Antonio Bonomo – WTERT 2006.10.19

WTERT 2006 Annual Meeting At Columbia UniversityNew York, Oct 19-20th, 2006

INDUSTRIAL INSTALLATION AND TESTINGOF AN INNOVATIVE CATALYST SYSTEM

FOR NOx REMOVAL IN WTE UNITSAntonio Bonomo

Director, Energy DivisionASM Spa

Brescia - Italy

Antonio Bonomo – WTERT 2006.10.19

Brescia - Ancient city

Historical centre Augustus emperor Capitolium 70 A.D

Antonio Bonomo – WTERT 2006.10.19

COMPANY OVERVIEW (2005 data)

Generation

W.T.E.

Transmission

Distribution

Trading

Sale

Public Lighting

Import

Transmission

Distribution

Sale

Sourcing

Distribution

Sewage

Sewage treatment

Collection

Street cleaning

Disposal

Electricity Gas Water Waste Management

Generation

Distribution

Sale

District heating

2.710 Gwh 1.159 Gwh 89,8 Mm3779 Mm3 1.193 Mt

ASM ASM SpaSpa

Antonio Bonomo – WTERT 2006.10.19

•• Share holding utilityShare holding utility

•• Since July 2002 listed in Milan stock exchangeSince July 2002 listed in Milan stock exchange

•• 69 % of shares owned by Brescia municipality (200,000 69 % of shares owned by Brescia municipality (200,000 inhabinhab.).)

•• Employees nr. : 2100Employees nr. : 2100

•• Revenues (year 2005):Revenues (year 2005): 1,6721,672 MM€€

ASM ASM SpaSpa

Antonio Bonomo – WTERT 2006.10.19

OPERATIONS DATA 2005

Treated waste( of which biomass 290.000 tons )

Electricity production (net)

District heating

Fossil fuels saving (Tons of Oil Equivalent)

CO2 avoided emissions

757,000 tons

510 Gwhel

491 Gwhth

> 150,000 TOE

> 400,000 tons

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

1 km

Plant north

Plant south

WTE

DISTRICT HEATING SYSTEM OF BRESCIA

523 km of double pipe

>130,000 inhabitants supplied

36.5 Mm3 heated buildings

15,110 connected buildings

695 MWth

223 MWel

(Dec, 31st 2005)

Antonio Bonomo – WTERT 2006.10.19

MAIN DATA

• Heat capacity of treated waste (3 boilers)2 x 88,3 + 1 x 100 = 276 MWwaste

• Waste throughput 3 x 33 t/h

• Electric generation capacity 75 MWel

• Heat generation capacity 160 MWth

• INVESTMENT 300 M€

• Waste disposal fee 65 €/t

• ISO 14001 Environmental certification in april 2006

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

COMBUSTION SYSTEM

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

NOx CONTROL METHODS

• PRIMARY (NOx prevention)

- staged combustion (gradual O2 supply)- combustion temperature control

• SECONDARY (NOx reduction)

- SNCR (Selective Non-Catalytic Reduction)- SCR (Selective Catalytic Reduction):

- “Tail-end” (after gas cleaning)- “Low dust” (after gas de-dusting)- “High dust” (on raw gas)

Antonio Bonomo – WTERT 2006.10.19

IMPLEMENTED NOx CONTROL IN BRESCIA WTE(since 1998)

• PRIMARY

- low combustion excess air- 30 compartment grate- infrared camera for optimization of primary andsecondary air supply

- flue gas recirculation- combustion air preheating

• SECONDARY (NOx reduction)

- SNCR (NH3 injection with 27 nozzles, positioned atthree levels)

Antonio Bonomo – WTERT 2006.10.19

SNCR DENOX SYSTEM

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19FLUE GAS CLEANING

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

All values in mg/Nm3 (except for Dioxin - ng/Nm3)Values referred to dry gas, normal conditions, 11 % O2

PLANT AUTHORIZATION

LIMITS

1993

PLANT DESIGN DATA

1994

EUROPEAN UNION LIMITS

2000

ACTUAL OPERATION

DATA

2005

Particulate matter 10 3 10 0,4Suplhure doxide 150 40 50 6,5Nitrogen oxides (NOx) 200 100 200 <80Chlorine acid (HCl) 30 20 10 3,5Fluorine acid (HF) 1 1 1 0,1Carbon monoxide 100 40 50 15Heavy metals 2 0,5 0,5 0,01Cadmium (Cd) 0,1 0,02 0,05 0,002Mercury (Hg) 0,1 0,02 0,05 0,002PAH (Policyclic aromatic hydrocarbon) 0,05 0,01 - 0,00001Dioxin (TCDD Teq) ng/Nm3 0,1 0,1 0,1 0,002

STACK EMISSIONS

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

TYPICAL SCR TAIL-END SOLUTION(industrially available)

SCR system downstream of a non-wet Flue Gas Treatment showing heat exchange and temperature profiles

Antonio Bonomo – WTERT 2006.10.19

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

INSTALLATION AND TESTING OF A SCR “HIGH DUST” SYSTEM(non industrially available yet)

GOALS:

- further NOx reduction

- ammonia slip improvement

- lowering ammonia consumption

- keep high energy plant efficiency

Antonio Bonomo – WTERT 2006.10.19

PROBLEMS:

- catalyst clogging- catalyst poisoning

ADVANTAGES:

- much higher energy efficiency (no need of gasreheating and lower gas pressure losses)

- simpler installation- lower investment and operating cost

SCR “HIGH DUST” SYSTEM(non industrially available yet)

Antonio Bonomo – WTERT 2006.10.19

”Innovative demonstrations for the next generation of biomass and waste combustion plants for energy recovery and renewable electricity production”

• Funded by the European Commission (6th FrameworkResearch Program)

• Project duration:2006-2010 (48 months)• Budget: 29 M€

The ”NextGenBioWaste” Project

Antonio Bonomo – WTERT 2006.10.19

NextGenBioWaste Project(Consortium : 17 partners from 7 countries)Co-ordinator:

SINTEF Energiforskning AS (NO)

Partners:Afval Energie Bedrijf, Amsterdam (NL)ASM BRESCIA SPA (IT) (16% share – 4.5 M€ SCR HD)Gemeinschaftskraftwerk Schweinfurt GmbH (DE)Joint Research Centre of the EC (NL)KEMA (NL)Max-Planck-Institute (DE)N.V. Afvalverwerking Rijnmond (NL)SEGHERS Keppel Technology Group (BE)SINTEF Energiforskning AS (NO)SVUM, a.s., Prague (CZ)TNO (NL)Trondheim Energiverk Fjernvarme AS (NO)Vattenfall AB Business unit Nordic Heat (SE)Vattenfall Europe Waste to Energy GmbH (DE)Vattenfall Power Consultant AB (SE) Vattenfall Utveckling AB (SE)Visser & Smit Hanab (NL)

Antonio Bonomo – WTERT 2006.10.19HIGH DUST SCR LOCATION

HIGH DUST SCR

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19SPACE FOR SCR HIGH DUST INSTALLATION

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

HIGH DUST SCR LAYOUT

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

MIXER

CATALYST LAYER

(SPACE FOR UP TO 5LAYERS)

FLUEGAS

DAMPERS

NOx NOx

Antonio Bonomo – WTERT 2006.10.19

• installation: 2005 Sep. – 2006 Feb.

• operation: started 2006 Mar. (1st phase –one cat. layer)

• inspection: 2006 Sep.

• 2nd phase: started 2006 Oct.

SCR “HIGH DUST”FIRST TEST RESULTS

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

HIGH DUST SCR RESULTS (1 LAYER)

SCR Catalyst Effect

0

20

40

60

80

100

01/07/2006 11/07/2006 21/07/2006 31/07/2006 10/08/2006 20/08/2006 30/08/2006

NO

(as

NO

2) [m

g/N

m3 ]

NO before cat.NO after cat.

Reduction:~ 31 mg/Nm3

= 40%

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

0

10

20

30

40

50

60

70

80

90

01/01/2006 31/01/2006 02/03/2006 01/04/2006 01/05/2006 31/05/2006 30/06/2006 30/07/2006 29/08/2006

NO

x - N

H3 s

tack

[mg/

Nm

3]

0

30

60

90

120

150

180

210

240

270

300

330

360

390

420

450

480

NH

3 con

sum

ptio

n [l/

h]

NH3 slip

NOx

NH3consumption217 l/h

170 l/h179 l/h

188 l/h

12 mg/Nm3

4 mg/Nm3 6 mg/Nm3

8 mg/Nm3

74 mg/Nm3

61 mg/Nm3

70 mg/Nm3

44 mg/Nm3

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Start of the test

NOx – NH3 consumption – ammonia slip

HIGH DUST SCR RESULTS (1 LAYER)

Antonio Bonomo – WTERT 2006.10.19

SCR Catalyst Pressure Loss

0,00

0,10

0,20

0,30

0,40

0,50

05/04/2006 04/05/2006 02/06/2006 01/07/2006 30/07/2006 28/08/2006

pres

sure

diff

eren

ce [m

bar]

pressure loss

~ 0.35 mbar

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

HIGH DUST SCR RESULTS (1 LAYER)

Antonio Bonomo – WTERT 2006.10.19

CATALYST AFTER 5 MONTHS OF OPERATION

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

1 SCR LAYER (5 months operation):

• NOx: 80 ~50 mg/Nm3

• NH3 slip: 12 4 - 8 mg/Nm3

• NH3 consumption: 0.22 0.18 m3/h (25% concentrated)

2 SCR LAYER (2 weeks operation – very preliminary!):

• NOx: ~40 mg/Nm3

SCR “HIGH DUST”FIRST TEST RESULTS (preliminary)

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

HIGH DUST SCR

FUTURE TEST STEPS (2006 – 2009):

monitoring of fouling and activity of catalyst

optimization of catalyst layout (single / multiple layers)

optimization of dust cleaning

testing of different NH3 injection points

testing of NH3 air vs. water injection

lifetime assessment of the catalyst

industrial cost evaluation

TERMOUTILIZZATORE(The waste to energy plant of Brescia)

Antonio Bonomo – WTERT 2006.10.19

Antonio Bonomo – WTERT 2006.10.19

Antonio Bonomo – WTERT 2006.10.19

Antonio Bonomo – WTERT 2006.10.19