Data Center Solution & Migration
Data Center Solution & Migration
Part of the design Company Space Matrix Group of Companies who have a strong technology
solution back ground and have implemented numerous projects for our clients across Asian Region
• Founded in May 2001• Headquartered in Singapore• 11 Offices in Asia• 250+ Team Members• 400+ Projects • 2006 Revenue S$38 Million • 2007 Forecast at S$65 Million• Strong Management Team• Strong Technical Team
Data Center Solution & Migration
Data Center Solution & Migration
•Strategic Planning•Interior Design•Design and Build•Project Management•Architecture Design•Architectural Process Outsourcing (APO)•IT Services•IT Outsourced Services ( Contact Center , BPO , KPO)•Rendering and Animation
Data Center Solution & Migration
• Storage Management• Backup Assessment• Disaster Recovery & BCP• StorageAudit
• Remote Backup Services
• DR Services
• Replication Services
• Storage Consolidation• Data Protection• Disaster Recovery• Storage Security•
• Network Appliance• Symantec/SUN• Network Appliance/Hitachi/• Brocade EMC
• Remote Monitoring/Remote • Management
• Facility Management Services
• Infra. Design & Consultancy• Network Audit• Bandwidth Audit
• Enterprise Routing• Application Acceleration• Bandwidth Optimisation• Content Delivery Networks• Internet Optimisation
• Juniper Networks / Cisco• Citrix/ F5 / Radware • Juniper WX/WXC• Bluecoat
• Antivirus / Antispam
• Auto Patch Service
• Managed Security Services
• Infrastructure Security• Content Management• Identity Management• Email Security
• Juniper , Cisco• Trend Micro• RSA• Ironport
• Security Audit• VA/PT• ISO27000
• SOX• HIPAA• Application Audit
• Services• Solutions • Technologies • Practices
• Blue Coat
Data Center Solution & Migration
• Turnkey IT Environment Design/Build Construction • IT Environment Construction/Project Management • Engineering Services• Data Center Design Criteria/Guideline Consulting • IT Environment Availability Analysis & Assessment • Office Environment Space Planning & Layout Design • Structured Cabling Design & Installation • Passive components sizing, Design & Implementation • Network/Server/Storage Design & Implementation • Collaborative Communication Design & Implementation
Data Center Solution & Migration
• Singapore (HQ)• Australia• Thailand• Hong Kong• India, Bangalore• India, New Delhi• India, Mumbai• India,
Hyderabad• India, Kolkata• India, Pune• India, Chennai
We have presence in China, Vietnam through tight partnerships with local companies in these countries.
Space Matrix currently has 11 offices across Asia
Data Center Solution & Migration
Where Can we Demonstrate Business Value
The value of SPACE MATRIX lies primarily in delivering key applications
• We will continually demonstrate the value that the infrastructure brings to those key applications
•We will be able to successfully deliver the applications that are running on your required network
Deliver Utility performance
Provide Better control
Promote Business agility
Provide Greater productivity
Support Technological Complexity
Data Center Solution & Migration
Data Center Solution & Migration
Messaging Services
Enterprise Exchange/Outlook Email Enterprise Collaboration tools Active Directory, DNS
Desktop
Mass Desktop Refresh Projects Network Printer Consolidation and Refresh Enterprise Desktop Management Systems
Help Desk
Enterprise Help Desk in House Field Based agents and technicians for Level 3 Enterprise Help Desk System
Enterprise Security Operations Center Computer Security Incident Response Center Secure Internet
Gateway
Security
Network
Reliable, High Performance,Enterprise-Wide IT Infrastructure
CVE : Collaborative Virtual Enterprise
“People – Processes – Technology ”
New HP Blade Server and the Data Center Consolidation and refresh of servers Migration of servers to the data center
Servers
Certification Ready
WAN – VPN Links , Exchange Servers , Active Directory, Security
Migration
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
ACTIVITIES
RESULTS
needs assessment initial situation capacity requirements reliability requirements security requirements expansion plans
location analysis risk analysis functional concept floor concept preliminary dimensioning of technical equipment cost estimate budget cross check
concept describing: capacity, reliability and security, equipment, costs road map for planning and implementation
Consulting1
preliminary design functional schemes description of technical
systems and building
client´s acceptance + adjustments
final design detailed drawings of
systems and building detailed specification of
systems cost calculation
preliminary design documents
client´s acceptance final design documents cost calculation basis for functional
tendering
Design2
supervision of the execution planning
