26
ZONING MAP CHANGE REPORT 2720 FAUCETTE AVE Z1900021 Page 1 of 5 Meeting Date: July 21, 2020 A. Summary Tim Sivers of Horvath Associates, proposes to change the zoning designation of three parcels located generally at 2720 Faucette Avenue. The site is presently zoned Residential Rural (RR) and the applicant proposes to change this designation to Planned Development Residential 3.159 (PDR 3.159). The development plan associated with this request commits to a maximum of 320 single family detached and townhouse residential units and permitted accessory uses with a minimum of 20 percent of each unit type. The property is Low Density Residential on the Future Land Use Map (FLUM) which is consistent with the rezoning request for PDR 3.159. An annexation petition has been submitted for the 36.171 acre portion of the site that is not within the existing city limits. Application Summary Application Information Reference Name 2720 Faucette Ave Submittal Date April 13, 2019 Application Type(s) (Case#) Zoning Map Change (Z1900021), Annexation (BDG1900012) Proposal Up to 320 single family detached and townhouse residential units Applicant Tim Sivers, Horvath Associates Staff Contact Emily Struthers, Senior Planner ([email protected]) Site Information Location 2720 Faucette Ave, 1035 Junction Road, and 2509 Cheek Road Legacy Cases N/A Site Acreage 101.311 Existing Use Undeveloped Request Designations Existing Proposed Jurisdiction City/ County City Development Tier Suburban No change Future Land Use Low Density Residential No change Zoning Residential Rural (RR) Planned Development Residential 3.159 (PDR 3.159) Overlay Zoning District(s) Falls/Jordan Lake Watershed Protection Overlay District-B (F/J-B) No change TIA Required Yes, See Attachments 10 and 11 Recommendations and Determinations Staff Staff determines that this request is consistent with the Comprehensive Plan and other adopted ordinances and policies. Planning Commission TBD BPAC See Attachment 8

ZONING MAP CHANGE REPORT - Durham, NC

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

ZONING MAP CHANGE REPORT

2720 FAUCETTE AVE Z1900021

Page 1 of 5

Meeting Date: July 21, 2020

A. Summary

Tim Sivers of Horvath Associates, proposes to change the zoning designation of three parcels located generally at 2720 Faucette Avenue. The site is presently zoned Residential Rural (RR) and the applicant proposes to change this designation to Planned Development Residential 3.159 (PDR 3.159). The development plan associated with this request commits to a maximum of 320 single family detached and townhouse residential units and permitted accessory uses with a minimum of 20 percent of each unit type. The property is Low Density Residential on the Future Land Use Map (FLUM) which is consistent with the rezoning request for PDR 3.159. An annexation petition has been submitted for the 36.171 acre portion of the site that is not within the existing city limits.

Application Summary Application Information Reference Name 2720 Faucette Ave Submittal Date April 13, 2019 Application Type(s) (Case#) Zoning Map Change (Z1900021), Annexation (BDG1900012) Proposal Up to 320 single family detached and townhouse residential units

Applicant Tim Sivers, Horvath Associates Staff Contact Emily Struthers, Senior Planner ([email protected]) Site Information

Location 2720 Faucette Ave, 1035 Junction Road, and 2509 Cheek Road Legacy Cases N/A

Site Acreage 101.311 Existing Use Undeveloped Request

Designations Existing Proposed

Jurisdiction City/ County City

Development Tier Suburban No change

Future Land Use Low Density Residential No change

Zoning Residential Rural (RR) Planned Development Residential 3.159 (PDR 3.159)

Overlay Zoning District(s) Falls/Jordan Lake Watershed Protection Overlay District-B (F/J-B) No change

TIA Required Yes, See Attachments 10 and 11 Recommendations and Determinations

Staff Staff determines that this request is consistent with the Comprehensive Plan and other adopted ordinances and policies.

Planning Commission TBD BPAC See Attachment 8

Z1900021, 2720 Faucette Ave Zoning Map Change Report

Page 2 of 5

B. Site History

There have been no recent development approvals for this site. In 2017 a rezoning application was submitted and subsequently withdrawn for Industrial Light with a development plan for 400,000 square feet of light industrial uses on the northern portion of the site.

C. Existing Site Characteristics

Site Conditions. The 101.311 acre site proposed for rezoning comprises three parcels. As shown on the Existing Conditions Sheet of the development plan, the site contains mature forest, wetlands, streams, and sanitary sewer lines and easements. The following photos provide a visual context of the site. Their locations have been identified on the Aerial Map (Attachment 2).

Area Characteristics. The site is located in the Suburban Development Tier and the Falls/Jordan District B Watershed Protection Overlay. The area west of the site includes single family residences and Merrick Moore Elementary School. Single family residences and undeveloped land is located to the north. The area east of the site includes a mix of industrial-light and industrial properties including an undeveloped parcel owned by Durham County. Parcels to the south include a solar field and an industrial-light building. The following photos provide a visual context of the area. Their locations have been identified on the Aerial Map (Attachment 2).

Photo 3 Photo 4

Photo 1 Photo 2

Z1900021, 2720 Faucette Ave Zoning Map Change Report

Page 3 of 5

Photo 5 Photo 6

Photo 7 Photo 8

Photo 9 Photo 10

D. Consistency with Adopted Plans

A zoning map change is reviewed for consistency with the Future Land Use Map and policies of the Comprehensive Plan, as well as other adopted plans. Attachment 6 provides the associated Comprehensive Plan policies which are applicable to the proposal.

Staff Analysis. The requested PDR 3.159 zoning district meets the policy requirements in relation to the Comprehensive Plan and other adopted plans and policies.

Z1900021, 2720 Faucette Ave Zoning Map Change Report

Page 4 of 5

E. Compliance with the Unified Development Ordinance

The zoning map change request has been reviewed by staff and determined to be consistent with UDO requirements. The proposed commitments can be found in Attachment 5, Development Plan. Summaries of the commitments in excess of UDO requirements are below.

• Text Commitments. Text commitments include a maximum of 320 single family detached residential units and multi-family townhome residential units and permitted accessory uses; A minimum of 20% of each unit type shall be provided within the development; Transit improvements; Roadway improvements at site access points; Right of way dedication; Average block length shall not exceed 550 feet; Traffic calming devices shall be provided; A minimum of 2,000 linear feet of natural trails shall be constructed.

• Graphic Commitments. Graphic commitments include the location of site access points, building and parking envelopes, stream crossings, tree coverage locations, maximum 60% impervious surface, project boundary buffers including a screen fence in some locations.

• Design Commitments. Design commitments specify a variety of rooflines and exterior building materials. Distinctive architectural features shall be a choice or combination of projected bays, vertically proportioned windows, and/or gable end walls with accent siding.

Staff Analysis. The requested zoning district and associated development plan exceeds the minimum requirements of the UDO. If the zoning map change request is approved, the attached development plan establishes the level of development allowed on the property.

F. Development Impact Assessment

The impact of the requested change has been evaluated to suggest its potential impact on the transportation system, water and sewer, stormwater, and schools.

The proposal, assumed to have a maximum of 196 single family units and 124 townhouse units, is estimated to increase the traffic generation of the site by 1,714 vehicle trips per day. The site will be served by water and sewer in accordance with the Summary Utility Development Statement issued by the Department of Water Management for this project (Attachment 9). The Durham Stormwater Engineering Division of the Public Works Department reviewed the rezoning and has determined that adequate riparian buffers, floodplains requirements and impervious limitations have been addressed, where required.

Compared to the existing zoning, there will be an estimated elementary school demand increase by 18 students, a middle school demand increase by 10 students, and a high school demand increase by 13 students. Additional details are available in Attachment 7.

The City of Durham Departments of Transportation and Public Works, and City-County Planning, are conducting a conditions and cost assessment relating to the NCDOT roadways located within east and southeast Durham that are experiencing rapid transition from Rural to Suburban characteristics. The assessment will determine if the roadways meet current and potential future City standards. The departments are also assessing the physical road conditions and roadway design to determine what improvements might be needed to support the increase in vehicle trips that will be generated and will cause future deterioration of these roadways. The assessment is underway and a final completion date has not been identified.

Z1900021, 2720 Faucette Ave Zoning Map Change Report

Page 5 of 5

Staff Analysis. The proposed PDR 3.159 district is consistent with Comprehensive Plan policies regarding the infrastructure impacts of transportation, utilities, and schools.

G. Reasonable and in the Public Interest

UDO subsection 1.2.1 states that the purpose of the ordinance is to “promote the health, safety and general welfare of the residents of Durham City and County” and subsection 1.2.2 provides the intent behind the regulations contained in the ordinance. These requests have been evaluated based upon the ordinance’s purpose and intent and the policies of the Durham Comprehensive Plan.

Staff Analysis. The proposed zoning of PDR 3.159 is consistent with the goals and policies of the Comprehensive Plan and Suburban Tier designation. Staff finds the requested designation reasonable as it is compatible with the present Future Land Use Map. This proposal would result in additional housing in the Suburban Tier through infill and greenfield development. The proposed use provides an opportunity for additional housing which is a current need due to Durham’s population growth, housing demand, and escalating housing prices.

H. Staff Recommendation and Determination

Staff determines that this request is consistent with the Comprehensive Plan, including the Future Land Use Map, and other adopted ordinances and plans.

I. Contacts

Staff Contact

Emily Struthers, Senior Planner 919.560.4137 ext. 28263 [email protected]

Applicant Contact

Tim Sivers, Horvath Associates 919.490.4990 [email protected]

J. Notification

Staff certifies that newspaper advertisements, letters to property owners, and the posting of a zoning sign on the property has been carried out in accordance with Section 3.2.5 of the UDO. In addition, email notice was provided per the Durham Planning Public Notification Service.

K. Attachments

1. Context Map 2. Aerial Map 3. Future Land Use Map 4. Application 5. Development Plan Reduction 6. Comprehensive Plan Consistency Analysis 7. Summary of Development Impacts 8. BPAC Comments 9. Summary Utility Development Statement 10. City of Durham TIA 11. NCDOT TIA

F/J-B

Milan St

Cheek Rd

Harv

est S

t

Loga

n St

E Geer St

Joci

Ct

Junction Rd

Melrose Ave

Winburn Ave

Catal

pa D

r Rochester St

Syracuse St

Alicia Ct

Heide

lberg

St

Cone Ave

Attachment 1 - Context Map 2720 Faucette Ave

Legend:

Durham City-County Planning Department, 5/28/19

F/J-B

Milan St

Cheek Rd

Harv

est S

t

Loga

n St

E Geer St

Joci

Ct

Junction Rd

Melrose Ave

Winburn Ave

Catal

pa D

r Rochester St

Syracuse St

Alicia Ct

Heide

lberg

St

Cone Ave

±

Zoning Districts:

Proposed Zoning:Existing Zoning:

0 300 600Feet

PDR-LDR (2 - 4du/ac)RRRS-20RS-10IIL

Case AreaParcel LinesStreamsWatershedProtection Overlay

XY

XY XY XY XY

XY

XY

XYXYXYXY

Major TransportationCorridor Overlay

City Limits

PDR 3.500PDR 3.500

PDR 3.360PDR 3.360

PDR 3.159

Map prepared by the Durham City/County PlanningDepartment on 6/30/2020. Information depicted hereonis for reference purposes only and is compiled from thebest available sources. The City of Durham/DurhamCounty assumes no responsibility for errors arising fromuse or misuse of this map. Some basemapingprovided by ESRI via ArcGIS Online.

Case Number:Z1900021

Aerial Map

2720 Faucette Ave

85

EGeerSt

70

Midland

Ter

85

JunctionRd

FerrellRd

LandonFarms

NortheastHills

JunctionR

d

JunctionRdChe

ekRd

TwinLakesPark

Hoover RoadPark

MerrickMoore

MilanWoods

FerrellRd

CheekRd

Copyright nearmap 2015

Person County

Granville County

Orange County

Durham County

Wake County

Chatham County

F0.15 0 0.150.07

mi

Planning CasesZoning Change Cases

Attachment 2

EmilySt
Text Box
1
EmilySt
Text Box
2
EmilySt
Text Box
3
EmilySt
Text Box
4
EmilySt
Text Box
5
EmilySt
Text Box
6
EmilySt
Text Box
7
EmilySt
Text Box
8
EmilySt
Text Box
9
EmilySt
Text Box
10

Durham City/County Planning Department, 8/05/2019

Lindmont Ave

Rochester St

Hellen Ct

FlatfordCt

Estel

leCt

Sue

Ann Ct

AikenAve

Jessica Ct

Buffalo Way

Rachel Ln

Junc

tion R

d

Loga

n St

Faucette Ave

Overland Dr

Cynthia Dr

Cynthia Ct

Faucette Ave

Alicia Ct

Cheek Rd

MattieCt

Heide

lberg

St

Amberley Dr

Catal

paDr

Joci Ct

Milan St

Wayne Dr

Cone Ave

Willis Ct

Cliffo

rd Dr

Watson Rd

E Geer St

SpringCreek Dr

SyracusePl

CambianPl

Winburn Ave

MidlandTer

N Ho

over

Rd

Syracuse St

Mayo

St

Midland Ter Ext

Inlet Ave

Roane St Cent

er St

Melrose Ave

I85 S I85 N

Mich

ael D

r

Junction Rd

Clayton Rd

Harv

est S

t Pervis Rd

Legend:

0 500 1,000Feet

Attachment 3 - Future Land Use Map 2720 Faucette Ave

±

FLUM Designations:Low DensityResidential (4DU/Acre or less)CommercialIndustrialOfficeRecreation / OpenSpace

Case Area

Parcel Lines

Attachment 4

APPROVAL STAMP

ZONING CASE #Z1900021

INDEX OF DRAWINGS:D000 COVER SHEETD001 EXISTING CONDITIONSD100 DEVELOPMENT PLAN

DEVELOPER/OWNERJOVEN GROUP FOUR624 W CHATHAM STAPEX, NC 27502P: (919) 586-2628

ENGINEER/LAND PLANNERHORVATH ASSOCIATES, PA16 CONSULTANT PLACE, SUITE 201DURHAM, N.C. 27707P: (919) 490-4990F: (919) 490-8953e-mail: [email protected]

©

DRAWN BY: CHECKED BY:

DATE

SCALE

PROJECT NO.

SHEET NO.

16 CONSULTANT PLACE, SUITE 201DURHAM, NORTH CAROLINA 27707P 919.490.4990 F 919.490.8953

www.horvathassociates.com

HORVATHA S S O C I A T E S

DU

RH

AM

, N

OR

TH

C

AR

OL

IN

A

TS

MAY 13, 2019

1827

<DEVELOPMENT PLAN>

PIN: 0842-43-84-5553.DURPID: 168452

2720

FA

UCET

TE A

VE

No. 1576

PRO

FESS

IO

NAL LANDSCAPE ARCH

I TECT

NORT H CAROL I NA

T IMO T H Y J . S I V

E RS

« «

NORT H CAROL I NA

HO

RVA T H A S S OCIA T ES ,

P.A

.C-200

REGIS

TER

EDLA

NDSCAP E ARCH I T ECT U

RAL

CORP

4

APRIL 8, 2020

PER 4TH CITY REVIEW

COMMENTS

MS

3

FEBRUARY 6, 2020

PER 3RD CITY REVIEW

COMMENTS

MS

OCTOBER 17, 2019

PER 2ND CITY REVIEW

COMMENTS

MS

AUGUST 1, 2019

PER 1ST CITY REVIEW

COMMENTS

MS

2

1

PRELIMINARY

NOT FOR

CONSTRUCTION

PIN: 0842-43-84-5553.REDPID: 168453

PIN: 0842-03-41-9242PID: 168334

MS

AS NOTED

D000

COVERSHEET

VICINITY MAPNO SCALE N

CHEEK RD

HARV

EST

ST

E GEER ST

MILLA

N ST

CONE AVE

MELROSE AVE

LOG

AN

ST

FAUCETTE AVE

WINBURN AVE

JOCIE CT

RACHEL LN

JUN

CTIO

N R

D

SITE

2720 FAUCETTE AVEDURHAM,NC

DEVELOPMENT PLAN

GENERAL NOTES1. TOPOGRAPHIC INFORMATION TAKEN FROM CITY OF DURHAM GIS.

2. BOUNDARY INFORMATION PROVIDED BY TRIANGLE SURVEYORS DATED OCTOBER 12, 2018.

3. ADJACENT PARCEL BOUNDARY INFORMATION TAKEN FROM CITY OF DURHAM GIS.

4. BY REFERENCING ROADWAY IMPROVEMENTS ON THE PLAN, THE APPLICANT AGREES TO CONSTRUCT SAID IMPROVEMENTS PRIOR TO THEISSUANCE OF ANY CERTIFICATE OF OCCUPANCY IN A MANNER THAT WILL ALLOW THEM TO FUNCTION AS NOTED ON THE PLAN AND INACCORDANCE WITH NCDOT AND CITY OF DURHAM STANDARDS AND POLICIES. THIS INCLUDES (WHERE APPROPRIATE) BUT IS NOT LIMITEDTO: ADEQUATE TRANSITION TAPERS, ALIGNMENT OF LANES THROUGH INTERSECTIONS, ASSOCIATED SIGNAL MODIFICATIONS, PAVEMENTMARKINGS, ASSOCIATED SIGNAGE, CURB AND GUTTER, COORDINATION WITH OTHER PROPOSED ROADWAY IMPROVEMENTS AND BIKELANES. THE APPLICANT ALSO ACCEPTS THE FINANCIAL RESPONSIBILITY FOR ACQUISITION OF ANY ADDITIONAL RIGHT-OF-WAY NECESSARYTO ACCOMMODATE THESE IMPROVEMENTS AND ANY REQUIRED SIDEWALK CONSTRUCTION.

5. A TRAFFIC IMPACT ANALYSIS (TIA) DATED 07/22/19 WAS PREPARED BY RAMEY KEMP & ASSOCIATES, INC. WITH AN ADDENDUM DATED01/27/2020

TEXT COMMITMENTS1. THE PROPOSED DEVELOPMENT WILL INCLUDE A MAXIMUM OF 320 SINGLE FAMILY DETACHED RESIDENTIAL UNITS AND MULTI-FAMILY TOWNHOME

RESIDENTIAL UNITS AND PERMITTED ACCESSORY USES.

2. A MINIMUM OF 20% OF EACH UNIT TYPE SHALL BE PROVIDED WITHIN THE DEVELOPMENT.

3. A MINIMUM OF 20% PRESERVED TREE COVERAGE AREA WILL BE PROVIDED.

4. SUBJECT TO A DETERMINATION BY GODURHAM AND GOTRIANGLE ON THE NEED FOR TRANSIT RELATED IMPROVEMENTS AT THE TIME OF SITE PLANSUBMITTAL, CONSTRUCT A CONCRETE PAD/ BUS SHELTER TO GODURHAM/GOTRIANGLE SPECIFICATIONS ALONG THE SOUTH SIDE OF E. GEER STREETNORTH OF THE SITE.

5. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY, CONSTRUCT SITE ACCESS #6 WITH ONE INGRESS LANE, TWO EGRESS LANES,ADEQUATE STORAGE AND INTERNAL PROTECTIVE STEM.

6. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY, CONSTRUCT AN EXCLUSIVE EASTBOUND LEFT-TURN LANE ON CHEEK ROAD AT SITEACCESS #6 WITH ADEQUATE STORAGE AND APPROPRIATE TAPERS.

7. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY, A MINIMUM OF 5 FT. OF ADDITIONAL ASPHALT (IN ADDITION TO THE PROPOSEDROADWAY IMPROVEMENTS) WILL BE PROVIDED FOR THE FULL FRONTAGE OF THE SITE ALONG THE NORTH SIDE OF CHEEK ROAD. THE ADDITIONALASPHALT WIDENING WILL BE PROVIDED TO ALLOW FOR A BICYCLE LANE.

8. PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY, CONSTRUCT FAUCETTE AVENUE TO THE CITY OF DURHAM STANDARDS WITHIN THE EXISTINGRIGHT-OF-WAY FROM LOGAN STREET TO SITE ACCESS #2.

9. PRIOR TO ISSUANCE OF A BUILDING PERMIT, DEDICATE AN ADDITIONAL 10' OF RIGHT-OF-WAY FOR THE FRONTAGE OF THE SITE ALONG CHEEKROAD.

10. THE REQUIRED ROADWAY IMPROVEMENTS MAY BE PHASED AT THE SITE PLAN SUBMITTAL STAGE WITH A TRAFFIC PHASING PLAN APPROVED BY CITYTRANSPORTATION AND NCDOT.

11. THE AVERAGE BLOCK LENGTH SHALL NOT EXCEED 550 FEET.  BLOCK LENGTH SHALL BE DEFINED AS THE DISTANCE FROM INTERSECTION TOINTERSECTION OR PROJECT BOUNDARY MEASURED ALONG THE CENTERLINE OF THE STREET.

12. TRAFFIC CALMING DEVICES WILL BE PROVIDED AT ACCESS POINTS #1, #3, AND #4.

13. A MINIMUM OF 2,000 LINEAR FEET OF NATURAL TRAILS SHALL BE CONSTRUCTED BY THE DEVELOPER AND PRIVATELY MAINTAINED BY THE HOMEOWNERS ASSOCIATION. TRAIL LENGTH AND LOCATION ARE SUBJECT TO APPROVAL BY FEDERAL, STATE, AND LOCAL REGULATORY AGENCIES.

SURVEYORTRIANGLE SURVEYORS3715 UNIVERSITY DRIVEDURHAM, NC 27707-2646P: (919) 490-2929email: [email protected]

ANNEXATION CASE #BDG1900012

GENERAL STATUTEPER N.C. GENERAL STATUTE § 160A-393.2, ALL COMMITTED ELEMENTS (BOTH GRAPHICAL AND TEXT) DESCRIBED ON THIS PLAN HAVE BEENCONSENTED TO BY THE UNDERSIGNED APPLICANT.

_________________________________APPLICANT PRINT NAME

_________________________________APPLICANT SIGNATURE

DESIGN COMMITMENTS1. DESCRIPTION OF PROPOSED ARCHITECTURE:

GENERAL ARCHITECTURAL STYLE:

THE ARCHITECTURAL DESIGN FOR THE TOWNHOME UNITS OF THIS DEVELOPMENT WILL INCLUDE ELEMENTS AS DESCRIBED BELOW.

PROPOSED ROOFLINE(S):

UNITS WILL USE HIPPED, GABLED, OR SHED ROOFS, SINGLY OR IN COMBINATION.

PROPOSED BUILDING MATERIALS:

THE PRIMARY BUILDING MATERIAL TO BE USED SHALL BE A CHOICE OR COMBINATION OF THE FOLLOWING MATERIALS: BRICK, BLOCK, STONE, WOOD,EIFS, VINYL, AND / OR FIBER CEMENT BOARD / CEMENTITIOUS CLADDING.

