Upload
clyde-shields
View
222
Download
0
Embed Size (px)
DESCRIPTION
front-end E.Gousou | BE-CO |15 Oct 2014 WorldFIP Infrastructure | Architecture master client node diagnostic node user app Cu- opt Opt -Cu Cu-Opt repeater Cu-Cu repeater Cryo, QPS, EPC,..
Citation preview
WorldFIP Infrastructure
E.Gousou | BE-CO |15 Oct 2014
| R2E | Maintenance | Availability
WorldFIP Infrastructure| Architecture
E.Gousou | BE-CO |15 Oct 2014
| R2E | Maintenance | Availability
front-end
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Architecture
masterclient node
client node
client node
diagnosticnode
user app
user app
user app
Cu-opt
Opt-Cu
Cu-Opt repeater
Cu-Cu repeater
Cryo, QPS, EPC, ..
front-end
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Architecture
masterclient node
client node
client node
diagnosticnode
user app
user app
user app
Cu-opt
Opt-Cu
Cu-Opt repeater
Cu-Cu repeater
Cryo, QPS, EPC, ..
Designed for reliability | Solid results Run1
| Run1 Lessons learnt
front-end
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure
masterclient node
client node
client node
diagnosticnode
user app
user app
user app
Cu-opt
Opt-Cu
Cu-Opt repeater
Cu-Cu repeater
Cryo, QPS, EPC, ..
Designed for reliability | Solid results Run1Lower rad-tolerance of newer uFIP nodes
Obsolescence of WorldFIP components
| Run1 Lessons learnt
front-end
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| New Developments
masterclient node
client node
client node
diagnosticnode
user app
user app
user app
Cu-opt
Opt-Cu
Cu-Opt repeater
Cu-Cu repeater
Cryo, QPS, EPC, ..
Lower rad-tolerance of newer uFIP nodes
Obsolescence of WorldFIP components
| Run1 Lessons learnt
front-end
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| New Developments
client node
client node
client node
diagnosticnode
user app
user app
user app
Cu-opt
Opt-Cu
Cu-Opt repeater
Cu-Cu repeater
Cryo, QPS, EPC, ..
Issues of master board in newer front ends
master
[Currently: short term solution]
Lower rad-tolerance of newer uFIP nodes
Obsolescence of WorldFIP components
[2015 Q4: proto of new master]
front-end
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| New Developments
client node
client node
client node
diagnosticnode
user app
user app
user app
Cu-opt
Opt-Cu
Cu-Opt repeater
Cu-Cu repeater
Cryo, QPS, EPC, ..
Issues of master board in newer front ends
master
[Currently: short term solution]
Lower rad-tolerance of newer uFIP nodes
Obsolescence of WorldFIP components
[2015 Q4: proto of new master]
[2015-2016] master development
[2016] finalizing insourcing of repeaters
[2017] replacement of FielDrive/TR
Ro
ad
ma
p
Complete insourcing of the technology
[2010-2012] client node
front-end
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure
client node
client node
client node
diagnosticnode
user app
user app
user app
Cu-opt
Opt-Cu
Cu-Opt repeater
Cu-Cu repeater
Cryo, QPS, EPC, ..