construction details construction drawings graphic projection and
dimensioning of installation
instructions for installation detailed lists of required
material with quantities shaft plans time schedules and
interfaces
construction and installation documents
construction drawings material lists
Execution Planning4
selection of suppliers or setting up short lists
purchasing of equipment and services, or
handling of tendering tender documents tendering assessment contract awards
control and approval of delivery
tender prepared and executed
equipment and services purchased
Procurement3
Data Center Solution & Migration
RESULTS
ACTIVITIES construction and
installation supervision project management
monitoring time, quality and costscoordinating interfaces
of different specialist works
monitoring the compliance with specifications, drawings and building approvals
data center ready for final checks and handing over
Construction +Installation
5
performing tests runs system performance checks preparing the necessary
documents manuals, technical descriptions, as is- drawingsoperation instructions test certificates
defining inspection and maintenance
operations training operational staff official handing over
data center ready for operation
Handing Over6
IT operation (different SLAs)
infrastructure operation security services facility management
services controlling warranty
periods monitoring and checking
defined performance levels
operation of the data center
Operation7
regular audits energy efficiency checks continuous adjustment to
changes of equipment and of loads
certifications
continuously updated data center
Constant Improvement
8
Data Center Solution & Migration
ACTIVITIES
RESULTS
options of different locations options of different sites within locations inter-site evaluation matrix incorporating over 100 factors with customised weightages
grading of locations and sites recommendation for best fit
Location and Site Selection
1
ten year business plan with detailed assumptions sizing and capacity build phases capital structure and capex deployment opex and fill rate financial analysis through scenario build
budgeting and investment recommendation
Business Case2
mapping of IT hardware inventory to physical infrastructure labelling, tagging and signage guidelines transposition of As Built drawings to AutoCAD
inventory database to support HelpDesk operations and align to ITIL framework
Data Center Inventory Mapping
4
propose organisation structure functional roles and responsibilities job profiles ramp up strategy
HR blueprint to commence data center operations
HR Requirements3
Data Center Solution & Migration
Datacenter
Workplace
Security
Network
Strategy,Planning& Value
Realization
Solution Design &
Development
Operating
Manage Business Case
Conduct On- Going Operations-
Develop & Approve Business Case
Control Change & Manage Program Progress
Process
People
Technology
Define Customer Goals & Expectations
Define High- Level Requirements & Assess Capabilities
Develop Business- Driven Strategy, Define Operating Model & Infrastructure Services
DevelopPerformanceBaseline &
Targets
Develop Performance Reporting
Develop Communications Plan Manage Stakeholders
Review Strategy, Operating Model,
& Service Catalogue
Analyze Current Management, Project,
& Operations Processes
UnderstandOrganization& Role Impact
Identify &Decompose
Management, Project &
OperationsProcesses
DesignManagement,
Project & OperationsProcesses
ValidateManagement,
Project & OperationsProcesses
Develop Detailed Infrastructure &
Operations Procedures
Develop InfrastructureStandards
Confirm Process Designs & Assess
Current Performance
Perform Detailed Organization Impact
& Training Needs Analysis
Design Roles,Organization, Performance
Goals, Training &
PerformanceSupport Needs
Build Roles,Organization, Performance
Goals, Training &
PerformanceSupport Needs
Staff New Organization
Deploy
Pilot Training
Launch Communications
Conduct Training
Pilot Organization &Perform Production
Simulation
Analyze Target BusinessProcess Models & Current
Application Blueprint
Develop Application &Infrastructure Inventories
Conduct Detailed Performance Baseline
DevelopInfrastructureStrategy &DetailedBusiness
Case
DesignInfrastructure& OperationsArchitecture
BuildInfrastructure& OperationsArchitecture
TestInfrastructure& OperationsArchitecture
Migrate,Re- Platform, &DecommissionApplications
DeployInfrastructure& OperationsArchitecture
Data Center Solution & Migration
Acceptance on support serviceDefine Escalation Matrix Incident Management Procedure
Support
Telephonic response timewindow of 8 x 5
Onsite response time on same Business day of call logging, if call logged before 12:30 PM
Onsite response on Next BusinessDay of call logging if call logged after 12:30PM.