DISTINCTIVE ARCHITECTURAL FEATURES (MULTI-FAMILY UNITS ONLY):

A MINIMUM OF ONE DISTINCTIVE ARCHITECTURAL FEATURE SHALL BE USED ON EACH BUILDING. THE DISTINCTIVE ARCHITECTURAL FEATURE(S) SHALL BE ACHOICE OR COMBINATION OF PROJECTED BAYS, VERTICALLY PROPORTIONED WINDOWS, AND / OR GABLE END WALLS WITH ACCENT SIDING.

2. DESCRIPTION OF HOW PROPOSED DESIGN WILL FIT INTO THE CONTEXT AREA:

HOW WILL THE PROPOSED DESIGN, INCLUDING TRANSITION TO ON AND OFF SITE DEVELOPMENT, FIT INTO THE CONTEXT AREA?

BY THE USE OF BOTH UNIT TYPES AND THROUGH PROPOSED LANDSCAPE BUFFERS, THIS DEVELOPMENT WILL PROVIDE A TRANSITION BETWEEN THE SINGLEFAMILY DETACHED RESIDENTIAL UNITS TO THE WEST AND THE INDUSTRIAL DEVELOPMENTS TO THE EAST.

Attachment 5

AutoCAD SHX Text
COPYRIGHT 2019 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED
AutoCAD SHX Text
NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676
AutoCAD SHX Text
CIVIL ENGINEERING LANDSCAPE ARCHITECTURE
AutoCAD SHX Text
LAND PLANNING STORMWATER MANAGEMENT

S72°

28'3

9"E

1383

.34

N05°48'08"E 1282.12 (TOTAL)

N76

°26'

00"W

1124

.81(

TOTA

L)

S13°57'35"E 1127.80 (TOTAL)

N15°40'12"E 632.26

N15°26'26"E861.97 (TOTAL)

S86°47'49"W 262.61

N88

°45'

45"W

927

.48

(TO

TAL)

N03°47'06"W 447.79

S64°57'32"W 464.94

S02°49'09"W133.04

916.

12

CITY

LIM

ITS

CITY

LIM

ITS

NC GRID COORDINATESNAD 83(2011)N 820909.71E 2044534.64

NC GRID COORDINATESNAD 83(2011)N 825439.97E 2043964.34

S13°57'35"E 1122.07

N88

°11'

04"W

615

.51

N14°17'18"E200.57

N76

°26'

00"W

116

2.04

N14°17'18"E1154.82 (TOTAL)

1

6059 58 57

56 55 54 53

52 5150

4948

47

4645

44

43

42

4140

39 3837

3534

33

32

31

30

29

28

27

26

2524

23 22 21 20 19 18

17

16

15

141312

11109876

5

4

3

2

36

61

MATUREMIXED

FOREST

MATUREMIXED

FOREST

MATUREMIXED

FOREST

MATUREMIXED

FOREST

MATUREEVERGREEN

FOREST

MATUREEVERGREEN

FOREST

MATUREEVERGREEN

FOREST

1,033 SFWETLAND

1,329 SFWETLAND

8,434 SFWETLAND

3,872 SFWETLAND

12,603 SFWETLAND

4,172 SFWETLAND

2,150 SFWETLAND

2,150 SFWETLAND

352 SFWETLAND

389 SFWETLAND

652 SFWETLAND

25,561 SFWETLAND

47,613 SFSTREAM BUFFER

680 SFWETLAND

357,371 SFSTREAM BUFFER

247,636 SFSTREAM BUFFER

47,097 SFSTREAMBUFFER

62

63

64

CHEEK RD

VARIABLE WIDTH R/W

21' PAVEMENT W

IDTH

GEER ST

VARIABLE WIDTH R/W

VARIABLE PAVEMENT W

IDTH

RAC

HEL

LN50

' PUB

LIC R

/W32

' PA

VEM

ENT W

IDTH

LOGAN ST60' PUBLIC R/W23' PAVEMENT WIDTH

CO

NE A

VE

60' PUBLIC R/W

20' PAVEM

ENT W

IDTH

S02°43'16"W 2595.42 (TOTAL)

HARVEST ST60' WIDTH R/W

40' PAVEMENT WIDTH

EXISTING SANITARYSEWER LINE AND

EASEMENT

EXISTING SANITARYSEWER LINE AND

EASEMENT

EXISTING SANITARYSEWER LINE AND

EASEMENT

LOGAN ST

50' PUBLIC R/W

24' PAVEMENT WIDTH

FAUC

ETTE

AVE

50' P

UBLIC

R/W

20' P

AVE

MEN

T WID

TH

MILAN ST

60' PUBLIC R/W

22' PAVEMENT WIDTH

C1

N88

°45

'45

"W11

.36

13,348 SFWETLAND

©

DRAWN BY: CHECKED BY:

DATE

SCALE

PROJECT NO.

SHEET NO.

16 CONSULTANT PLACE, SUITE 201DURHAM, NORTH CAROLINA 27707P 919.490.4990 F 919.490.8953

www.horvathassociates.com

HORVATHA S S O C I A T E S

DU

RH

AM

, N

OR

TH

C

AR

OL

IN

A

TS

MAY 13, 2019

1827

<DEVELOPMENT PLAN>

PIN: 0842-43-84-5553.DURPID: 168452

2720

FA

UCET

TE A

VE

No. 1576

PRO

FESS

IO

NAL LANDSCAPE ARCH

I TECT

NORT H CAROL I NA

T IMO T H Y J . S I V

E RS

« «

NORT H CAROL I NA

HO

RVA T H A S S OCIA T ES ,

P.A

.C-200

REGIS

TER

EDLA

NDSCAP E ARCH I T ECT U

RAL

CORP

4

APRIL 8, 2020

PER 4TH CITY REVIEW

COMMENTS

MS

3

FEBRUARY 6, 2020

PER 3RD CITY REVIEW

COMMENTS

MS

OCTOBER 17, 2019

PER 2ND CITY REVIEW

COMMENTS

MS

AUGUST 1, 2019

PER 1ST CITY REVIEW

COMMENTS

MS

2

1

PRELIMINARY

NOT FOR

CONSTRUCTION

PIN: 0842-43-84-5553.REDPID: 168453

PIN: 0842-03-41-9242PID: 168334

0

SCALE: 1" =

100 200 400

200'

N

SCALE:

EXISTING CONDITIONS1"=200'D001

1

MS

1"=200'

D001

EXISTINGCONDITIONSLEGEND

STREAM BUFFER HATCH

TOTAL PROJECT AREA BOUNDARY

ADJACENT PROPERTY BOUNDARY

WETLAND

EXISTING CONDITIONS NOTES:1. BOUNDARY INFORMATION TAKEN FROM SURVEY PROVIDED BY TRIANGLE

SURVEYORS.

2. TOPOGRAPHIC INFORMATION FROM CITY OF DURHAM.

3. NO STEEP SLOPES FOUND ON THE SITE.

4. NO DURHAM HISTORIC INVENTORY SITES OR DURHAM NATURAL INVENTORY AREASLOCATED ON OR WITHIN 100' OF THIS PROPERTY.

5. NO GREENWAY OR TRAILS ARE LOCATED OR PLANNED FOR THIS SITE AS PER THEDURHAM URBAN TRAILS AND GREENWAY MASTER PLAN.

6. TREE SAMPLING AREA AND SPECIMEN TREE SURVEYS ARE NOT REQUIRED WITHINFLOOD PLAIN, STREAM BUFFERS, OR ALONG STEEP SLOPES AS PER THE UDO.

