Op#on  1:  Historic  Building  

Reuse  (5  points)  

No  demo  unless  structurally  unsound  

All  altera:ons  according  to  local/nat’l.  standards  

Consult  preserva:on  pro  if  no  historic  review  

required  

Op#on  2:  Abandoned/Blighted  Bldg.  Renova:on  

(5  points)  

Maintain  at  least  50%  of  exis:ng  structure  

Renovate  to  state  of  produc:ve  occupancy  

May  exclude  up  to  25%  of  surface  area  due  to  deteriora:on/damage  

Op#on  3:                      Building  And  Material  

Reuse      (2  –  4  Points)  

Reuse  or  salvage  building  materials  as  %  of  surface  

area  

Include  structural  elements,  enclosure  

materials,  &  permanent  interior  elements  

Exclude  from  calcula:on  window  assemblies  &  

any  hazardous  materials  remediated  

   

Op#on  4:  Whole-­‐Building  Life-­‐

Cycle  Analysis      (3  Points)  

   

For  NC,  LCA  must  show  10%  less  in  3  of  6  impact  measures  vs.  ref.  bldg.  

One  impact  measure  must  be  global  warming  

poten:al  

No  impact  measure  may  be  more  than  5%  

increase  over  ref.  bldg.  

NC-­‐v4  Credit  MRc1    Building  Life-­‐Cycle  Impact  Reduc:on    

Page 3: Zak Patten - Presentation - LEED v4 14-03-03

Op#on  1:  Environmental  Product  Declara:on  

(1  point)  

Use  20+  diff.  permanent  products  from  5+  manufacturers  w/  cradle-­‐to-­‐gate  scope  

mee:ng  one  of  following  criteria:  

Publicly  available,  cri:cally  reviewed  LCA                      (1/4  credit)  

Industry-­‐wide  (generic)  EPD  w/  3rd-­‐party  cer:fica:on  (Type  III),  incl.  external  verifica:on  

(1/2  credit)  

Product-­‐specific  EPD  w/  3rd-­‐party  cer:fica:on  (Type  III),  incl.  external  verifica:on                                                    

(1  whole  credit  )  

Op#on  2:  Mul:-­‐aaribute  Op:miza:on    

(1  Point)  

Use  products  that  meet  one  of  following  criteria  for  50%  of  the  total  cost  of  permanent  

products:  

Show  impact  below  industry  avg.  in  at  least  3  environmental  categories                                                                        

(100%  of  cost)  

Sourced  within  100  miles  of  project  site                              (200%  of  cost)  

Structure  +  enclosure  materials  must  be  ≤  30%  of  value  of  compliant  building  products  

NC-­‐v4  Credit  MRc2    Building  Product  Disclosure  &  Op:miza:on  –  Enviro.  Product  Declara:ons  (EPDs)  

Page 4: Zak Patten - Presentation - LEED v4 14-03-03

Op#on  1:  Raw  Material  Source  &  Extrac:on  Repor:ng  

(1  point)  

Use  20+  diff.  permanent  products  from  5+  manufacturers  w/  public  reports  incl.  raw  material  extrac:on  loca:ons  &  specific  

commitments  to  environmental  responsibility  

Sourced  from  mfr.  w/  self-­‐declared  reports              (1/2  credit)  

3rd-­‐party  verified  corp.  sustainability  reports  incl.  enviro.  impacts  of  extrac:on  &  supply  chain                                                                                                                                                            

(1  whole  credit  )  

Op#on  2:  Leadership  Extrac:on  Prac:ces  

(1  Point)  

Use  products  that  meet  one  of  following  criteria  for  25%  of  the  total  cost  of  permanent  products:  

1)  Extended  producer  responsibility  2)  Bio-­‐based  raw  materials  3)  Cer:fied  wood  4)  Reused  

materials  5)  Recycled  content  

Sourced  within  100  miles  of  project  site                              (200%  of  cost)  

No  double  coun:ng  of  single  product  components  compliant  w/  mul:ple  responsible  extrac:on  

criteria  

NC-­‐v4  Credit  MRc3    Building  product  disclosure  and  op:miza:on  -­‐  sourcing  of  raw  materials  

Page 5: Zak Patten - Presentation - LEED v4 14-03-03

Op#on  1:  Material  Ingredient  Repor:ng  

(1  point)  

Use  20+  diff.  permanent  products  from  5+  mfrs.  using  any  of  below  to  show  chemical  inventory  product  to    

≥  0.1%  (1000  ppm):  

Manufacturer  has  published  complete  content  inventory  

Health  Product  Declara:on  has  published  full  disclosure  of  known  

hazards  

Cer:fied  at  Cradle  to  Cradle  

Op#on  2:  Material  Ingredient  Op:miza:on    

(1  Point)  

Use  products  that  document  material  ingredient  op:miza:on  for  ≥  25%  of  total  cost  of  

permanent  products  using  the  paths  below:  

If  any  ingredients  are  assessed  w/  GreenScreen  List  Translator  

(100%  of  cost)  

If  all  ingredients  are  assessed  w/  GreenScreen  List  Translator  

(150%  of  cost)  

End-­‐use  products  are  cer:fied                                      Cradle  to  Cradle  

(100%  to  150%  of  cost)  

If  no  ingredients  on  EU’s  REACH                            Authoriza:on  or  Candidate  list    

(100%  of  cost)  

Op#on  3:  Product  Manufacturer  Supply  

Chain  Op:miza:on                                              (1  Point)  

Use  products  that  meet  one  of  following  criteria  for  ≥  25%  of  the  total  cost  of  permanent  products:  

Sourced  from  product  mfrs.  who  document  ≥  99%  of  ingredients  and  3rd-­‐party  verified  supply  chain  w/  processes  in  place  to  maximize  health,  safety,  and  stewardship  

(100%  of  cost)  

NC-­‐v4  Credit  MRc4  Building  product  disclosure  and  op:miza:on  -­‐  material  ingredients  

#2  &  #3:  Sourced  within  100  miles  of  

project  site        (200%  of  cost)    

Value  of  indiv.  

products  w/  op:ons  #2  or  #3  can  be  

combined  to  reach  25%  (ea.  product    only  counts  once)  

Page 6: Zak Patten - Presentation - LEED v4 14-03-03

NC-­‐v4  SSc1:  Site  assessment    Before  design,  evaluate  sustainable  op:ons  by  documen:ng  the  below:  

(1  point)                                  

Topography  Contour  mapping,  unique  topographic  

features,  slope  stability  risks  

Hydrology  Flood  hazards,  wetlands,  

lakes,  streams,  shorelines,  rainwater  collec:on/reuse  

opportuni:es,  water  storage  capacity  

Climate  Solar  exposure,  heat  island  effect  poten:al,  seasonal  sun  angles,  prevailing  winds,  

monthly  precipita:on  &  temp.  ranges  

Vegeta3on  Vegeta:on  types,  

greenfield  area,  tree  mapping,  threatened  or  endangered  species,  

unique  habitat,  invasive  plant  species  

Soils  NRCS  soils  delinea:on,  USDA  prime  farmland,  healthy  soils,  previous  development,  disturbed  

soils    

Human  use  Views,  adjacent  transporta:on  infrastructure  &  

proper:es,  construc:on  materials  w/  exis:ng  recycle/reuse  poten:al  

Human  health  effects  Proximity  of  vulnerable  popula:ons,  adjacent  physical  ac:vity  opp.,  proximity  to  major  

sources  of  air  pollu:on  

Page 7: Zak Patten - Presentation - LEED v4 14-03-03

NC-­‐v4  SSc2:    Site  development  -­‐  protect  or  restore  habitat  

   

Op#on  1:  On-­‐Site  Restora:on  

(2  points  for  non-­‐healthcare,  1  for  healthcare)                                  

Using  na:ve  or  adapted  vegeta:on,  restore  30%  (incl.  bldg.  footprint)  of  all  por:ons  

of  site  ID’d  as  previously  developed  

Restore  all  disturbed  or  compacted  soils  that  will  be  revegetated  w/in  project’s  development  footprint  to  meet  

following  requirements:  

Soils  must  be  reused  for  func:ons  comparable  to  original  

Imported  topsoils/soil  blends  for  topsoil  may  not  incl.  following:  soils  defined  by  NRCS  as  prime  farmland,  unique  farmland,  or  farmland  of  statewide  or  local  

importance;  or  soils  fr.  other  greenfield  sites  (unless  those  soils  are  byproduct  of  construc:on  process)  

Restored  soil  must  meet  criteria  of  ref.  soils  in  1–3  &  criteria  of  either  4  or  5:    1)  organic  maaer  2)  compac:on  3)  infiltra:on  rates    

4)  soil  biological  func:on  5)  soil  chemical  characteris:cs    

Projects  that  achieve  a  density  of  1.5  FAR  may  incl.  veg.  roof  in  calcula:on  if  plants  na:ve  or  adapted,  

provide  habitat,  &  promote  biodiversity  

Page 8: Zak Patten - Presentation - LEED v4 14-03-03

NC-­‐v4  SSc2  (con:nued):    Site  development  -­‐  protect  or  restore  habitat  

   

Op#on  2:  Financial  Support  

(1  point)                                  

Provide  financial  support  to  at  least  $0.40  per  square  foot  ($4  per  square  meter)  for  total  site  area  (including  bldg.  footprint)  

Financial  support  must  be  provided  to  recognized  land  trust  or  conserva:on  org.  w/in  same  EPA  Level  III  ecoregion  or  project’s  state  (or  w/in  100  miles  of  project  outside  U.S.).  For  U.S.  projects,  land  trust  must  be  accredited  by  Land  

Trust  Alliance  

Page 9: Zak Patten - Presentation - LEED v4 14-03-03

NC-­‐v4  SSc3:  Open  space  To  create  exterior  open  space  encouraging  interac:on  w/  environment,  social  interac:on,  passive  

recrea:on,  &  physical  ac:vi:es  

   

(1  point)                                  

Outdoor  space  must  be  physically  accessible  and  be  1+  of  the  following:  Provide  outdoor  space  greater  than  or  equal  to  30%  of  total  

site  area  (incl.  building  footprint).    

A  minimum  of  25%  of  outdoor  space  must  be  

vegetated  (turf  grass  does  not  count)  or  have  overhead  

vegetated  canopy  

Pedestrian-­‐oriented  paving  or  turf  area  w/  site  elements  that  allow  outdoor  social  ac:vi:es  

Preserved  or  created  habitat  &  meets  criteria  of  Protect  or  Restore  Habitat  &  incl.  elements  of  human  interac:on  

Recrea:on-­‐oriented  paving  or  turf  area  w/  site  elements  that  encourage  physical  ac:vity  

Garden  space  w/  diversity  of  vegeta:on  types  and  species  that  provide  opportuni:es  for  year-­‐round  visual  interest  

Garden  space  dedicated  to  community  gardens  or  urban  food  produc:on  

Page 10: Zak Patten - Presentation - LEED v4 14-03-03

NC-­‐v4  SSc5:  Heat  island  reduc:on  To  minimize  effects  on  microclimates  and  human  and  wildlife  habitats  by  reducing  heat  islands    

Op#on  1  (nonroof  &  roof):  (2  points  for  non-­‐healthcare,  1  for  healthcare)                                  

Meet  following:  Area  Nonroof  Measures  (0.5)  +  Area  High-­‐Reflectance  Roof  (0.75)  +  Area  Vegetated  Roof  (0.75)  ≥  Total  Site  Paving  Area  +  Total  Roof  Area  

And  use  any  combina:on  of  these  strategies:  

High-­‐reflectance  roof    w/  low  slope:  

≤  2:12,  ini:al  SRI  ≥  82  &  3-­‐year  aged  SRI  ≥  64  w/  steep  slope:    

>  2:12,  ini:al  SRI  ≥  39  &  3-­‐year  aged  SRI  ≥  32  

Install  a  vegetated  roof  

Nonroof  measures:    1)  Use  exis:ng  plant  material/install  plants  to  provide  shade  over  paving  areas  w/in  10  yrs    

2)  Install  vegetated  planters    3)  Plants  in  place  at  :me  of  occupancy  permit  (no  ar:ficial  turf)    

4)  Provide  shade  w/  structures  covered  by  energy-­‐genera:on  systems    

5)  Provide  shade  w/  architectural  devices  or  structures  that  have  3-­‐year-­‐aged  SRI  value  of  ≥  0.28    

6)  If  3-­‐yr  value  info  not  avail.,  use  materials  w/  ini:al  SRI  of  ≥  0.33    

7)  Provide  shade  with  vegetated  structures    8)  Use  paving  materials  w/  3-­‐year-­‐aged  SRI  value  of  ≥  0.28    

9)  If  not  avail.,  use  materials  w/  ini:al  SRI  of  ≥  0.33    

10)  Use  open-­‐grid  pavement  system  (≥  50%  unbound)  

Page 11: Zak Patten - Presentation - LEED v4 14-03-03

NC-­‐v4  SSc5  (con:nued):  Heat  island  reduc:on    To  minimize  effects  on  microclimates  and  human  and  wildlife  habitats  by  reducing  heat  islands    

Op#on  2  (parking  under  cover):    (1  point)  

                               

Place  a  minimum  of  75%  of  parking  spaces  under  cover.  Any  roof  used  to  shade  or  cover  parking  must:      

1)  have  a  three-­‐year  aged  SRI  of  at  least  32  (if  three-­‐year  aged  value  informa:on  is  not  available,  use  materials  with  an  ini:al  SRI  of  at  least  39  at  installa:on),  or    

2)  be  a  vegetated  roof,  or    

3)  be  covered  by  energy  genera:on  systems,  such  as  solar  thermal  collectors,  photovoltaics,  and  wind  turbines  

Page 12: Zak Patten - Presentation - LEED v4 14-03-03

NC-­‐v4  SSc4:  Rainwater  Management  To  reduce  runoff  vol.  &  improve  water  quality  by  replica:ng  site's  natural  hydrology  &  water  

balance  based  on  historical  condi:ons  &  region's  undeveloped  ecosystems        

Op#on  1  (Percen:le  Of  Rainfall  Events),    

 Path  1  (95th  percen:le):    (2  points  for  non-­‐healthcare,  

1  for  healthcare)                                  

     

Op#on  1  (Percen:le  Of  Rainfall  Events),    

 Path  2  (98th  percen:le):    (3  points  for  non-­‐healthcare,  

2  for  healthcare)                                  

       

Op#on  1  (Percen:le  Of  Rainfall  Events),    

 Path  3  (Zero  Lot  Line  Projects  Only  –  85th  Percen:le):  

 (3  points  for  non-­‐healthcare,  2  for  healthcare)  

                               

Manage  on  site  runoff  from  developed  site  for  95th  

percen:le  of  regional  or  local  rainfall  events  using  low-­‐

impact  development  (LID)  &  green  infrastructure  

Use  daily  rainfall  data  &  methodology  from  EPA  

technical  guidance  for  federal  projects  to  determine  95th  

percen:le  amount  

Achieve  Path  1  but  for  98th  percen:le  of  regional  or  local  rainfall  events,  using  LID  and  

green  infrastructure  

Applies  to  zero  lot  line  projects  in  urban  areas  w/  min.  density  

of  1.5  FAR  

Achieve  Path  1  but  for  98th  percen:le  of  regional  or  local  rainfall  events,  using  LID  and  

green  infrastructure  

Page 13: Zak Patten - Presentation - LEED v4 14-03-03

NC-­‐v4  SSc4  (con:nued):  Rainwater  Management  To  reduce  runoff  vol.  &  improve  water  quality  by  replica:ng  site's  natural  hydrology  &  water  

balance  based  on  historical  condi:ons  &  region's  undeveloped  ecosystems  

Op#on  2  (Natural  land  cover  condi:ons):  (3  points  for  non-­‐healthcare,  2  for  healthcare)  

                     

Manage  on  site  annual  increase  in  runoff  volume  from  natural  land  cover  condi:on  to  post-­‐developed  condi:on  

Projects  that  are  part  of  mul:tenant  complex  only:  Credit  requirements  may  be  met  using  coordinated  approach  affec:ng  defined  project  site  w/in  master  plan  boundary.  Distributed  techniques  based  on  watershed  approach  are  then  

required.