Transcript
Page 1: Proposed new 2 lane bridge to the east of Isis Highway ... · PIER 1. 200.000 300.000 400.000. Datum Ht -40.000 ... enue connecting from the roundabout at Bundaberg North State School

100

200

300

400

500

600

700

800

900

1000

900

800

700

60050

0

400

300

200

100

BH7BH6

BH8

BH5

BH9

BH4BH3

BH2

BH1

GIN GINGIN GIN

HINKLER AVENUE

ISIS HIGHWAY

HINKLER AVENUE

ISIS HIGHWAYGIN GIN

CAIR

NSBR

ISBAN

E

BUNDABERG CITY

GAVE

GAN

ST

STEU

ART S

T

GAVI

N ST

STAT

ION

ST

PERR

Y ST

THOR

NHILL

ST

HANBURY ST

CONTROL LINE MC02 & BRIDGE CONTROL

188° 17' 19" MC02

Relieving slab

Proposed new 2 lane bridge to the east of Isis Highway (with no on or off ramps while providing east west movement at Thornhill Street)

Not government policy

GRADE HEIGHT

SURFACE HEIGHT

CHAINAGE

ABUT

A

PIER

1

100.

000

200.

000

300.

000

400.

000

Datum Ht -40.000

PIER

2

PIER

3

PIER

4

PIER

5

PIER

6

PIER

7

PIER

8

PIER

9

PIER

10

PIER

11

PIER

12

PIER

13

PIER

14

10.0

40

10.1

70

10.2

90

10.4

20

10.5

40

10.6

70

10.7

90

10.9

20

11.0

40

11.1

70

11.2

90

11.4

20

11.5

40

11.7

40

12.0

70

500.

000

600.

000

700.

000

PIER

23

PIER

15

PIER

16

PIER

17

PIER

18

PIER

19

PIER

20

PIER

21

PIER

22

PIER

24

PIER

25

PIER

26

PIER

27

PIER

28

12.0

70

12.5

30

13.0

90

13.5

20

13.7

90

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

900.

000

800.

000

PIER

28

PIER

29

PIER

30

PIER

E1

PIER

E2

PIER

E3

PIER

E4

13.9

00

14.1

30

14.6

20

15.5

00

16.1

50

16.5

50

16.7

00

Key features of the proposed design:• proposed new two-lane viaduct on the eastern side of Hinkler Av-

enue connecting from the roundabout at Bundaberg North State School to the existing Tallon Bridge

• proposed new pedestrian and cycle facilities across the existing Tallon Bridge

• provide a continuous raised route between the CBD and Bund-aberg North

• existing intersections at Thornhill Street and Hinkler Avenue Ser-vice Road east are maintained for the lower level road.

Benefits of the proposed design:• increased evacuation time to the south for Bundaberg North,

Gooburrum and surrounding areas

• improved access into Bundaberg North and the greater area after a flood event

• improved connection between Bundaberg North and Bundaberg CBD during flood events for community and emergency services

• new pedestrian/cycleway will provide an active travel connection between the CBD and Bundaberg North and, additional capacity during and after flood events

• minimised impact to Tallon Bridge and old Burnett Traffic Bridge during construction

• minimised impact to the flow of flood water during a flood event.

Recommended