Getting your Cellular M2M Solution to     Getting your Cellular M2M Solution to     Market: OnMarket: On‐‐time, Ontime, On‐‐budgetbudget

CDG Smart Wireless WorkshopCDG Smart Wireless WorkshopOctober 4, 2010October 4, 2010

Pat VerringtonDirector, Advanced Programs

404‐444‐[email protected]

Page 2: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

IntroductionIntroduction

On‐time, on‐budget– Many companies fall short of these goals…

– …and produce varying undesirable results.

Competitor beats you to 

market

Lose anchor customer

Costs are too high

Run out of money

Negative Impacton ROI

Page 3: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

IntroductionIntroduction

Why do companies miss the target?

Both components are critical to hitting schedule and cost targets

Page 4: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

Solution DevelopmentSolution Development

All components have to come together….

Page 5: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

Solution DevelopmentSolution Development….and timing matters!

ConceptConcept DesignDesign DevelopmentDevelopment TestingTesting

Application

Device

Network

RequirementsBuild vs. BuyRequirementsBuild vs. Buy

Data Req’mtsPresentationData Req’mtsPresentation

PrototypingInternal TestPrototypingInternal Test

Production Version

Production Version

RequirementsBuild vs. BuyRequirementsBuild vs. Buy

Device‐specificFunctionalityDevice‐specificFunctionality

PrototypingInternal TestPrototypingInternal Test

CertificationCertification

Technology SelectionTechnology Selection

Operator AnalysisOperator Analysis

Operator SelectionOperator Selection

End‐to‐End Testing

End‐to‐End Testing

If one or more components lag, then the entire project falls behind!

Page 6: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

ApplicationApplication

Build vs. Buy?

ConsiderationsApplication component on device

Data protocols: TCP vs. UDP

Data payload/content and frequency

Security

Sensitivity to latency, device unavailability

Mission critical ‐> Redundancy

Recommendations1. Test application on every network2. Understand your data usage profile3. Optimize data usage: How much? When?  

Recommendations1. Test application on every network2. Understand your data usage profile3. Optimize data usage: How much? When?  

Page 7: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

DeviceDeviceBuild vs. Buy?

Off‐the Shelf Custom Built

Development Time Short Long

Development Cost Minimal High

Certification Cost None $15K+

Time‐to‐Market/Revenue Minimal Months+

Hardware COGS Moderate to High Lower

Quantity Small quantities Moderate to high volume

Unique Requirements May be limited Primary justification???

Expertise Moderate High (train wreck)

Recommendations1. Start with off‐the‐shelf if possible2. Build your own as cost reduction strategy

Recommendations1. Start with off‐the‐shelf if possible2. Build your own as cost reduction strategy

Page 8: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

NetworkNetwork

Getting the right service: Perception vs. Reality

Considerations– Buying data vs. buying a solution

– GSM vs. CDMA• Other wireless technologies

– Direct Operator vs. MVNO

Page 9: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

SummarySummary

Plan early and often

Analyze the complexities of developing and bringing your total solution to market

Take the time to consider options and make informed decisions

Vs.

Maximize your return!!!

Page 10: your Cellular M2M Solution to Market: On time, On budget...CDG Smart Wireless Workshop October 4, 2010 Pat Verrington Director, Advanced Programs 404 ... – Direct Operator vs. MVNO

KORE …your one‐stop for:– All major wireless technologies

– North America, International service

– Pricing/packaging that fits your business needs

– M2M specialized tools that integrate into your business

– Expert consulting and support

– Access to a broad partner network

– Developer programs and device approvals

Learn more by visiting us at: