2
I. FY 2014‐2019 Roadways CIP – Overview
II. FY 2014‐2019 VDOT Six‐Year Improvement Program (SYIP) – Overview
III. CIP Project/Program Information
A. Congestion Relief and Capacity Improvement Projects
B. Safety Improvement Projects/ Programs
C. Special Projects/Programs
D. Bridges
E. Maintenance Projects/Programs
FY 2014‐2019Roadways CIP
Highlights• 47 Projects and Programs• Total Project Cost = $ 1.1B• Total FY14‐FY19 Funding = $192.3M• City Funding in Program = $ 157.6M (increase of $56.4M)• State/Federal Funding in Program = $ 34.7M • Continue to fully fund Council’s priorities: Lesner Bridge Replacement Lynnhaven Pkwy. – Phase XIWitchduck Road – Phase II Holland Road – Phase VI Shore Drive – Phase III
• Introduced (12) new projects into program3
HighlightsWith the additional funding, we are able to fully fund the following projects:
• Centerville Turnpike – Phase II
• First Colonial Road/Virginia Beach Blvd.
• Cleveland Street/Clearfield Ave Intersection Improvements
• Lynnhaven Parkway/International Parkway Intersection Improvements
4
FY 2014‐2019Roadways CIP
HighlightsWith the additional funding, we are able to add the following 12 projects to the program:
Fully Funded:• Shipps Corner Road (Holland Rd to London Bridge Rd)• Indian River Road/Providence Road Intersection Improvements• S. Independence Blvd/Silverleaf Drive Intersection• Sandbridge Road Bridge Replacement• Pacific Avenue Improvements
Preliminary Engineering (PE):• Rosemont Road – Phase V• Newtown Road /Baker Road Intersection Improvements• Centerville Turnpike – Phase III (Kempsville Road to Chesapeake Line) • Dam Neck Road – Phase I• Dam Neck Road – Phase II• Princess Anne Road – Phase VII‐A (Upton Dr to Indian River Rd)• Laskin Road Bridge Replacement
5
FY 2014‐2019Roadways CIP
FY 2014‐2019VB Roadways CIP
Special Programs &
Projects,$32.8 M
17%
Safety Improvement
Programs,$20.4 M
11%
BridgeProjects,
$23.1 M12%
Maintenance Programs &
Projects,$17.5 M
9%
CongestionRelief & Capacity
Improvement Projects
$98.5 M51% 6
Total: $192.3 M
7
FY 2014‐2019 VDOT Six‐YearImprovement Program (SYIP)
Approved FY 2013‐2018 Program
Approved FY 2014‐2019 Program
Change
Highway Construction $9.0 B $11.1 B $2.1 B
Rail & Public Transportation $2.4 B $3.0 B $0.6 B
SubTotal SYIP $11.4 B $14.1 B $2.7 B
Hampton Roads Transportation Fund $1.3 B $1.3 B
Total $15.4 B $4.0 B
VB CIP Project/ProgramInformation
Congestion Relief and Capacity Improvement Projects
8
• Four‐lane divided highway from Indian River Road to Kempsville Road
• Design – 30% complete
• Acquisition: April 2014 to April 2015
• Start Construction –July 2015
• Complete Construction –October 2017
Total Project Cost: $28.0M9
Centerville Turnpike – Phase IICIP 2‐409
First Colonial Rd/Virginia Beach BlvdIntersection Improvement
CIP 2‐072• Improvement of intersection
including turn lanes and signalization upgrades
• Currently in site acquisition
• Utility Relocations: August 2014 to August 2015
• Start Construction –July 2015
• Complete Construction –January 2017
Total Project Cost: $25.6M10
Holland Road – Phase VICIP 2‐158
• Four‐lane divided highway from Dam Neck Road to Nimmo Parkway
• VDOT managed project• Currently in Utility
Relocation Phase• Advertise for Construction –
July 2014• Complete Construction –
February 2017
Total Project Cost: $49.3M
11
Indian River Rd/Kempsville RdIntersection Improvements
CIP 2‐418• Increase capacity of the intersection
using innovative designs
• Indirect left turns to the north and south on Kempsville Road
• Median U‐Turn lefts to the east and west on Indian River Road
• Site Acquisition: June 2013 – October 2014
• Start Construction – May 2015
• Complete Construction – Nov 2016
Total Project Cost: $13.8M12
Lynnhaven Pkwy/International PkwyIntersection Improvements
CIP 2‐032
Lynn
haven Pkwy
• Improvements Include additional turn lanes at the north, south and west legs of the intersection
• Right of way is 90% complete
• Construction Start –July 2015
• Construction Complete –July 2016
Total Project Cost: $7.4M13
Lynnhaven Parkway – Phase XICIP 2‐167
• Four‐lane divided highway from Indian River Road to Centerville Turnpike
• Utility Relocations – 90% Complete
• Advertise for Construction –July 2013
• Complete Construction – July 2016
Total Project Cost: $37.4M
14
Nimmo Parkway – Phase V‐ACIP 2‐121
• Four‐lane divided roadway from Princess Anne Road to General Booth Boulevard
• Construction 45% Complete
• Complete Construction –July 2014
Total Project Cost: $60.4M
15
Princess Anne Road – Phase IVCIP 2‐305
• Four‐lane divided roadway from Dam Neck Road to Nimmo Parkway
• Construction 85% complete
• Complete Construction –April 2014
Total Project Cost: $63.2M
16
Seaboard RoadCIP 2‐107
• Three‐lane roadway from Princess Anne Road to Nimmo Parkway
• Construction Started – April 2013• Complete Construction – August
2014
Total Project Cost: $8.3M
17
Princess Anne Rd/Kempsville Rd IntersectionCIP 2‐048
• Relocate/Reconstruct intersection to 6‐lanes
