Year Three Review of Water Quality Monitoring on the Upper Strawberry River Project 07-1000 T.R. Brueggen 1 and J.L. Bouldin 1,2 1 Environmental Sciences Graduate Program, Arkansas State University, State University, AR 72467 2 Department of Biological Sciences, Arkansas State University, State University, AR 72467

Year Three Review of Water Quality Monitoring on the Upper Strawberry River Project 07-1000

  • Upload
    yachi

  • View
    28

  • Download
    0

Embed Size (px)

DESCRIPTION

Year Three Review of Water Quality Monitoring on the Upper Strawberry River Project 07-1000. T.R. Brueggen 1 and J.L. Bouldin 1,2 1 Environmental Sciences Graduate Program, Arkansas State University, State University, AR 72467 - PowerPoint PPT Presentation

Citation preview

Page 1: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Year Three Review of Water Quality Monitoring on the Upper Strawberry River

Project 07-1000

T.R. Brueggen1and J.L. Bouldin1,2

1 Environmental Sciences Graduate Program, Arkansas State University,

State University, AR 724672Department of Biological Sciences, Arkansas State University, State

University, AR 72467

Page 2: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Overview• Major headwater streams in the upper Strawberry River

watershed– Little Strawberry (LS)– Sandy Creek (SC)– Greasy Creek (GC)

• Above and below BMP implementation

• Surface Water Quality Tests– Nutrients

• Nitrites• Nitrates• Ortho-Phosphates

– Total Suspended Solids

http://arkansas-dar.org/strawberryriver.htm

Page 3: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

LSUP

LSLO

SCLO

SCUP

GCLO

GCUP

Greasy Creek (GC) Subwatershed

Sandy Creek (SC) Subwatershed

Little Strawberry (LS) Subwatershed

Page 4: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Sampling sites

Greasy Creek

Little Strawberry

Sandy Creek

Fulton County LSUP

LSLO

SCLO

SCUP

GCLO

GCUP

Page 5: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Little Strawberry (LS) NOX Data

Upper

Lower

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/1

12/0

61/

142/

1803

/07

04/0

405

/13

06/0

807

/05

07/0

707

/12

07/1

407

/19

07/2

107

/26

07/2

808

/02

08/0

408

/09

08/1

108

/15

08/1

808

/23

08/2

5

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.0

0.4

0.8

1.2

1.6

2.0

2.4

2.8

3.2

3.6

4.0

Nitrates (mg NO3/L)Nitrites (mg NO2/L)

Collection Date

Conc

entr

ation

(mg/

L)

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/1

12/0

61/

142/

1803

/07

04/0

405

/13

06/0

807

/05

07/0

707

/12

07/1

407

/19

07/2

107

/26

07/2

808

/02

08/0

408

/09

08/1

108

/15

08/1

808

/23

08/2

5

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.0

0.4

0.8

1.2

1.6

2.0

2.4

2.8

3.2

3.6

4.0

Nitrates (mg NO3/L)Nitrites (mg NO2/L)

Collection Date

Conc

entr

ation

(mg/

L)

Page 6: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Little Strawberry (LS) Ortho-Phosphate Data

Upper

Lower

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/1

12/0

61/

142/

1803

/07

04/0

405

/13

06/0

807

/05

07/0

707

/12

07/1

407

/19

07/2

107

/26

07/2

808

/02

08/0

408

/09

08/1

108

/15

08/1

808

/23

08/2

5

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)-0.10

0.00

0.10

0.20

0.30

0.40

0.50

0.60 Phosphates (mg PO4/L)

Collection Date

Conc

entr

ation

(mg/

L)

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/1

12/0

61/

142/

1803

/07

04/0

405

/13

06/0

807

/05

07/0

707

/12

07/1

407

/19

07/2

107

/26

07/2

808

/02

08/0

408

/09

08/1

108

/15

08/1

808

/23

08/2

5

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.00

0.10

0.20

0.30

0.40

0.50

0.60

Phosphates (mg PO4/L)

Collection Date

Conc

entr

ation

(mg/

L)

Page 7: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

6/5 6/19 7/3 7/17 7/31 8/14 8/28 9/11 10/7 10/21 11/4 11/18 1/6 5/5 9/2 1/11 05/11 9/13 1/14 05/13 07/12 07/26 08/09 08/23 09/062008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

TSS (mg/L)

Collection Date

Conc

entr

ation

(mg/

L)Little Strawberry Total Suspended Solid (TSS) Data

Upper

Lower

7/31 10/21 9/2 05/136/10 6/26 7/15 8/19 9/4 10/2 11/6 11/23 4/7 02/12 07/19 12/06 07/14 08/02 08/18 09/06 08/30 09/15 09/082008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

