Transcript
Page 1: Phase IV Major › fileadmin › ecra › media › ECRA-CEMCAP...Phase II Phase III Phase IV Phase V Phase VI Demonstration plant (time-frame: 3-5 years) Post-Combustion: Tail-end

The cement industry’s approach to carbon capture

ECRA’s approach from basic research towards an industrial implementation of carbon capture

• All low-carbon roadmaps require a significant

reduction of CO2, also in the cement sector.

• Correspondingly and according to CEMBUREAU

approx. 60% of cement plants in the EU should

be equipped with CCS technology by 2050.

• Based on the need to develop this breakthrough

technology, ECRA is investigating its technical

and economic feasibility in its CCS research

project.

• A focus is also being placed on CO2 reuse in

cooperation with the University of Mons.

• In the current phase IV of the project an oxyfuel

pilot plant is being prepared, taking economic

and technical issues into account.

Study about oxyfuel and post-combustion technology

(summer 2007 – summer 2009)

Phase I Literature study (January - June 2007)

Laboratory-scale / small-scale research

activities (autumn 2009 – autumn 2011)

Prepare pilot plant (time-frame: 2 - 3 years)

Build and operate pilot plant (time-frame: 3-5 years)

Phase II

Phase III

Phase IV

Phase V

Phase VI Demonstration plant (time-frame: 3-5 years)

Post-Combustion: Tail-end separation of CO2 from

flue gas by e.g. chemical absorption, adsorption,

membranes or Calcium Looping.

• A very energy-intensive technology.

• Important projects: Norcem‘s Brevik project (pilot

testing), CEMCAP (prototype testing).

Oxyfuel Technology: Combustion with pure

oxygen instead of air in combination with flue gas

recirculation to increase the CO2 concentration.

• Requires process and design adaptations.

• Important projects: ECRA (complete oxyfuel),

LafargeHolcim / AirLiquide / FLSmidth (pilot

testing of partial oxyfuel), CEMCAP (prototype

testing).

Post-Combustion and Oxyfuel Technology as potential capture solutions for the cement industry

Pilot project

Finan-cing

Consor-tium

Project scope

Plant design

Busi-ness case

Suitablelocation

Legal struc-ture

Envisaged next steps towards an industrial-scale oxyfuel cement kiln

Potential sites for the oxyfuel demo project

0 20 40 60 80 100 120 140 160 180

2050

Breakthrough techn. like CCS/U

Decarb. power

Transport efficiency

Clinker substitution/ new cements

Energy efficiency/ fuel mix

1990

Mton CO2

2050

Majorcontribution from carbon capture technologies expected to fulfil climate target

1990

2050

1990

• Demonstration of technical and economic feasibility

in an industrial surrounding.

• Designs: Brownfield (new installation using the

infrastructure of existing line) or blackfield

(retrofitting existing line).

• Size: Industrial-scale > 500 t/d

• Two potential locations (blackfield) have been

selected.

• Projects costs estimated at up to 80 M €.

• Project includes engineering/construction, training

and operation/scientific evaluation.

• Project requires significant funding which might

only be available in 2019/20.

Colleferro Plant:

• HeidelbergCement Group (Italcementi Plant)

• Plant located in Italy, close to Rome

• Kiln not used for daily production

• Petcoke as fuel; no alternative fuels

• Kiln currently on stand-by

• Lowest CAPEX / medium OPEX

Retznei Plant:

• LafargeHolcim Group

• Plant located in the south-east of Austria

• 100 % alternative fuels goal

• Currently operated at maximum production

• Low CAPEX / high OPEX

0

20

40

60

80

100

120

2020 2025 2030 langfrist.

EU

R/t

CO

2

long -term

Post-

combustion

Oxyfuel

technology

Su

cc

es

sfu

l d

em

on

str

ati

on

EU

R/ t

CO

2

Cooler design

Burner design

CO2

conditioning

unit

Future oxygen

supply systems

CO2 reuse

Plant operation and

false air reduction

Refractory

durability/

material

conversion

Post-Combustion

Oxyfuel Technology

Time schedule of ECRA‘s CCS project, so far fully industry-funded. Multiple paths to emission reduction

Source: CEMBUREAU: the role of cement in the 2050 low

carbon economy

Estimated costs for carbon capture and its corresponding

implementation horizon.

Source: ECRA CCS Project: Report on Phase III, 2012

Production

cost

increase of

up to 100%

uncertainty

Finalisation of the most important research packages

Source: ECRA CCS Project : Reports on phase III, 2012 and

phase IV.A, 2015

Contact ECRA:

www.ecra-online.org

Email: [email protected]

Phone: +49 (0) 211 23 98 380

New calciner for the

Colleferro Kiln

New calciner for the

Colleferro Kiln

Layout of the modified

Retznei Kiln

Recommended