• Construction – 65% Complete
• Complete Construction –April 2014
• Funding:51% City49% Federal/State
Total Project Cost: $90.0M
18
Wesleyan DriveCIP 2‐145
• Four‐lane divided roadway from Baker Road to Northampton Boulevard
• Construction – 65% Complete
• Complete Construction –December 2013
Total Project Cost: $15.6M
19
Witchduck Road – Phase IICIP 2‐025
• Six‐lane divided highway from I‐264 to Virginia Beach Boulevard
• Design – 90% Complete• Site Acquisition: April 2013 to
July 2014• Start Construction –
October 2014• Complete Construction –
October 2016
Total Project Cost: $54.4M
G
20
21
Centerville Turnpike – Phase IIICIP 2‐419
• Four‐lane divided highway from Kempsville Road to the Chesapeake City Line
• #15 of 60 in the 2011 Technical Ranking of Congested Roadway Segments
Total Project Cost: $24.7M
BTC: $19.1M
22
• Six‐lane divided highway from Princess Anne Road to Holland Road
• #19 of 60 in the 2011 Technical Ranking of Congested Roadway Segments
• Preliminary Engineering Underway
Total Project Cost: $31.3M
BTC: $29.2M
Dam Neck Road – Phase ICIP 2‐041
23
• Six‐lane divided highway from Holland Road to Drakesmile Road
• #21 of 60 in the 2011 Technical Ranking of Congested Roadway Segments
Total Project Cost: $23.0M
BTC: $21.5M
Dam Neck Road – Phase IICIP 2‐413
Elbow Road Extended – Phase IICIP 2‐152
• Four‐lane divided highway from Dam Neck Road (near the amphitheater) to Indian River Road
• Currently in site acquisition
• Construction is not currently funded
Total Project Cost: $70.3M
24BTC: $43.1M
Indian River Road – Phase VIICIP 2‐256
• Four‐lane divided highway from Lynnhaven Parkway to Elbow Road
• Currently in site acquisition
• Not currently funded for construction
Total Project Cost: $89.1M
25
BTC: $82.2M
• Six‐lane divided highway with continuous right turn lanes from Republic Road to Winwood Drive and six‐lane divided highway to Oriole Drive
• Site acquisition is complete
• Utility Relocations: November 2013 to November 2014
• Construction Start scheduled for Fall 2014 (dependent upon funding) Virginia Beach Blvd.
Total Project Cost: $102.7M
26
BTC: $66.3M
Laskin Road – Phase ICIP 2‐156
Laskin Road – Phase IICIP 2‐165
• Six‐lane divided highway from Oriole Drive to the 31st/30th Street split
• Design ‐ 10% Complete
Total Project Cost: $21.2M
27
BTC: $19.6M
28
Newtown Road/Baker RoadIntersection Improvements
CIP 2‐037• Improve Safety
• Reduce Congestion
• Additional Turn Lanes
• Intersection Reconfiguration
• Ranks #11 in the 2011 Technical Ranking of Congested Intersections
Total Project Cost: $1M
BTC: $650K
Princess Anne Road – Phase VIICIP 2‐195
• Four‐lane divided roadway from General Booth Blvd to Sandbridge Road/Upton Drive
• Improvements at the intersections of General Booth Boulevard, Elson Green Avenue, and Upton Drive/Sandbridge Road are included
• Design ‐ 100% Complete
• Currently in acquisitionTotal Project Cost: $23.0M
29
BTC: $13.1M
30
Princess Anne Road – Phase VII‐ACIP 2‐033
• Safety Improvements from Sandbridge Road/Upton Drive to Indian River Road
• Intersection improvements at Princess Anne Rd/Indian River Rd
• Preliminary Engineering Underway
Total Project Cost: $4.0M
BTC: $3.4M
31
Rosemont Road – Phase VCIP 2‐038
• Four‐Lane divided roadway between Lynnhaven Parkway and Dam Neck Road
• Reduce Congestion
• Ranks #17 in the 2011 Technical Ranking of Congested Roadway Segments
• Preliminary Engineering Underway
Total Project Cost: $5.8M
BTC: $5.4M
VB CIP Project/ProgramInformation
Safety Improvement Projects/ Programs
32
Citywide Street Lighting Improvements – Phase II
CIP 2‐160• Helps preserve older neighborhoods by improving nighttime safety
• Provides greater safety on existing roadways by lighting previously unlit areas
Funding: $60K/year
33
34
Indian River Rd/Princess Anne RdInterim Intersection Improvements
CIP 2‐422• Left Turn Lanes on Princess
Anne Road at this intersection• Cost‐ Participation project• Construction start is being
coordinated with developer
Total Project Cost: $250K
Rural Roads Improvements• Program is to improve safety and
geometrics of substandard roads in the “rural” part of the City. $200K/year
• Two active turn lane projects.– Princess Anne Rd and Gum Bridge
Road Left Turn Lane– Princess Anne Rd Turn Lanes at
Pleasant Ridge Rd & West Neck Rd• Acquisition Underway• Start Construction –
– August 2013 (PA/GB)– November 2013 (PA/PR)
• Complete Construction –– February 2014 (PA/GB)– June 2014 (PA/PR)
Gum Bridge Rd
35Total Project Cost: $2.0M
36
• Improvements from Holland Road to LondonBridge Road
• Access Management, Turn Lanes, Geometric/Pedestrian Improvements
• Start Construction –July 2015
• Complete Construction –March 2016
Total Project Cost: $1.5M
Shipps Corner Road CIP 2‐414
37
• Access Management
• Geometric Improvements
• PedestrianImprovements
• Start Construction –July 2015
• Complete Construction – March 2016
Total Project Cost: $1M
South Independence Blvd/Silverleaf Dr Intersection Improvements
CIP 2‐034
South Inde
pend
ence
Blvd.