master
[Currently: short term solution]
[2015 Q4: proto of new master]
[2015-2016] master development
[2016] finalizing insourcing of repeaters
[2017] replacement of FielDrive/TR
Ro
ad
ma
p
Complete insourcing of the technology
[2010-2012] client node
| Radiation-tolerance: nanoFIP| New Developments
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure
Location
RR|MB|MQ[95%]
TID
OK till 2035![>400Gy]
Run2+Run3Tech
ProASIC3
HL-LHC
< 1 SEU/y
SEEStock
10’000[> 100% current
inventory]
No need for relocations | no preventive maintenance[ageing tests to be scheduled]
< 1 SEU[till end of Run3]
Stock of 10’000 nanoFIP units enough till 2035[climate controlled storage]
In case of ProASIC3 obsolescence -> IGLOO2
client node
[system of 1’000 units]
| Radiation-tolerance: nanoFIP
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure
Location
RR|MB|MQ[95%]
OK till 2035![>400Gy]
Run2+Run3Tech
ProASIC3
HL-LHC
< 1 SEU/y
SEEStock
10’000[> 100% current
inventory]
< 1 SEU[till end of Run3]
client node
[system of 1’000 units]
| Radiation-tolerance: FielDrive/TR| Radiation-tolerance: nanoFIP
No need for relocations | no preventive maintenance[ageing tests to be scheduled]
Stock of 10’000 nanoFIP units enough till 2035[climate controlled storage]
In case of ProASIC3 obsolescence -> IGLOO2
TID | NIELTID
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure
Location
RR|MB|MQ[95%]
TID | NIEL
OK till 2035![>400Gy][>6e12]
Tech
CMOS+Passive
Stock
4’000[~60% current
inventoryUsers+BE/CO]
FielDrive/TR
Plans for complete replacement of FielDrive/TR [2017]
Run2+Run3 HL-LHC
< 1 SEU/y
SEE
< 1 SEU[till end of Run3]
[system of 1’000 units]
| Radiation-tolerance: FielDrive/TR
No need for relocations | no preventive maintenance[ageing tests pending]
Components still available for purchase
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure
Location
RR|MB|MQ[95%]
OK till 2035![>400Gy]
Tech
CMOS
Stock
4’000[~60% current
inventoryUsers+BE/CO]
FielDrive/TR
Run2+Run3 HL-LHC
< 1 SEU/y
SEE
< 1 SEU[till end of Run3]
[system of 1’000 units]
| Radiation-tolerance :FielDrive/TR| Radiation-tolerance: repeater
Plans for complete replacement of FielDrive/TR [2017]
No need for relocations | no preventive maintenance[ageing tests pending]
Components still available for purchase
TID | NIEL
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure
Location
above MB OK till 2035![>300Gy]
Tech
AntifuseAntilatch-up
Stock
60[20%]
Run2+Run3 HL-LHC
< 1 SEE/y
SEE
< 1 SEE[till end of Run3]
[system of 200 units]
| Radiation-tolerance: repeater
No need for relocations | no preventive maintenance
Plan to produce more at CERN [2016]
In case of Antifuse obsolescence -> ProASIC3 -> IGLOO2
TID | NIEL
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure | Radiation-tolerance: repeater
Location
above MB OK till 2035![>300Gy]
Tech
AntifuseAntilatchup
Stock
60[20%]
Run2+Run3 HL-LHC
< 1 SEE/y
SEE
< 1 SEE[till end of Run3]
[system of 200 units]
No need for relocations | no preventive maintenance
Plan to produce more at CERN [2016]
In case of Antifuse obsolescence -> IGLOO2
TID | NIEL
| Run2 Inventory
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Run2 Inventory
masters
Cu-Opt repeater
nodes
diagnostic node
Cu-Cu repeater
PO QPS Cryo RadMon Survey BI
85 80 70 20 20 25
80 120 100 0 0 0
1’700 2’200 2’000 400 150 600
85 80 70 20 20 25
80 50 130 38 0 2
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Run2 Inventory
masters
Cu-Opt repeater
nodes
diagnostic node
Cu-Cu repeater
PO QPS Cryo RadMon Survey BI
85 80 70 20 20 25
80 120 100 0 0 0
1’700 2’200 2’000 400 150 600
85 80 70 20 20 25
80 50 130 38 0 2
Run2Total Qty
300
300
7’000
300
300
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Run2 Inventory
masters
Cu-Opt repeater
nodes
diagnostic node
Cu-Cu repeater
85 80 70 20 20 25
80 120 100 0 0 0
1’700 2’000 2’200 400 150 600
85 80 70 20 20 25
80 50 130 38 0 2
PO QPS Cryo RadMon Survey BIRun2
Total Qty
300
300
7’000
300
300
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Run2 Inventory
masters
Cu-Opt repeater
nodes
diagnostic node
Cu-Cu repeater
Run2Total Qty
300
300
7’000
300
300
Run2%Insourced
12%
1 - 16%
13%
100%
0 - 5% Partial migration to new masters during Run2
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Run2 Inventory
masters
Cu-Opt repeater
nodes
diagnostic node
Cu-Cu repeater
Run2Total Qty
300
300
7’000
300
300
Run2%Insourced
12%
1 - 16%
13%
100%
0 - 5%
17% [70 unt] RadMon0 - 65% [1100 unt] PO0% QPS0% Cryo0% Survey0% BI
Partial migration to new masters during Run2
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Run2 Inventory
masters
Cu-Opt repeater
nodes
diagnostic node
Cu-Cu repeater
Run2Total Qty
300
300
7’000
300
300
Run2%Insourced
12%
1 - 16%
13%
100%
0 - 5%
17% [70 unt] RadMon0 - 65% [1100 unt] PO0% QPS0% Cryo0% Survey0% BI
100%
allreplacements
16%
100%
Run3%Insourced
Run3Total Qty
no significant changesall
replacements
HL-LHCTotal Qty
HL-LHC%Insourced
Same as Run3
16%+CRYO?+QPS?
