23
OrgTianjin Tianhe-Cloud Building Engineering Technology Co. , Ltd. AddsXiqing Economic-Technological Development Area,XEDA Sci-Tech Park,Tianjin 300385 China. Tel+86 22 23752860

Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Org:Tianjin Tianhe-Cloud Building Engineering Technology Co. , Ltd. Adds:Xiqing Economic-Technological Development Area,XEDA Sci-Tech

Park,Tianjin 300385 China. Tel:+86 22 23752860

Page 2: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

THE LARGE GATHERING INTERNATIONAL GEOSPATITAL COMMUNITY

15-19 JANUARY 2018, HICC, HYDERABAD, INDIA

Management Decision & Artificial Intelligence for Large-scale Infrastructure construction project

SPEAKER: MR. MA XIAOYU

Page 3: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting
Page 4: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting
Page 5: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

29%

5% 7%

41% 57%

25% 30% 38%

68%

0%

20%

40%

60%

80%

BIM application rate of

less than 15%

BIM application rate of

15% -30%

BIM application rate of

more than 30%

China BIM user's return on investment

Loss breakeven profit

17% 10% 32% 28% 20% 23%

35% 40% 48% 49% 58% 65%

0%20%40%60%80%

Huadong

Region

Southwest

Region

Shanghai Huabei

China

Beijing Central

China

BIM applications in various regions of China

2014 2015

The higher the BIM application rate, the higher the ROI of the user

BIM application rate of more than 30% of the project, user profit is much larger

than other users

BIM is emerging technology for information and intelligence

The owner's requirement for the quality, cost and progress increase, the use of

BIM technology project management has become a new demand; project

participants use BIM technology to provide better service to the owner have

become a new supply.

BIM implementation in all regions of our country has increased significantly

The implementation of BIM in all regions of the country increased significantly, and

the application rate of BIM in Shanghai, Beijing and other regions exceeded 50%.

"New supply" is coming

——BIM technology will usher in explosive growth

1.1 Industry Outlook

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 6: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Owner company

Design company

Construction company

Consulting company

The United States Market Research released the "Global BIM Market" report. By

2022, the global BIM market will reach 11.7 billion U.S. dollars and its CAGR

will reach 21.6% in 2016-2022. Demand in the Asia Pacific region will increase

dramatically as a result of the construction industry's rapid growth and the

government's mandatory use of BIM's supporting legislation. It is estimated that

by 2021, the Asia Pacific region will dominate the market. The growing business

and infrastructure development activities in countries such as China, India and the

United Arab Emirates provide the Asia Pacific region with predictable market

opportunities.

2016-2022 BIM yield compound annual growth rate

BIM market demand grows repidly

BIM demand companies and demand direction

Consulting

Software

Training

Operation and maintenance market

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

1.2 Industry Outlook

Page 7: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Kunkun Fan Education and Training Division

Tengteng Jiang

Software Engineer

BIM training director, good at consulting bim + ppp, project experience 6, graduated from

Tianjin University of Technology wisdom

building simulation center.

Kebin Zhao Administrative Operations Department

Yangsuo Jin Education and Training Division

Zipeng Zhao BIM Consulting Division

Xi Zhang BIM Consulting Division

Liping Li Cost Consulting Division

Xiaojing Mu

Cost Consulting

Division

BIM engineer, specializes in training system

development, project experience 8, graduated

from Tianjin University of Technology

wisdom building simulation center.

BIM engineer, BIM second level modeling

modeler, project experience 10, graduated from

Tianjin University of Technology wisdom

building simulation center.

Software development engineer, BIM engineer, project experience 10, graduated

from Tianjin University of Technology

wisdom building simulation center.

Finance Leader, and Chief of Administrative

Services, worked in Market Risk

Management in the United States

Cloudparticle Company .

BIM engineer, specializes in emerging

technology research and development, project

experience 12, graduated from Tianjin

University of Technology wisdom building

simulation center.

BIM engineer, good at BIM cost management,

project experience 8, graduated from Tianjin

University of Technology wisdom building simulation center.

BIM engineer, specializes in BIM virtual

simulation, project experience 8, graduated

from Tianjin University of Technology wisdom

building simulation center.

Young Entrepreneur, founder of Tianhe Construction, Tianjin, China. Research on intelligent construction and simulation, information integration and so on for large infrastructure projects. Now he is a researcher of the center for

intelligent building simulation of Tianjin University of Technology, a research fellow of Construction

Industrialization and Integrated Technology Research Center, and a distinguished expert of Beijing Green Building

Association.

