ISPA Measure 2002 BG 16 P PE 015
WWTP Popovo and main collectors
Works Contract
• Commencement Date: 13th June 2007
• Completion Date: 31st Dec. 2009
• Physical Execution: 100 %
• Financial Execution: 100 %
• WWTP became operational on 29th March 2010
• 1 year DNP will expire on 29th March 2011
WWTP Popovo - Completed
WWTP Popovo (during DNP and operation)
WWTP Popovo (during DNP and operation)
WWTP Popovo (during DNP and operation)
WWTP Popovo (during DNP and operation)
WWTP PopovoPublicity
Supervision Contract
• Commencement Date: 24th April 2007
• Completion Date: 30th April 2011
• Time elapsed: 100 %
• Financial Execution: 100 %
Compliance with Article 8of the Financing Memorandum
Art. 8.3.a)
According to EC’s letter Ref. REGIO I2/UN/ sd (2011) 910308 dated 01.08.2011 the conditions under point 8.3.a are considered as fulfilled.
Art. 8.3.b)According to EC’s letter Ref. Reg12/SP/vg D/(2010)920241), 007401 dated 16.08.2010 the conditions under point 8.3.b are considered as fulfilled.
Art. 8.3.c)
According to EC’s letter Ref. Reg12/VN/vg D/(2011)668482), 610178 dated 07.06.2011, the EC considers the conditions under Article 8.3.c as fulfilled.
Thank you for your attention!