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Run2 Inventory| Availability improvement
masters
Cu-Opt repeater
nodes
diagnostic node
Cu-Cu repeater
Run2Total Qty
300
300
7’000
300
300
Run2%Insourced
12%
1 - 16%
13%
100%
0 - 5%
17% RadMon0 - 65% PO0% QPS0% Cryo0% Survey0% BI
100%
allreplacements
16%
100%
Run3%Insourced
Run3Total Qty
no significant changesall
replacements
HL-LHCTotal Qty
HL-LHC%Insourced
Same as Run3
16%+CRYO?+QPS?
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Availability improvement
Run1 2x Cu-Cu repeaters failure due to overheating
Repeaters overheating
Action: LS1 campaign for lowering their temperature
Last batches of uFIP were showing a high σ, giving SEUs in LHC
Client node SEUs
Action: nanoFIP development; σnanoFIP < x100 σuFIP
LS1 showed some misbehaving of the Master boards installed in newer computers
Master compatibility with newer computers
Action: masterFIP development
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Availability improvement
Run1 2x Cu-Cu repeaters failure due to overheating
Repeaters overheating
Action: LS1 campaign for lowering their temperature
Last batches of microFIP were showing a high σ, giving SEUs in LHC
Client node SEUs
Action: nanoFIP development; σnanoFIP < x100 σmicroFIP
LS1 showed some misbehaving of the Master boards installed in newer computers
Master compatibility with newer computers
Action: masterFIP development
| A new system?
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025… 2035
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| A new system?
LS1 Run3
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025… 2035
HL-LHC
WorldFIP proven to be a reliable solution
Support till the end of HL-LHC
Run1 Run2 LS2 LS3
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| A new system?
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
LS1Run1
…Run2 LS2 Run3 LS3
2035
HL-LHC
WorldFIP proven to be a reliable solution
Support till the end of HL-LHC
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| A new system?
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
LS1Run1
…Run2 LS2 Run3 LS3
2035
HL-LHC
Do the users need a new system for HL-LHC?WorldFIP bandwidth issues?
o Expansion of WorldFIP to 5Mbpso Study of a new solution | Development in a centralized way | PH collaboration
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| A new system?
LS1Run1 Run2 LS2 Run3 LS3
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025… 2035
HL-LHC
Do the users need a new system for HL-LHC?WorldFIP bandwidth issues?
o Expansion of WorldFIP to 5Mbpso Study of a new solution | Development in a centralized way | PH collaboration
| Conclusions
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure| Conclusions
Actions for even higher availability
Good stock management & insourcing provide margins for maneuver if needed
Expansion of WorldFIP up to 5Mbps
Explore other systems
Compete insourcing of the WorldFIP technology
Run1 Experience
WorldFIP support will be essential till the end of life of the LHC | HL-LHC
Run2 & beyond
BE-CO to understand users’ needs
New system for HL-LHC
E.Gousou | BE-CO |15 Oct 2014
WorldFIP Infrastructure
Location
above MB OK till 2035![>200Gy]
Tech
AntifuseAntilatchup
Stock
not much[plan to produce]
Run2+Run3 HL-LHC
< 1 SEU/y
SEE
< 1 SEU[till end of Run3]
[system of 300 units]
| Radiation-tolerance diagnostic
Need for dedicated tests
Plan to produce more at CERN
Case of Antifuse obsolescence -> IGLOO2
TID | NIEL