Traffic Safety Improvements ‐ Phase III CIP 2‐300
• This program provides for modification of existing roadways by constructing turn lanes and bypass lanes, realignment of existing roadways, installing traffic signals, installing guardrails, installing sidewalks, removing visual obstructions, and various other traffic safety improvements. The following are the active projects in the program:
Holland Road RTL Mill Dam Road LTL Roadways Old Princess Anne (Bellamy to Timberlake) Old Princess Anne (Dunhill to Timberlake) Regent University Sidewalk Independence Blvd/Windsor Oaks Blvd Fairfield Sidewalk
General Booth Blvd/Dam Neck Road Safety Improvement
Old Providence Road Sidewalk Daytona Dr & Dillon Dr Sidewalk North Lynnhaven Road Sidewalk Old Virginia Beach Blvd/Realty Lane
Road Widening North Great Neck Rd/Lynnhaven Dr.
SignalAverage Funding: $2.3M/year
38
Transportation NetworkModeling Projects
CIP 2‐176• Used to partner with Old Dominion University's Center for Innovative
Transportation Solutions (CITS) to develop a comprehensive and detailed transportation network model of the City's transportation system.
• This project will analyze the following corridors from the 2011 Transportation Reference Notebook Congested Roadway Segments: – Ferrell Parkway between Indian River Road and Indian Lakes Blvd.– Holland Road between South Independence Blvd. and Rosemont Road– Indian River Road between I‐64 and Centerville Turnpike– Indian River Road between Centerville Turnpike and Kempsville Rd– Providence Road between Kempsville Road and Princess Anne Road– Independence Blvd. between Northampton Blvd. and Haygood Road– Virginia Beach Blvd. between I‐264 and First Colonial Road
Average Funding: $233K/year 39
40
• Signal Improvements
• Road Improvements
• PedestrianImprovements
• Preliminary Engineering Underway
Total Project Cost: $1M
BTC: $650K
Indian River Road/Providence RoadIntersection Improvements
CIP 2‐042
VB CIP Project/ProgramInformation
Special Projects/Programs
41
• Component of VDOT’s I‐64/I‐264 Interstate Project ($350M)• Phase 1 ($55M)
42
I‐64/I‐264 Interstate ProjectPhase 1: Greenwich Rd Crossover
CIP 2‐401
43
Cleveland Street/Clearfield AveIntersection Improvements
• Phases 1 & 2: Intersection improvements at Cleveland Street/Clearfield Avenue
• Phase 3: Improvements to Cleveland St. from Clearfield to Witchduck Rd. To become a stand alone project.
Total Project Cost: $15.9M
44
Landstown Centre WayCIP 2‐421• 1,650 linear feet of
new roadway
• Two‐lane road with center turn lane
• Connects Landstown Road to a new development, Southgate Commons
• Construction – 75% Complete
• Complete Construction –October 2013 Total Project Cost: $2.8M
Pacific Avenue ImprovementsCIP 2‐045
• Improvements from 16th Street to 23rd Street
• Includes Undergrounding Private Utilities, Streetscapes, Sidewalks, Additional Turn Lanes, New Traffic Signals, Stormwater, and Public Utility Upgrades
• Start Construction –September 2014
• Complete Construction –May 2016
Total Project Cost: $20M
45
Shore Drive – Phase IIICIP 2‐117• No capacity expansion –
Retains four lanes from Vista Circle to N. Great Neck Road
• Includes safety improvements, edge treatments, and multi‐use paths
• Project also includes a major storm water trunk line under roadway to serve current and future needs for the corridor
• Design – 60% Complete
• Start Construction –June 2015
• Complete Construction‐ June 2017
Total Project Cost: $24M(Roadway ‐ $14M; Storm Water ‐ $10M)
46
Shore Drive – Phase IVCIP 2‐118
• No capacity expansion –retains four lanes from Marlin Bay Drive to East Stratford Road
• Includes safety improvements, edge treatments, and multi‐use paths
• Design ‐ 30% Complete
Total Project Cost: $12.8M
47BTC: $12.0M
Others• Wetlands Mitigation Banking
– Establishes and maintains the Wetland Banking System including property acquisition, wetlands design, construction and monitoring
• Various Cost Participation Projects II– Provides the City’s share of cost to enable cost sharing projects with residents
and private developers
• Traffic Signal Retiming– Retimes all the major arterial corridors, including Lynnhaven Parkway, Dam Neck
Road, Holland Road, Kempsville Road, Great Neck Road, First Colonial Road, Northampton Boulevard, Virginia Beach Boulevard, Providence Road, South Independence Boulevard, and Princess Anne Road
• Network Modeling: Southeastern Parkway & Greenbelt– VB’s partnership with ODU in 2012 created the Center for Innovative
Transportation solutions. Currently completing the Macro and the Micro transportation model for VB. Next task order is to model the SEPG and the EQSV.
