project:

(i) Revise the Project Development Objective (PDO) to reflect changes in the scope of

project activities;

(ii) Revise the project’s RF, including key indicators, to be in line with the modified PDO;

(iii) Extend the project’s closing date from December 31, 2016 to December 31, 2018;

The proposed changes will require an amendment of the Grant Agreement.

Change in Implementing Agency Yes [ ] No [ X ]

Change in Project's Development Objectives Yes [ X ] No [ ]

Change in Results Framework Yes [ X ] No [ ]

Change in Safeguard Policies Triggered Yes [ ] No [ X ]

Change of EA category Yes [ ] No [ X ]

Other Changes to Safeguards Yes [ ] No [ X ]

Change in Legal Covenants Yes [ ] No [ X ]

Change in Loan Closing Date(s) Yes [ X ] No [ ]

Cancellations Proposed Yes [ ] No [ X ]

Change in Disbursement Arrangements Yes [ ] No [ X ]

Reallocation between Disbursement Categories Yes [ ] No [ X ]

Change in Disbursement Estimates Yes [ X ] No [ ]

Page 17: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-17-

Change to Components and Cost Yes [ X ] No [ ]

Change in Institutional Arrangements Yes [ ] No [ X ]

Change in Financial Management Yes [ ] No [ X ]

Change in Procurement Yes [ ] No [ X ]

Change in Implementation Schedule Yes [ X ] No [ ]

Other Change(s) Yes [ ] No [ X ]

Development Objective/Results PHHHDO

Project’s Development Objectives

Original PDO

The original PDO is to “increase youth civic engagement to contribute to improved social cohesion

across communities and regions by: (i) expanding youth volunteerism, particularly in communities

other than the communities from which the volunteers come; and (ii) improving the employability

of youth through enhanced skills.”

Change in Project's Development Objectives PHHCPDO

Explanation:

The proposed change in the PDO reflects the addition of a new a set of new activities that address

the needs of participating youth as well as the targeted host communities. In addition, the new PDO

aims to improve social stability (as opposed to social cohesion), so that the project is better aligned

with the definition and strategic objectives of the LCRP 2015-2016.

The original project envisaged to improve the employability (both in terms of skills and insertion)

of participating youth (Lebanese aged 15-24) through: (i) civic engagement, and (ii) soft skills

training. In terms of outcomes, to-date, 1,265 youth have benefited both from 80 hours of

volunteering as well as from 20 hours of soft-skills training through the completion of 22 projects

financed under the first call for proposals (CfP) of the Small Grants Program (SGP). An additional

835 youth are expected to benefit from volunteering and soft skills training through the completion

of 13 projects that were financed under the second CfP, and which are expected to be completed by

mid-late December 2016. There is an ongoing impact evaluation to assess whether civic

engagement coupled with soft skills training does indeed lead to improve employability. The results

of the impact evaluation will be available in March/April 2017. In addition, a process evaluation,

which is also ongoing and whose results will be available during the first quarter of 2017, will help

to identify some of the project’s implementation bottlenecks and lessons learned, including those

related to the delivery of volunteering opportunities and soft skills training.

The revised PDO does not include “improving the employability of youth” as a project objective,

despite the fact that both civic engagement and soft skills training, both of which are thought to

increase youth employability, are critical components of the proposed new phase of NVSP.

Proposed New PDO - Additional Financing (AF)

Page 18: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-18-

The proposed new PDO is to “improve social stability and service delivery in the most vulnerable

Lebanese communities hosting Syrian refugees through youth volunteering, soft skills

development, and psychosocial awareness activities.”

Change in Results Framework PHHCRF

The RF has been revised to be consistent with the revised PDO and the addition of new activities.

Moreover, the revised RF incorporates up-to-date project monitoring data available in the setting of

revised baseline values and new target values. Please refer to Annex 2 for all the changes of

indicators and their baseline and target values.

