How...The bond is focused on four key areas:
Prioritize Safety and Security● Security cameras, including cameras on
school buses
● Seismic and roofing upgrades● Playground upgrades
Renovate and Repair Aging Schools● HVAC, plumbing and electrical upgrades
● Significant remodeling at Hilhi &
Reedville● Replacement of 15 portable classrooms
Relieve Crowding, Plan for Growth● Construction of two new elementary schools
and replacement of Brookwood
● Construction of separate gymnasiums at
schools with shared gym & cafeteria space● Expansion of Evergreen and Glencoe
Provide a Modern Education for Students● Student and teacher technology
● Expansion of CTE spaces in high schools
● Flexible classroom furniture● Internet self-sufficiency
2018 Bond ProjectsRemodel of Reedville Elementary School
Front Entrance Line-of-Sight ○ CHS, LHS
Elementary Playground Replacements ○ WL Henry, Butternut Creek, Farmington View, West
Union
Parent/Bus Drop-Off Improvements ○ Jackson, Ladd Acres, McKinney, Eastwood
Replace Domestic Water Pipes○ Ladd Acres, Miller Big Picture (David Hill)
Replace Portable Classrooms○ WL Henry, McKinney, Farmington View
Artificial Turf FIelds w/ Lights ○ Glencoe, Hilhi (includes new track)
Flexible Classroom Furniture○ Butternut Creek, Farmington View, Free Orchards,
Groner, Jackson, Lincoln Street, N Plains, Reedville, Tobias, Witch Hazel, Mooberry
Distributed Antenna System-Phase 1○ GHS, CHS, LHS, S. Meadows, Witch Hazel
Replace Student Computers ○ All Schools
Replace Teacher Computers ○ All secondary schools
Security Camera Project-Phase 1 ○ Poynter, Brown, S. Meadows, Miller Big
Picture
Roofing Upgrades ○ N Plains, Tobias, Peter Boscow
Boiler Replacement ○ Brown
Security Cameras on School Buses○ Transportation
Perimeter Fencing○ Ladd Acres
Reedville Elementary Site Plan
Reedville Elementary Modular Building
Elementary Playground Replacements
Parent Bus/Drop-Off - Jackson
Parent/Bus Drop-Off - Ladd Acres
Parent/Bus Drop-Off - McKinney
Parent/Bus Drop-Off - Eastwood
Replace Portable Building with 3-Classroom Modular - WL Henry
Replace Portable Building with 2-Classroom Modular - Farmington View
Synthetic Turf Field - Glencoe
Synthetic Turf Field/Track - Hilhi
Elementary Flexible Classroom Furniture(Butternut Creek, Farmington View, Free Orchards, Groner, Jackson, Lincoln Street, North Plains, Reedville, Tobias,
Witch Hazel, Mooberry
Distributed Antenna System(Glencoe, Century, Liberty, South Meadows, Witch Hazel)
Other 2018 Bond Projects
Replace Student Computers – 4,700 student computers have been distributed through the District.
Replace Teacher Computers – All Secondary Schools
Security Cameras – Poynter, Brown, South Meadows and Miller Big Picture
Roofing Upgrades – North Plains, Tobias and Peter Boscow
Boiler Replacement – Brown Middle School
Perimeter Fencing – Ladd Acres Elementary School
Citizens’ Bond Oversight Committee● First meeting will take place on April 19, 2018
● 12-member committee comprised of 10 local community members and 2 high school students
● Meet monthly to review bond project budgets and schedules
● Report to school board and community quarterly
● All meetings will be open to the public
● All meeting minutes will be posted on the Bond Website
Learn More...You can follow the progress of the Hillsboro School District
2017 Bond at:
www.Hillsboro-Bond.orgOr contact:
Adam Stewart, Capital Projects Officer,
[email protected] or 503-844-1340
Jane Siguenza, Bond Marketing Specialist,
[email protected] or 503-844-1500