Problem diagnosis commitmentof NBD
TAC escalation to OEM for bugs / resolution
Provision of patches, fixes as perOEM guideline from time-to-time*
Spares replacement as per OEM terms
Pro-active health check once a year during period of warranty
Silver Support
Auth - Ramp
Telephonic response timewindow of 8 x 5
Onsite response time on same Business day of call logging, if call logged before 12:30 PM
Onsite response on Next BusinessDay of call logging if call logged after 12:30PM.
Problem diagnosis commitmentof NBD
TAC escalation to OEM for bugs / resolution
Provision of patches, fixes as perOEM guideline from time-to-time*
Spares replacement as per OEM terms
Pro-active health check once a year during period of warranty
Silver Support
Telephonic response timewindow of 8 x 5
Onsite response time on same Business day of call logging, if call logged before 12:30 PM
Onsite response on Next BusinessDay of call logging if call logged after 12:30PM.
Problem diagnosis commitmentof NBD
TAC escalation to OEM for bugs / resolution
Provision of patches, fixes as perOEM guideline from time-to-time*
Spares replacement as per OEM terms
Pro-active health check once a year during period of warranty
Silver Support
Auth - Ramp
Data Center Solution & Migration
• What’s the same– Security– High availability– High performance– Hosting business criticalapplications
• Trends– Consolidation Location Infrastructure– Virtualization– Cluster and Grid Computing– Service Oriented Networking– Greening (Power)
•Business Drivers– Maximize ROI– Reduce costs– Improve performance– Improve manageability– Greater control and Security
• Change is constant• Need to know howchange impacts usersof data-center hostedapplications
Data Center Solution & Migration
Regulatory requirements and impact on IT
Disaster recovery planning is non-negotiable
Ability to deploy new services is critical to remain competitive
Power and cooling constraints are very real issues
Changing Business Needs, Acquisitions and integration of
Data centers
Sprawling IT infrastructure is increasingly
hard to manage
Under-utilized, inefficient systemsare limiting growth
Data Center Solution & Migration
Fully meshed and redundant networks powered by flagship Cisco
products.
Redundant power systems with back-up generators and UPS
systems.
Sophisticated fire detection and FM-200 gas suppression systems.
Advanced HVAC systems providing optimal server operating
conditions.
Tamper-resistant computing hardware, designed to protect
customer transactions from all possible intrusions.
A sophisticated security shield to protect your data from hackers.
Data Center Solution & Migration
Data Center Solution & Migration
Discrete communications
Unified messaging/communications
Limited B2B Integrated B2B (eg web services)
Video Conferencing
IM / Chat
Data Center Solution & Migration
Distribution Layer
Core Layer
Gateway Layer
Core Switch
Web Optimisation Layer 3 Redundancy
Layer 3 Redundancy
Data Centre
Customer Office
WAN Link
Optimise
Server Farm Storage
StorageDisaster Recovery Site
Performance Optimisation
Router
FirewallFirewall
EMS ConsoleeMail
Security
Authentication
QOS
FirewallFirewall
Access Switch
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
•Scalable / Modular / Flexibility
•Available & Redundant
•“Right Size” Technology
•24 Hour On-Site Remote Hands Service and Security
•Under Floor Water Dams with Liquid Sensors
•Conditioned Redundant Power
•Automated Monitoring of Power, Environmental, Fire Detection and
Prevention
•Raised Floor Facility
•Cooling upto 8kw Per Rack on Center ( NOC )
Data Center Solution & Migration
Data Center Solution & Migration
RACKS
AREA
POWER
COOLING
Data Center Solution & Migration
SERVER LOADS
YearTotal Number of
Racks
Power requirement @
3kW / Rack
Power requirement in
kVA
Cooling equipment AC
tones.