Risk PHHHRISKS

Risk Category Rating (H, S, M, L)

1. Political and Governance H

2. Macroeconomic S

3. Sector Strategies and Policies S

4. Technical Design of Project or Program M

5. Institutional Capacity for Implementation and Sustainability M

6. Fiduciary M

7. Environment and Social L

8. Stakeholders M

9. Other

OVERALL M

Finance

Loan Closing Date - Additional Financing ( Additional Financing for National

Volunteer Service Program – P126734)

Source of Funds Proposed Additional Financing Loan Closing Date

State and Peace Building Fund 31-Dec-2018

Loan Closing Date(s) - Parent (National Volunteer Service Program- P126734) PHHCLCD

Explanation:

It is proposed that the closing date of the parent project is extended for a period of 24 months (from

December 31, 2016 to December 31, 2018). The extension is sought to fully implement all of the

project activities and to align it with the closing date of the proposed AF.

The project has no overdue audits. The first audit and management letter due June 30, 2015,

covering the period from effectiveness (February 7, 2013) until December 31, 2014, were received

on time and were found acceptable. The second audit and management letter due June 30, 2015,

covering the period from January 1, 2015 to December 31, 2015, were also received on time and

Page 19: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-19-

found acceptable. The third audit, covering the period from January 1, 2016 to December 31, 2016,

is expected to be submitted by April 2017.

Ln/Cr/TF Status Original

Closing Date

Current

Closing Date

Proposed

Closing Date

Previous

Closing Date(s)

TF-10404 Effective 31-Mar-2014 31-Dec-2016 31-Dec-2018

Change in Disbursement

Estimates

(including all sources of Financing)PHHCDE

Explanation:

The project’s disbursement estimates are being revised to take into account the additional

financing amount as well as the additional 24 months of project implementation.

Expected Disbursements (in USD Million)(including all Sources of Financing)

Fiscal Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026

Annual 2177,030 1,067,500 755,470 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Cumulative 2177,030 3,244,530 4,000,000 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Allocations – Initial and Additional Financing (National Volunteer Service

Program - P126734)

Source of

Fund

Currenc

y Category of Expenditure

Allocation Disbursement

%(Type Total)

Proposed Proposed

SPF USD

Goods, works, consultants’

services, training, and

operating costs for capacity

development,

communications and

outreach, weekend activities,

M&E, as well as program

management

2.10 100%

SPF USD

Goods, works, consultants’

services and training for SGP

of the Project

1.90 100%

USD

Total: 4.00 100%

Components

Change to Components and Cost PHHCCC

Explanation:

Page 20: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-20-

While most of the activities included under each of the original three components will continue to

be financed through the AF, the name of the three components will be slightly revised to reflect

minor adjustments to the project’s design and implementation arrangements. In addition, and given

the changes in the scope of project activities, the cost per project component will also be adjusted.

Current Component

Name

Proposed Component

Name

Current

Cost

(US$M)

Proposed

Cost

(US$M)

Action

Institution building and

capacity development

for volunteer civic

engagement

Capacity development,

communications and

outreach

0.72 1.02 Revised

Small Grants Program

for NGOs, universities

and schools as well as

weekend volunteering

programs and summer

camps for expanding

volunteer opportunities

and building

employability skills

Youth volunteering for

social stability and

service delivery

1.10 2.30 Revised

M&E of civic

engagement

M&E and program

management 0.18 .68 Revised

Total: 2.00 4.00

Other Change(s)

Implementing Agency Name Type Action

Ministry of Social Affairs Implementing Agency No Change

Change in Implementation

Schedule

Explanation: Given the proposed extension of project closing date to allow for the additional

activities to be financed under the AF to be completed, the implementation schedule will be

adjusted accordingly.

IV. Appraisal Summary

Economic and Financial Analysis PHHASEFA

Explanation:

Page 21: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-21-

Volunteerism can provide youth the opportunity to participate in an unpaid work experience, thus

increasing their chances of employment. In addition, training in soft skills has been proven to

increase youth’s employability in the short and medium term. Finally, the proposed AF has a strong

component on capacity building of all project stakeholder, which will contribute to the

sustainability of the project activities.

Technical Analysis PHHASTA

Explanation:

The design of all the activities to be financed under the AF are based on: (i) lessons learned from

the implementation of the NVSP; and (ii) international good practices, especially those related to

the soft skills and psychosocial awareness training. The AF implementation will be carried out by

expert specialized agencies in partnership with relevant World Bank teams, thus ensuring that the

AF activities and outputs are of high quality.

