Bhide & Hall Architects, P.A.
GREEN COVE SPRINGS
e s t . 1 8 7 4
Introduce Design Team
Project Approach
Schedule
Design Concepts
• Local Firm • Established in 1974
• 16 Employees • 6 Registered Architects
B h i d e & H a l l A r c h i t e c t s , P. A .
A R C H I T E C T S Bob McVeigh, Principal Brian Sawyer, Principal Wendell Hall, Principal Sandy Ciciora, Architect Paul Lutton, Architect Amit Vaswani, Architect P R O J E C T M A N A G E R S Jaime Mendoza
A R C H I T E C T I N T E R N S Ahmon Williams Alex Knoll Lauren Wells Patrice Garrett Peter Ryan C A D D T E C H N I C I A N S Ivette Crespo Dylan Deguzman
L A N D S C A P E A R C H I T E C T Castle Bay Design & Studio Jonathan Daniels, RLA M E C H A N I C A L E N G I N E E R M.V. Cummings Engineers, Inc. Wayne Kelly, P.A. C I V I L E N G I N E E R Michele Agee, P.E., P.A. Michele Agee, P.E.
S T R U C T U R A L E N G I N E E R JAMSE Engineering, Inc. John Miller, P.E. E L E C T R I C A L E N G I N E E R Haddad Engineering, Inc. Namir Haddad, P.E.
Wild Waters Recreational Facility
Typhoon Lagoon Water Park Expansion
Friendship Fountain
JAWS Universal Studios
Accessible Design
Subsurface Conditions
Project Schedule
Budget
Operations and Maintenance
Park Context
Fieldwork: Existing Conditions / Existing Drawings
Design Conference with Staff / Final Scope
Confirmed Layout Concept
Plans and Specifications
Bidding
Construction Administration
RESEARCH on Existing Conditions
V A L I D A T I O N M E E T I N G CONCENSUS PRO GRAM SCHEMATIC CONCEPTS
Design Criteria Confirm Project Scope Prioritize Budget Project Schedule
Site Plan Floor Plans Building Elevation Cost Estimate
Architect / City Staff Maintenance / Engineers
o Finalize Site Plan & Floor Plan o Outline Specifications o Building Systems o Cost Estimate
o Construction Plans & Specifications for Building Permit and Bidding
o Submission to Building Department o Cost Estimate
FINAL PLANS
DESIGN DEVELOPMENT
BIDDING
o Responses to contractor’s questions o Issue addenda
CONSTRUCTION
o On-site Construction Meetings - OAC
o Review/certify Contractor’s pay requests
o Site visits as needed
o Timely response to Contractor Request for Information (RFI’S)
o Submittal Review
o Finish color selection prepared for Owner’s review and approval
o Project punch out
o Delivery of close-out documents
Select Des ign Team
Des ign Team Contract
Schematic Des ign
City Counci l review/approvalPresentation to Counci l
Des ign Deveopment
Counci l review/approval
Construction Bid Documents - Completed Oct. 31, 2015
Counci l Approval
Bidding - 30 days
Bid Award
Construction Contract
ConstructionDec. 15 - May 15, 2016
Prepare Separate Documents Punch Lis t / Close-outfor pool demol i tion
OPEN MAY 30, 2016POOL City Counci l Approval MEMORIAL DAYDEMOLITIONOPTIONAL BiddingSCHEDULE
Bid Award
Demol i tion Contract
Demol i tion of poolprior to new construction
JUL AUG SEPT OCT MAY JUN JUL AUG SEPT2015 2016
NOV DEC JAN FEB MAR APRMAY JUN
o Local Firm with Resources and Staff o A Team with experience in components of
this project o Positive and practical approach to o Design o Budget o Construction Administration
Thank You