Module Outline
Part 4 - System Turn Up and Commissioning
1. System Provisioning
1. Establish connection to the network
2. Connect outside plant fiber
3. DCU Adjustment
2. Commissioning
3. Verifications and Backup
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning System Provisioning
Establish connection to the network
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Starting 1354 RM-PhM
Make sure services are started (apache ftp, MySQL, PhM…)
1. Start the 1354 RM-PhM application on your PC.
2. Click the “Change Server/Port”
3. Enter the IP address of your PC(localhost) in the Server, or the server
provided for Management.
User name and Password: If this is your first time logging in, the User
name is admin and Password is tropxnms. You will then be required to
change the password. (exple:tr0pxnms)
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Establish connection to the network
This procedure will establish connection to the network and discover all the
network elements.
Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and perform
“Establish connection to the network” procedure.
Connect the Line Fiber to the NE’s of the Network
Connect the craft terminal to CIT port of the EC board
1. Change the CIT IP address to a unique subnet within the entire DCN
2. Start the 1354 RM-PhM
3. select Maintenance /Auto Discovery/ “Auto Discovery by IP”
4. Select File /New NE/ create network element with CIT IP address
Additional network elements will being appearing in the map view.
All Rights Reserved © Alcatel-Lucent 2011
Connecting local 1354 RM-PhM throughout the Network via CIT port
While connecting through the CIT port of the EC board, the CIT IP address should be modify so as to be able to reach the next NEs in the network. The purpose is to change the CIT IP address on which you are connected to a unique subnet within the entire DCN. In CLI type: config interface ec cit ip 172.16.2.1/24 Re-connect to CLI: config int ec cit red enable
You are then able to establish connection with all NE of the Network.
NE 1 NE 2 NE 3
172.16.2.1/24 172.16.0.1/24 172.16.0.1/24
Local (craft Terminal) 1354 RM-PhM
OK
CIT IP
NE 1 NE 2 NE 3
172.16.0.1/24 172.16.2.1/24 172.16.0.1/24
Local (craft Terminal) 1354 RM-PhM
NOK
CIT IP
NE 1 NE 2 NE 3
172.16.11.1/24 172.16.12.1/24 172.16.13.1/24
Local (craft Terminal) 1354 RM-PhM
CIT IP
OK
At the end of the operation on this NE, you may change the CIT IP address back to its default (172.16.0.1)
However, during the deployment process, you may be willing to connect your local 1354 RM-PhM to another site. You may then perform the same steps and meet this configuration.
The 1354 RM-PhM has already allocated the CIT address to NE1 in its database and it will encounter a conflict.
Hence it is recommended, during the time of the deployment, to modify the CIT IP address of every NE of the network by defining a unique subnet for every NE, as shown:
You will then be able to connect you local 1354 RM-PhM to any site.
Observed with1354 RM-PhM R7.x
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning System Provisioning
Connect outside plant fiber
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up steps
CPB Provision using Plan
Greenfield Connect outside plant fiber
System Type ?
TOADM RING
system
Establish Network
Connection
NE provisionning
Yes
Unkeyed Och System?
No
specific
Line with External Raman Pump ?
Yes
No
Set LD Power Managment type to Manual Mode
FOADM only System ? No
Yes
Do not perform Greenfield
Wizard
Execute Greenfield using Plan
Line with External Raman Pump ?
Yes
No
Set LD Power Managment type to Auto Mode
Delete service- Power
Commissioning END
TOADM LINEAR System / Mixed FOADM
Provision required Wavelength Service
Power A-Z & Z-A Adjustment
Is the Status of all LD in the system « completed »
?
Adjust Un-completed EGRESS and
INGRESS points
No
Yes
Applied to: •Terminal end EGRESS
•Neighbour to Terminal INGRESS
To be discussed
All Rights Reserved © Alcatel-Lucent 2011
Connect outside plant fiber
Span loss calculation should be as close as possible from the minimum Loss given
in EPT file
The EPT file will be updated if calculation does not match the actual loss !
Note:
The OSC span loss calculation in not a Fiber Optic Characterisation.