Social Analysis PHHASSA

Explanation:

Countries with large percentages of youth who have limited opportunities for participation in

society are likely to face significant social tensions. It is the result of young people becoming

frustrated at their inability to positively affect their own lives or that of their communities.

Volunteerism is part of the solution, as it can bring youth together around shared goals, thus

building more cohesive societies through the development of more meaningful citizenship. In

particular, the proposed AF will enable Lebanese youth to interact with Syrian refugees, which

coupled with improved service delivery, will contribute to mitigate the rising intra-communal

tensions that are afflicting the most vulnerable communities.

Environmental Analysis

Explanation:

The AF is a category C project and, as such, it is not expected to trigger the Bank’s environmental

safeguards.

Risk PHHASRisk

Explanation:

The risks associated with the AF include but are not limited to: (i) unstable political economy; (ii)

conflict and fragility; (iii) challenging coordination among project stakeholders; and (iv) weak

capacity of implementing agencies. However, the parent project has been able to affectively address

these risks by: (i) being flexible in terms of targeting of project sites and implementation

arrangements; (ii) carrying out capacity building activities for all key stakeholders; and (iii) having

the Ministry of Social Affairs involved at all stages, thus building ownership/commitment.

Page 22: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-22-

V. WORLD BANK GRIEVANCE REDRESS

Communities and individuals who believe that they are adversely affected by a World Bank (WB)

supported project may submit complaints to existing project-level grievance redress mechanisms

or the WB’s Grievance Redress Service (GRS). The GRS ensures that complaints received are

promptly reviewed in order to address project-related concerns. Project affected communities and

individuals may submit their complaint to the WB’s independent Inspection Panel which

determines whether harm occurred, or could occur, as a result of WB non-compliance with its

policies and procedures. Complaints may be submitted at any time after concerns have been

brought directly to the World Bank's attention, and Bank Management has been given an

opportunity to respond. For information on how to submit complaints to the World Bank’s

corporate Grievance Redress Service (GRS), please visit http://www.worldbank.org/GRS. For

information on how to submit complaints to the World Bank Inspection Panel, please visit

www.inspectionpanel.org.

Page 23: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-23-

ANNEX 1: MAP OF THE MOST VULNERABLE CADASTRAL ZONES IN LEBANON

Page 24: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-24-

ANNEX 2: RESULTS FRAMEWORK

Project

Name: National Volunteer Service Program (P126734)

Project

Stage: Restructuring Status: DRAFT

Team

Leader: Rene Antonio Leon Solano

Requesting

Unit: GSP05 Created by:

Product

Line:

Recipient Executed

Activities

Responsible

Unit: GSP05 Modified by:

Country: Lebanon Approval FY: 2012

Region: MIDDLE EAST AND

NORTH AFRICA

Lending

Instrument: Specific Investment Loan

.

Project Development Objectives

Original Project Development Objective: To increase youth civic engagement which in the medium term will contribute to improved social cohesion across communities and

regions by: (i) expanding youth volunteerism and particularly in communities other than the communities from which the volunteers

come; and (ii) improving the employability of youth through enhanced (soft) skills.

Proposed New PDO - Additional Financing (AF):

To improve social stability and service delivery in the most vulnerable Lebanese communities hosting Syrian refugees through youth

volunteering, soft skills development, and psychosocial awareness activities.

Results

Core sector indicators are considered: Yes Results reporting level:

Page 25: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-25-

.

Project Development Objective Indicators

Status Indicator Name Core Unit of

Measure Baseline

Actual

(Current) End Target

Add – New

proposed

indicator

Number of Lebanese

municipalities where social

stability has been

strengthened through youth

volunteering

projects/activities

Number Value 0 0 30

Date 15-Nov-2016 31-Dec-2018

Comment No projects

targeting social

stability

No more than 2

projects in one

municipality

Revised –

Proposed

change in

target value

Number of volunteering

projects under SGP Number Value 0.00 22 65

Date 15-Nov-2016 31-Dec-2018

Comment No projects funded

by MOSA to

NGOs directly

targeting the

involvement of

volunteers

Original target was

33 projects. 13

projects are

underway and will

be completed, for a

total of 35 projects,

by current project

closing date

(December 31,

2016).