Power requirement in
kVA
TOTAL POWER WITH AC LOAD
[Cumulative] [Cumulative] [Cumulative] [Cumulative] [Cumulative] [Cumulative]
2009 16 48.00 60.00 30.00 55.00 115.00
2010 24 72.00 90.00 30.00 55.00 145.00
2011 48 144.00 180.00 60.00 110.00 290.00
UPS SIZING FOR SERVER LOADS
YearTotal Number of
Racks
Power requirement @
3kW / Rack
Power requirement in
kVA
Capacity required @ 80% loading
Recommanded UPS
Final with N+1 Configuration
[Cumulative] [Cumulative] [Cumulative] [Cumulative] [Cumulative] [Cumulative]
2009 16 48.00 60.00 75.00 1 x 80kVA 2 x 80kVA
2010 24 72.00 90.00 112.50 2 x 80kVA 3 x 80kVA
2011 48 144.00 180.00 225.00 3 x 80kVA 4 x 80kVA
Data Center Solution & Migration
Data Center Design compliant to Tier II/ III Standards as per UTI and TIA 942
Scalable Power and Cooling Infrastructure
Support + for 3 Years growth Plan
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
Cool air in, warm air outAll servers today are designed for front
to back airflow
“ Cooling Efficiency Directly Impacts Server Performance “
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
The CRAC Unit ( PAC) can be based on Direct Expansion (DX ) where the air circulating to and from the Data Center is cooled directly by the refrigerant
There may be some mixing of hot and cold air in this Design
Data Center Solution & Migration
The CRAC Unit ( PAC) can be a Chilled water system where the air circulating to and from the Data Center is cooled by the chilled water generated at a central or dedicated chiller ( Water is cooled by refrigerant )
There may be some mixing of hot and cold air in this Design
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
ELIMINATION OF HOT AIR MIXING WITH COLD BY PROVIDING CONTAINMENT OF THE COLD AISLE
Cold Air is delivered Under floor
Cold air entering the Cold Aisle is Contained , to avoid even minimal mixing with hot air
Data Center Solution & Migration
Data Center Solution & Migration
ELIMINATION OF BYPASS AND MIXING OF HOT AND COLD AIR IMPROVE COOLING EFFICIENCIES
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
Preliminary
Piped special cooling fluid can be delivered to the racks from a central cooling system
Data Center Solution & Migration
The pipes then deliver the cooling fluid to cooling units mounted on specific racks where the load is high
This solution generally is offered for rack densities upto 10 kw
Data Center Solution & Migration
Room Solution for rack densities up to 26 kW per rack
Data Center Solution & Migration
Data Center Solution & Migration
Data Center Solution & Migration
Upto 30 kw per single rack and 15 kw in dual rack configuration can be cooled by in rack cooling
Cooling Unit
Server Rack –30 kw
Cooling Unit
Server Rack 15kw
Server Rack 15kw
Internal details of the in rack cooling heat exchanger coupled to a server rack
Data Center Solution & Migration
Uptime Institute Standards / Definitions
Uptime Institute; Gartner, by Michael A. Bell
APPENDICES
Tier 1:Single path for power and cooling distribution, no redundant
components – less than 28.8 hours of downtime/year
Tier 4:Multiple active power and cooling distribution paths, redundant components, fault-
tolerant – less than 0.4 hour of downtime/year
Tier 3:Multiple power and cooling distribution paths, but only one path active, redundant
components, concurrently maintainable – less than 1.6 hours of downtime/year
Tier 2:Single path for power and cooling distribution, redundant
components – less than 22.0 hours of downtime/year
Data Center Solution & Migration
Tier I
Tier II
Susceptible to disruptions from both planned and unplanned activity.May not have UPS or generator.If UPS/generator present single module system with multiple points of failure.Annual shut down required for maintenance.Single path for power and cooling distribution, no redundant components.
Slightly less susceptible to disruption from planned and unplanned activities.Has UPS and generator, but capacity is “need plus one” (N+1).N+1 has single distribution path.Critical power path and other infrastructure systems require shut down for
maintenance.Single path for power and cooling distribution, redundant components.
Uptime Institute; Gartner, by Michael A. Bell
Data Center Solution & Migration
Understanding the TiersTier III • Allows planned infrastructure work without computer disruption.
• Planned work includes maintenance, testing, equipment replacement.• If chilled water used, requires two piping systems.• Both mechanical and electrical distribution systems capable of carrying entire load.• Errors in operation or spontaneous failures will cause computer disruption.• Multiple power and cooling distribution paths, but only one path active.• Redundant components, concurrently maintainable.