Remind that additional loss might be introduced within the head of the Line Cable and
the NE (such as bad connectors, dirty fibers, ODF Insertion loss, etc…)
NE2 NE1
LD
OSC
LD
OSC
Span loss= OPT NE1 –OPR NE2
Span loss= OPT NE2 –OPR NE1
NE side NE side LINE
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Connect outside plant fiber
This procedure will connect the outside plant fiber to the ingress and
egress LD circuit packs on the Alcatel-Lucent 1830 PSS-32/PSS-16. The
fiber loss will be checked and proper connectivity verified. Refer to your 1830 PSS-32/16 Installation Guide, Part ///, Chapter 9, and perform
“Connect outside plant fiber” procedure.
1. Connect the outside plant fibers to the appropriate LINE ports
2. From WebUi, select the OSC port of an LD pack facing a line that has been
connected at the neighbor node
3. Select: Performance / Clear bins
4. Select: Performance / PM Group / OPT
5. Select: Performance / PM Group / OPR
6. Repeat for each of the lines as they are connected to the neighbor nodes.
7. Calculate the span loss. These values should be provided to the EPT owner to
compare with the EPT span loss
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Commissioning
DCU Adjustment
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning
DCU Adjustment The DCU is provided with an attenuator to pad out the loss to 10 dB for use with
legacy amplifiers that require 10 dB mid-stage loss
If a double DCU, or different DCU has to be installed, make the adjustment of interstage with a Power Meter so as to get 10dB attenuation.
Note: Modulare Amplifier AM2125A & B
Modular Amplifier with low loss DCM have a mid-stage attenuation of 4dB
DCM bypass does not require an attenuator
Line Driver
SIG
Mid-stage LOSS
min 9 db
Max 11 dB
xdB PAD
Mid stage LOSS = DCU Loss +
PAD + connector loss
measure 10+/-1 dB attenuation with Power Meter
LINE
DCU 2 DCU1
All Rights Reserved © Alcatel-Lucent 2011
Module Outline
Part 4 - System Turn Up and Commissionning
1. System Provisioning
2. Commissioning
NE Provisioning
Power Commissioning on TOADM Ring System
Commission a TOADM linear system
Provision New Wavelength Services
Complete commissioning on TOADM Linear System
Commission a FOADM linear system
3. Verifications and Backup
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Commissioning
NE Provisioning
All Rights Reserved © Alcatel-Lucent 2011
Preconditioning
This procedure will ensure that the network and PC are ready for commissioning
using the 1354 RM-PhM.
1. Ensure that all the outside plant fibers (or test set) have been properly
connected to the correct line driver cards on each network element.
2. Verify one pair of OT cards is installed and fibered on the end terminals for a
TOADM system.
3. Obtain the loop back IP addresses of all the NE’s in the network.
4. Determine which NE in the network will be used as the connection
commissioning process, as directed by your instructor. Obtain the OAMP port
IP address.
5. Obtain the xml commissioning file produced by EPT and used for
commissioning.
6. Ensure that both the client and server 1354 RM-PhM software has been
installed on the PC. Refer to the 1354 RM-PhM Photonic Manager EMS
Reference Guide for detailed procedures on installing and configuring the
software.
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Provision the system
This procedure will provision the cards, power attributes and topological links for all the NE’s in a system as defined in the EPT output file.
Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and perform “Provision the system” procedure.
1. From PhM / Provision -> Launch CPB
2. Type the 1354 RM-PhM user name and password
3. Select Commissioning -> Provision System (using plan)
4. Select NE (one or several)
5. Next/Next/ then “Browse” button and browse to the folder containing the EPT commissioning file for the system to be commissioned
Review the error report and troubleshoot any problems encountered.
All Rights Reserved © Alcatel-Lucent 2011
Provision the system (continue)
Provisioning Steps:
1. validates any existing card slot assignments.
2. provisions topological links for NEs.
3. preprovisions any required cards defined in the plan (optional).
4. provisions non-OT cards admin states to "up" (optional).
5. provisions Optical Power Level Management (optional).
All Rights Reserved © Alcatel-Lucent 2011
Provision the system (continue)
validates any existing card slot
assignments.
provisions topological links for NEs.
View from WebUI:
Connection / Physical Topology
•Port highlighted in blue are admin up •Green logo underneath indicate connection •Click on the port to check its connection
All Rights Reserved © Alcatel-Lucent 2011
Provision the system (continue)
provisions Optical Power Level Management
Line driver SIG port detail:
• Default values before provisionning
• LD values provisionned
All Rights Reserved © Alcatel-Lucent 2011
Provision the system (continue)
provisions Optical Power Level Management (optional).
