21
1 moergeli + moergeli consulting engineering www.moergeli.com Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006 Risk Management Makes You Fit For Survival What Are Your Most Crucial Threats? What Are Your Critical Success Factors? Your Answer is ... ... Risk Management Alfred MOERGELI Certificated Civil Engineer FH, EUR ING SWISS Safety & Health Engineer EigV/BSV http:// www.moergeli.com

Your Answer is ... ... Risk Management Alfred MOERGELI Certificated Civil Engineer FH, EUR ING

Embed Size (px)

DESCRIPTION

Risk Management Makes You Fit For Survival What Are Your Most Crucial Threats? What Are Your Critical Success Factors?. Your Answer is ... ... Risk Management Alfred MOERGELI Certificated Civil Engineer FH, EUR ING SWISS Safety & Health Engineer EigV/BSV http://www.moergeli.com. - PowerPoint PPT Presentation

Citation preview

1

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

Risk Management Makes You FitFor Survival

What Are Your Most Crucial Threats?What Are Your Critical Success Factors?

Your Answer is ...... Risk Management 

Alfred MOERGELICertificated Civil Engineer FH, EUR INGSWISS Safety & Health Engineer EigV/BSVhttp://www.moergeli.com

2

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

1. Why Do You Need Risk Management?To Successfully Deal with Your Uncertainties

How do you deal with the remaining uncertainties of your ...

Projects?

Corporation?

Life?

Risk Management (RM) is ...

Your best investment

Your only tested, feasible and available instrument

To pro-activly control your uncertainties.

3

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

2. Risk Management For TunnelingWhat is Your Real Added Value?

Higher Performance

Lower Costs

Additional Safety ...

Identified Hazard ...

... Planned Solution

Down to Details

Risk Matrix – Double-check the Residual Risk

4

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

1. Definition of your system’s limits

2. What is Your Real Added Value fromRisk Management? (continued)

2. Register of all your relevant hazards

3. System safety by a safety system

4. Optimization of your processes

5. Higher productivity & safety, lower costs

6. Comprehensible communication of your residual risks

7. Transparent documentation

8. Win legal compliance, your liability remains limited

5

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

3. How does Risk Management Work?For the Safety of Your Company

The Safety of Your Company

=> Corporate Risk Management

Important Steps for your Integrated Safety:

7 Hazard Inventory (HI)

10 Risk Assessment (RA)

13 Set up & implement Action Plans

16 Work Instructions

Please Feel Free to Download All Original Flowcharts From Our Website http://www.moergeli.com

6

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

3. How does Risk Management Work?For the Safety of Your Projects

The Safety of Your Projects

=> Project Risk Management

Important Steps for your Integral Safety:

6 Preliminary Hazard Analysis (PHA)

11 Risk Assessment (RA)

17 Integral Safety Plan

18 Set up & implement Action Plans

Please Feel Free to Download All Original Flowcharts From Our Websitehttp://www.moergeli.com

7

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

3. How does Risk Management work?Use a Risk Profile

Can you really live with your risks?

Draw up a Risk Profile to make a sound decision.E.g. use a starter kit by ISO Guide 51:1999 / ISO TS 14’798:2000

8

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

3. How Does Risk Management Work? Risk Assessment in the Focus

Important steps for Risk Assessments:

1 Define your system’s limits

2 Identify all relevant hazards

6 Document all your results

8 Periodically update it

If you cannot live with your residual risks

=> Start Risk Mitigation

9

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

3. How Does Risk Management Work? Risk Mitigation

Use a Safety System (STOP)

10 Substitution

13 System/Strategy

16 Technology

19 Organisational/Personal Measures (Administrative Controls)

To end up with System Safety

=> US Military Standard 882 D, 02/10/2000, Appendix A, A 4.3.3, i. requires: You must

not use behavior oriented measures nnly

If hazards can lead up to an irrecoverable outcome!