Tier IV • Allows planned infrastructure work without computer disruption.• Planned work includes maintenance, testing, equipment replacement.• If chilled water used, requires two piping systems.• Allows for at least one worst-case unplanned failure with no computer interruption.• Two UPS systems must be N+1 each.• Computer hardware must be dual power cord.• Some downtime exposure due to fire alarm, human error, EPO malfunction.• Multiple active power and cooling distribution paths, redundant components, fault tolerant.
Uptime Institute; Gartner, by Michael A. Bell
APPENDICES
Data Center Solution & Migration
Uptime Institute Standards / Definitions
Uptime Institute; Gartner, by Michael A. Bell
APPENDICES
Data Center Solution & Migration
TIER I SCHEMATIC
LOAD
TIER II SCHEMATIC
LOAD
TIER III SCHEMATIC
LOAD
TIER IV SCHEMATIC
LOAD
Data Center Solution & Migration
Data Center Solution & Migration
Below rack / Under floor installation. Above Rack / floor installation
Advantages over conventional cabling system
1. No cable joints and loose connection in terminals.
2. Less number of joints and less failure.
3. No loose connection problem.
4. The area / space occupied for wire way trucking to carry cables is more and will block AC flow.
5. No loose wires will be there in floor/ceiling.
6. No shut down required for tapping additional power.
7. There is no limitation in using extra power at any point through out the length. [say more than 16A if required 32A at one place there is no changes required after installation]
Data Center Solution & Migration
Data Center Solution & Migration
Selection Criteria Evaluation Issues
1 Weather
• Tornadoes-Frequency & Severity• Mean annual number of days with thunderstorms• Annual snowfall• Hurricanes-Frequency & Severity
2 Seismic • Earthquakes-Frequency & Severity
3 Cost• Office Rental Rate• Sale Price• Operating Expense• Tax Expense
• Utility Rates• Cost of Living• Cost of Construction
4 Schedule
• Office Inventory• Office Space Under Construction• Office Space Vacant• Construction Outlook
5 Utilities • Utility Rates $ per KWH; Demand & Capacity Charges• Access to multiple utility substations is considered a site –specific issue
6 High Band Width• The LEC has the capability to support high speed traffic OC-24 through
OC_48• Multiple carriers can support the capability
7 Access to Fiber• Assumes that the LEC and Customer have agreement to provide
connectivity• Assumes Customer and LEC(s) can negotiate contract to enable access
8 Operational Synergies
• DC Staff access to both facilities (airfare and lodging, expenses)• Commonality and consistency of maintenance task and procedures• VP access to technical staff• Responsiveness in an emergency situation
Data Center Solution & Migration
Selection Criteria Evaluation Issues
9 Terrorism/Military Concerns •Terrorism – potential or risk of terrorist activity
10 Staffing/Recruitment •Unemployment Rate•Labor Force Population
11 Staffing Additions •Additional headcount
12 Cross Functional Staff Access During DR Event •Ability to staff via existing employees
13 Image to Self/Staff • Image projection
14 Customer Image • Image projection
15 Public Transportation •Transportation availability
PART II: Facility Considerations
Data Center Solution & Migration
Location Specific Criteria
• Travel Time from Existing Facility- Rush Hour• Local (site) Traffic Congestion• Access to State & Federal Highways• Compatibility of Neighborhood Businesses• Proximity to Industrial Facilities• Proximity to Residential Areas• Proximity to Existing Personnel• Safety/Security• Environmental Consideration• Freedom from Surrounding Hazards• Facility Hardening• Adaptability to Proposed Plan• Potential for Expansion
• Multi-story Building (Low Rise Desirable)• Low Profile (Level of Identification)• Cost of Lease/Purchase• Construction Cost Consideration• Timeliness of Projected Completion• Utilities• Communications Bandwidth• Amenities Near to Site• Access to Airport/Railroad• Approval Process ( External)• Leniency from Codes/ Restrictions • Labor Forces (Potential)• Quality of Police & Fire Protection• Corporate Facility Synergies
Data Center Solution & Migration
Adequate site for “at grade” development (e.g. parking, water storage, fuel storage, transformer yard or substation, generators)
