Page 2: Push ,Pull&  Kanban  Production Systems

Klasifikasi pengendalian sistem produksi

MRP 1

Push system MRP II

ERP

Pull system

Conwip model

Kanban system

JIT SYSTEM

Page 3: Push ,Pull&  Kanban  Production Systems

Diagram konsep push system

Page 4: Push ,Pull&  Kanban  Production Systems

Karakteristik push systemDue date

driven

Release order

wip

Page 5: Push ,Pull&  Kanban  Production Systems

Sistem order produksi jenis dorong(push)

Page 6: Push ,Pull&  Kanban  Production Systems

Filosofi push system

Start date

Production system

Due date

Lead time

Start Date = Due Date – Lead Time

Page 7: Push ,Pull&  Kanban  Production Systems

Urutan operasi

Aliran fisik aliran informasi

Page 8: Push ,Pull&  Kanban  Production Systems

Teknologi push vs market pull

Page 9: Push ,Pull&  Kanban  Production Systems

Push sytem- MRP

Page 10: Push ,Pull&  Kanban  Production Systems

Push system – MRP IIDemand forecast

MRP

Demand forecast

MPS

Agregate planing

CRPJob pool

Job release

Job dispatcingRouting data

Inventory status

BOM

RCP

Page 11: Push ,Pull&  Kanban  Production Systems

Diagram konsep pull system

Page 12: Push ,Pull&  Kanban  Production Systems

Karakteristik Pull SystemRate

driven LEVEL WIP

throughput

Page 13: Push ,Pull&  Kanban  Production Systems

Urutan operasi

Upstream downstream

Page 14: Push ,Pull&  Kanban  Production Systems

Pull system – JIT (Just In Time)

filosofi

produk

elemen

Building bock

operasiproses

Page 15: Push ,Pull&  Kanban  Production Systems

Just in time scheduled

Page 16: Push ,Pull&  Kanban  Production Systems

Finished good inventory

Page 17: Push ,Pull&  Kanban  Production Systems

Proporsi waste and value added

Page 18: Push ,Pull&  Kanban  Production Systems

JIT-Layoutjust in time in job shop

Page 19: Push ,Pull&  Kanban  Production Systems

Pull system - CONWIP

Page 20: Push ,Pull&  Kanban  Production Systems

20

CONWIP Controller

PC

PN Quant–— ––––––— ––––––— ––––––— ––––––— ––––––— ––––––— ––––––— ––––––— ––––––— ––––––— ––––––— ––––––— –––––

Work Backlog

. . .

Workstations

PC

Page 21: Push ,Pull&  Kanban  Production Systems

21

Push and Pull Schematics

StockPoint . . .

Pure Push (MRP)

. . .

. . .

Pure Pull (Kanban)

CONWIP

Full ContainersAuthorization Signals

StockPoint

StockPoint

StockPoint

StockPoint

StockPoint

Page 22: Push ,Pull&  Kanban  Production Systems

22

Using MVA to Evaluate Line Performance

0

0.1

0.2

0.3

0.4

0.5

0.6

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

WIP

Thro

ughp

ut

Best case

Worst case

Practical worst case (ce(j) = 1)

Reduced variability (ce(j) = 0.5)

Page 23: Push ,Pull&  Kanban  Production Systems

23

CONWIP vs. Pure Push Comparisons

-20

-10

0

10

20

30

40

50

60

70

0% 20% 40% 60% 80% 100% 120% 140%

Control as percent of optimal

Prof

it

Push

CONWIPOptimum

Efficiency

Robustness

Page 24: Push ,Pull&  Kanban  Production Systems

Pull system-Kanban

Page 25: Push ,Pull&  Kanban  Production Systems

Skematik Kanban

Page 26: Push ,Pull&  Kanban  Production Systems

Diagram Alir Kanban

Page 27: Push ,Pull&  Kanban  Production Systems

Kanban Board For Service Team

Page 28: Push ,Pull&  Kanban  Production Systems

Kanban + Scrum Board For Services Team

Page 29: Push ,Pull&  Kanban  Production Systems

Jenis kanban• Kanban pengambilan

Page 30: Push ,Pull&  Kanban  Production Systems

• Kanban perintah produksi

Page 31: Push ,Pull&  Kanban  Production Systems

• Kanban Penanda

Page 32: Push ,Pull&  Kanban  Production Systems

Urutan Berbagai Jenis Kanban

Page 33: Push ,Pull&  Kanban  Production Systems

Langkah-Langkah Menggunakan Kanban

Page 34: Push ,Pull&  Kanban  Production Systems

Sistem Kanban Pada Supermarket

Page 35: Push ,Pull&  Kanban  Production Systems

Interface push pull

Page 36: Push ,Pull&  Kanban  Production Systems

Perbandingan sistem dorong dan tarik

Page 37: Push ,Pull&  Kanban  Production Systems