Funding: $25K/year
Funding: $100K/year
48
VB CIP Project/ProgramInformation
Bridges
49
Lesner Bridge ReplacementCIP 2‐168 • Design 100%
complete
• Environmental Permitting Complete
• Site Acquisition Complete
• RFP advertise September 2013
• Start Construction February 2014
• Complete Construction –February 2017
Total Project Cost: $99.5M50
51
Sandbridge Road Bridge ReplacementCIP 2‐416
• Realignment Analysis to determine feasibility of constructing the new bridge adjacent to the existing bridge over Hells Point Creek
• Sufficiency rating – 35.2
• Rated as “FAIR” due to deck and beam deterioration
• Preliminary Engineering Underway
Total Project Cost: $4M
52
Laskin Road Bridge ReplacementCIP 2‐040
• Structure has exceeded useful life
• Sufficiency rating – 40.3
• Deck and Beam Deterioration
Total Project Cost: $17M
BTC: $16.5M
VB CIP Project/ProgramInformation
Maintenance Projects/Programs
53
Traffic Signal RehabilitationCIP 2‐052
• Includes, but not limited to, the replacement of deteriorated and/or antiquated components of traffic signals
54
21st Street & Pacific Ave
Princess Ann Road & Indian River Road
Constitution Drive &
Corporation Lane
Funding: $100K/year
Major Bridge RehabilitationCIP 2‐063
• Rehabilitation of bridges and overpasses
• Cox’s Bridge rehabilitation
• Various bridges ‐joint repairs and deck sealant completed
• Sandbridge Bridge deck replacement
55
Funding: $660K/year
Cox’s Bridge
Street ReconstructionCIP 2‐031
56
• Design and Reconstruction of one to three streets per year, as funding allows, that have reached the end of their service life and for which maintenance is not effective
Accomplishments Elbow Road (Salem Road to bridge) Wesleyan Drive HRT Bus Stop (4th and Atlantic) Hungarian Road
Scheduled/Underway Major Intersections Great Neck Road (parts) Indian River Road (parts)
Funding: $2.15M/year
4th & AtlanticElbow Road
VB CIP Project/ProgramInformation
Operations Division FY14 Resurfacing Program
57
BAYSIDE(Page 1)
STREET FROM TOAMBERLY ROAD W CUL‐DE‐SAC W DEAD END
ARAGONA BOULEVARD WESTGROVE ROAD HAYGOOD ROAD (WB)ARAGONA CIRCLE ARAGONA BOULEVARD W CUL‐DE‐SACBARK LANE HOLLADAY LANE WESTGROVE ROADBRINSON ARCH HOLLADAY LANE ARAGONA BOULEVARDCREPE MYRTLE LANE HOLLADAY LANE N CUL‐DE‐SACDIAMOND SPRINGS ROAD (SB) DIAMOND SPRINGS ROAD (SB) NORTHAMPTON BOULEVARD (SB)FIRST STREET SECOND ST (NB) BROAD STREET
HOLLADAY LANE WITCHDUCK ROAD N (NB) ARAGONA BOULEVARD
HONEYGROVE ROAD INDEPENDENCE BOULEVARD (NB) ARAGONA BOULEVARDHOUDON LANE WITCHDUCK ROAD (SB) JERICHO ROADHUNTING HILL COURT HUNTING HILL LANE E CUL‐DE‐SACHUNTING HILL LANE S CUL‐DE‐SAC HAYGOOD ROAD (WB)LINSHAW LANE WESTGROVE ROAD WESTGROVE ROADLONEWILLOW LANE HUNTING HILL LANE HOPWOOD LANEMEADE CIRCLE MEADE LANE E CUL‐DE‐SACMEADE LANE HOLLADAY LANE N CUL‐DE‐SACPARRY ROAD BONNEY ROAD (WB) AMBERLY ROADPEACHCREEK LANE WESTGROVE ROAD WESTGROVE ROAD
58
BAYSIDE(Page 2)
STREET FROM TOOVERMAN COURT OVERMAN AVENUE N CUL‐DE‐SAC
QUINWOOD LANE HONEYGROVE ROAD HUNTINGTON HILL LANEROMNEY LANE SULLIVAN BOULEVARD (NB) E CUL‐DE‐SACSECOND STREET (NB) VIRGINIA BEACH BOULEVARD (WB) FIRST STREETSECOND STREET (SB) START MEDIAN VIRGINIA BEACH BOULEVARD (WB)SHORE DRIVE (EB) INDEPENDENCE BOULEVARD (NB) GREENWELL ROADSHORE DRIVE (WB) GREENWELL ROAD D ST (NB) LCAB GATE 5
SHORE DRIVE (EB) CITY LINE INDEPENDENCE BOULEVARD (NB)
SHORE DRIVE (WB) D ST (NB)‐(LITTLE CREEK GATE 5) CITY LINE
STELL COURT STELL LANE E CUL‐DE‐SAC