7. 100 YR FLOOD PLAIN IS NOT LOCATED ON THE SITE.FLOODPLAIN ELEVATION: N/AFLOODPLAIN ZONE: X- AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAINFEMA MAP NUMBER: 3720084200KFEMA MAP DATE: 10/19/2018

8. FINAL STREAM BUFFER DELINEATION PER DWR SHALL BE APPLIED AT SITE PLAN.

TREELINE

PROPERTY OWNER INFO

Attachment 5

AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
COPYRIGHT 2019 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED
AutoCAD SHX Text
NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676
AutoCAD SHX Text
CIVIL ENGINEERING LANDSCAPE ARCHITECTURE
AutoCAD SHX Text
LAND PLANNING STORMWATER MANAGEMENT
AutoCAD SHX Text
CURVE TABLE
AutoCAD SHX Text
CURVE
AutoCAD SHX Text
DELTA
AutoCAD SHX Text
RADIUS
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
TANGENT
AutoCAD SHX Text
CHORD BRG
AutoCAD SHX Text
CHORD
AutoCAD SHX Text
C1
AutoCAD SHX Text
26°06'39"
AutoCAD SHX Text
1037.64
AutoCAD SHX Text
472.87
AutoCAD SHX Text
240.61
AutoCAD SHX Text
S78°00'51"W
AutoCAD SHX Text
468.79

1

6059 58 57

56 55 54 53

52 5150

4948

47

4645

44

43

42

4140

39 3837

3534

33

32

31

30

29

28

27

26

2524

23 22 21 20 19 18

17

16

15

141312

11109876

5

4

3

2

36

61

CHEEK RD

VARIABLE WIDTH R/W

21' PAVEMENT W

IDTH

GEER ST

VARIABLE WIDTH R/W

VARIABLE PAVEMENT W

IDTH

RAC

HEL

LN50

' PUB

LIC R

/W32

' PA

VEM

ENT W

IDTH

LOGAN ST60' PUBLIC R/W23' PAVEMENT WIDTH

CO

NE A

VE

60' PUBLIC R/W

20' PAVEM

ENT W

IDTH

HARVEST ST60' WIDTH R/W

40' PAVEMENT WIDTH

LOGAN ST

50' PUBLIC R/W

24' PAVEMENT WIDTH

FAUC

ETTE

AVE

50' P

UBLIC

R/W

20' P

AVE

MEN

T WID

TH

MILAN ST

60' PUBLIC R/W

22' PAVEMENT WIDTH

PROJECT BOUNDARY BUFFER0.8 OPACITY / 50' WIDTH WITH 6'TALL SCREEN FENCE OUTSIDESTREAM BUFFER

PROJECT BOUNDARY BUFFER0.2 OPACITY / 10' WIDTH

PROJECT BOUNDARY BUFFER0.8 OPACITY / 50' WIDTH WITH 6'

TALL SCREEN FENCE OUTSIDESTREAM BUFFER

PROJECTBOUNDARY

BUFFER0.8 OPACITY /

50' WIDTH WITH6' TALL SCREEN

FENCE

PROJECT BOUNDARY BUFFER0.8 OPACITY / 50' WIDTH WITH 6'

TALL SCREEN FENCE

PROJECTBOUNDARYBUFFER0.2 OPACITY /10' WIDTH

PROJECT BOUNDARY BUFFER0.4 OPACITY / 20' WIDTH

PROJECTBOUNDARY BUFFER0.2 OPACITY / 10'WIDTH

* PRESERVED TREECOVERAGE AREA75,000 - 100,000 SF * PRESERVED TREE

COVERAGE AREA75,000 - 200,000 SF

VEHICULARSTREAMCROSSING

VEHICULARSTREAM CROSSING

VEHICULARSTREAMCROSSING

PROPOSED PUBLIC STREETSITE ACCESS #1

FULL ACCESS WITH TRAFFICCALMING DEVICE

PROPOSED PUBLIC STREETSITE ACCESS #3FULL ACCESS WITH TRAFFICCALMING DEVICE

PROPOSED PUBLIC STREETSITE ACCESS #4 FULL

ACCESS WITH TRAFFICCALMING DEVICE

PROPOSED PUBLIC STREETSITE ACCESS #5FULL ACCESS

PROPOSED PUBLIC STREETSITE ACCESS #6 FULL

ACCESS CONTINGENTON NCDOT APPROVALS

PROPOSED ZONING: PDR 3.159MAXIMUM NUMBER OF UNITS: 320

COMMITTED MAXIMUM IMPERVIOUS AREA: 60.787 AC

PROPOSED PUBLIC STREETSITE ACCESS #2

FULL ACCESS

*PRESERVED TREECOVERAGE AREA10,000 - 40,000 SF

100' STREAMBUFFER

PROPOSED ZONING: PDR 3.159MAXIMUM NUMBER OF UNITS: 320

COMMITTED MAXIMUM IMPERVIOUS AREA: 60.787 AC

10' NO BUILD

10' NO BUILD

100' STREAMBUFFER

10' NO BUILD

100' STREAMBUFFER

10' ROWDEDICATION

PROJECT BOUNDARY BUFFER0.4 OPACITY / 20' WIDTH

PROJECTBOUNDARY BUFFER

0.4 OPACITY / 20'WIDTH

PROJECT BOUNDARY BUFFER0.4 OPACITY / 20' WIDTH

10' ROWDEDICATION

*

PRESERVED TREECOVERAGE AREA10,000 - 40,000 SF

PRESERVED TREECOVERAGE AREA50,000 - 150,000 SF

*

PROJECT BOUNDARY BUFFER1.0 OPACITY / 60' WIDTH IFREDUCED WITH 6' WALL

8' STREET YARD

PROJECT BOUNDARYBUFFER0.8 OPACITY / 50'WIDTH

10' PARKINGENVELOPE

BUILDING ANDPARKING

ENVELOPE

BUILDING ANDPARKING

ENVELOPE

BUILDING ANDPARKING

ENVELOPE

BUILDING ANDPARKING

ENVELOPE

BUILDING ANDPARKINGENVELOPE

BUILDING ANDPARKING ENVELOPE

BUILDING ANDPARKING ENVELOPE

BUILDING ANDPARKING ENVELOPE

BUILDING ANDPARKING ENVELOPE

BUILDING ANDPARKING ENVELOPE

BUILDING ANDPARKING

ENVELOPE

©

DRAWN BY: CHECKED BY:

DATE

SCALE

PROJECT NO.

SHEET NO.

16 CONSULTANT PLACE, SUITE 201DURHAM, NORTH CAROLINA 27707P 919.490.4990 F 919.490.8953

www.horvathassociates.com

HORVATHA S S O C I A T E S

DU

RH

AM

, N

OR

TH

C

AR

OL

IN

A

TS

MAY 13, 2019

1827

<DEVELOPMENT PLAN>

PIN: 0842-43-84-5553.DURPID: 168452

2720

FA

UCET

TE A

VE

No. 1576

PRO

FESS

IO

NAL LANDSCAPE ARCH

I TECT

NORT H CAROL I NA

T IMO T H Y J . S I V

E RS

« «

NORT H CAROL I NA

HO

RVA T H A S S OCIA T ES ,

P.A

.C-200

REGIS

TER

EDLA

NDSCAP E ARCH I T ECT U

RAL

CORP

4

APRIL 8, 2020

PER 4TH CITY REVIEW

COMMENTS

MS

3

FEBRUARY 6, 2020

PER 3RD CITY REVIEW

COMMENTS

MS

OCTOBER 17, 2019

PER 2ND CITY REVIEW

COMMENTS

MS

AUGUST 1, 2019

PER 1ST CITY REVIEW

COMMENTS

MS

2

1

PRELIMINARY

NOT FOR

CONSTRUCTION

PIN: 0842-43-84-5553.REDPID: 168453

PIN: 0842-03-41-9242PID: 168334

MS

D100

DEVELOPMENTPLAN

0

SCALE: 1" =

100 200 400

200'SCALE:

DEVELOPMENT PLAN1"=200'D100

1

LEGEND

TOTAL PROJECT AREA BOUNDARY

PROPOSED PROJECTBOUNDARY BUFFER

* PRESERVED TREE

ACCESS POINT

STREAM BUFFER HATCH

PROPERTY LINE (NOT INPROJECT AREA)

VEHICULAR STREAMCROSSING

1"=200'

N SITE ACCESS #6 ROAD IMPROVEMENTSSEE SHEET D000 FOR LIST OF ROAD IMPROVEMENTS

PROPOSED ROAD LANEEXISTING ROAD LANE

LEGENDLEGEND

BY THIS DEVELOPMENT

SITEACCESS

#6

CHEEK RD

PROPOSED BIKE LANE

DEVELOPMENT PLAN NOTES:1. DETERMINATION ON STREET STUB EXEMPTION(S) WILL BE

MADE AT THE SITE PLAN STAGE.

2. A TRAFFIC CALMING DEVICE SHALL BE INCLUDED IN AT LEASTONE OF THE FOLLOWING MEASURES FOR ACCESS POINT 1:NEIGHBORHOOD GATEWAY(S), NECKDOWNS, AND / ORMEDIAN(S) AS DEFINED IN THE CITY OF DURHAM TRAFFICCALMING GUIDELINES.

3. A TRAFFIC CALMING DEVICE SHALL BE INCLUDED IN AT LEASTONE OF THE FOLLOWING MEASURES FOR ACCESS POINT 3 &4 : NEIGHBORHOOD GATEWAY(S) AND / OR MEDIAN(S) ASDEFINED IN THE CITY OF DURHAM TRAFFIC CALMINGGUIDELINES.

COVERAGE AREA

BUILDING AND PARKINGENVELOPE

ACCESS POINT WITHTRAFFIC CALMING DEVICE

Attachment 5

AutoCAD SHX Text
COPYRIGHT 2019 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED
AutoCAD SHX Text
NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676
AutoCAD SHX Text
CIVIL ENGINEERING LANDSCAPE ARCHITECTURE
AutoCAD SHX Text
LAND PLANNING STORMWATER MANAGEMENT

ATTACHMENT 6:

COMPREHENSIVE PLAN CONSISTENCY ANALYSIS

Page 1 of 2

As directed by paragraph 3.4.7 of the Unified Development Ordinance, staff has reviewed the requested Zoning Map Change for consistency with all relevant policies of the Comprehensive Plan. That analysis is provided below.

Policy 2.1.2c. Suburban Tier Defined. The Suburban Tier is established to provide land for low to medium density residential development, employment centers, and commercial and industrial activity. Land located in the Suburban Tier is expected to accommodate a large proportion of Durham’s growth through greenfield development, infill, and redevelopment. While the Suburban Tier is expected to primarily develop at traditional suburban densities and patterns, it is recognized that the Research Triangle Park may develop one or more specific commercial nodes with more intense development and mix of uses that are walkable and able to be served by transit and bicycle facilities.

Staff Analysis: This proposal, if approved, will increase the density and commit to residential uses while remaining consistent with the Future Land Use designation of Low Density Residential. The proposed development plan would allow for more units than the current zoning thus better accommodating Durham’s growth in the Suburban Tier. The proposed zoning on this greenfield infill site will provide housing in the form of up to 320 units made up of both single family detached and townhouse residential units.

Policy 2.3.1a. Contiguous Development. Support orderly development patterns that take advantage of existing urban services, and avoid, insofar as possible, patterns of leapfrog, noncontiguous, scattered development.

Staff Analysis: The proposal supports orderly development patterns by expanding on the existing single family residential uses located to the west and north. The proposed development plan commits to a screen wall in locations along the eastern buffer to reduce conflicts between the proposed residential uses adjacent to existing industrial-light and industrial uses including salvage yards, warehouse storage, and undeveloped industrial light parcels. Residential proposed on this site capitalizes on the nearby elementary school and GoDurham routes 3 and 3T. Connection to water and sewer is available, following annexation of the northern portion of the site. This project will be required to provide a minimum of two waterline connections to existing mains, available in multiple locations which coordinate with proposed site access points and existing street stubs. Existing gravity sewer mains are available for connection of the site. This project will also be required to provide an easement dedication for a force main which is part of Phase 2 of the Southeast Regional Lift Station project.

Policy 2.3.2a Infrastructure

Capacity. In evaluating changes to the Future Land Use Map and Zoning Atlas, the City-County Planning Department shall consider impacts to the existing capacities of the transportation, water, and sewer systems, and other public facilities and services. In order to assess the impact on infrastructure and

Attachment 6 Comprehensive Plan Consistency Analysis

Z1900021 2720 Faucette

Page 2 of 2

services of changes to the Future Land Use and Zoning Maps, the City-County Planning Department shall measure from the potential maximum impact of current policy or regulation to the potential maximum impact of the proposed change in policy or regulation.

Staff Analysis: Existing infrastructure, such as road, water, and sewer capacity, is sufficient to accommodate potential impacts. Attachment 7 provides additional information.

Policy 8.1.2h. Transportation Level of Service Maintenance. In order to maintain the level of service on Durham roads, the City-County Planning Department shall not recommend approval for any zoning map change which would result in the average daily trips exceeding 110 percent of the adopted level of service standard for any adjacent road, unless the impact on the adjacent roads is mitigated. Development projects shall be exempt from this policy if the project results in a change in the average daily trips of no more than 3 percent of the level of service standard on any adjacent road. This exemption shall not apply if the present average daily trips exceed 120 percent of the level of service standard on any adjacent road. If the zoning map change request is found to be inconsistent with this policy, any associated Plan Amendment shall also be recommended for denial.

Staff Analysis: The proposed development plan is consistent with this policy; while the traffic from this proposed zoning will increase, the traffic volume is not anticipated to exceed the roadway capacity (LOS D) for East Geer Street or Cheek Road. Traffic Impact Analysis identified necessary roadwayimprovements that have been included as development plan text commitments.

Policy 8.1.4d. Development Review and Adopted Regional Bicycle Plans. The City-County Planning Department, the City Parks and Recreation Department, the City Public Works Department, and the City Department of Transportation shall review development proposals in relation to the 2006 Comprehensive Durham Bicycle Transportation Plan and the Bicycle Component of the most recent adopted Long Range Transportation Plan, and seek dedication or reservation of right-of-way or easements and construction of facilities in conformance with that Plan and Complete Street design standards.

Staff Analysis: The proposed development is consistent with this policy; the development plan commits to additional asphalt for a future bicycle lane along the north side of Cheek Road.

Policy 11.1.1a School Level of Service Standard. The level of service for public school facilities shall be established as a maximum enrollment of 110 percent of the system’s maximum permanent building capacity, measured on a system-wide basis for each type of facility.

Staff Analysis: The proposed development plan is consistent with this policy, as shown in Attachment 7, there is sufficient capacity within the school system to support the additional school aged children estimated as a result of the proposed zoning.

ATTACHMENT 7:

SUMMARY OF DEVELOPMENT IMPACTS

Page 1 of 3

This attachment provides a summary of the potential infrastructure impacts associated with the proposed request in terms of how it affects the transportation system, utilities (water, sewer systems, and stormwater) and schools.

1. Transportation Impacts

E. Geer Street and Cheek Road are the major roads impacted by the proposed zoning change. There areno scheduled City of Durham or NCDOT roadway improvement projects in the area.

Table 1: Existing Roadway Characteristics

Affected Segment E. Geer Street Cheek Road

Type of Roadway 2-lane undivided city/county classII arterial without left-turn lanes

2-lane undivided city/county class IIarterial without left-turn lanes

Current Roadway Capacity (LOS D) (AADT)*

11,800 11,800

Latest Traffic Volume (AADT)** 5,000

9,800

Source of LOS Capacity: FDOT Generalized Level of Service Volume Table 4-1 (2012) Source of Latest Traffic Volume: 2017 NCDOT Traffic Count Map

Table 2, below, shows the projected vehicle trips generated under the proposed rezoning compared to the present zoning designation.

