100 200 300 400 500 600 700 8 0 0 9 0 0 1 0 0 0 9 0 0 800 700 600 500 400 300 200 100 BH7 BH6 BH8 BH5 BH9 BH4 BH3 BH2 BH1 GIN GIN GIN GIN HINKLER AVENUE ISIS HIGHWAY HINKLER AVENUE ISIS HIGHWAY GIN GIN CAIRNS BRISBANE B UNDABERG CITY GAVEGAN ST STEUART ST GAVIN ST STATION ST PERRY ST THORNHILL ST HANBURY ST CONTROL LINE MC02 & BRIDGE CONTROL 188° 17' 19" MC02 Relieving slab Proposed new 2 lane bridge to the east of Isis Highway (with no on or off ramps while providing east west movement at Thornhill Street) Not government policy GRADE HEIGHT SURFACE HEIGHT CHAINAGE ABUT A PIER 1 100.000 200.000 300.000 400.000 Datum Ht -40.000 PIER 2 PIER 3 PIER 4 PIER 5 PIER 6 PIER 7 PIER 8 PIER 9 PIER 10 PIER 11 PIER 12 PIER 13 PIER 14 10.040 10.170 10.290 10.420 10.540 10.670 10.790 10.920 11.040 11.170 11.290 11.420 11.540 11.740 12.070 500.000 600.000 700.000 PIER 23 PIER 15 PIER 16 PIER 17 PIER 18 PIER 19 PIER 20 PIER 21 PIER 22 PIER 24 PIER 25 PIER 26 PIER 27 PIER 28 12.070 12.530 13.090 13.520 13.790 13.900 13.900 13.900 13.900 13.900 13.900 13.900 13.900 13.900 13.900 900.000 800.000 PIER 28 PIER 29 PIER 30 PIER E1 PIER E2 PIER E3 PIER E4 13.900 14.130 14.620 15.500 16.150 16.550 16.700 Key features of the proposed design: • proposed new two-lane viaduct on the eastern side of Hinkler Av- enue connecting from the roundabout at Bundaberg North State School to the existing Tallon Bridge • proposed new pedestrian and cycle facilities across the existing Tallon Bridge • provide a continuous raised route between the CBD and Bund- aberg North • existing intersections at Thornhill Street and Hinkler Avenue Ser- vice Road east are maintained for the lower level road. Benefits of the proposed design: • increased evacuation time to the south for Bundaberg North, Gooburrum and surrounding areas • improved access into Bundaberg North and the greater area aſter a flood event • improved connection between Bundaberg North and Bundaberg CBD during flood events for community and emergency services • new pedestrian/cycleway will provide an active travel connection between the CBD and Bundaberg North and, additional capacity during and aſter flood events • minimised impact to Tallon Bridge and old Burnett Traffic Bridge during construction • minimised impact to the flow of flood water during a flood event.

Proposed new 2 lane bridge to the east of Isis Highway ... · PIER 1. 200.000 300.000 400.000. Datum Ht -40.000 ... enue connecting from the roundabout at Bundaberg North State School

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proposed new 2 lane bridge to the east of Isis Highway ... · PIER 1. 200.000 300.000 400.000. Datum Ht -40.000 ... enue connecting from the roundabout at Bundaberg North State School

100

200

300

400

500

600

700

800

900

1000

900

800

700

60050

0

400

300

200

100

BH7BH6

BH8

BH5

BH9

BH4BH3

BH2

BH1

GIN GINGIN GIN

HINKLER AVENUE

ISIS HIGHWAY

HINKLER AVENUE

ISIS HIGHWAYGIN GIN

CAIR

NSBR

ISBAN

E

BUNDABERG CITY

GAVE

GAN

ST

STEU

ART S

T

GAVI

N ST

STAT

ION

ST

PERR

Y ST

THOR

NHILL

ST

HANBURY ST

CONTROL LINE MC02 & BRIDGE CONTROL

188° 17' 19" MC02

Relieving slab

Proposed new 2 lane bridge to the east of Isis Highway (with no on or off ramps while providing east west movement at Thornhill Street)

Not government policy

GRADE HEIGHT

SURFACE HEIGHT

CHAINAGE

ABUT

A

PIER

1

100.

000

200.

000

300.

000

400.

000

Datum Ht -40.000

PIER

2

PIER

3

PIER

4

PIER

5

PIER

6

PIER

7

PIER

8

PIER

9

PIER

10

PIER

11

PIER

12

PIER

13

PIER

14

10.0

40

10.1

70

10.2

90

10.4

20

10.5

40

10.6

70

10.7

90

10.9

20

11.0

40

11.1

70

11.2

90

11.4

20

11.5

40

11.7

40

12.0

70

500.

000

600.

000

700.

000

PIER

23

PIER

15

PIER

16

PIER

17

PIER

18

PIER

19

PIER

20

PIER

21

PIER

22

PIER

24

PIER

25

PIER

26

PIER

27

PIER

28

12.0

70

12.5

30

13.0

90

13.5

20

13.7

90

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

13.9

00

900.

000

800.

000

PIER

28

PIER

29

PIER

30

PIER

E1

PIER

E2

PIER

E3

PIER

E4

13.9

00

14.1

30

14.6

20

15.5

00

16.1

50

16.5

50

16.7

00

Key features of the proposed design:• proposed new two-lane viaduct on the eastern side of Hinkler Av-

enue connecting from the roundabout at Bundaberg North State School to the existing Tallon Bridge

• proposed new pedestrian and cycle facilities across the existing Tallon Bridge

• provide a continuous raised route between the CBD and Bund-aberg North

• existing intersections at Thornhill Street and Hinkler Avenue Ser-vice Road east are maintained for the lower level road.

Benefits of the proposed design:• increased evacuation time to the south for Bundaberg North,

Gooburrum and surrounding areas

• improved access into Bundaberg North and the greater area after a flood event

• improved connection between Bundaberg North and Bundaberg CBD during flood events for community and emergency services

• new pedestrian/cycleway will provide an active travel connection between the CBD and Bundaberg North and, additional capacity during and after flood events

• minimised impact to Tallon Bridge and old Burnett Traffic Bridge during construction

• minimised impact to the flow of flood water during a flood event.