TSS (mg/L)

Collection Date

Conc

entr

ation

(mg/

L)

Page 8: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Greasy Creek (GC) NOX Data

Upper

Lower

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/0

112

/06

1/14

2/18

03/0

704

/04

05/1

306

/08

07/0

507

/07

07/1

207

/14

07/1

907

/21

07/2

607

/28

08/0

208

/04

08/0

908

/11

08/1

508

/18

08/2

308

/25

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.000.100.200.300.400.500.600.700.800.901.001.101.201.301.40 Nitrates (mg NO3/L)

Nitrites (mg NO2/L)

Collection Date

Conc

entr

ation

(mg/

L)

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/0

112

/06

1/14

2/18

03/0

704

/04

05/1

306

/08

07/0

507

/07

07/1

207

/14

07/1

907

/21

07/2

607

/28

08/0

208

/04

08/0

908

/11

08/1

508

/18

08/2

308

/25

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.000.100.200.300.400.500.600.700.800.901.001.101.201.301.40

Nitrates (mg NO3/L)Nitrites (mg NO2/L)

Collection Date

Conc

entr

ation

(mg/

L)

Page 9: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Greasy Creek (GC) Ortho-Phosphate Data

Upper

Lower

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/1

12/0

61/

142/

1803

/07

04/0

405

/13

06/0

807

/05

07/0

707

/12

07/1

407

/19

07/2

107

/26

07/2

808

/02

08/0

408

/09

08/1

108

/15

08/1

808

/23

08/2

5

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18

Phosphates (mg PO4/L)

Collection Date

Conc

entr

ation

(mg/

L)

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/0

112

/06

1/14

2/18

03/0

704

/04

05/1

306

/08

07/0

507

/07

07/1

207

/14

07/1

907

/21

07/2

607

/28

08/0

208

/04

08/0

908

/11

08/1

508

/18

08/2

308

/25

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

-0.02

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18Phosphates (mg PO4/L)

Collection Date

Conc

entr

ation

(mg/

L)

Page 10: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Greasy Creek (GC) Total Suspended Solid (TSS) Data

Upper

Lower

6/5 6/19 7/3 7/17 7/31 8/14 8/28 9/11 10/7 10/21 11/4 11/18 1/6 5/5 9/2 1/11 05/11 9/13 1/14 05/13 07/12 07/26 08/09 08/23 09/062008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

TSS (mg/L)

Collection Date

Conc

entr

ation

(mg/

L)

158.7

6/5 6/19 7/3 7/17 7/31 8/14 8/28 9/11 10/7 10/21 11/4 11/18 1/6 5/5 9/2 1/11 05/11 9/13 1/14 05/13 07/12 07/26 08/09 08/23 09/062008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

TSS (mg/L)

Collection Date

Conc

entr

ation

(mg/

L)

670.0

Page 11: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

5/27

5/29 6/

36/

56/

106/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

99/

1312

/06

2/18

03/0

704

/04

05/1

306

/08

07/0

7

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.000.200.400.600.801.001.201.401.601.802.002.202.40

Nitrates (mg NO3/L)Nitrites (mg NO2/L)

Collection Date

Conc

entr

ation

(mg/

L)

Sandy Creek (SC) NOX Data

Upper

Lower

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/0

112

/06

1/14

2/18

03/0

704

/04

05/1

306

/08

07/0

507

/07

07/1

207

/14

07/1

907

/21

07/2

607

/28

08/0

208

/04

08/0

908

/11

08/1

508

/18

08/2

308

/25

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40

Nitrates (mg NO3/L)Nitrites (mg NO2/L)

Collection Date

Conc

entr

ation

(mg/

L)

2011 2011 (Post-BMP)

Page 12: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Sandy Creek (SC) Ortho-Phosphate Data

Upper

Lower

5/27

5/29 6/

36/

56/

106/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2 1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

99/

1312

/06

2/18

03/0

704

/04

05/1

306

/08

07/0

7

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18

0.20

0.22

Phosphates (mg PO4/L)

Collection Date

Conc

entr

ation

(mg/

L)

5/27

5/29 6/

36/

56/

106/

126/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/2M

EAN

1/6

2/12 3/

34/

75/

56/

11 7/9

8/7

9/2

10/4

11/4

12/1

01/

1102

/12

03/0

804

/05

05/1

106

/08

07/1

98/

119/

1310

/02

11/0

112

/06

1/14

2/18

03/0

704

/04

05/1

306

/08

07/0

507

/07

07/1

207

/14

07/1

907

/21

07/2

607

/28

08/0

208

/04

08/0

908

/11

08/1

508

/18

08/2

308

/25

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18

0.20

0.22

Phosphates (mg PO4/L)

