Page 1: Z & RR XING IMPROVEMENTS OR153: BELLEVUE - HOPEWELL …

YAMHILL COUNTYBELLEVUE - HOPEWELL HIGHWAY

SAFETY PROJECT (PHASE 2) (RX1182) SEC.OR153: BELLEVUE - HOPEWELL HWY. RAIL XING

Z

Z

PLANS FOR PROPOSED PROJECT

ST. HELENS

ASTORIA

TILLAMOOK

MCMINNVILLE

ALBANYNEWPORT

CORVALLIS

HOODRIVER

DALLESTHE

MADRAS

PRINEVILLE

BEND

COQUILLE

GRANTSPASS

Ashland

BURNS

KLAMATH

FALLS

CONDON

MORO

PENDLETON

LA GRANDE

ENTERPRISE

VALE Ontario

PORTLAND

SALEM

MEDFORD

EUGENE

ROSEBURG

Athena

N. Powder

UnityDayville

Sisters

Juntura

Frenchglen

Burns Jct.

McDermitt

Paisley

La Pine

Crescent

Biggs

Lexington

HermistonBoardman

Ukiah

Arlington

Malin

Brookings

Coos Bay

Drain

Canyonvil le

Reedsport

Oakridge

GoshenFlorence

Lincoln City

Waldport

HomeSweet

DetroitAntelope

Maupin

ForestGrove

Hebo

Cannon Beach

SeasideRainier

Milton-Freewater

30

26

101

20

99W

26 35 197

97

74

84

82

3

3951926

26

205

34

36

126

38

126

20

395

26

7

20

78

95

3953197

58

42

62

140

66

140

101

199

5

22

Bonanza

84

Junction City

BAKER CITY

HEPPNER

Copperfield

LakeSilver

JunctionCaveBEACH

GOLD

OrfordPort

82

LAKEVIEW

CANYONCITY

DayJohn

CITYOREGON

HILLSBORO

DALLAS

Redmond

Val leyJordan

205

140

STATE OF OREGON

DEPARTMENT OF TRANSPORTATION

??V-??

ATTENTION:

The Oregon Utility Center Is (503) 232-1987.)

The Center. (Note: The Telephone Number For

You May Obtain Copies Of The Rules By Calling

OAR 952-001-0010 Through OAR 952-001-0090.

Center. Those Rules Are Set Forth In

Adopted By The Oregon Utility Notification

Oregon Law Requires You To Follow Rules

LET'S ALL

WORK TOGETHER

TO MAKE THIS

JOB SAFE

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

FIR

ST

SAFETY

INDEX OF SHEETS

SHEET NO. DESCRIPTION

Title Sheet

Index Of Sheets Cont'd. & Std. Drg. Nos.

A01

A02

________________________________

________________________________

Signature & date

Print name and title

Concurrence by ODOT Chief Engineer

Approving Authority: ________________________________

authority.

and approved by the ODOT Chief Engineer or their delegated

Exceptions to these standards, if any, have been submitted

These plans were developed using ODOT design standards.

F

O T

NE

MTRAPED N

OG

ER

O

NOI

TATROPS

NA

RT

R_K19683_ts_01.dgn :: Default 6/5/2018 10:27:36 AM hwye07x 1"=100' Scale: Rotation: 0°

ADMINISTRATION

FEDERAL HIGHWAY

DIVISION

OREGON

PROJECT NUMBERNO.

SHEET

A01

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

BELLEVUE - HOPEWELL HIGHWAY

OR153: BELLEVUE - HOPEWELL HWY. RAIL XING

YAMHILL COUNTY

Harrison(hist.)

PACIFIC

HWY.

DELA

SH

MUTT

HO

OK

LANCEFIELD RD.

BROAD

MEA

D

RD.

MCKEE

RD.

RD.

AN

D31

Salt

20

29

21

28

19 20

2930

30 29

3231 29 28

3332

17

20

16

21

18

19

17

20

NO. 153

RICELN.

WADDELL AVE.

WOLFE AVE.

ROSEDELL AVE.

2ND AVE.

3RD AVE.

1ST

SHERMAN

NURSERY

CHURCH

THATCHER

ROTH

GO

UC

HER

JEL

LISO

N

OAK

6TH

5TH

4TH

3RD

GETC

HEL

L

AVE.

AVE.

AVE.

AVE.

AVE.

JEL

LISO

N

TR

ADE

STANL

EYST.

ST.

ST.

ST.

ST.

ST.

2ND

ST.

WAY

WO

ODLA

ND

EN

OS

ST.

AVE.

AMITY

RD.

VIN

EYARDS

AVE.

AVE.

AVE.

AVE.