• Default values before provisionning
Note that Commissioned status is IN PROGRESS
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Commissioning
Power Commissioning on TOADM Ring System
All Rights Reserved © Alcatel-Lucent 2011
Power Commissioning of a TOADM Ring System
The Power Commissioning of a Linear System requires to perform the
power adjustement using the CPB/ Greenfield Wizard.
1. Perform System Provisioning
2. Perform Greenfield using Plan
For a Ring System, all Line Drivers adjustment will be in state
completed after the process.
TOADM RING System
LD
LD
Thru
A
A
LD
CW
R8
LD
CW
R8
Thru
A A LD
CWR8
LD
CWR8
Thru
A
A A
LD
CW
R8
LD
CW
R8
Thru
A
CWR8
CWR8
All Rights Reserved © Alcatel-Lucent 2011
Thru LD
CWR8
OMD CLS
CWR-8 LD
OMD CLS
LD
CW
R-8
LD
OM
D C
LS
ASE
1 2 3
Thru
CWR8
OMD CLS
CWR-8 LD
OMD CLS
Adjustment
Completed
EGRESS
Adjustment
completed
Light emitting
INGRESS
Adjustment
completed
4 5 EGRESS
Adjustment
completed
6
7 INGRESS
Adjustment
completed
Adjustment
Completed 8
1. In A to Z direction, LD emit light (ASE) toward Egress LD through CWR. 2. EGRESS point is adjusted. 3. Next NE receive Light INGRESS point is adjusted. 4. In Z to A direction, LD emit light (ASE) toward Egress LD through CWR. 5. EGRESS point is adjusted. 6. The LD adjustement is completed 7. Next NE receive Light INGRESS point is adjusted. 8. The LD adjustement is completed 9. Process is applied on every span.
A to Z
Z to A
Power Commissioning of a TOADM Ring System CPB tool - Greenfield
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Commissioning
Commission a TOADM linear system
All Rights Reserved © Alcatel-Lucent 2011
Commission a TOADM Linear System
The auto managed lines on a linear system adjacent to the terminal sites as well as the terminal sites themselves will not complete using the commissioning wizard. Those lines must have further power adjustments to complete commissioning.
Identify the two terminal nodes and their immediate neighbors in the linear system. These four nodes have lines that will need power adjustments.
A service must be created to complete the commissioning on these nodes
LD
CW
R8
LD
CW
R8
Thru
LD
CW
R8
LD
CW
R8
Thru
LD
CW
R8
LD
CW
R8
LD
CW
R8
Thru
A
1
A A A LD
CW
R8 A A A
2 3 4
A
Service Service
All Rights Reserved © Alcatel-Lucent 2011
LD
Commission a TOADM Linear System Greenfield
Perform GREENFIELD using Plan:
1. Intermediate spans are adjusted with ASE
2. LD neighbours of Line Terminal are partially adjusted
3. No Emitting light can achieve the adjustment
4. The LD adjustment at End Terminal & neighbours is skipped
A service must be created to complete adjustment
CWR-8
OMD CLS
1
2
3
LD Thru
CWR8
OMD CLS
CWR-8 LD
OMD CLS
CWR-8 LD
OMD CLS
LD Thru
CWR8
OMD CLS
CWR-8 LD
OMD CLS
EN
D T
ER
MIN
AL
E
ND
TE
RM
INA
L
NE A NE B
NE C NE Z
Adjustment
completed
EGRESS
completed
Adjustment
completed
2
EGRESS
completed
INGRESS
completed
INGRESS
completed
3
All Rights Reserved © Alcatel-Lucent 2011
EN
D T
ER
MIN
AL
LD
Commission a TOADM Linear System complete Commissioning
Completing commissioning: 1. Create a service between A and Z NE and run Power Management 2. Adjust Egress Power 3. Terminal A EGRESS LD is adjusted and LD completed 4. Adjust Ingress Power 5. Next INGRESS point is adjusted and LD completed 6. Repeat steps for Z to A direction (NE Z and NE C)
A to Z
CWR-8
OMD CLS
1
2
3
4
LD Thru
CWR8
OMD CLS
CWR-8 LD
OMD CLS
5
CWR-8 LD
OMD CLS
LD Thru
CWR8
OMD CLS
CWR-8 LD
OMD CLS
EN
D T
ER
MIN
AL
NE A NE B
NE C NE Z
Z to A
EGRESS
completed
Adjustment
completed
INGRESS
completed
Adjustment
completed
6
EGRESS
completed
Adjustment
completed
INGRESS
completed
Adjustment
completed
commission Greenfield system
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Power Commissioning
This procedure will perform power commissioning on the network using
parameters provided by the EPT output file.