Collection Date

Conc

entr

ation

(mg/

L)

2011 2011 (Post-BMP)

Page 13: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Sandy Creek (SC) Total Suspended Solid (TSS) Data

Upper

Lower

5/27

5/29 6/

36/

56/

106/

176/

196/

246/

26 7/1

7/3

7/8

7/10

7/15

7/17

7/22

7/24

7/29

7/31 8/

58/

78/

128/

148/

198/

218/

268/

28 9/2

9/4

9/9

9/11

9/23

9/25

10/2

10/7

10/9

10/1

410

/16

10/2

110

/23

10/2

810

/30

11/4

11/6

11/1

111

/13

11/1

811

/20

11/2

312

/21/

62/

12 3/3

4/7

5/5

6/11 7/

98/

79/

210

/411

/412

/10

1/11

02/1

203

/08

04/0

505

/11

06/0

807

/19

9/13

12/0

62/

1803

/07

04/0

405

/13

06/0

807

/07

2008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0TSS (mg/L)

Collection Date

Conc

entr

ation

(mg/

L)

7/3 8/14 10/76/5 6/19 7/17 7/31 8/28 9/11 10/21 11/4 11/18 1/6 5/5 9/2 1/11 05/11 9/13 1/14 05/13 07/12 07/26 08/09 08/23 09/062008 (Pre-BMP) 2009 2010 2011 2011 (Post-BMP)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

TSS (mg/L)

Collection Date

Conc

entr

ation

(mg/

L)

2011 2011 (Post-BMP)

179.8

Page 14: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

High and Mean Values: Pre-BMP 2008, 2009, 2010

Nitrate (mg/L)

Pre-BMP 2009 20102011

(Jan-June)Post BMP

(July-Aug 25)

Site High Mean High Mean High Mean High Mean High Mean

LSUP 2.05 0.76 1.34 0.67 2.95 1.09 3.97 1.38 2.07 0.49

LSLO 2.37 0.56 0.90 0.58 1.18 0.43 1.34 0.57 1.26 0.13

GCUP 0.67 0.29 0.69 0.30 0.48 0.19 0.92 0.31 0.80 0.10

GCLO 1.28 0.29 0.73 0.34 0.71 0.24 0.89 0.19 BDL BDL

SCUP 2.30 0.46 1.11 0.40 0.83 0.31 1.46 0.43 1.04 NA

SCLO 0.74 0.31 0.54 0.27 0.73 0.24 0.63 0.15 BDL BDL

Page 15: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Nitrite (mg/L)

Pre-BMP 2009 20102011

(Jan-June)Post BMP

(July-Aug 25)

Site High Mean High Mean High Mean High Mean High Mean

LSUP 0.16 0.16 BDL BDL BDL BDL BDL BDL BDL BDL

LSLO BDL BDL BDL BDL BDL BDL BDL BDL BDL BDL

GCUP BDL BDL BDL BDL BDL BDL BDL BDL BDL BDL

GCLO BDL BDL BDL BDL BDL BDL BDL BDL BDL BDL

SCUP 0.13 0.13 BDL BDL BDL BDL BDL BDL BDL BDL

SCLO BDL BDL BDL BDL BDL BDL BDL BDL BDL BDL

High and Mean Values: Pre-BMP 2008, 2009, 2010

Page 16: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Ortho-phosphate (mg/L)

Pre-BMP 2009 20102011

(Jan-June)Post BMP

(July-Aug 25)

Site High Mean High Mean High Mean High Mean High Mean

LSUP 0.18 0.04 0.11 0.05 0.09 0.05 0.14 0.05 0.48 0.06

LSLO 0.06 0.01 0.12 0.05 0.09 0.04 0.09 0.03 0.14 0.04

GCUP 0.05 0.02 0.08 0.02 0.05 0.03 0.09 0.04 0.06 0.03

GCLO 0.08 0.03 0.13 0.05 0.05 0.03 0.18 0.05 0.14 0.04

SCUP 0.05 0.03 0.13 0.05 0.21 0.05 0.13 0.04 0.14 NA

SCLO 0.04 0.02 0.14 0.05 0.06 0.03 0.06 0.04 0.14 0.04

High and Mean Values: Pre-BMP 2008, 2009, 2010

Page 17: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

TSS (mg/L)

Pre-BMP 2009 20102011

(Jan-June)Post BMP

(July-Sept 15)

Site High Mean High Mean High Mean High Mean High Mean

LSUP 26.6 4.2 55.8 7.6 7.9 4.0 15.9 7.5 35.0 7.2

LSLO 41.3 5.0 20.0 4.6 8.9 4.3 19.6 7.7 33.8 7.2

GCUP 14.3 2.4 16.6 4.4 4.4 2.9 158.7 29.2 8.0 3.5

GCLO 13.9 4.4 14.6 5.2 15.9 7.8 670.0 115.3 10.5 5.2

SCUP 71.4 8.8 36.6 7.1 19.3 5.0 179.8 41.0 10.5 NA

SCLO 29.3 4.6 8.8 3.5 37.7 8.1 32.6 10.9 18.5 5.2

High and Mean Values: Pre-BMP 2008, 2009, 2010

Page 18: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Other Analyses

• Stream bank erosion• Benthic macroinvertebrate survey• Escherichia coli

http://www.esf.edu/rwls/Research/Benthic/ACRONE1-1.jpghttp://www.famu.org/mayfly/images/pluteus_nym.jpg http://www.lifeinfreshwater.org.uk/species%20pages/caddis%20flies.jpg.html

Supported by 104-B Grant: AWRC and Arkansas State University

Page 19: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

• Little Strawberry

• ≈2.74 stream km (1.7 miles) surveyed• 5,480 m stream bank

• 2010 (light blue)• 24 sites determined of severe or very severe

erosion• 746 m stream bank

• 2011 (purple)• 28 sites determined of severe or very severe

erosion• 995 m stream bank

Page 20: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

• Greasy Creek

• ≈3.17 stream km (2.0 miles) surveyed• 6,340 m stream bank

• 2010 (green)• 16 sites determined of severe or very

severe erosion• 500 m stream bank

• 2011 (red)• 16 sites determined of severe or very

severe erosion• 575 m stream bank

Page 21: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

• Sandy Creek

• ≈6.63 stream km (4.1 miles) surveyed• 13,260 m stream bank

• 2010 (pink)• 22 sites determined of severe or very

severe erosion• 505 m stream bank

• 2011 (blue)• 21 sites determined of severe or very

severe erosion• 525 m stream bank

Page 22: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Benthic Macroinvertebrates Abundance

Spring 2009

Spring 2010

High (yellow) 456 750*

Low (white) 21 99

Fall 2009

Fall2010

High (yellow) 295 795*

Low (white) 135 36

LSUP LSLO GCUP GCLO SCUP SCLO0

100200300400500600700800

Spring 2009Spring 2010

Collection Site

Num

ber o

f org

anis

ms

LSUP LSLO GCUP GCLO SCUP SCLO0

100200300400500600700800

Fall 2009Fall 2010

Collection Site

Num

ber o

f org

anis

ms

*704 Chironomidae

*715 Chironomidae

Page 23: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Family Richness

LSUP LSLO GCUP GCLO SCUP SCLO

16

2219

11 106

1518

24

9

14

2

Spring 2009Spring 2010

LSUP LSLO GCUP GCLO SCUP SCLO

1713

21

1517

10

1719

15

6 6

Fall 2009Fall 2010

Page 24: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Ephemeroptera, Plecoptera and Trichoptera (EPT)

LSUP LSLO GCUP GCLO SCUP SCLO

9

12

9

4 4

1

910

16

5

9

1

Spring 2009Spring 2010

Collection Site

LSUP LSLO GCUP GCLO SCUP SCLO

98

109

4 44

9

43

01

Fall 2009Fall 2010

Collection Site

Page 25: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

LSUP LSLO GCUP GCLO SCUP SCLO0

40

80

120

160

200

240

280

320

360 20092010

Collection Site

Mea

n Co

ncen

trati

on (C

FU/1

00m

L)

* *

Escherichia coli

* Samples exceeded 298 CFU/100mL maximum for single samples for ERW, ESW, and NSW

* No values for June, July, August 2009

*

* Samples exceeded 1490 CFU/100mL max for single sample during the remainder of the year for ERW, ESW, and NSW

*

Page 26: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Acknowledgments• USEPA 319 Grant • AWRC 104-B USGS Grant• Fulton County Conservation District• Arkansas State University (ASU) Environmental

Sciences Graduate Program• All graduate and undergraduate ASU Ecotoxicology

Research Facility Workers

Page 27: Year Three Review of Water Quality Monitoring on the Upper Strawberry River  Project 07-1000

Questions?