AMIT

Y

LN.LAUGHTER

WOODSON AVE.

MADDOX AVE.

ST.

&

&

Ash

M.P. 44.89

M.P. 5.80

M.P. 5.83

M.P. 5.97

M.P. 6.76

M.P. 44.15

AMITY

CEMETERY

AMITY

AMITYHIGH

PARK

MIDDLE

AMITY

SCHOOLELEM.

SCHOOL

SCHOOL

KETCHUM AVE.

RICELN.

WILLA

MET

TE

EYE

PACIFIC

LN.

BELLEVUE-

WILLA

METTE

AMITY

Briedwell

Salt

Irrigation

Harrison

Lake

SwaleAsh

River

Creek

36

HOPEWELL

PACIFIC

R.R.

BRIE

DW

ELL

RD. R.R.

HW

Y.

WEST

NO. 1W

Creek

Sheridan

To

LN.

Dear

153

153 153

223

SewageTreatment

Lagoons

Salt

Creek

Res.

Ash

T. 6 S.

T. 5 S.

Swale

STA. "L" 10+00 (M.P. 4.46)

STA. "L" 16+10 (M.P. 4.58)

FEBRUARY 2019

Overall Length Of Project - 0.12 Miles

PE002628

James E. West-R2 Tech Center Manager

R. 4

W.

R. 5

W.

R. 4 & 5 W., W.M.

T. 5 S.,

BEGINNING OF PROJECT

S153(007)PE

END OF PROJECT

S153(007)PE

S153(007)PE

GRADING, DRAINAGE, PAVING, ROADSIDE DEVELOPMENT,

& RR XING IMPROVEMENTS

BETHEL

OLD

RD.

OREGON TRANSPORTATION COMMISSION

DIRECTOR OF TRANSPORTATION

COMMISSIONER

COMMISSIONER

COMMISSIONER

COMMISSIONER

CHAIR

Matthew L. Garrett

Martin Callery

Sean O'Hollaren

Alando Simpson

Bob Van Brocklin

Tammy Baney

SAFETY PROJECT (PHASE 2) (RX1182) SEC.

A03 Survey Control Data

ADVANCE COPYSUBJECT TO CHANGE

Page 2: Z & RR XING IMPROVEMENTS OR153: BELLEVUE - HOPEWELL …
Page 3: Z & RR XING IMPROVEMENTS OR153: BELLEVUE - HOPEWELL …

For updated information on this project, other highway work and current travel information throughout Oregon, visit www.tripcheck.com, or call the toll-free Oregon road report at 1-800-977-6368.

Oregon Department of Transportation

Highway Project Information

Area 3 Project Office: Salem (503) 986-2900 State Highway Development and Construction in Marion, Polk, and Yamhill Counties

OR153: Bellevue-Hopewell Hwy Rail Xing Safety Project Last updated 6/20/2018

Location :

Highway 153 (MP 4.46-4.58)

Key milestones: Bid Let date – Spring 2019 Construction –Summer 2019 Cost Estimate: $600,000 KEY CONTACT PERSON Melissa Sutkowski (503) 986-2639

PROJECT PURPOSE AND NEED The project will complete the safety improvements at the railroad-highway grade crossing on Bellevue-Hopewell Highway (OR153). CONSTRUCTION OVERVIEW

Regrade approaches to meet AASTHO standards

Widen shoulders and install guardrail

Improve drainage and install water quality treatment facilities

The roadway surface width is too narrow to accommodate safe passage of traffic during construction; therefore a full roadway closure will be necessary. Traffic will be detoured around the closure onto OR18 and OR99W.

PROJECT SPECIFICS

Page 4: Z & RR XING IMPROVEMENTS OR153: BELLEVUE - HOPEWELL …

Project Length • Bellevue-Hopewell Highway (OR153), MP 4.46 — 4.58, 0.01 miles. Roadway Characteristics • This section of OR153 is classified as a Rural Major Collector and is not designated as a Reduction Review Route. •This section of OR153 is not designated as part of the OHP Freight Route or as part of the National Highway System. • 1 lane each direction. • The existing roadway width is approximately 20 ft. at railroad crossing. Traffic Volumes and Delays • Bellevue-Hopewell Highway (OR153), within the limits indicated, AADT = 1200. • 16% of traffic volume is trucks. • Estimated out of direction travel time is 7 minutes.

Page 5: Z & RR XING IMPROVEMENTS OR153: BELLEVUE - HOPEWELL …

Schedule • Bid opening – February 7, 2019 • Construction Start – Spring 2019 • Completion – Summer 2019 Mobility Restriction • Complete closure for approximately 3 weeks • All traffic to use detour