8/10/2019 CapacityPlanning(PP CRP)
1/30
Capacity Planning
Production Scheduling
(PP-CRP)
8/10/2019 CapacityPlanning(PP CRP)
2/30
Capacity Planning
Production Scheduling
Functional RequirementsCustomizing
MRP execution and Orders creation
Capacity Requirements Planning
Capacity and Scheduling
8/10/2019 CapacityPlanning(PP CRP)
3/30
8/10/2019 CapacityPlanning(PP CRP)
4/30
Functional Requirements
Selection Method!!3 = Always select Production
versions
MM02
8/10/2019 CapacityPlanning(PP CRP)
5/30
Functional Requirements
Review Standard
available capacity
times
Active Version = 01
Capacity Requirement
Factory Calendar is
needed to manage
holidays and non
working days
CR02
8/10/2019 CapacityPlanning(PP CRP)
6/30
Customizing
Scheduling Type!!It was not set. You should choose
an option between: backwards,
forwards, etc.
In this example
I selected
forwards
SPRO
8/10/2019 CapacityPlanning(PP CRP)
7/30
MRP execution
ProductionRequirements
MD04
8/10/2019 CapacityPlanning(PP CRP)
8/30
MRP execution
MD02
8/10/2019 CapacityPlanning(PP CRP)
9/30
MRP execution
Pord.Version
selected
In this example Max.lot size (MRP view) was set to 1000 CS
MD04
8/10/2019 CapacityPlanning(PP CRP)
10/30
MRP - Planned Orders creation
Pord.Version
selected
Capacity
Requirements
8/10/2019 CapacityPlanning(PP CRP)
11/30
MRP - Planned Orders creation
Planned OrderMaster Data
8/10/2019 CapacityPlanning(PP CRP)
12/30
MRP - Planned Orders creation
CapacityRequirements
8/10/2019 CapacityPlanning(PP CRP)
13/30
MRPProcess Order creation
Planned Order Process Order
8/10/2019 CapacityPlanning(PP CRP)
14/30
CM25
Capacity Requirement Planning
8/10/2019 CapacityPlanning(PP CRP)
15/30
CM25
Capacity Requirement Planning
8/10/2019 CapacityPlanning(PP CRP)
16/30
Capacity Requirement Planning
C i R i Pl i
8/10/2019 CapacityPlanning(PP CRP)
17/30
Capacity Requirement Planning
Select the orders to be scheduled
Automatic Dispatch
C it R i t Pl i
8/10/2019 CapacityPlanning(PP CRP)
18/30
Capacity Requirement Planning
Select the orders to be scheduled
Dispatch (Drug and Drop)
C it R i t Pl i
8/10/2019 CapacityPlanning(PP CRP)
19/30
Capacity Requirement Planning
Save the Schedule
New Process Order
Start Date
C it R i t Pl i
8/10/2019 CapacityPlanning(PP CRP)
20/30
Capacity Requirement Planning
Strategy Profile
This Profile is who guide
the system in the
dispatch process.
A new Profile should becreated according to the
Grace requirements.
C it R i t Pl i
8/10/2019 CapacityPlanning(PP CRP)
21/30
Capacity Requirement Planning
Dispatch Sequence
Here you have the
criteria used in the
example to execute the
automatic dispatch.
It is a standard criteria.
The dispatch procedure should be performed according to
Grace requirements.
C it R i t Pl i
8/10/2019 CapacityPlanning(PP CRP)
22/30
Capacity Requirement Planning
Now Lets see how it workswith several products
C it R i t Pl i
8/10/2019 CapacityPlanning(PP CRP)
23/30
Capacity Requirement Planning
Material: 402782
C it R i t Pl i
8/10/2019 CapacityPlanning(PP CRP)
24/30
Capacity Requirement Planning
Material: 402784
C it R i t Pl i
8/10/2019 CapacityPlanning(PP CRP)
25/30
Capacity Requirement Planning
Material: 402787
Capacit Req irement Planning
8/10/2019 CapacityPlanning(PP CRP)
26/30
Capacity Requirement Planning
Material: 402782
Capacity Requirement Planning
8/10/2019 CapacityPlanning(PP CRP)
27/30
Capacity Requirement Planning
Select the orders to be scheduled
Automatic Dispatch
Capacity Requirement Planning
8/10/2019 CapacityPlanning(PP CRP)
28/30
Capacity Requirement Planning
Goals:
Fixed production sequence.
Reduce time for analysis.
Detailed analysis of prod.line usage.Flexible tool for making changes.
Allows different areas align activities
along with production sequence.
Capacity and Scheduling
8/10/2019 CapacityPlanning(PP CRP)
29/30
Capacity and Scheduling
Issues and Risks:
Factory Calendar, holidays and shifts.
Production rates.
Master data
Capacity and Scheduling
8/10/2019 CapacityPlanning(PP CRP)
30/30
Capacity and Scheduling