STELL LANE HOLLADAY LANE BRINSON ARCHSULLIVAN BOULEVARD (NB) WITCHDUCK ROAD N (NB) HAYGOOD ROAD (WB)TEETS LANE HOLLADAY LANE MEADE LANEWESTGROVE ROAD LINSHAW LANE LINSHAW LANEWHISTLER LANE FERRY PLANTATION ROAD ROMNEY LANE
59
BEACH(Page 1)
STREET FROM TO05TH 1/2 STREET ATLANTIC AVENUE (NB) PACIFIC AVENUE (NB)
07TH 1/2 STREET ATLANTIC AVENUE (SB) PACIFIC AVENUE (NB)11TH 1/2 STREET ATLANTIC AVENUE (NB) PACIFIC AVENUE (SB)17TH 1/2 STREET BALTIC AVENUE MEDITERRANEAN AVENUE20TH 1/2 STREET ARCTIC AVENUE CYPRESS AVENUE29TH 1/2 STREET ATLANTIC AVENUE (SB) PACIFIC AVENUE (NB)APPIAN AVENUE SILINA DRIVE (WB) MEILINDA PLACE
APPLEWOOD LANE LYNNHAVEN ROAD N PINEWOOD LANE
BARRY STREET VICTORIA DRIVE PALADIN DRIVE
CASSADY AVENUE SILINA DRIVE (WB) CHESTER STREET
COLONEL CIRCLE CHESTER STREET S CUL‐DE‐SACCONTINENTAL STREET DILLION DRIVE PLAZA TRAIL S (NB)DEERWOOD COURT PINEWOOD DRIVE N CUL‐DE‐SACDOCTOR DRIVE DILLION DRIVE HOSPITAL DRIVEDODGE DRIVE FLORENCE STREET SILINA DRIVE (WB)DRIFTWOOD ROAD GREENWOOD LANE PINEWOOD LANEGOLDEN MAPLE COURT GOLDEN MAPLE DRIVE W CUL‐DE‐SACGOLDEN MAPLE DRIVE PERSIMMON COURT LONG CREEK ROADGREENWOOD LANE PINEWOOD LANE DRIFTWOOD ROAD
60
BEACH(Page 2)
STREET FROM TOGROVELAND ROAD S DEAD END VIRGINIA BEACH BL (EB)
GROVELAND ROAD E GROVELAND ROAD VIRGINIA BEACH BL (EB)HILBER STREET VICTORIA DRIVE ROSEMONT RD S (SB)HORNBEAM COURT HORNBEAM DR E CUL‐DE‐SACHOSPITAL DRIVE SILINA DRIVE (EB) DILLION DRIVEMAVERICK STREET DILLION DRIVE CASSADY AVENUEMELINDA PLACE MAVERICK STREET WAVERLY DRIVEPALADIN DRIVE MELINDA PLACE BOYD ROAD
PAVILION DRIVE 19TH STREET (WB) BIRDNECK ROAD N (NB)
PEACHWOOD LANE GREENWOOD LANE PINEWOOD DRIVEPINEWOOD DRIVE LYNNHAVEN ROAD N GREENWOOD LANERED MAPLE LANE GOLDEN MAPLE DRIVE N CUL‐DE‐SACREMUS LANE MELINDA PLACE CHESTER STREETSILINA DRIVE (EB) DILLION DRIVE LYNNHAVEN ROAD S (SB)SILINA DRIVE (WB) LYNNHAVEN ROAD S (SB) CORVETTE LANESPRUCE PINE ROAD OLD CLUBHOUSE ROAD WARWICK DRIVEVALIANT AVENUE GARRISON PLACE TERRAZZO TRAILVICTORIA DRIVE BOYD ROAD ROSEMONT ROAD S (SB)WAYNE STREET VICTORIA DRIVE PALADIN DRIVE
61
CENTERVILLE(Page 1)
STREET FROM TOALBRIGHT COURT ALBRIGHT DRIVE (EB) S CUL‐DE‐SAC
ALVENA LANE BATTLEFORD DRIVE ORILLIA ROADARBORFIELD COURT S CUL‐DE‐SAC NORTHVALE DRIVEBALSTON COURT CHESTERBROOK DRIVE S CUL‐DE‐SACBARNARD WAY COLLEGE PARK BOULEVARD (NB) BARNARD WAYBATTLEFORD DRIVE PLEASANT VALLEY ROAD GRAVENHURST LANEBEECHWALK DRIVE LEVEL GREEN BOULEVARD N DEAD END
BRIDGEFORD COURT ASHMONT DRIVE S CUL‐DE‐SAC
BRIGHTWELL PLACE GREY FRIARS CHASE CLEVHAMM COMMON
CARIBOU COURT CENTENNIAL CIRCLE S CUL‐DE‐SAC
CENTERVILLE TURNPIKE (SB) INDIAN RIVER ROAD (WB) END MEDIANCHESHIRE FOREST COURT S CUL‐DE‐SAC N CUL‐DE‐SACCHESTERBROOK DRIVE GRAVENHURST LANE INDIAN RIVER ROAD (WB)CLARION COURT CHESTERBROOK DRIVE S CUL‐DE‐SACCOYOTE CIRCLE COUGAR COURT E CUL‐DE‐SACDAGAN COURT CENTENNIAL CIRCLE N CUL‐DE‐SACDEVONFIELD ROAD CASTLEFIELD ROAD DEVON WAYDIGHTON COURT GRAVENHURST DRIVE W CUL‐DE‐SACDILLARD PLACE COLLEGE PARK BOULEVARD (SB) COLLEGE PARK BOULEVARD (SB)
62
CENTERVILLE(Page 2)
STREET FROM TODOVE RIDGE DRIVE PLEASANT VALLEY ROAD W CUL‐DE‐SAC
DOVE VIEW DRIVE PLEASANT VALLEY ROAD E CUL‐DE‐SACDUQUESNE PLACE COLLEGE PARK BOULEVARD (SB) COLLEGE PARK BOULEVARD (SB)EASTOVER COURT RIPPLEMEAD DRIVE N CUL‐DE‐SACEDDYSTONE DRIVE GRAVENHURST LANE W DEAD ENDELLOREE COURT SILVER LAKE DRIVE S CUL‐DE‐SACFRAZIER LANE CENTENNIAL CIRCLE CENTENNIAL CIRCLE
GASSETT COURT STACEY PLACE W CUL‐DE‐SAC
GLENMONT COURT GLENMONT LANE E CUL‐DE‐SAC
