Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
YAMHILL COUNTYBELLEVUE - HOPEWELL HIGHWAY
SAFETY PROJECT (PHASE 2) (RX1182) SEC.OR153: BELLEVUE - HOPEWELL HWY. RAIL XING
Z
Z
PLANS FOR PROPOSED PROJECT
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOODRIVER
DALLESTHE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTSPASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
UnityDayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
HermistonBoardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
GoshenFlorence
Lincoln City
Waldport
HomeSweet
DetroitAntelope
Maupin
ForestGrove
Hebo
Cannon Beach
SeasideRainier
Milton-Freewater
30
26
101
20
99W
26 35 197
97
74
84
82
3
3951926
26
205
34
36
126
38
126
20
395
26
7
20
78
95
3953197
58
42
62
140
66
140
101
199
5
22
Bonanza
84
Junction City
BAKER CITY
HEPPNER
Copperfield
LakeSilver
JunctionCaveBEACH
GOLD
OrfordPort
82
LAKEVIEW
CANYONCITY
DayJohn
CITYOREGON
HILLSBORO
DALLAS
Redmond
Val leyJordan
205
140
STATE OF OREGON
DEPARTMENT OF TRANSPORTATION
??V-??
ATTENTION:
The Oregon Utility Center Is (503) 232-1987.)
The Center. (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
OAR 952-001-0010 Through OAR 952-001-0090.
Center. Those Rules Are Set Forth In
Adopted By The Oregon Utility Notification
Oregon Law Requires You To Follow Rules
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
FIR
ST
SAFETY
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title Sheet
Index Of Sheets Cont'd. & Std. Drg. Nos.
A01
A02
________________________________
________________________________
Signature & date
Print name and title
Concurrence by ODOT Chief Engineer
Approving Authority: ________________________________
authority.
and approved by the ODOT Chief Engineer or their delegated
Exceptions to these standards, if any, have been submitted
These plans were developed using ODOT design standards.
F
O T
NE
MTRAPED N
OG
ER
O
NOI
TATROPS
NA
RT
R_K19683_ts_01.dgn :: Default 6/5/2018 10:27:36 AM hwye07x 1"=100' Scale: Rotation: 0°
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBERNO.
SHEET
A01
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
BELLEVUE - HOPEWELL HIGHWAY
OR153: BELLEVUE - HOPEWELL HWY. RAIL XING
YAMHILL COUNTY
Harrison(hist.)
PACIFIC
HWY.
DELA
SH
MUTT
HO
OK
LANCEFIELD RD.
BROAD
MEA
D
RD.
MCKEE
RD.
RD.
AN
D31
Salt
20
29
21
28
19 20
2930
30 29
3231 29 28
3332
17
20
16
21
18
19
17
20
NO. 153
RICELN.
WADDELL AVE.
WOLFE AVE.
ROSEDELL AVE.
2ND AVE.
3RD AVE.
1ST
SHERMAN
NURSERY
CHURCH
THATCHER
ROTH
GO
UC
HER
JEL
LISO
N
OAK
6TH
5TH
4TH
3RD
GETC
HEL
L
AVE.
AVE.
AVE.
AVE.
AVE.
JEL
LISO
N
TR
ADE
STANL
EYST.
ST.
ST.
ST.
ST.
ST.
2ND
ST.
WAY
WO
ODLA
ND
EN
OS
ST.
AVE.
AMITY
RD.
VIN
EYARDS
AVE.
AVE.
AVE.
AVE.
AMIT
Y
LN.LAUGHTER
WOODSON AVE.
MADDOX AVE.
ST.
&
&
Ash
M.P. 44.89
M.P. 5.80
M.P. 5.83
M.P. 5.97
M.P. 6.76
M.P. 44.15
AMITY
CEMETERY
AMITY
AMITYHIGH
PARK
MIDDLE
AMITY
SCHOOLELEM.
SCHOOL
SCHOOL
KETCHUM AVE.
RICELN.
WILLA
MET
TE
EYE
PACIFIC
LN.
BELLEVUE-
WILLA
METTE
AMITY
Briedwell
Salt
Irrigation
Harrison
Lake
SwaleAsh
River
Creek
36
HOPEWELL
PACIFIC
R.R.
BRIE
DW
ELL
RD. R.R.
HW
Y.
WEST
NO. 1W
Creek
Sheridan
To
LN.
Dear
153
153 153
223
SewageTreatment
Lagoons
Salt
Creek
Res.
Ash
T. 6 S.
T. 5 S.
Swale
STA. "L" 10+00 (M.P. 4.46)
STA. "L" 16+10 (M.P. 4.58)
FEBRUARY 2019
Overall Length Of Project - 0.12 Miles
PE002628
James E. West-R2 Tech Center Manager
R. 4
W.
R. 5
W.
R. 4 & 5 W., W.M.
T. 5 S.,
BEGINNING OF PROJECT
S153(007)PE
END OF PROJECT
S153(007)PE
S153(007)PE
GRADING, DRAINAGE, PAVING, ROADSIDE DEVELOPMENT,
& RR XING IMPROVEMENTS
BETHEL
OLD
RD.
OREGON TRANSPORTATION COMMISSION
DIRECTOR OF TRANSPORTATION
COMMISSIONER
COMMISSIONER
COMMISSIONER
COMMISSIONER
CHAIR
Matthew L. Garrett
Martin Callery
Sean O'Hollaren
Alando Simpson
Bob Van Brocklin
Tammy Baney
SAFETY PROJECT (PHASE 2) (RX1182) SEC.
A03 Survey Control Data
ADVANCE COPYSUBJECT TO CHANGE
For updated information on this project, other highway work and current travel information throughout Oregon, visit www.tripcheck.com, or call the toll-free Oregon road report at 1-800-977-6368.
Oregon Department of Transportation
Highway Project Information
Area 3 Project Office: Salem (503) 986-2900 State Highway Development and Construction in Marion, Polk, and Yamhill Counties
OR153: Bellevue-Hopewell Hwy Rail Xing Safety Project Last updated 6/20/2018
Location :
Highway 153 (MP 4.46-4.58)
Key milestones: Bid Let date – Spring 2019 Construction –Summer 2019 Cost Estimate: $600,000 KEY CONTACT PERSON Melissa Sutkowski (503) 986-2639
PROJECT PURPOSE AND NEED The project will complete the safety improvements at the railroad-highway grade crossing on Bellevue-Hopewell Highway (OR153). CONSTRUCTION OVERVIEW
Regrade approaches to meet AASTHO standards
Widen shoulders and install guardrail
Improve drainage and install water quality treatment facilities
The roadway surface width is too narrow to accommodate safe passage of traffic during construction; therefore a full roadway closure will be necessary. Traffic will be detoured around the closure onto OR18 and OR99W.
PROJECT SPECIFICS
Project Length • Bellevue-Hopewell Highway (OR153), MP 4.46 — 4.58, 0.01 miles. Roadway Characteristics • This section of OR153 is classified as a Rural Major Collector and is not designated as a Reduction Review Route. •This section of OR153 is not designated as part of the OHP Freight Route or as part of the National Highway System. • 1 lane each direction. • The existing roadway width is approximately 20 ft. at railroad crossing. Traffic Volumes and Delays • Bellevue-Hopewell Highway (OR153), within the limits indicated, AADT = 1200. • 16% of traffic volume is trucks. • Estimated out of direction travel time is 7 minutes.
Schedule • Bid opening – February 7, 2019 • Construction Start – Spring 2019 • Completion – Summer 2019 Mobility Restriction • Complete closure for approximately 3 weeks • All traffic to use detour