10

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

4. What Are Residual Risks? When Are Residual Risks to be Accepted?

Residual Risks = Risks after measures have been implemented

They are identified.

They are evaluated and assessed by an approved method in a moderated,

inter-disciplinary and inter-hierarchical team.

They are minimized by a Safety System.

They cannot be reduced more by reasonable effort.

They are well known to everyone involved.

Everyone involved is well trained and equipped to safely control them.

Everyone involved has a fair chance to survive. They are periodically updated and reviewed.

Residual Risks are to be accepted only, if ...

11

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

5. How Does Risk Management Work? Risk Assessment in the Focus

Joint Venture Gotthard Nord (AGN): http://www.agn-amsteg.ch

12

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

6. Risk Management in Action Action Plans & Implementation

Evacuation of TBM Trailing Back-up

Courtesy of rowa:http://www.rowa-ag.ch

Fire Fighting (AFFF) on TBM:

Joint Venture Gotthard Nord (AGN):http://www.agn-amsteg.ch

13

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

7. Risk Management in Action Machinery Safety / CE Conformity of Systems

Consorzio TAT: http://www.tat-ti.ch

AGN: http://www.agn-amsteg.ch

CE Conformity Assessment of 4 TBMs with trailing back-up:Each more than 400 m long, each weighting more than 4’000 to,Each with installed power of more than 4’000 KWTotal investment of CHF 110 Mio

14

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

8. Risk Management in ActionSihlcity – Safety & Security in the City of Zurich

Planning for Operations / Maintenance (O / M)For Switzerland’s biggest building project

15

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

8. Risk Management in ActionSihlcity – Security for 20,000 Clients per Day

Identify and control hazards

Risk Management MandateFor Total Services Contractor

16

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

9. Risk Management in ActionGotthard Base Tunnel, World’s Longest Tunnel

Safety & Health Engineer for Tunneling Contractors(2nd Level Support)

2 New Railway Tunnels @ 57 km, Cross Passages every 330 mConstruction 1996 - 2016Hard Rock Tunneling

17

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

10. Risk Management in Action Beacon Hill Tunnel, Light Rail, Seattle, WA/USA

Light Rail, Construction 2002 – 2008Tunneling in Soft Ground(SEM)Below the City of Seattle

Risk Management Mandate for Construction Management

18

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

11. Risk Management ... Works Everywhere Protect Yourself by Protecting your Crew

Risk Management Makes Them Safe – Saving Yourself and Your Project

Video: Shotcrete, 04/12/2004 Video: Invert Concrete, 11/06/2003If Risk Management Works Here ... It Works Everywhere!

AlpTransit, Gotthard Base Tunnel: http://www.alptransit.chLot 252, Tunnel Amsteg: http://www.agn-amsteg.ch

19

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

Risk Management (RM) is not rocket science and does not take a wizard!

12. Conclusions Set up Your Team and Get Started ... Today!

All you really have to do is:

Set up your team as early on as possible.

Select your team members with care.

As interdisciplinary as possible.

Under the leadership of an experienced Risk Manager.

Start with a Preliminary Hazard Analysis.

Start documenting all your plans, ideas and results.

Use a well known and accepted risk management method.

20

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

13. Your Consequences - What’s Your Next Step? Just Do It!

Risk Management (RM) is not rocket science and does not take a wizard!

So, start (or resume) your Risk Management today!

We are here to assist you: http://www.moergeli.com

All our tools are available for download from our website.

Take care and stay safe!

We need you all to shape a safer and more economic world!

Just get it started – and keep it going and current.

21

moergeli + moergeliconsulting

engineering

www.moergeli.com

Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006

Risk Management Makes You FitFor Survival

What Are Your Most Crucial Threats?What Are Your Critical Success Factors?

Your Answer is ...... Risk Management 

Alfred MOERGELICertificated Civil Engineer FH, EUR INGSWISS Safety & Health Engineer EigV/BSVhttp://www.moergeli.com