GLENMONT LANE COLLINGSWOOD TRAIL MILLINGTON DRIVE
GLYDON DRIVE COLLEGE PARK BOULEVARD (SB) COLLEGE PARK BOULEVARD (SB)GRAVENHURST CIRCLE GRAVENHURST DRIVE E CUL‐DE‐SACGRAVENHURST DRIVE W CUL‐DE‐SAC SAGAMORE COURTGRAYLYN ROAD S CUL‐DE‐SAC GRAVENHURST DRIVEHAFFORD ROAD ALVENA LANE GRAVENHURST DRIVEHAYWARDS HEATH HANDCROSS WAY HANDCROSS WAYINDEPENDENCE BOULEVARD (NB) INDIAN RIVER ROAD (WB) ROUND HILL DRIVE (NB)INDIAN RIVER ROAD (EB) REGENT UNIVERSITY DRIVE (SB) CENTERVILLE TURNPIKE (NB)INDIAN RIVER RD (WB) ELBOW RD TURN LA LYNNHAVEN PW (NB)
63
CENTERVILLE(Page 3)
STREET FROM TOIVANROAD COURT CLEVHAMM COMMON S CUL‐DE‐SAC
KASBA COURT PLEASANT VALLEY ROAD SOUTHAVEN DRIVELANTANA PLACE CENTENNIAL CIRCLE W CUL‐DE‐SACLONGLAC ROAD ALVENA LANE GRAVENHURST DRIVELOVE COURT BEECHWALK DRIVE W CUL‐DE‐SACLYNDORA ROAD CHESTERBROOK DRIVE CHESTERBROOK DRIVEMIDDLETON PLACE GREY FRIARS CHASE N CUL‐DE‐SACMILLINGTON DRIVE E CUL‐DE‐SAC THAMESFORD DRIVE
NEWCOMBE DRIVE GOOLAGONG DRIVE BEECHWALK DRIVE
NORTHVALE DRIVE BELSPRING DRIVE GRAVENHURST DRIVEOLD PROVIDENCE ROAD E CUL‐DE‐SAC W DEAD ENDORILLIA ROAD PLEASANT VALLEY ROAD GRAVENHURST DRIVEPLEASANT VALLEY ROAD DOVE RIDGE DRIVE KASBA COURTPLEASANT VALLEY ROAD BRIDAL CREEK BOULEVARD GREENLAW DRIVEPRAIRIE COURT LEVEL GREEN BOULEVARD LEVEL GREEN BOULEVARDRENFREW STREET SYDNEHAM TRAIL PLEASANT VALLEY ROADREON DRIVE BEECHWALK DRIVE INDIAN RIVER ROAD (EB)RIPPLEMEAD DRIVE BELSPRING DRIVE N DEAD ENDRYDALE COURT CHESTERBROOK DRIVE S CUL‐DE‐SAC
64
CENTERVILLE(Page 4)
STREET FROM TOSAGAMORE COURT GRAVENHURST DRIVE N CUL‐DE‐SAC
SHARBOT COURT SHARBOT DRIVE N CUL‐DE‐SACSHARBOT DRIVE PLEASANT VALLEY ROAD GRAYLYN ROADSOUTHAVEN DRIVE KASABA COURT ARBORFIELD COURTSUMMERHEDGE CLOSE HANDCROSS WAY HANDCROSS WAYSYDNEHAM TRAIL PLEASANT VALLEY ROAD N CUL‐DE‐SACTHAMESFORD DRIVE EDDYSTONE DRIVE LYNNHAVEN PARKWAY (SB)WAYMART COURT CHESTERBROOK DRIVE N CUL‐DE‐SAC
WEATHERSTONE DRIVE SALEM ROAD (NB) CHESHIRE FOREST COURT
WELLFLEET COURT GRAVENHURST DRIVE E CUL‐DE‐SACWEYBURN COURT SOUTHAVEN DRIVE S CUL‐DE‐SAC
65
KEMPSVILLE (Page 1)
STREET FROM TOAMBERLY ROAD E CUL‐DE‐SAC OVERLAND ROAD
BANQUO STREET WHITEHURST LANDING ROAD BIRNAMWOODS DRBELVOIR LANE LAKE JAMES DRIVE BELVOIR LANECARISBROOKE COURT S CUL‐DE‐SAC LAKE JAMES DRIVECENTER LANE INDIAN RIVER ROAD (EB) FORDHAM DRIVECENTERVILLE TURNPIKE (NB) START MEDIAN INDIAN RIVER ROAD (EB)CHARLECOTE CIRCLE CHARLECOTE DRIVE W CUL‐DE‐SAC
CHARLECOTE DRIVE SUNNYSIDE DRIVE N CUL‐DE‐SAC
CHICHESTER COURT WALLINGFORD ARCH N CUL‐DE‐SAC
CLEEVE ABBEY LANE S CUL‐DE‐SAC NEWTOWN ROAD (NB)
COMPTON CIRCLE LAKE JAMES DRIVE N CUL‐DE‐SACEARLSTON LANE AUTUMN HARVEST DRIVE E CUL‐DE‐SACEGTON COURT AUTUMN HARVEST DRIVE S CUL‐DE‐SACETWORTH LANE EGTON COURT S CUL‐DE‐SACFORDHAM DRIVE KEMPSRIVER DRIVE KEMPSRIVER DRIVEHILLINGDON COURT PRINCESS ANNE ROAD (NB) N CUL‐DE‐SACINDIAN RIVER ROAD (EB) MACDONALD ROAD MILITARY HIGHWAY S (SB)INDIAN RIVER ROAD (EB) CENTERVILLE TURNPIKE (NB) FERRY POINT ROADINDIAN RIVER ROAD (WB) THOMPKINS LANE STRICKLAND BOULEVARD
66
KEMPSVILLE(Page 2)
STREET FROM TOINDIAN RIVER ROAD (WB) MILITARY HIGHWAY S (SB) MACDONALD ROAD
KEMP LANE KEMPSVILLE ROAD (NB) FORDHAM DRIVE
KEMPSRIVER DRIVE INDIAN RIVER ROAD (EB) KEMPSVILLE ROAD (NB)LAKE JAMES DRIVE INDIAN RIVER ROAD (EB) LAKE JAMES DRIVELANDINGS CREST THOMPKINS LANE W CUL‐DE‐SACMATYIKO DRIVE PROVIDENCE ROAD (EB) N CUL‐DE‐SACMACDONALD ROAD CITY LINE INDIAN RIVER ROAD (EB)MONTAGUE CIRCLE LAKE JAMES DRIVE N CUL‐DE‐SACOAKEHAMPTON COURT BELVOIR LANE N CUL‐DE‐SAC