Revised –

Proposed

change in

target value

Number of youth involved

with volunteering projects of

NGOs, universities, and

schools.

Number Value 0 1,265 3,600

Date 15-Nov-2016 31-Dec-2018

Comment No youth involved

with volunteering

projects funded by

MOSA of NGOs,

Original target was

1,650 projects. 835

volunteers are

expected to benefit

from the 13 projects

Page 26: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-26-

universities, and

schools

that are underway,

for a total of 2,100

by current project

closing date

(December 31,

2016).

No change Increased employability/soft

skills of volunteers

participating in the program

Percentage Value - 0.00 5.00

Date - 15-Nov-2016 31-Dec-2016

Comment - Value refers

to baseline

data collected

in December

2015. No

difference

observed in

leadership/tea

mwork and

communicati

on skills.

5% increase from

baseline value one

year after their

volunteering

experience

Revised –

Proposed

change in

target value

Number of volunteers

involved in volunteering

activities financed by the

project (Youth Summer

Camps and Weekend

Activities)

Number Value 0 1,249 2,749

Date 15-Nov-2016 31-Dec-2018

Comment No summer camps

are planned for

2017-2018.

Original target was

1,650 youth

volunteers by

current project

closing date

(December 31,

2016).

Page 27: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-27-

Add – new

proposed

indicator

Proportion of youth

volunteers with increased

awareness/understanding of

key psychosocial concepts.

Percentage Value 0.00 00.00 80.00

Date 15-Nov-2016 31-Dec-2018

Comment

No Change Understanding of youth

volunteer needs and attitudes

through a baseline survey

addressed to youth included

in project proposals

submitted to the NVSP

Yes/No Value No Baseline survey

completed

Yes

Date 15-Nov-2016 30-Dec-2016

Comment No national

survey has

been done to

specifically

understand

the needs and

attitudes of

youth

towards

volunteerism

1 baseline

survey

conducted

Delete –

Substitute by

proposed new

indicator

below

Increased the sense of social

cohesion of the youth

following their volunteering

experience

Percentage Value - 15-Nov-2016 31-Dec-2016

Date 40.00 42.00

Comment 5% increase

from baseline

value one year

following their

volunteering

New proposed

indicator

Increase in tolerance values

of the youth at the end of

their volunteering

experience.

Percentage Value - 07-Jan-2016 31-Dec-2016

Date 40.00 42.00

Comment Value refers to

baseline data

2% increase

from baseline

Page 28: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-28-

collected in

December 2015.

value one year

following their

volunteering

No Change Information on volunteer

opportunities through

development of an online

portal

Yes/No Value No Yes Yes

Date 15-Nov-2016 31-Dec-2016

Comment No online

portal at

MOSA for

volunteering

activities

Portal has been

developed and is

operational and

being used

Online portal

fully

operational

No Change Percentage of former

volunteers who were offered

a job following their

volunteering experience

Percentage Value 0.00 12.00 15.00

Date 15-Nov-2016 31-Dec-2016

Comment Value refers to

baseline data

collected in

December 2015.

15% increase

from baseline

value one year

following their

volunteering

experience.

Intermediate Results Indicators

Status Indicator Name Core Unit of Measure Baseline Actual(Current) End Target

Add – New

proposed

indicator

Number of social service

projects carried out in

communities hosting Syrian

refugees by youth volunteers

Number Value 0 0 30

Date 15-Nov-2016 31-Dec-2018

Comment

Add – New

proposed

indicator

Number of social service

weekend activities carried

out in communities hosting

Number Value 0 0 30

Date 15-Nov-2016 31-Dec-2018

Comment

Page 29: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-29-

Syrian refugees by youth

volunteers

No Change Communication &

Awareness plan approved by

the NPCV

Yes/No Value No Yes

Date 15-Nov-2016 31-Dec-2016

Comment 1 plan

approved by

NPCVP

Revised –

Proposed

change in

target value

Partner organizations

interested in volunteerism

are registered at the online

portal

Number Value 0.00 148 168

Date 15-Nov-2016 31-Dec-2018

Comment 70 NGOs and

20 universities /

schools

Original target

was 100 by

current project

closing date

(December

2016). Some

partner

organizations

are expected to

be current

partners and/or

implement

both SGP and

weekend

activities

Revised –

Proposed

change in

target value

Number of youth interested

in volunteering who have

registered on the online

portal

Number Value 0 6,584 7,584

Date 15-Nov-2016 31-Dec-2018

Comment Original target

was 1,850

youth by

Page 30: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-30-

current project

closing date

(December 31,

2016). 2/3 of

already

registered

volunteers are

expected to

participate in

new phase.