Easy highway access for deliveries and end- user access for maintenanceMinimal risk vibration (railroad tracks, motor vehicle traffic, manufacturing or construction noise)Larger column bays (30 feet by 50 feet preferred)Minimum 14 feet from structural slab to lowest structural member
Efficient floor plates (rectangular, square, side core preferable; elevator and service core on side rather thancentral to building)Single story preferredMinimal fenestration (i.e. few if any windows preferred for security reasons)Good roof: level roof without skylightsTruck- level loading docks for equipment deliveryFor multiple- story building, ensure adequate riser capacity for primary/emergency power, HVAC (heating, ventilating, and air conditioning), diverse fiber entries and other vertical services (water, gas, communicationcabling)
Gartner, Michael A. Bell
Data Center Solution & Migration
100 pounds per square foot live-load capacity minimum250 pounds per square foot live-load capacity for battery backup and uninterrupted power
supply equipmentRooftop area adequate for cooling systemsAdequate fuel oil storage capacity ( i.e., 24 to 72 hour operational cycle for backup diesel
generators)
Utility power at reasonable costAdequate site area for transformers or substation if requiredSite location for backup generatorsPerimeter roof drainage desirableRedundant domestic-water service and fire serviceAvailability of fiber-optic service to the building from the twp separate service providers
Gartner, Michael A. Bell
Data Center Solution & Migration
Site Validation Criteria:The site selection criteria of this specific location for data centers included:
•Building Shell, Floor, Roof
•Fiber Access (Redundant)
•Fire Protection Infrastructure
•Security Systems
•HVAC Infrastructure
•Utility Company/Building Power
• Earthing / Grounding
Data Center Solution & Migration
Building Shell –
• Must be code compliant• Must be designed for Zone Seismic Rating• Availability of Service Lift• Water tight construction• Blast resistant Design
Floors –• Floor structural loading to be capable of 400 kgs/ sqmt.• In case of facility located at ground level, the facility landscape should be pitched away from the building’s exterior
Roof–• The roof of the building should be able to support installed equipment for HVAC, antennas, satellite and microwave equipment
Data Center Solution & Migration
Fiber Access – • The building should have a minimum of two diverse and dedicated fiber access points with two (2) four-inch conduits each. These conduits are for the distribution of telecommunications from multiple carriers (when possible) and dark fiber providers.
Fire Protection Infrastructure – • Local Code compliant• Availability of a Building wide Public Address System• Provision to integrate Tenant FAS with House FAS• Availability to tap into House Sprinkler system in case of Pre-Action System or to Deactivate House Sprinkler in case of Gas based Suppression system• Fire Separation for shafts / risers
Security Systems – • CCTV System for common areas• General access control into the building at various levels (onion peel concept)
Data Center Solution & Migration
HVAC Infrastructure – • The building will have the ability to deliver chilled water or condenser water and /or will accommodate the mounting of such hardware necessary on the roof or other designated area to deliver air conditioning to data center space.• Space Availability at roof for mounting DX outdoor units• Provision for Pipe Routing• Provision for condensate drain at floor level
Data Center Solution & Migration
Utility Company/Building Power –
• Requirement of power for UPS and Cooling needs
• Required 2 diverse sources for UPS input
• Dual Utility power source
• Power Back-up – 100% with sufficient fuel storage capacity.
• Space Provision in the shafts / risers for Dedicated Earth Strips
• Space Provision in the compound for Dedicated Earth Pits
• Base Building provision of General Earthing
Data Center Solution & Migration
Investment SummarySl No Description Prices (USD) Prices (INR)
1 LAN Switching / Routing ( Cisco ) 2 Application optimization (RDW) 3 Servers (HP) 4 Storage (EMC) 5 Symantec Netbackup 6 KVM Infrastructure 7 Advance Console Server 8 Intelligent Power Distribution Units 9 Centralised device Management (Avocent)
10 Intelligent Network Cabling 11 Racks12 NOC Display Solutions and Monitoring 13 Engineering Services
• POWER • COOLING • PROTECTION • SECURITY • ALARM NOTIFICATION • ENVIRONMENTAL BUILD OUT
Total Onetime installation Cost Grand Total
Data Center Solution & Migration