LAYOUT POWER CONVERTERIN UL55

THERE ISN’T ENOUGH SPACE TO PUT ONLY THE VOLUME OF POWER CONVERTER RACKS !!!!

DFXP5 RIGHT

DFXP5 LEFT

ONLY POWER CONVERTER!

NEED SPACE TO FIT IN !!

usc55

IP 5

AND WHAT IS MISSING?• OTHERS EQUIPMENTS : RACKS, SERVICES,CABLES

TRAYS, COOLING VENTILATION,…• CONSTRAINTS OF MAINTENANCE OF RACKS (NEED

SPACE AROUND P.C. RACKS NOT TAKEN INTO ACCOUNT)

• R2E REQUEST• DES/INSTALLATION OLD/NEW INNER TRIPLET &

EQUIPMENTS.

X 2 for each Point (P1 and P5)

VOLUME DEFINITION OF POWER CONVERTER RACKS

MQXPOWER CONVERTER

D1POWER CONVERTER

MCBXPOWER CONVERTER

MQSXPOWER CONVERTER

RYCAPOWER CONVERTER

MCSXPOWER CONVERTER

EXTRACTION ENERGIE