No Change Partner organization &

MoSA staff trained on

volunteer management /

volunteer training on soft

skills and social cohesion

Text Value 0 116 176

Date 07-Jan-2016 31-Dec-2016

Comment Original target

was 1,850

youth by

current project

closing date

(December 31,

2016).

Add – New

proposed

indicator

Number of youth volunteers

who have received 24h of

soft skills /psycho-social

awareness training.

Number Value 0 0 1,500

Date 15-Nov-2016 31-Dec-2018

Comment No psycho-

social

awareness

training was

delivered to

youth

volunteers

20h of soft

skills and 4h of

psycho-social

awareness

training

No Change Percentage Value 0.00 0.00 80.00

Date 15-Nov-2016 31-Dec-2016

Page 31: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-31-

Percentage of youth satisfied

with their NVSP

volunteering experience

Comment Satisfaction data

to be collected

in Dec 2016.

80% of

volunteers

satisfied

Add – New

proposed

indicator

Proportion of beneficiaries

of volunteering projects in

host communities who are

satisfied with the services

received.

Percentage Value 0 0.00 80.00

Date 15-Nov-2016 31-Dec-2018

Comment No psycho-

social

awareness

training was

delivered to

youth

volunteers

No Change Percentage of youth

involved in volunteering

activities in communities

other than their own

Percentage Value 0.00 43 25.00

Date 15-Nov-2016 31-Dec-2016

Comment

Delete Increased understanding of

social cohesion by the youth

volunteering in NVSP

projects following the

training

Percentage points

increase

Value 0 0 10.00

Date 15-Nov-2016 31-Dec-2016

Comment No pre-post

learning

assessment was

conducted

No Change M&E plan approved by the

NPCV Yes/NO Value No 0 Yes

Date 07-Jan-2016 31-Dec-2016

Comment

Evaluation report produced Yes/No Value No 0 Yes

Page 32: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-32-

Delete –

substitute by

indicator

below

Date 07-Jan-2016 31-Dec-2016

Comment

Add – New

proposed

indicator

Evaluation reports produced Number Value 0 1 3

Date 15-Nov-2016 31-Dec-2018

1 baseline

analysis report

produced

Includes

impact and

process

evaluation

reports

Page 33: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-33-

ANNEX 3: FIDUCIARY ARRANGEMENTS

Financial Management

The financial management arrangements have been discussed and will follow the same

arrangements of the ongoing NVSP. The PIU housed at the MoSA handling the execution of the

initial project will be responsible for the FM arrangements of the project. The PIU team includes

a Financial Officer (FO) who will be responsible, among others tasks, for managing the Project

Designated Account (DA), honor the entities requests for issuing payments, consolidating the

project accounts and issue periodical financial reports to reflect the overall grant financial position.

The FM performance of the NVSP is satisfactory. The main challenge is the delays in transfers of

funds from the Ministry of Finance (MoF) treasury account to the project’s DA.

Accounting: The project will utilize the current accounting procedures of the initial project, which

are based on a ring fenced system of excel spread sheets. The PIU will be responsible for recording

the daily transactions and preparing the required financial reports.

Internal Controls: a Project Operations Manual (POM) is being utilized by the current project and

will also be used for the AF. The POM contains a detailed chapter on accounting and financial

management. The POM will be updated for the AF.

Financial Reporting: The PIU will be responsible for preparing Quarterly un-audited Interim

Financial Reports (IFRs) detailing the grant: (i) sources and uses of funds; (ii) contract

expenditures; (iii) uses of funds by grant activity, component and category; (iv) DA reconciliation

statement; and (v) consolidated list of fixed assets purchased through the project. The IFRs will be

submitted to the Bank no later than 45 days after the end of the quarter to which they relate. In

addition, the annual Project Financial Statements (PFS) will be prepared by the PIU bearing the

same information as the IFRs and will be audited by an external independent auditor.