1. Lauch CPB
2. Execute Commission Greenfield system using plan
3. Check if the process has been achieved successfully: check the
warning message in the logs.
4. Proceed to View Report and check the presence of errors
5. Check the Commissioning Status of Amplifiers :
1. Select Line port of Ingress amplifier
2. Select Power adjustment Tab
3. Check if Status is Completed or In progress
4. On PhM, select Line port of the Ingress LD and check Power commissioning
mngt
5. True means complteted/false for in progress..
6. Proceed to Power Balancing to achieve commissioning
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Commissioning
Provision New Wavelength Services
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Provision New Wavelength Services With 1354 RM-PhM
Use this procedure to establish a new wavelength service.
1. Double Click the NE from the Network Map to enter the Inventory View.
2. Branch the Equipment Tree down to view the cards.
3. Highlight the Transponder Network Port and in the Right Side Pane set the Programmed ITU Channel and then click Apply.
4. Right Click on the Transponder Network Port and set it to Admin Up AINS.
5. Right Click on the Transponder Client Port and set it to Assigned.
6. Set the Client Signal Type if required.
7. Right Click on the Transponder Client Port and set the Signal Timeslot if required.
8. Right Click on the Transponder Client Port and set it to Admin Up AINS.
9. Exit the Inventory Window and return to the Network Map.
10. Highlight the NE and click on the Topology Button on the Tool Bar.
11. Create the Transponder Line Port Topology Link to either a Filter Port or a Colorless Port as required.
12. Exit the Topology Window and return to the Network Map.
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Provision New Wavelength Services (continue) With 1354 RM-PhM
Use this procedure to establish a new wavelength service.
13. Highlight both Nodes that are end points for the new Wavelength Service and then go to Provisioning and Provision New Wavelength Service.
14. Enter all of the necessary information for the new wavelength service and create it.
15. Check Force cross-connection
16. Verify both A to Z and Z to A directions of the circuit through Wave Tracker and enable the 10 second auto refresh function.
17. When both directions are all green, a test set can be setup at one client port end and a fiber loop at the other client port end to perform the Error Free Testing – observe optical TX and RX levels and install attenuators as needed.
18. Capture the test results from the test set as proof of the Error Free Tests.
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Commissioning
Complete commissioning on TOADM Linear System
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Power Commissioning Complete Commissioning
1. Lauch CPB
2. One wavelength has been created through the system
3. Execute Power Balance System using plan
4. Check if the process has been achieved successfully: check the
warning message in the logs.
5. Proceed to View Report and check the presence of errors
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Commissioning
Commission a FOADM linear system
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Commission a FOADM System
This procedure will verify the “Commission Greenfield System wizard” procedure
completed successfully for each NE in the FOADM linear system.
1. Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and
perform “Commission a FOADM system” procedure.