Table 2: Traffic Generation

Traffic Generated by Present Designation (average 24 hour)* *1,201

Traffic Generated by Proposed Designation (average 24 hour)** **2,915 (103% of TIA)

Impact of Proposed Designation 1,714 *Assumption- (Max Use of Existing Zoning) – RR: 117 single family homes

**Assumption- (Max Use of Proposed Zoning) – PDR 3.159: 196 single family and 124 townhouses

Transit service is currently provided north of the site along E. Geer Street by via GoDurham Routes 3 and 3T.

Attachment 7 Summary of Development Impacts

Z1900021, 2720 Faucette

Page 2 of 3

2. Water and Sewer Impacts

This site will be served by city water and sewer. Water Management has reviewed the impact the proposed zoning will have on the following utilities:

1. Drinking water supply, treatment and distribution infrastructure, including available fire flowcapacity; and

2. Waste water collection and treatment infrastructure, including downstream lift station capacity.

As a result of this review, Water Management has issued a Summary Utility Development Statement to the applicant summarizing required off-site and on-site improvements to the water and wastewater systems to serve this proposed use, see Attachment 9 for additional information.

3. Stormwater Impacts

The Durham Stormwater Engineering Department reviewed the proposed zoning and determined that adequate riparian buffers, floodplain requirements and the appropriate impervious surface limitations have been addressed, where required.

All other impacts associated with the application would be addressed at the time of site plan review, because that requires a level of detail not required at the time of rezoning.

4. School System Impact

Durham Public Schools serving the area are Merrick-Moore Elementary, Neal Middle, and Southern School of Energy and Sustainability High School. Table 3 provides a summary of the current building capacity for the elementary, middle and high schools, as well as the current enrollment and the available capacity.

Table 3: School Enrollment and Capacity Figures

Elementary School

Students

Middle School

Students

High School

Students

Current Building Capacity 15,047 7,779 10,500

Maximum Building Capacity (110% of Building Capacity)

16,552 8,557 11,550

20th Day Attendance (2019-2020 School Year) 15,045 7,311 10,354

Committed to Date, Based on Recent Approvals (October 2016-September 2019) 121 24 (28)

Available Capacity 1,386 1,221 1,224

As shown in Table 4, the proposed zoning will generate 41 additional students compared to the existing zoning.

Attachment 7 Summary of Development Impacts

Z1900021, 2720 Faucette

Page 3 of 3

Table 4: Number of Projected Students Under Rezoning

Elementary School

Students

Middle School

Students

High School

Students

Potential Students Generated – Current Zoning*

18 9 13

Potential Students Generated – Proposed Zoning**

36 19 26

Impact of Proposed Zoning +18 +10 +13

*Assumption- (Max Use of Existing Zoning) – RR: 117 single family homes**Assumption- (Max Use of Proposed Zoning) – PDR 3.159: 196 single family and 124 townhouses

5. Summary

The proposed PDR3.159 zoning district and associated development plan is consistent with Comprehensive Plan policies regarding the infrastructure impacts of the transportation system, utilities, and schools.

ATTACHMENT 8:

BICYCLE AND PEDESTRIAN ADVISORY COMMISSION (BPAC) COMMENTS AND

RESPONSE

1. BPAC requests the applicant proffer off-site sidewalk construction on along Cheek Rd. tothe nearby Merrick Moore Elementary School to avoid a gap in the sidewalk system. If theapplicant agrees to make the requested proffer, add a text commitment to the CoverSheet. It is our understanding that the determination of providing the sidewalk cannot bedeferred to the site plan stage. Please perform the due diligence needed to determinewhether or not you can proffer the requested off-site improvement.

Applicant response: The existing topography, wetlands, and stream along this portion of the road makes this sidewalk very difficult to construct in addition to the impacts on the wetlands and stream that will be needed in order to construct it. For these reasons, we cannot include the construction of this sidewalk as a text commitment.

Staff response: BPAC requested a proffer for off-site sidewalk which the applicant may or may not wish to proffer.

2. In order to access transit service on E. Geer Street, BPAC requests the applicant proffer off-site sidewalk construction along the north side of existing Cone Avenue and along the eastside of Milan Street from Cone Avenue to E. Geer Street. If the applicant agrees to makethe requested proffer, add the following text commitment to the Cover Sheet: “Prior to theissuance of a certificate of occupancy, construct a 5’ sidewalk along the north side ofexisting Cone Avenue and along the east side of Milan Street from Cone Avenue to E. GeerStreet.” It is our understanding that the determination of providing the sidewalk cannot bedeferred to the site plan stage. Please perform the due diligence needed to determinewhether or not you can proffer the requested off-site improvement.

Applicant response: The existing topography along Cone Ave and the stream impacts along Milan St make this portion of the sidewalk difficult to construct as well. For these reasons, we cannot include the construction of this sidewalk as a text commitment.

Staff response: BPAC requested a proffer for off-site sidewalk which the applicant may or may not wish to proffer. Transportation also requested this proffer.

3. For conformance with Policy 8.1.6m of the Durham Comprehensive Plan and to further thegoals of Vision Zero Durham, BPAC requests that the applicant proffer the provision oftraffic calming features in the neighborhood to ensure safe bicycle and pedestrian use byadding traffic calming circles at intersections, speed humps/tables, or other design features.It is more efficient when building new neighborhoods to incorporate traffic calming features

into the street design, rather than to retrofit the streets later at taxpayer expense after residents complain to City Council about high speed traffic. Please perform the due diligence needed to determine whether or not you can proffer the requested improvement.

Applicant response: Traffic calming devices have been included on the development plan. A text commitment has been added.

Staff response: BPAC has requested a proffer for traffic calming devices which the applicant may or may not wish to proffer. If the applicant cannot provide the specificity required for a committed element, the requested proffer should not be made. Traffic calming devices or design techniques should be coordinated with Transportation and Public Works during the site plan and construction drawing stages.

4. For conformance with Policy 8.1.6m of the Durham Comprehensive Plan and to further thegoals of Vision Zero Durham, BPAC requests that the applicant proffer to provide off-roadtrails in this new residential development, with connectivity, where feasible, to adjacentdevelopment and community facilities. Off road trails have been provided in otherneighborhoods, such as Woodcroft, and contribute to the health and livability of theneighborhood. Please perform the due diligence needed to determine whether or not youcan proffer the requested improvement.

Applicant response: A text commitment concerning the trails has been added to the development plan.

Staff response: The applicant has proffered the commitment that a minimum of 2,000 linear feet of natural trails shall be constructed by the developer and privately maintained by the home owner’s association. Trail length and location are subject to approval by federal, state, and local regulatory agencies.

Attachment 9

Date: August 2, 2019 Revised August 20, 2019

To: Emily Struthers, Durham City County Planning Department From: Earlene Thomas PE, City of Durham Department of Transportation Subject: Cheek Road Residential (Z1900021 – 2720 Faucette Ave) Traffic Impact Analysis

The Unified Development Ordinance (UDO) requires a Traffic Impact Analysis (TIA) to be provided with site plan submittals estimated to generate 150 or more peak-hour vehicle trips. The proposed residential development consists of 280 single family homes. The development is expected to generate 2,690 trips per day, with 204 a.m. peak-hour trips (51 entering and 153 exiting) and 273 p.m. peak-hour trips (172 entering and 101 exiting). The proposed development is located north of Cheek Road, west of Junction Road and east of Milan Street. Access to the site will be provided via one full movement intersection on Cheek Road and through four roadway connections to the development west of the site. The expected completion year is 2022, and the TIA analysis year is 2023. The TIA was prepared Ramey Kemp & Associates, Inc. in April 2019 and revised July 2019.