Budgeting: A project annual budget and disbursement plan will be produced and maintained by

the project based on the project procurement plan and implementation schedule, to ensure timely

availability of funds. It will be used as an effective monitoring tool for comparing planned

expenditures with actual ones and monitoring the existing variances.

External Audit: the PFS will be audited by an independent private external auditor acceptable to

the World Bank, to be engaged within six months after effectiveness. The audit Terms of Reference

(TORs) will be cleared by the World Bank. The project audited PFS and management letter will

be due for submission by no later than 6 months after the end of each fiscal year. The audited PFS

will be made public as per the World Bank disclosure policy. There are no overdue audit reports

related to the ongoing NVSP project.

Flow of Funds: The project flow of funds will go through MoF treasury account for grants and

donations and then transferred to the DA based on transfer requests submitted by PIU to MoF.

Funds will then be disbursed to fund the various activities.

Page 34: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-34-

Disbursements Arrangements

The additional financing will follow the same disbursements arrangements as the parent project.

The provisions of the parent project disbursement letter will form the basis for the additional

financing. The project will utilize the same Designated Account (DA) to receive the funds of the

additional financing. The disbursements methods will be advances to and documentation,

reimbursements and direct payments. The DA ceiling is set at US$ 200,000. The minimum ceiling

for direct payments and reimbursements will be set at US$ 100,000. MOSA through the PIU will

be responsible for submitting monthly replenishments applications with appropriate supporting

documents. Funds will be channeled through MoF treasury account for grants and donations to the

project DA.

The following table specifies the categories of eligible expenditures that will be financed out of

the proceeds of the Grant (including initial and additional financing) as per the amended grant

agreement:

Category Amount of the Grant

Allocated (expressed in

USD)

Percentage of Expenditures

to be financed (inclusive of

Taxes)

(1) Goods, works consultant

services, training, and

operating costs under parts A,

B.2 and C of the project

2,100,000 100%

(2) Goods, works,

consultants’ services and

Training for Small Grants

under Part B.1 of the project

1,900,000 100%

TOTAL AMOUNT 4,000,000 100%

E – Disbursement: The World Bank has introduced e-disbursement for all Lebanon supported

projects. Under e-disbursement, all transactions will be conducted and associated supporting

documents scanned and transmitted on line through the Bank’s Client Connection system. E-

disbursement will considerably speed up disbursements and facilitate project implementation.

Reporting on Use of Grant Proceeds

(i) Supporting Documentation. Supporting documentation should be provided with each

application for withdrawal as set out below:

For requests for Reimbursement and reporting eligible expenditures paid from the Designated Account:

- Records evidencing eligible expenditures (e.g. copies of receipts, supplier

invoices) for payments made under contracts costing US$ 50,000 per contract or

more;

Page 35: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-35-

- Statement of Expenditure in the form attached (Attachment 4 of the Disbursement Letter)

List of payments against contracts that are subject to the World Bank's prior

review, in the form attached (Attachment 5 of the Disbursement letter).

For requests for Direct Payment: records evidencing eligible expenditures, e.g., copies

of receipts, supplier invoices

Procurement

The MoSA/PIU has acquired solid experience in processing procurement using international

procedures. Capacity and knowledge has been enhanced in finding efficient channels of

communication with the project’s implementing agencies - IAs (NGOs and municipalities), and

incorporating their procurement processes within a satisfactory business line. The project design

was enhanced during the implementation of the original project, and no procurement issues are

expected to be challenging the proposed AF. The capacity assessment is reviewed, and

implementation arrangements are confirmed satisfactory and will thus remain the same. Therefore,

the project shall continue to be managed centrally by MoSA, but the component that provides

grants to IAs (Component 2 of the proposed AF) shall use the simplified procurement processing

as defined in the grant OM.

For purchase of Goods and Works, the World Bank same Guidelines “Procurement under IBRD

Loans and IDA Credits” version of January 2011, updated in July 2014 shall be used. No

international competitive bidding is expected. For national competitive bidding, the MoSA/PIU

has developed Standard Bidding Documents acceptable to the Bank. The grant shall use, especially

with respect to the sub-projects provided to the IAs, shopping procedures that include: (a) explicit

statement to bidders of the evaluation and award criteria; (b) local advertising or through MoSA

website, allowing bidders not less than 14 days to prepare and submit quotations; (c) award to

lowest evaluated bidder; and (d) foreign bidders would not be precluded from participation.

