Page 1: Kaigah HPP

8/10/2019 Kaigah HPP

http://slidepdf.com/reader/full/kaigah-hpp 1/1

KARR ANG

REST HOUSE

    B    A    R    R    A    G    O

    N    A    L    L    A

K  AN D I  AH R I V E R 

K ANDI AHRIV ER

K ANDIAHRIV ER

T     H     O    T     I     

N     A     L    L    A     H     

K   A N  D I  A H   R I V  E  R 

BIRT I

CanalL= 2290 m

Surge tank

Powerhouse

access tunnel

Powerhouse

 Adit 2

 Adit 1

Road

Dam

                                                       E                                       =

                                                       3                                                      1

                                                       9                                                      2

                                                      0                                                      0

                                                      0

                                                       E                                       =

                                                       3                                                      1                                                       9

                                                      6                                                       0

                                                      0                                                      0

                                                       E                                       =

                                                       3                                                      2

                                                      0                                                      0

                                                      0                                                      0

                                                      0

                                                       E                                       =

                                                       3                                                      2

                                                      0                                                      4

                                                      0                                                      0

                                                      0

                                                       E                                       =

                                                       3                                                      2                                                      0

                                                      8                                                       0                                                      0                                                      0

                                                       E                                       =

                                                       3                                                      2

                                                      1                                                      2

                                                      0                                                      0

                                                      0

N= 1258 000

N= 1 254 000

N= 1250 000

Road

Intake 2

Intake 3

T  AI LR  AC E T U N N E L

  H  E A  D  R A

 C  E  T  U

  N  N  E  L

DONG

Intake

Intersection with adit 1Intersection with adit 2

Headrace tunnel

L= 17200 m

P= -1,00%

Powerhouse

Penstock tunnel

L= 179 m

Surge tank

Pressure shaft

L= 364 m

P= -0,20%

Tailrace tunnel

L= 4102 m

1100120013001400150016001700180019002000210022002300240025002600

1000900800700600

2700280029003000310032003300

35003400

1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 17000 18000 19000 20000 21000 220000

   A   b  s  c .

   0 ,   0

   0

   A   b  s  c .

   1   0   4   3   5 ,   0

   0

   A   b  s  c .

   1   6   8   9   4 ,   0

   0

   A   b  s  c .

   2   1   5   5   4 ,   0

   0

   A   b  s  c .

   1   7   2   0   0 ,   0

   0

PLAN

PROFILECONVENTIONS:

River 

Tunnel

Canal

Powerhouse access road

Industrialtrack

Bridges

   E   L   E   V   A   T   I   O   N

   (  m .  a .  s .   l   )

DISTANCE(m)

CHARACTERISTICSKAIGAH

HYDROPOWER

Designdischarge (m3/s) 125.0

Dam height (m) 90.0

Grosshead(m) 525

Designcapacity(MW)548.0

NOTE:

Profile contours are given through tunnels axis.

0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 0 5 10 15 20 0 5 10 15 20 25 0 5 10 15 20 25 30 35 40 0 10 20 30 40 50 60

1:100 1:2501:200 1:333.3 1:500 1:75030

CHECKED:

DRAFTSMAN:

DESIGNED:

 APPROVED:

VERIFIED:

3 421

F

98

DATE:SCALE:

DRAWING No.

FILE:

CODE:

 A

B

C

D

E

5 6 7

1:150

0 1 2 3 4 5 6 7 8 9 1 0

D ESC R I PT I O NDATE

V E R S I O N S

No.

FEASIBILITY STUDY OF KAIGAH

HIDROPOWER PROJECT Associated Technologies

 An Infrastructure Development Company

1 :3 33 33 ,3 3 J AN UA RY 2 01 3LAYOUT

LEFT BANK SCHEME

GENERAL PLANANDPROFILE

Left Bank Layout.dwg

LAYOUT

David Angee M.

Left Bank LayoutGabrielJ. Cano

Nombre A. Apellido A.