Study Area The study area includes the following intersections:

Cheek Road and Midland Terrace / Muldee Street;

Cheek Road and (Western) Junction Road;

Cheek Road and (Eastern) Junction Road;

Midland Terrace and Geer Street;

Geer Street and Milan Street; and,

Cheek Road and Site Drive.

Trip Generation Trip generation numbers are based on the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition, 2017. The residential development will generate an estimated 2,690 trips per day, with 204 a.m. peak-hour trips (51 entering and 153 exiting) and 273 p.m. peak-hour trips (172 entering and 101 exiting).

Traffic Data Collection The a.m. and p.m. peak- hour turning movement counts for the intersections in the study area were collected in March 2019 during the hours of 7:00-9:00 a.m. and 4:00-6:00 p.m. on days when school was in session.

Trip Distribution and Assignment The assignment of site traffic on the study area roadway network was based on the following trip distribution percentages:

20% to/from the north via US 70;

10% to/from the south via US 70;

15% to/from the west via Cheek Road ;

5% to/from the east via Cheek Road;

20% to/from the west via Geer Street;

Attachment 10

3% to/from the north via Geer Street;

10% to/from the west via Club Boulevard;

5% to/from the north via Midland Terrace;

5% to/from the south via Clayton Road;

5% to/from the south via E. Junction Road; and

2% to/from the south via Muldee Road.

Approved Developments and Background Growth A uniform annual compounded growth rate of 3% was utilized to determine the background traffic projections. Additionally, The TIA included trips generated by the approved Harris Beverage development, which were distributed based on existing traffic patterns.

TIP Roadway Improvements There are no significant scheduled transportation improvement projects in the study area vicinity.

Capacity Analysis Capacity analyses were performed using the a.m. peak-hour and p.m. peak-hour for the following scenarios:

Existing (2019) conditions;

No-Build (2023) conditions (2019 Existing + Background growth traffic + Improvements by others);

Build (2023) conditions (2019 Existing + Background growth traffic + Site traffic); and

Build (2023) with Improvements conditions (2023 Build + Improvements).

This development and project study area are located within the Suburban Tier where the adopted LOS standard is LOS D. The following table summarizes the average delay for the various Levels of Service (LOS) for unsignalized and signalized intersections:

Signalized Intersections Unsignalized Intersections

Level of Service Average Vehicle Delay

(Seconds) Average Vehicle Delay

(Seconds)

A 0-10 0-10

B 10-20 10-15

C 20-35 15-25

D 35-55 25-35

E 55-80 35-50

F >80 >50

Summary Level of Service Table

Intersection Existing (2019) No-Build (2023) Build (2023) Build (2023) with

Improvements

a.m.

LOS (delay)

p.m.

LOS (delay)

a.m.

LOS (delay)

p.m.

LOS (delay)

a.m.

LOS (delay)

p.m.

LOS (delay)

a.m.

LOS (delay)

p.m.

LOS (delay)

Cheek Rd and Midland Terrace / Muldee St

B (15)

B (13)

B (16)

B (14)

B (16)

B (14)

- -

Cheek Rd and (Western) Junction Road

E* (41)

F* (64)

F* (136)

F* (344)

F* (153)

F* (402)

- -

Cheek Road and (Eastern) Junction Rd

E* (42)

D* (29)

F* (91)

E* (48)

F* (109)

F* (61)

- -

Midland Terrace and Geer St

C (21)

C (20)

C (21)

C (20)

C (21)

B (20)

- -

Geer St and Milan St A*

(10) B*

(11) B*

(10) B*

(12) B*

(12) B*

(14) - -

Cheek Rd/ Site Drive - - - - D*

(25) D*

(31) D*

(25) D*

(31)

* Unsignalized operation, with LOS reported for the worst approach

Improvements Required Of This Development:

The following improvements are not currently required of any other development. Per the TIA, to provide an acceptable Level of Service for the Build scenario, the following improvements are required.

Cheek Road and Site Drive

The TIA recommended the following required improvement to address site traffic impacts:

Construct the Site Drive as a full movement driveway with one ingress lane and two egress lanes with aminimum 50 feet of storage and internal protective stem.

Construct an exclusive eastbound left-turn lane on Cheek Road at the Site Drives with a minimum 75feet of storage and appropriate tapers.

With the improvements listed above, the intersection will operate at an acceptable LOS D in both the a.m. and p.m. peak-hours for the Build (2023) condition.

Intersections With No Required Improvements

With the additional site traffic, the following intersections are projected to operate at an acceptable LOS C or better during both the a.m. and p.m. peak-hours for the Build (2023) condition. No roadway improvements are required to address site traffic impacts.

Cheek Road and Midland Terrace / Muldee Street;

Midland Terrace and Geer Street; and,

Geer Street and Milan Street.

With the additional site traffic, the following intersections are projected to operate at a LOS F during both the a.m. and p.m. peak-hours for the Build (2023) condition. Although a LOS F is undesirable at signalizedintersections, a LOS F is typical at many unsignalized intersections and driveways during the peak hours untilsuch time a traffic signal is warranted since nearly all of the anticipated delay is confined to the side streetapproach. The required improvements at this intersection were based on NCDOT requirements rather than Cityof Durham requirements since the city’s published TIA guidelines did not require this intersection to be includedin the study. NCDOT did not require any improvement at this intersection; therefore no roadway improvementsare required of this development.

Cheek Road and (Western) Junction Road; and,

Cheek Road and (Eastern) Junction Road.

Summary Of Improvements Required Of This Development:

Cheek Road and Site Drive

1. Construct the Site Drive as a full movement driveway with one ingress lane and two egress lanes withadequate storage and internal protective stem.

2. Construct an exclusive eastbound left-turn lane on Cheek Road at the Site Drives with adequate storageand appropriate tapers.

STATE OF NORTH CAROLINA

DEPARTMENT OF TRANSPORTATIONROY COOPER JAMES H. TROGDON, III

GOVERNOR SECRETARY

Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION 5/DISTRICT 2 815 STADIUM DRIVE DURHAM, NC 27704

Telephone: 919-220-4750 Fax: 919-560-3357

Customer Service: 1-877-368-4968

Website: www.ncdot.gov

Location: 815 STADIUM DRIVE DURHAM, NC 27704

August 16, 2019

Mr. Joshua Reinke, PE Ramey Kemp & Associates, Inc. 5808 Faringdon Place, Suite 100 Raleigh, NC 27609

SUBJECT: Traffic Impact Analysis for Cheek Road Residential in Durham Originally sealed April 9, 2019 Update sealed July 22, 2019

Dear Mr. Reinke:

The NCDOT has completed its review of the updated Traffic Impact Analysis for Cheek Road Residential sealed on July 22, 2019. In order to accommodate the site-generated traffic safely and efficiently, while also attempting to protect the functional integrity and operational capacity of the adjacent roadway facilities, the below noted improvements and/or restrictions are required.

SR 1800 (Cheek Road) at Proposed Site Access • Install a dedicated eastbound left turn lane on Cheek Road with 75ft of storage and

appropriate deceleration/taper.• The site access shall consist of one ingress lane and two egress lanes with 50ft of storage

and Internal Protective Stem.• Advisory note: The proposed access is subject to meeting NCDOT sight distance

requirements.

All improvements proposed on state maintained roadways shall meet all applicable NCDOT design requirements. If you have questions or need additional information, please feel free to contact me at (919) 220-4750.

Sincerely,

John Sandor, PE District Engineer

Ec: Earlene W. Thomas, PE, City of Durham Transportation Clarence Bunting, PE, Congestion Management

Attachment 11