ORKNEY DRIVE PROVIDENCE ROAD (EB) S CUL‐DE‐SAC
PARTRIDGE DRIVE E CUL‐DE‐SAC W DEAD ENDPRINCESS ANNE ROAD (NB) PLAZA TRAIL S (SB) EDWIN DRIVE (NB)PRINCESS ANNE ROAD (SB) EDWIN DRIVE (NB) PROVIDENCE ROAD (EB)RIVERTON POINT COPPER KETTLE DRIVE N DEAD ENDSUNNYSIDE DRIVE PARTRIDGE DRIVE HUNTS POINTE DRIVETHOMPKINS COURT THOMPKINS LANE W CUL‐DE‐SACTHOMPKINS LANE INDIAN RIVER ROAD (EB) THOMPKINS COURTWALLINGFORD ARCH LAKE JAMES DRIVE LAKE JAMES DRIVEWESSEX LANE BELVOIR LANE BELVOIR LANEWOBURN LANE CLEEVE ABBEY LANE NEWTOWN ROAD (NB)
67
LYNNHAVEN(Page 1)
STREET FROM TOADMIRAL CIRCLE ADMIRAL DRIVE E ADMIRAL DRIVE E
ADMIRAL DRIVE E W CUL‐DE‐SAC KENDAL STREETBANISTER COURT PARAMORE DRIVE W CUL‐DE‐SACBEASLEY DRIVE VIRGINIA BEACH BOULEVARD (EB) S DEAD ENDBRETON COURT PARAMORE DRIVE N CUL‐DE‐SACCALVERT STREET S DEAD END SHORE DRIVE (WB)CATHERINE COURT RIVER ROAD S CUL‐DE‐SACCEDAR LANE THALIA ROAD THALIA POINT ROAD
CHESTNUT AVENUE BONNEY ROAD (WB) S DEAD END
COLE COURT COACH LANE S CUL‐DE‐SACCONVOY COURT PARAMORE DRIVE S CUL‐DE‐SACHATTON STREET S DEAD END SHORE DRIVE (WB)KENDAL STREET KENDALL CIRCLE E SHORE DRIVE (WB)LYNNVILLE CRESCENT THALIA ROAD THALIA ROADMIDDLEBURG ROAD PARAMORE DRIVE PARAMORE DRIVEOCEAN MIST COURT LANDVIEW CIRCLE W CUL‐DE‐SACPARAMORE DRIVE PARAMORE DRIVE FIRST COLONIAL ROAD (NB)PULLEY COURT WILEY PLACE W CUL‐DE‐SACRIVER ROAD GREAT NECK ROAD N (NB) LANDVIEW CIRCLE
68
LYNNHAVEN(Page 2)
STREET FROM TORIVER ROAD N RIVER ROAD N CUL‐DE‐SAC
ROYSTER COURT LANDVIEW CIRCLE E CUL‐DE‐SACSHERBROOKE CIRCLE PARAMORE DRIVE W CUL‐DE‐SACSUBER DRIVE LYNNVILLE CRESCENT LYNNVILLE CRESCENTTRANQUIL COURT WIMBLEDON POINT DR S CUL‐DE‐SACUPPER JAMES COURT WIMBLEDON POINT DR W CUL‐DE‐SACWALKE STREET S DEAD END SHORE DRIVE (WB)
WILEY PLACE POLLYPINE DRIVE PULLEY COURT
WIMBLEDON POINT DRIVE GREAT NECK ROAD N (NB) W CUL‐DE‐SAC
69
PRINCESS ANNE(Page 1)
STREET FROM TOADOBE COURT SALEM LAKES BOULEVARD S CUL‐DE‐SAC
ADONIS COURT ANTELOPE PLACE N CUL‐DE‐SACALDRICH LANE QUESNEL DRIVE QUESNEL DRIVEBIG BEAR COURT CENTENNIAL CIRCLE E CUL‐DE‐SACBUCKHORN COURT BUCKHORN PLACE N CUL‐DE‐SACCANNONADE TRAIL SWORD DANCER DRIVE BOLD RULER DRIVEDAM NECK ROAD (EB) STUB ROAD DEAD END PRINCESS ANNE ROAD (SB)DAM NECK ROAD (WB) PRINCESS ANNE ROAD (SB) RECREATION DRIVE (WB)
FIREFALL COURT FIREFALL DRIVE S CUL‐DE‐SAC
GOODARD DRIVE UNICORN DRIVE BOLD RULER DRIVEGREY DOVE COURT GREY DOVE LANE N CUL‐DE‐SACHAZEL COURT CENTENNIAL CIRCLE N CUL‐DE‐SACHECATE DRIVE QUESNEL DRIVE BOLD RULER DRIVEHUEY COURT CENTENNIAL CIRCLE N CUL‐DE‐SACINDIAN RIVER ROAD (WB) DEWBERRY LANE (NB) SAVANNAH WAYINVERRARY COURT CENTENNIAL CIRCLE E CUL‐DE‐SACJESSAMINE COURT JOUSTING ARCH S CUL‐DE‐SACJUANITA CIRCLE JOUSTING ARCH E CUL‐DE‐SACKITIMAL DRIVE BOLD RULER DRIVE BOLD RULER DRIVE
70
PRINCESS ANNE(Page 2)
STREET FROM TOLANDSTOWN ROAD SALEM ROAD (NB) DAM NECK RD (WB)
MARTINGALE COURT FIREFALL DRIVE S CUL‐DE‐SACOLD DAM NECK ROAD DA VINCI DRIVE WELLSFORD DRIVEPINK STAR COURT FIREFALL DRIVE N CUL‐DE‐SACPURCHASE ARCH GOODARD DRIVE BOLD RULER DRIVEQUESNEL DRIVE SWORD DANCER DRIVE SWORD DANCER DRIVEREXTON STREET WELLSFORD DRIVE WELLSFORD DRIVE
SENIOR COURT SHERMAN OAKS AVENUE S CUL‐DE‐SAC
SHERMAN OAKS AVENUE DONNINGTON DRIVE JESSICA LANE
SINGER COURT SHERMAN OAKS AVENUE S CUL‐DE‐SAC
