Antonio Bonomo – WTERT 2006.10.19
WTERT 2006 Annual Meeting At Columbia UniversityNew York, Oct 19-20th, 2006
INDUSTRIAL INSTALLATION AND TESTINGOF AN INNOVATIVE CATALYST SYSTEM
FOR NOx REMOVAL IN WTE UNITSAntonio Bonomo
Director, Energy DivisionASM Spa
Brescia - Italy
Antonio Bonomo – WTERT 2006.10.19
Brescia - Ancient city
Historical centre Augustus emperor Capitolium 70 A.D
Antonio Bonomo – WTERT 2006.10.19
COMPANY OVERVIEW (2005 data)
Generation
W.T.E.
Transmission
Distribution
Trading
Sale
Public Lighting
Import
Transmission
Distribution
Sale
Sourcing
Distribution
Sewage
Sewage treatment
Collection
Street cleaning
Disposal
Electricity Gas Water Waste Management
Generation
Distribution
Sale
District heating
2.710 Gwh 1.159 Gwh 89,8 Mm3779 Mm3 1.193 Mt
ASM ASM SpaSpa
Antonio Bonomo – WTERT 2006.10.19
•• Share holding utilityShare holding utility
•• Since July 2002 listed in Milan stock exchangeSince July 2002 listed in Milan stock exchange
•• 69 % of shares owned by Brescia municipality (200,000 69 % of shares owned by Brescia municipality (200,000 inhabinhab.).)
•• Employees nr. : 2100Employees nr. : 2100
•• Revenues (year 2005):Revenues (year 2005): 1,6721,672 MM€€
ASM ASM SpaSpa
Antonio Bonomo – WTERT 2006.10.19
OPERATIONS DATA 2005
Treated waste( of which biomass 290.000 tons )
Electricity production (net)
District heating
Fossil fuels saving (Tons of Oil Equivalent)
CO2 avoided emissions
757,000 tons
510 Gwhel
491 Gwhth
> 150,000 TOE
> 400,000 tons
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
1 km
Plant north
Plant south
WTE
DISTRICT HEATING SYSTEM OF BRESCIA
523 km of double pipe
>130,000 inhabitants supplied
36.5 Mm3 heated buildings
15,110 connected buildings
695 MWth
223 MWel
(Dec, 31st 2005)
Antonio Bonomo – WTERT 2006.10.19
MAIN DATA
• Heat capacity of treated waste (3 boilers)2 x 88,3 + 1 x 100 = 276 MWwaste
• Waste throughput 3 x 33 t/h
• Electric generation capacity 75 MWel
• Heat generation capacity 160 MWth
• INVESTMENT 300 M€
• Waste disposal fee 65 €/t
• ISO 14001 Environmental certification in april 2006
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
COMBUSTION SYSTEM
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
NOx CONTROL METHODS
• PRIMARY (NOx prevention)
- staged combustion (gradual O2 supply)- combustion temperature control
• SECONDARY (NOx reduction)
- SNCR (Selective Non-Catalytic Reduction)- SCR (Selective Catalytic Reduction):
- “Tail-end” (after gas cleaning)- “Low dust” (after gas de-dusting)- “High dust” (on raw gas)
Antonio Bonomo – WTERT 2006.10.19
IMPLEMENTED NOx CONTROL IN BRESCIA WTE(since 1998)
• PRIMARY
- low combustion excess air- 30 compartment grate- infrared camera for optimization of primary andsecondary air supply
- flue gas recirculation- combustion air preheating
• SECONDARY (NOx reduction)
- SNCR (NH3 injection with 27 nozzles, positioned atthree levels)
Antonio Bonomo – WTERT 2006.10.19
SNCR DENOX SYSTEM
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19FLUE GAS CLEANING
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
All values in mg/Nm3 (except for Dioxin - ng/Nm3)Values referred to dry gas, normal conditions, 11 % O2
PLANT AUTHORIZATION
LIMITS
1993
PLANT DESIGN DATA
1994
EUROPEAN UNION LIMITS
2000
ACTUAL OPERATION
DATA
2005
Particulate matter 10 3 10 0,4Suplhure doxide 150 40 50 6,5Nitrogen oxides (NOx) 200 100 200 <80Chlorine acid (HCl) 30 20 10 3,5Fluorine acid (HF) 1 1 1 0,1Carbon monoxide 100 40 50 15Heavy metals 2 0,5 0,5 0,01Cadmium (Cd) 0,1 0,02 0,05 0,002Mercury (Hg) 0,1 0,02 0,05 0,002PAH (Policyclic aromatic hydrocarbon) 0,05 0,01 - 0,00001Dioxin (TCDD Teq) ng/Nm3 0,1 0,1 0,1 0,002
STACK EMISSIONS
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
TYPICAL SCR TAIL-END SOLUTION(industrially available)
SCR system downstream of a non-wet Flue Gas Treatment showing heat exchange and temperature profiles
Antonio Bonomo – WTERT 2006.10.19
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
INSTALLATION AND TESTING OF A SCR “HIGH DUST” SYSTEM(non industrially available yet)
GOALS:
- further NOx reduction
- ammonia slip improvement
- lowering ammonia consumption
- keep high energy plant efficiency
Antonio Bonomo – WTERT 2006.10.19
PROBLEMS:
- catalyst clogging- catalyst poisoning
ADVANTAGES:
- much higher energy efficiency (no need of gasreheating and lower gas pressure losses)
- simpler installation- lower investment and operating cost
SCR “HIGH DUST” SYSTEM(non industrially available yet)
Antonio Bonomo – WTERT 2006.10.19
”Innovative demonstrations for the next generation of biomass and waste combustion plants for energy recovery and renewable electricity production”
• Funded by the European Commission (6th FrameworkResearch Program)
• Project duration:2006-2010 (48 months)• Budget: 29 M€
The ”NextGenBioWaste” Project
Antonio Bonomo – WTERT 2006.10.19
NextGenBioWaste Project(Consortium : 17 partners from 7 countries)Co-ordinator:
SINTEF Energiforskning AS (NO)
Partners:Afval Energie Bedrijf, Amsterdam (NL)ASM BRESCIA SPA (IT) (16% share – 4.5 M€ SCR HD)Gemeinschaftskraftwerk Schweinfurt GmbH (DE)Joint Research Centre of the EC (NL)KEMA (NL)Max-Planck-Institute (DE)N.V. Afvalverwerking Rijnmond (NL)SEGHERS Keppel Technology Group (BE)SINTEF Energiforskning AS (NO)SVUM, a.s., Prague (CZ)TNO (NL)Trondheim Energiverk Fjernvarme AS (NO)Vattenfall AB Business unit Nordic Heat (SE)Vattenfall Europe Waste to Energy GmbH (DE)Vattenfall Power Consultant AB (SE) Vattenfall Utveckling AB (SE)Visser & Smit Hanab (NL)
Antonio Bonomo – WTERT 2006.10.19HIGH DUST SCR LOCATION
HIGH DUST SCR
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19SPACE FOR SCR HIGH DUST INSTALLATION
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
HIGH DUST SCR LAYOUT
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
MIXER
CATALYST LAYER
(SPACE FOR UP TO 5LAYERS)
FLUEGAS
DAMPERS
NOx NOx
Antonio Bonomo – WTERT 2006.10.19
• installation: 2005 Sep. – 2006 Feb.
• operation: started 2006 Mar. (1st phase –one cat. layer)
• inspection: 2006 Sep.
• 2nd phase: started 2006 Oct.
SCR “HIGH DUST”FIRST TEST RESULTS
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
HIGH DUST SCR RESULTS (1 LAYER)
SCR Catalyst Effect
0
20
40
60
80
100
01/07/2006 11/07/2006 21/07/2006 31/07/2006 10/08/2006 20/08/2006 30/08/2006
NO
(as
NO
2) [m
g/N
m3 ]
NO before cat.NO after cat.
Reduction:~ 31 mg/Nm3
= 40%
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
0
10
20
30
40
50
60
70
80
90
01/01/2006 31/01/2006 02/03/2006 01/04/2006 01/05/2006 31/05/2006 30/06/2006 30/07/2006 29/08/2006
NO
x - N
H3 s
tack
[mg/
Nm
3]
0
30
60
90
120
150
180
210
240
270
300
330
360
390
420
450
480
NH
3 con
sum
ptio
n [l/
h]
NH3 slip
NOx
NH3consumption217 l/h
170 l/h179 l/h
188 l/h
12 mg/Nm3
4 mg/Nm3 6 mg/Nm3
8 mg/Nm3
74 mg/Nm3
61 mg/Nm3
70 mg/Nm3
44 mg/Nm3
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Start of the test
NOx – NH3 consumption – ammonia slip
HIGH DUST SCR RESULTS (1 LAYER)
Antonio Bonomo – WTERT 2006.10.19
SCR Catalyst Pressure Loss
0,00
0,10
0,20
0,30
0,40
0,50
05/04/2006 04/05/2006 02/06/2006 01/07/2006 30/07/2006 28/08/2006
pres
sure
diff
eren
ce [m
bar]
pressure loss
~ 0.35 mbar
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
HIGH DUST SCR RESULTS (1 LAYER)
Antonio Bonomo – WTERT 2006.10.19
CATALYST AFTER 5 MONTHS OF OPERATION
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
1 SCR LAYER (5 months operation):
• NOx: 80 ~50 mg/Nm3
• NH3 slip: 12 4 - 8 mg/Nm3
• NH3 consumption: 0.22 0.18 m3/h (25% concentrated)
2 SCR LAYER (2 weeks operation – very preliminary!):
• NOx: ~40 mg/Nm3
SCR “HIGH DUST”FIRST TEST RESULTS (preliminary)
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Antonio Bonomo – WTERT 2006.10.19
HIGH DUST SCR
FUTURE TEST STEPS (2006 – 2009):
monitoring of fouling and activity of catalyst
optimization of catalyst layout (single / multiple layers)
optimization of dust cleaning
testing of different NH3 injection points
testing of NH3 air vs. water injection
lifetime assessment of the catalyst
industrial cost evaluation
TERMOUTILIZZATORE(The waste to energy plant of Brescia)