LD
SFD
LD SFD
PAD
Thru
LD SFD
LD
SFD
LD SFD
PAD
Thru
LD
SFD
Thru Band Thru Band
NE 1 A
1 NE 2
M
M
2
3 NE 4
A
4 NE 3
M
M
2
3
Service
All Rights Reserved © Alcatel-Lucent 2011
Manual Power Adjustment All Line Drivers in Manual Mode
Adjust OT Power Z-bar to mid range
Adjust INGRESS LD
Gain
until ch. Level is green within the Z-bar at LD EGRESS point
Adjust EGRESS LD
(OT Tx)
Measure Power at the Ingress SIG
OUT port
Calculate delta between actual and expected
value
Add delta to Power Gain value
until ch. Level is in the middle of Z-bar at SIG OUT point
Adjust EGRESS LD (Add PAD)
Measure Power at the EGRESS LD
OUT port
Calculate delta between actual and expected
value
Add PAD of the delta value
until ch. Level is green within the Z-
bar at LD EGRESS point
1 2 4 3
Adjust INGRESS LD
Gain
Measure Power at the Ingress SIG
OUT port
Calculate delta between actual and expected
value
Add delta to Power Gain value
5
Synchronize Wave Key expected
Power
Repeat steps for Z to A
Power Adjustment
until ch. Level is green within the Z-bar at LD EGRESS point
NE 1
Service
M
A to Z
1 NE 2
M
M
2
3 NE 3
M
4
PAD
All Rights Reserved © Alcatel-Lucent 2011
Commission a System Case of double amplification
LD Power Management in FOADM Linear System with double Amplification
SFD
SFD
PAD
Thru
SFD
PAD
SFD
Thru Band Thru Band
NE 1 A
NE 2 M
A NE 5
A NE 3
A
M
LD LD
LD LD
LD LD
LD LD
LD LD
LD LD
SFD
SFD
LD
LD
LD
LD
A
A NE 4 ILA
All Rights Reserved © Alcatel-Lucent 2011
Complete Commissionning steps
Provisionn the required wavelength
service
Power A-Z managment
Manually adjust OT output Power
Is the first NE in signal path AUTO
Managed ?
Yes No
Execute Power control EGRESS
Egress point adjusted
Is the INGRESS Line of next NE AUTO
Managed ?
Yes No
Execute Power control INGRESS
Manually Adjust INGRESS LD Gain Power
Adjust EGRESS LD
with upstream PAD
Execute Power control EGRESS
Is the EGRESS Line of same NE AUTO
Managed ?
No Yes
Egress point adjusted
Ingress point adjusted
Is the INGRESS Line of next NE ending
the path?
No
Is the INGRESS Line of last NE AUTO
Managed ?
Yes No
Execute Power control INGRESS
Ingress point adjusted
Adjust INGRESS LD Gain Power
Power Z-A managment
END Delete Wavelength
service
1
2
3
4
Check all LD status are completed
(commissioning flag set to true)
All Rights Reserved © Alcatel-Lucent 2011
FOADM End Terminal - Commissionning
1. OA provisioned , parameters before Greenfield
Power Management attributes
Gain adj checked
Power / channel not checked
Identical for TOADM
All Rights Reserved © Alcatel-Lucent 2011
Module Outline
Part 4 - System Turn Up and Commissioning
1. System Provisioning
2. Commissioning
3. Verifications and Backup
understanding Loss Report
Wavelength Tracker
Perform Backup with PhM
Perform Backup with WebUi
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Verification and Backup
Understanding Loss Report
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Generating and Understanding the Loss Report
Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and review
the sample loss report “Generate and review network element loss report” and
“Understanding the loss report” procedures.
Pre requisite: complete provisioning of the EPT parameters for the
target system (Provision System using plan)
1. From CPB: Commissioning /Create System Loss Report (using plan)...
2. Follow instruction/Next>” button until the system loss report stages
window will display Minimum EPT parameters for network element
EPT Commissioning Parameter
Tag in planning tool commissioning
.xml file Applicable Port
LD Gmin AmpMinGain LD Sig Out
LD Gmax AmpMaxGain LD Sig Out
Ingress LD target output power TargetOutputPower LD Sig Out
Ingress LD power deviation out DeviationOut LD Sig Out
Egress target output power TargetOutputPower LD Line Out
Egress power deviation out DeviationOut LD Line Out
All Rights Reserved © Alcatel-Lucent 2011
Wavelength Tracker – Coding Example
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Generating and Understanding the Loss Report
Launch CPB / Commissioning / Create system loss report (using plan…)
Span Margin + connecto loss
Span Loss from design
CWR-8 1/8
LD
PSS32-5
SFD ALPHG
1/6
LD
AHPHG
1/7
Thru CWR-8 1/8 LD
LD CWR-8 1/4 LD
PSS32-6
AHPHG
1/3
ALPHG
1/2
ALPHG
1/6
LD
DCM 50
18.6 dB
17.9 dB
75km
AHPHG
1/7
LIN
E
SIG
LIN
E
LIN
E
SIG
LIN
E
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Generating and Understanding the Loss Report
CWR-8 1/8
LD
PSS32-5
SFD ALPHG
1/6
LD
AHPHG
1/7
Thru CWR-8 1/8 LD
LD CWR-8 1/4 LD
PSS32-6
AHPHG
1/3
ALPHG
1/2
ALPHG
1/6
LD
DCU 50
18.6 dB
17.9 dB
75km
AHPHG
1/7
LIN
E
SIG
LIN
E
LIN
E
SIG
LIN
E
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Generating and Understanding the Loss Report
CWR-8 1/8
LD
PSS32-5
SFD ALPHG
1/6
LD
AHPHG
1/7
Thru CWR-8 1/8 LD
LD CWR-8 1/4 LD
PSS32-6
AHPHG
1/3
ALPHG
1/2
ALPHG
1/6
LD
DCM 50
18.6 dB
17.9 dB
75km
AHPHG
1/7
LIN
E
SIG
LIN
E
LIN
E
SIG
LIN
E
LIN
E
SIG
LIN
E
75km
All Rights Reserved © Alcatel-Lucent 2011
Failed Adjustment (Examples)
Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 10, and review the sample loss report “Troubleshooting failed Adjustment”.
no through services provisioned: 1. Provision at least one present wavelength on the through path.
2. Re-try adjustment.
loss too high (ingress adjustment) 1. Identify the source of the excess loss using the loss report
2. If the span loss is too high, perform the following sub steps and re-try the adjustment after each step. If not, go to Step 8.
3. Clean the fiber connection between the patch panel and the LD Line In port.
4. Perform an in-service adjustment from the PhM light path trace power management interface.
5. If the Loss too high error remains, check the loss on the affected segment and if the span loss is too high field personnel will need to try to correct the span loss.
6. If the Loss too high error remains, clean the fiber connection between the patch panel and the LD Line Out port of the upstream network element.
7. If the span loss cannot be reduced to meet the planned limit, then a re-plan of the system will be required using the EPT.
8. If the message is generated during ASE commissioning, re-run the commissioning wizard.
9. If the message is generated as a result of an in-service power adjustment, perform a power adjustment on the affected span using the PhM, CLI, or WebUI.
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Verification and Backup
Wavelength Tracker
All Rights Reserved © Alcatel-Lucent 2011
Wavelength Tracker
All Rights Reserved © Alcatel-Lucent 2011
Wavelength Tracker – Light Path Power Trace (1354 RM-PhM)
All Rights Reserved © Alcatel-Lucent 2011
Wavelength Tracker Data (CLI)
Example of Wavelength Tracker parameter
data (from CLI):
Type: show wavekey wtsource keys
Type: show wavekey wtsource power
ITU Channel : 28
Expected WaveKey 1: 428
Expected WaveKey 2: 972
WaveKeys Received : Yes
Channel AINS : Disabled
Expected Power : -19.90 dBm
Power Deviation : 2.50 dB
Power Tolerance : 0.00 dB
Measured Power : -19.82 dBm
Keys
Power
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Verification and Backup
Perform Backup with PhM
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Perform database backups with PhM
Database backups are performed using TFTP server, which is provided with the 1354 RMPhM Photonic Manager Refer to your 1830 PSS-32/16 Installation Guide, Part IV, Chapter 12, and review
the sample loss report “Perform database backups” procedures. Refer to the Alcatel-Lucent 1354 RM-PhM Photonic Manager EMS Reference Guide
for more information.
1. From Phm: Admin /Settings /System Settings /File Transfer 2. TFTP Root Directory : Verify the root directory is /tftpfiles 3. select FTP & Remove Prefix 4. Select the NE you want to backup 5. Maintenance / NE Database Backup & Restore 6. Right click on the NE / select “Details...” 7. check “Use the EMS Server as Backup host recommended” and “Use default
backup directory recommended”. 8. click on the Backup
All Rights Reserved © Alcatel-Lucent 2011
System Turn Up and Commissionning Verification and Backup
Perform Backup with WebUI
All Rights Reserved © Alcatel-Lucent 2011
Exercises - Perform database backups with WebUi
Database backups can be performed with WebUI and a TFTP Server (3CDaemon in this example)
1. Run a TFTP server and browse directory 2. From WebUi: Administration/ database / backup and restore 3. Protocol/TFTP 4. Enter the local host server IP 5. Enter path to directory from the TFTP server root directory 6. Enter backup filename 7. Apply 8. Backup 9. Verify progression in TFTP server window
Enter a new folder name of required
GPEC
Global Delivery Readiness
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
End of Module System Turn Up and Commissionning