SLIDELL LANE QUESNEL DRIVE QUESNEL DRIVESTILLMEADOW COURT STARWOOD ARCH S CUL‐DE‐SACSTILLWOOD COURT STILLWOOD LANE N CUL‐DE‐SACSTILLWOOD LANE STARWOOD ARCH STARWOOD ARCHSTORMY COURT SHERMAN OAKS AVENUE N CUL‐DE‐SACSWORD DANCER DRIVE GOODARD DRIVE BOLD RULER DRIVEUNICORN DRIVE BOLD RULER DRIVE S CUL‐DE‐SAC
71
ROSE HALL(Page 1)
STREET FROM TOASHAWAY ROAD S CUL‐DE‐SAC WOODBURNE DRIVE
BLUE SPRING COURT BLUE SPRING LANE E CUL‐DE‐SAC
BLUE SPRING LANE ASHAWAY ROAD ASHAWAY ROADCARRIAGE HILL ROAD KINGS ARMS DRIVE BOW CREEK BOULEVARDCOBBLESTONE DRIVE CARRIAGE HILL ROAD KINGS ARMS DRIVECORRINE LANE ASHAWAY ROAD SPRING GARDEN LANEDIXIE DRIVE CLUB HOUSE ROAD S ASHAWAY ROADGRANT AVENUE HOLLAND ROAD (NB) N DEAD ENDHOLLY HEDGE AVENUE OLE TOWNE LANE LAMPLIGHT LANE
INDEPENDENCE BOULEVARD (NB) FOXWOOD DRIVE HOLLAND ROAD (SB)
INDEPENDENCE BOULEVARD (SB) SILVERLEAF DRIVE FOXWOOD DRIVEJOHN HANCOCK DRIVE CARRIAGE HILL ROAD LAMPLIGHT LANEMALIBU DRIVE (NB) S DEAD END VIRGINIA BEACH BOULEVARD (EB)ROSEMONT ROAD S (NB) LYNNHAVEN PARKWAY (SB) DAHLIA DRIVEROSEMONT ROAD S (NB) HOLLAND ROAD (NB) STATE I‐264 ON RAMPROSEMONT ROAD S (SB) STATE I‐264 ON RAMP (EB) LYNNHAVEN PARKWAY (SB)SENTARA WAY ROSEMONT ROAD S (SB) SPRUCE STREETSPRUCE STREET BONNEY ROAD (EB) S DEAD ENDSPRING GARDEN LANE ASHAWAY ROAD N CUL‐DE‐SACTIVERTON DRIVE RIVERBEND ROAD (NB) N CUL‐DE‐SAC
72
FY14‐19 SYIP Top 10 Major Road Project Shortfalls
• I 64/I 264 Intersection Improvement $300M– Phase I Greenwich Flyover $55M
• Indian River Ph VII (FHWA expiration 2016) $82.2M• Elbow Road Ph II (FHWA expiration 2016) $43.1M• Laskin Road Ph I (FHWA expiration 2013) $66.3M• Laskin Road Bridge $16.5M• Centerville Turnpike Ph III $19.1M• Shore Drive Ph IV $12.0M• Princess Anne Ph VII + Ph VIIA $13.1M + $3.4M• Laskin Road Ph II $19.6M
73
BTC
Balance To Complete = $330M
Virginia Beach Transit Extension StudyDraft Environmental Impact StatementStation Locations and Conceptual Design
Public Informational MeetingsApril 18, 22, and 25, 2013
74
Virginia Beach Transit Extension StudyThe Virginia Beach Transit Extension Study (VBTES) is examining the best transit options for a former freight rail right of way that runs from Newtown Road to Birdneck Road in Virginia Beach. The study area extends from Newtown Road to the Oceanfront area on 19th Street. • Three Fixed Guideway Alignment Alternatives from Newtown Road
– To the Rosemont Area– To the Oceanfront along the NSRR corridor (with Maintenance Facility)– To the Oceanfront through the Hilltop Area (with Maintenance Facility)
75
Results of Hilltop Area Assessment• Eliminated as not Reasonable or Feasible
– First Colonial Fixed Guideway Alignment and Station Eliminated– London Bridge Fixed Guideway Alignment Eliminated– Side/Split Running Fixed Guideway Design Options Eliminated
76
NSRR ROW Alignment
Results of Hilltop Area Assessment• Advanced for study and comparison in DEIS
– Fixed Guideway Alignment Alternative ‐ Laskin to Birdneck– Parker Avenue Alignment from NSRR corridor– Median Running Design Option– Two Additional Stations Added (Great Neck and Birdneck)
77
DEIS Study Alternatives• Transit Technology Alternatives
– No Build – existing fixed route service– TSM: Expanded Bus Service – all fixed route– Bus Rapid Transit (BRT) Service – fixed‐guideway/fixed route– Light Rail Transit (LRT) Service – all fixed‐guideway
78
• Other Considerations under review– Number and location of stations– Station amenities– Grade seperated/at grade crossings– Park & Ride sites
• Results of Environmental Analysis due Nov 2013
79
Discussion
Congratulations – you made it to the end