Transcript

SESSION I2: RENEWABLE ENERGY & ECONOMIC CHANGE IMPACTS

THIRTY FIVE YEARS OF RENEWABLE ENERGY PROJECT EXPERIENCE AT FORT HUACHUCA, ARIZONA

1 OCTOBER 2015 BILL STEIN, CEM, CEP, CSDP, CMVP, CEA, REP, CDSM

U.S. ARMY CORPS OF ENGINEERS CONSTRUCTION ENGINEERING RESEARCH LABORATORY

2000 SF UNGLAZED INDOOR POOL SOLAR SYSTEM - 1980

900 SF SOLAR DOMESTIC HOT WATER - 1981

1000 SF SOLAR ATTIC SYSTEM - 2002

2300 SF TRANSPIRED AIR SOLAR SYSTEMS- 2001

SOLAR AIR PANEL SYSTEM - 2009

DAYLIGHTING – 1998

5 KW GRID CONNECTED PV SYSTEM - 1982

W. FACING GRID CONNECTED PV SYSTEM – 1998 AND 2015

30 KW BUILDING INTEGRATED PHOTOVOLTAIC (BIPV) - 2009

42.8 KW TRUCK SHED MOUNTED PHOTOVOLTAIC - 2009

13.6 MW (A/C) PHOTOVOLTAIC SYSTEM - JAN 2015

10 KW DISH/STIRLING SOLAR THERMAL ELECTRIC GENERATOR - 1996

DISH/STIRLING SOLAR THERMAL ELECTRIC GENERATOR -2010??

10 KW WIND TURBINE - 2002

1 MW WIND TURBINE – SEPT 2011 TO FEB 2013

50 KW ORGANIC RANKIN CYCLE SOLAR THERMAL ELECTRIC GENERATOR AT THE SOUTH CENTRAL PLANT – 2010

1.7 MILLION BTU WOOD CHIP BOILER AT THE WEST CENTRAL HEATING AND COOLING PLANT – 2010

BUILDING STRONG®

Thank You!!

Questions?? My contact information

►Bill Stein ►[email protected] ►217-373-4470 or 520-456-1377


Recommended