1
Signal Test 5-Dec 6-Dec 7-Dec 8-Dec 10-Dec 11-Dec 12-Dec Record Short Test 1 day 1 day 1 day 2 days 1 day 1 day Holding Tank Transfer Totalizer (Optiflux) 19.4 391.6 734.7 1224.9 1531.1 1931.6 2295.4 Discharge Water Totalizer (Optiflux) 19.6 555.9 1059.9 1884.8 2396.5 3015.9 3429.2 Holding Tank Transfer Totalizer (PLC) 19 383 724 490 796 1197 1568 Discharge Tank Totalizer (PLC) 20 545 1068 845 1403 2109 2672 IWO Transfer Totalizer (Optiflux) 335.4 335.4 IWO Transfer Totalizer (PLC) 0 0 0 IWM Transfer Totalizer (Optiflux) 218915 21962.7 IWM Transfer Totalizer (PLC) 0 0 0 IWO1 Totalizer (Optiflux) 3253.4 3257.7 3261.1 IWO1 Totalizer (PLC) 23 28 32 IWO2 Totalizer (Optiflux) 3433.4 3434.1 3435.1 IWO2 Totalizer (PLC) 1 1 2 IWM Totalizer (Optiflux) 16649.2 16650.1 16652.1 IWM Totalizer (PLC) 7 8 10 IWG Totalizer (Optiflux) 11961 12276.9 12534.2 IWG Totalizer (PLC) 1518 1841 2108 Calculation Volume transferred (Holding) 19.4 372.2 343.1 490.2 306.2 400.5 363.8 Volume transferred (Discharge) 19.6 536.3 504 824.9 511.7 619.4 413.3 PLC recording (Holding) 19 364 341 490 306 401 371 PLC recording (Discharge) 20 525 523 845 558 706 563 Totalizer Deviation (Optiflux) 1.0% 44.1% 46.9% 68.3% 67.1% 54.7% 13.6% Communication Error Rate (Holding Tank) 0.0% -2.2% -0.6% 0.0% 0.0% 0.2% 2.2% Communication Error Rate (Discharge) 5.3% -2.1% 3.8% 2.5% 9.2% 14.1% 36.3% PLC reset PLC reset short test shield connection finished Other Flow Meter Calc Volume Transferred (IWO1) 4.3 3.4 PLC Recording 5 4 Communication Error Rate (IWO1) 25.0% 33.3% Volume Transferred (IWO2) 0.7 1 PLC Recording 0 1 Volume Transferred (IWM) 0.9 2 PLC Recording 1 2 Volume Transferred (IWG) 315.9 257.3 PLC Recording 323 267 Communication Error Rate (IWG) 2.5% 3.9% 0 100 200 300 400 500 600 0% 10% 20% 30% 40% 50% 60% 70% 80% 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec Discharge-Holding Deviation (see schematic process flow) Series1 Series2 400 500 600 30.0% 40.0% 50.0% Discharge-Holding to PLC Communication Error Rate 20 mA current loop - HART™ Do FM and PLC work ? discharge record by gravity flow measurement of holding transfer Is deviation OK ? Is error rate OK ? Does PLC work ? 0 100 200 300 -10.0% 0.0% 10.0% 20.0% 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec Series1 Series2 Series3

WWT Magnetic Flow Meter, EMI Signal Analysis

Embed Size (px)

Citation preview

Signal Test 5-Dec 6-Dec 7-Dec 8-Dec 10-Dec 11-Dec 12-DecRecord Short Test 1 day 1 day 1 day 2 days 1 day 1 dayHolding Tank Transfer Totalizer (Optiflux) 19.4 391.6 734.7 1224.9 1531.1 1931.6 2295.4Discharge Water Totalizer (Optiflux) 19.6 555.9 1059.9 1884.8 2396.5 3015.9 3429.2Holding Tank Transfer Totalizer (PLC) 19 383 724 490 796 1197 1568Discharge Tank Totalizer (PLC) 20 545 1068 845 1403 2109 2672IWO Transfer Totalizer (Optiflux) 335.4 335.4IWO Transfer Totalizer (PLC) 0 0 0IWM Transfer Totalizer (Optiflux) 218915 21962.7IWM Transfer Totalizer (PLC) 0 0 0IWO1 Totalizer (Optiflux) 3253.4 3257.7 3261.1IWO1 Totalizer (PLC) 23 28 32IWO2 Totalizer (Optiflux) 3433.4 3434.1 3435.1IWO2 Totalizer (PLC) 1 1 2IWM Totalizer (Optiflux) 16649.2 16650.1 16652.1IWM Totalizer (PLC) 7 8 10IWG Totalizer (Optiflux) 11961 12276.9 12534.2IWG Totalizer (PLC) 1518 1841 2108

CalculationVolume transferred (Holding) 19.4 372.2 343.1 490.2 306.2 400.5 363.8Volume transferred (Discharge) 19.6 536.3 504 824.9 511.7 619.4 413.3PLC recording (Holding) 19 364 341 490 306 401 371PLC recording (Discharge) 20 525 523 845 558 706 563Totalizer Deviation (Optiflux) 1.0% 44.1% 46.9% 68.3% 67.1% 54.7% 13.6%Communication Error Rate (Holding Tank) 0.0% -2.2% -0.6% 0.0% 0.0% 0.2% 2.2%Communication Error Rate (Discharge) 5.3% -2.1% 3.8% 2.5% 9.2% 14.1% 36.3%

PLC reset PLC resetshort test shield connection finished

Other Flow Meter CalcVolume Transferred (IWO1) 4.3 3.4PLC Recording 5 4Communication Error Rate (IWO1) 25.0% 33.3%Volume Transferred (IWO2) 0.7 1PLC Recording 0 1

Volume Transferred (IWM) 0.9 2PLC Recording 1 2

Volume Transferred (IWG) 315.9 257.3PLC Recording 323 267Communication Error Rate (IWG) 2.5% 3.9%

0

100

200

300

400

500

600

0%10%20%30%40%50%60%70%80%

5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec

Discharge-Holding Deviation(see schematic process flow)

Series1 Series2

200

300

400

500

600

10.0%

20.0%

30.0%

40.0%

50.0%

Discharge-Holding to PLCCommunication Error Rate

20 mA current loop - HART™

Do FM and PLC work ?

discharge recordby gravity flow

measurement of holding transfer

Is deviation OK ?

Is error rate OK ?

Does PLC work ?

0

100

200

300

-10.0%

0.0%

10.0%

20.0%

5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec

Series1 Series2 Series3