Retrofit Measures
or
, ,
8/11/2019 Retrofit Abutments
2/39
Pur ose
To describe typical retrofit measures for:
Abutments Footings
8/11/2019 Retrofit Abutments
3/39
Abutment retrofit measures
Approach slabs
Anchor slabs
Diaphragm walls
ransverse s ear eys Transverse soil anchors
Soil and gravity anchors
8/11/2019 Retrofit Abutments
4/39
Abutment retrofit measures
California settlement (approach) slab
Design as SS 10 min Spans soil to deck
Connection FD isFD
F D S a
DL
0.6 Friction Coeff
Sa=Spectrum Acc
DL=Dead Load
8/11/2019 Retrofit Abutments
5/39
Abutment retrofit measures New Zealand settlement slab
ng e o ers ong u na res s ance
Still have smooth approach
8/11/2019 Retrofit Abutments
6/39
Abutment retrofit measures
Waffle slab retrofit
2h
es s ance=. s
Resistance 16 pile=40 kips ultimate
8/11/2019 Retrofit Abutments
7/39
Abutment retrofit measures
Anchor slab retrofit
Vertical capacity is of no concern
Must be securel connected to su erstructure Use damping ratio of 10%
Longitudinal forces will reduce 20%
8/11/2019 Retrofit Abutments
8/39
Abutment retrofit measures
Must act composite Utilize dowels to provide
shear transfer
8/11/2019 Retrofit Abutments
9/39
Abutment retrofit measures Concrete transverse shear keys
8/11/2019 Retrofit Abutments
10/39
Abutment retrofit measures
Concrete transverse shear keys
8/11/2019 Retrofit Abutments
11/39
Abutment retrofit measures
Transverse soil anchors
Lateral resistance methods: Lateral capacity of piles
Passive pressure on wingwalls
Friction on bottom of footing Anchor slabs (previously discussed)
When these are not sufficient, consider soil anchors
8/11/2019 Retrofit Abutments
12/39
Abutment retrofit measures
Wingwall cross-tie
8/11/2019 Retrofit Abutments
13/39
Abutment retrofit measures Abutment soil shear keys
-Pp=.96h ksf
Design tips
-To be fully effective:
clear space=2h
-Design shear for full passive pressure-Use R=2 for flexure
-Abutment connection designed
for overstrength moment
h
8/11/2019 Retrofit Abutments
14/39
Abutment retrofit measures
Wing overlay
8/11/2019 Retrofit Abutments
15/39
Abutment retrofit measures
Wing overlay
8/11/2019 Retrofit Abutments
16/39
Abutment retrofit measures
CIDH pile shear key
Designed for lateralcapacity only
More effective when
fixed at top
8/11/2019 Retrofit Abutments
17/39
Abutment retrofit measures
Deadman anchor
Extend anchors to avoid backfill movement Embed tie rods in concrete trench for protection
8/11/2019 Retrofit Abutments
18/39
Abutment retrofit measures
Deadman anchor
8/11/2019 Retrofit Abutments
19/39
8/11/2019 Retrofit Abutments
20/39
Abutment retrofit measures Soil anchors
Prestress ensures anchor is solid
8/11/2019 Retrofit Abutments
21/39
Abutment retrofit measures Abutment friction anchor
se w granu ar so s w e se emen
15 degree slope compresses slab as longitudinalmovemen occurs
Steel piles resist uplift
8/11/2019 Retrofit Abutments
22/39
Footin retrofit measures Footing strengthening
or s a y
Check moment at top
8/11/2019 Retrofit Abutments
23/39
8/11/2019 Retrofit Abutments
24/39
Footin retrofit measures Footing concrete overlay
se over ay o ncrease nega ve momen capac y
Use added depth to check positive moment
8/11/2019 Retrofit Abutments
25/39
Footin retrofit measures
Reinforcing splice detail
8/11/2019 Retrofit Abutments
26/39
Footin retrofit measures
Prestressing
Use to help positive moment
8/11/2019 Retrofit Abutments
27/39
Footin retrofit measures ste 1
Determine design forces
Limit to flexural capacity of pier
Use overstren th moment Material stronger than expected
Confinement of concrete
Strain hardening of steel
Increase axial load from EQ
8/11/2019 Retrofit Abutments
28/39
Footin retrofit measures ste 2
Check OT capacity
If exceeded-check stability with a rocking analysis This may eliminate retrofit requirements
8/11/2019 Retrofit Abutments
29/39
Footin retrofit measures ste 3
Design for shear
Difficult to retrofit Increase footing depth with overlay
Add prestressing bars
Add vertical bars through drilled holes (must passbottom layer with hooks (anchors) to be effective or
8/11/2019 Retrofit Abutments
30/39
Footin retrofit measures ste 4
Design for flexure
Top reinforcing lacking very often Add overlay with steel and dowels
should be within thickness of footing from column
Extra depth helps positive moment Place prestress as close to column as possible
8/11/2019 Retrofit Abutments
31/39
Footin retrofit measures ste 5
Design dowels to connect to existing concrete
Should transfer shear stress at interface Use shear friction approach-friction=1.0
,
bottom is required-(difficult to do this)
8/11/2019 Retrofit Abutments
32/39
Footin retrofit measures ste 6 Check column-to-footing joint shear
Overlay capacity
Yield line theory
Easier to ust make overla thickerExample 10.1
retrofit of
footing
8/11/2019 Retrofit Abutments
33/39
Pil t f ti ti
8/11/2019 Retrofit Abutments
34/39
Pile to footin connection
Steel pipe piles filled with conc and rebar
Good connection to new footing
Can be drilled in low head room
Very stiff for lateral loads
Good connection to new footing
Pil t f ti ti
8/11/2019 Retrofit Abutments
35/39
Pile to footin connection Prestress tie down
roo oa e own
Pile capacity limits
amoun o
prestress
ue o oo ng
rotation, limited useto short columns
(before fully
effective-rotation
S
8/11/2019 Retrofit Abutments
36/39
Summar
To describe typical retrofit measures for:
Abutments Footings
Ab t t t fit
8/11/2019 Retrofit Abutments
37/39
Abutment retrofit measures
Approach slabs
Anchor slabs Diaphragm walls
ransverse s ear eys Transverse soil anchors
Soil and gravity anchors
8/11/2019 Retrofit Abutments
38/39
8/11/2019 Retrofit Abutments
39/39