XIAOYU MA

General manager

1.3 Team members

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 8: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Project Name: Tianjin Rail Transit line Z4

Commissioned by: Tianhe Dacheng

Building cloud Technology Co., Ltd.

Project Description: Based on BIM

technology, assisting construction cost

control, completing the process of nuclear,

the amount of work, contrasting the gap

between the traditional algorithm and the

new algorithm to provide index for similar

projects.

Project Name: DoubleTree by Hilton,

Hainan Xinglong Binhu Resort

Commissioned by: Wanning Kaide

Investment Co., Ltd.

Project Description: Combining the

construction conditions at the scene, a

digital model of engineering measurement

consistent with the actual construction was

built to measure payment finely for the

progress payment, and the project won the

second prize of the 5th Longtu Cup

National BIM Contest.

Project Name: South China Sea Pearl

Bridge

Commissioned by: China Construction

Sixth Engineering Division Co., Ltd.

Project Description: Based on the BIM

simulation technology, it helps to optimize

the pre-construction design scheme,

dynamic simulation of the construction

process and virtual construction, provide

construction technology and construction

schedule optimization, and assist the

construction site management.

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

1.4 projects introduction

Page 9: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Project Name: Airbus A330 Widebody

Passenger Aircraft Completion and Delivery

Center

Commissioned by: Tianjin Bonded Zone

Tianbao Construction Co., Ltd.

Project Description: The project uses BIM

technology to realize the entrusting units' real-

time monitoring on the progress, cost of the

design, construction and supervision units,

setting up information sharing platform during

the construction phase, and transferring them

to the operating units for use.

Project Name: Tianjin Airport Economic Zone Bombardier first project

Commissioned by: Tianjin Bonded Zone Tianbao Construction Co., Ltd.

Project Description: BIM visual simulation for pipeline layout of

mechanical and electrical equipment during project construction,

improve installation efficiency and construction schedule, and save

information in asset management platform.

Project Name: Hainan Sanya new airport

reclamation project

Commissioned by: China Construction

Sixth Engineering Bureau Co., Ltd.

Project Description: Based on the

collaborative platform to achieve wisdom

building, simulation, optimization of

construction programs, supporting

decision-making, to build domestic large-

scale marine construction project and

intelligent construction of the patent

cluster.

Project Name: Tianjin Airport

Economic Zone Bombardier first project

Commissioned by: Tianjin Bonded

Zone Tianbao Construction Co., Ltd.

Project Description: BIM visual

simulation for pipeline layout of

mechanical and electrical equipment

during project construction, improve

installation efficiency and construction

schedule, and save information in asset

management platform.

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

1.4 projects introduction

Page 10: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting
Page 11: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Position

The Sanya artificial island reclamation project is located in Hongtang Bay, Sanya, Hainan province.This project is invested and developed by Hainan Airlines Group, and the investment amount is over RMB 200 billion yuan.

The land-reclamation project of Sanya new airport is a key state project with the approval of the State Council, a gateway airport of the South China Sea and the radiation of southeast Asia. It’s of great importance to restart the maritime silk road and realize the great strategy One Belt And One Road in the South China Sea Area.

Significance

The overall layout of the project can be divided into three parts: the aviation ground operation zone, the empty airport commercial zone and the auxiliary service area of the airport. The reclamation area of the airport is 2.4 x 107m2.

The Overall Introduction

SanYa

One Belt And

One Road

2.1 Project introduction

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 12: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Major challenges for the project: Safety in the process of steel cylinder processing

and storage

The stability of the shipment of the steel cylinder Accurate positioning of the cylinder

Workload of extracting complicated structure

The material damage after the typhoon

How to deal with the multi-profession information

collaborative management

What can I

do?

Why choose it?

The infrastructure construction of

this project

Large marine project

Emphasis on the development

......

Bentley

Digital

Platform

2.2 Technical Difficulties

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 13: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

VCR

Page 14: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting
Page 15: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

“Big BIM” = “Bentley Information Model”

3.1 Application system of BIM technology

服务器

CPU 智能英特尔至强E7-8800v3

内存 256GB(16*16GB)DDR31600RegECC

显卡 QuadroM4000显卡内存8G

工作站

CPU 酷睿i7-4900MQ

内存 2x8GB1600MHzDDR3L

显卡 NvidiaQuadroK4100MGDDR5

移动个人终端

CPU 四核CPU主频2.5GHz酷睿i74710HQ

内存 4GB

显卡 NVIDIAGeForceGTX850M

无人机

定位 专业摄影、高画质航拍

影响传感器 一英寸CMOS,有效像素2000万

organization structure

Application

system of BIM

simulation

technology

Model display: Lumen RT

Descartes

Context Capture

Navigator

3D model: MicroStation

Power Civil

gINT

GEOPAK

Model

analysis: SACS

MOSES

Navigator

Data collaboration:

ProjectWise

Private cloud

Workspace

The project-level

working space to

set up object of

land reclamation.

Data Format

Date source —2-D data source:dwg、dgn

—3-D data source:dwg、dae

Output file and format —dgn,I.dgn

—3MX、obj、fbx etc.

Staffing structure

Standard of the Model

Work portfolio architecture

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 16: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

gINT

PowerCivil-SUE

PowerCivil PowerCivil

McroStation

The application project of

the reclamation BIM

simulation technology in

Sanya new airport is a

system based on the object

of the reclamation project,

and optimizated the BIM

simulation and decision

system, amongst the

model is the basic carrier

of BIM technology

application. Therefore, the

Bentley series softwares

are used to create the

three-dimensional model

of artificial island.

Steel cylinder

Three - dimensional geology accropode block

offshore structure anti-billows wall

3.2 Model display - artificial island

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 17: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Image extraction

Programming

Output data

Image Identification

Problems

faced

reasons

solution

Process

Results

Typhoon caused a large number of stone loss that is out

of the sea, then how to conduct on-site measurement

work before and after the typhoon accurately and rapidly?

Using the exploratory research method, to put forward

the solution of "based on the depth of learning, the

disaster damage after the typhoon."

Start→Image acquisition→Input image→Image

pretreatment→Thresholdsegmentation→Morphological

processing→Connectedegioncalibration→count→Finish

the project data processing capabilities can be improved,

the accuracy is improved by 32.54%.

Grayscale: Binarization:

Development results will be used in typhoon disasters and other applications, the current system is

still under development. The measurement method also provides new ideas for similar projects.

thinking map(Things

analysis)

H*=𝜎12

𝜎1𝜎2=

𝑤0𝑤1 𝜇𝑦−𝜇12

𝜎1𝜎2 𝐹 𝑥, 𝑦 =

0.299𝑅 𝑥, 𝑦 + 0.587𝐺 𝑥, y + 0.114𝐵 𝑥, y

3

Hainan Province is a subtropical monsoon climate. It has

experienced typhoon 2~3 times all year round, and the

typhoon has great destructive power.

3.5 Material - oriented damage to the disaster

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 18: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting
Page 19: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

private cloud of project management

VR safety experience and training

Implementation points of intelligent construction sites:Application of Bentley project management ideas and models;

ProjectWise-based information collaboration platform; accurate, timely and comprehensive information collection system.

Using Bentley series of software and other software to serve the project, the establishment of the whole process of digital

control and management platform.

site security management

remote inspection positioning system to conduct ship

management and rescue

QR code on-

site display

3.6 Cloud-based smart construction sites

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 20: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting
Page 21: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Project summary

Through the use of Bentley series of software and other related software, steel cylinder processing, steel cylinder

transportation, steel cylinder vibration sinking efficiency increased by 25%, 28%, 30%; groove excavation

engineering, the engineering of the island dike structure, the engineering of post-disaster loss calculation

accuracy increased by 18%, 20%, 32.54%.

Steel cylinder

processing

Steel cylinder

transport

Steel cylinder

vibration sinking

Series1 25 28 30

25

28

30

22

23

24

25

26

27

28

29

30

31

Effic

ienc

y

Steel cylinder processing

Steel cylinder transport

Steel cylinder vibration sinking

groove

excavation

Island dike

structureDisaster loss

Series1 18 20 32.54

18 20

32.54

0

5

10

15

20

25

30

35

Calc

ulat

ion

accu

racy

of

engi

neer

ing

quan

tity

groove excavation

Island dike structure

Disaster loss

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation

Page 22: Xiqing Economic-Technological Development Area,XEDA Sci ......Kunkun Fan Education and Training Division Tengteng Jiang Software Engineer BIM training director, good at consulting

Sanya reclamation project is a key supporting project of exploring the BIM technology optimization of large-scale

infrastructure construction and auxiliary decision.

The land-reclamation project is a key state project of applying BIM technology to One Belt And One Road

strategy. In the aspect of intelligent construction informationization, it provides a useful case for similar national

key projects.

Project summary

Changes in

management

patterns Changes in

working mode

Marine

engineering BIM

application

A virtuous cycle

TIAN HE ZHU GONG —— Begin in professional, grow in change, win in innovation