Whenever justifiable, Direct Contracting can also be used.

For the selection of consultants, the World Bank same Guidelines “Selection and Employment of

Consultants by World Bank Borrowers” version of January 2011, updated in July 2014 shall be

used. It is foreseen that Quality and Cost Based Selection as well as other methods, as seen

appropriate to the assignments, and selection of Individual consultants shall be used. Whenever

justifiable, single sourcing of firms and sole sourcing of individuals can also be used.

The procurement function shall be supported by MoSA technical staff with the support of the

Procurement Officer and field consultants (for approval of projects and reception).

The procurement plan shall be developed and will be updated bi-yearly or as seen necessary.

SGP arrangements

The selected NGOs are responsible for implementing their approved projects, which could include

contracting for civil works, purchasing goods, as well as selecting and recruiting consultants and

temporary personnel that they may need to carry out their projects.

Page 36: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-36-

Selected IAs must comply with the World Bank “Procurement Guidelines”[1] and “Consultant

Guidelines”[2]

Procurement Process: Selected IAs can launch the procurement of works, goods, and consultants

once their project has been approved. All selected IAs should designate a Procurement Focal Point

who will handle all procurement related matters. The PIU shall conduct on-site spot checks to

ascertain whether the prices paid and the quality of the works and goods supplied and of services

performed are within acceptable limits.

Procurement of Works and Goods: The method of procurement largely depends on the estimated

value of each contract, taking also into account local practices and the capacity of the IA to manage

the process:

a- Direct Contracting:

When the estimated amount of the contract is lower than US$500, the selected IA will

select a contractor or supplier familiar to them, agree on a price with him/her and award

the contract for this negotiated price.

b- Local Shopping:

When the estimated amount of the contract is equal to or greater than US$500 but lower

than US$30,000, local shopping should be used. At least two quotations from different

bidders are needed to prove that the IA has conducted and selected the lowest evaluated

bidder on the basis of criteria mentioned in the request for quotation (RFQ).

Procurement of Services (Consultants): In most cases, services (consultants) will consist of the

recruitment by the selected IA of an individual consultant or engineering consulting firm for SGP

approved project preparation and supervision, or of temporary personnel to carry out activities

(such as training) included in the approved project. Selected IAs should prepare terms of references

clearly stating the scope of the assignments, and the required qualifications and experience.

a- Single Sourcing:

When the estimated amount of the contract is lower than US$5,000, contracting directly

on a single source basis is acceptable.

b- Competition:

When the estimated amount of the contract is equal to or greater than US$5,000, the

selected IA should collect at least three interested and qualified candidates.

Conflict of Interest: In order to avoid conflicts of interest, members of the selected IA responsible

for the management of the approved project cannot be selected as contractors, suppliers or

consultants for the implementation of the community approved project. Members of their families,

and enterprises managed by them and by members of their families, are also excluded.

Formal Contract Agreements: The selected IA shall ensure that formal contract agreements are

executed whenever the contract value exceeds US$ 5,000; in all other cases, the selected IA may

not be required to prepare formal contract documents provided that clear letters of award

[1] These guidelines can be found on the following link: http://go.worldbank.org/1KKD1KNT40 [2] These guidelines can be found on the following link: http://go.worldbank.org/U9IPSLUDC0

Page 37: World Bank Document - Documents & Reportsdocuments.worldbank.org/.../pdf/...Paper-AF-NVSP-Dec-29-FINAL-002.pdf · -2- CURRENCY EQUIVALENTS (Exchange Rate Effective {November 30, 2016})

-37-

notification, acceptance or other acceptable documents are issued on behalf of the selected IA. All

contract agreements or other documents shall be for definite duration. Renewal or extension of

contracts shall not be undertaken without the prior approval of the selected IA.

Procurement Records: The selected IA should keep all procurement records and documents

available for inspection by the PIU and World Bank representatives / auditors, as well as other

relevant parties, for a period of five (5) years.