ROUTE 630 DIVERGING DIAMOND INTERCHANGE
Virginia Department of Transportation
Contract Value and DatesContract Value:$99,949,969.50
Start of Construction:Summer 2017
Final Completion Date: July 31, 202090 Day Incentive of $12,000/day
Virginia Department of Transportation
5
Project LocationNorth
South
WIDENING
INTERCHANGE
Project Highlights
• Interstate 95 at Exit 140 (Courthouse Road) • Diverging Diamond Interchange design• Moves Courthouse Road and Route 1 intersection south to
Hospital Center Boulevard• Wider Courthouse Road with more vehicle capacity• Commuter lot moves east of I-95
• Courthouse Road Widening• Widens road to 4 lanes from Cedar Lane to Ramoth Church
Road and Winding Creek Road• New traffic signals at:
• Ramoth Church and Winding Creek roads• Colonial Forge High School and Liberty Knolls entrance
Traffic Counts in 2017I-95 at Exit 140: 134,000 vehicles a dayRt. 1 traffic: 14,000 vehicles a day
7
Courthouse Road from Rt. 1 to I-95:17,000 vehicles a dayCourthouse Road from I-95 to Shelton Shop Road:10,000 vehicles a day
Typical Section:Courthouse Road after
Widening
• Median may be grass or concrete • 5 foot sidewalk to be built south of Courthouse Road near Colonial
Forge High School
9
Exit 140 Diverging Diamond Interchange
10
New Park & Ride Lots
11
Overall Project ScheduleMilestone Date
Courthouse Road 4-lane section
complete
December 20, 2019
Courthouse Road widening complete
July 2020
Final Park & Ride commuter lots open east of I-95
July 2020
New Exit 140 diverging diamond interchange complete
July 2020
I-95 SOUTHBOUND RAPPAHANNOCK RIVER CROSSING
UPC 101595 – Design Build Contract with Wagman Heavy Civil
Virginia Department of Transportation
Contract Value and DatesContract Value:$101,608,779.00
Planned Start of Construction:September 28, 2018
Final Completion Date: May 26, 2022 w/90 Day Incentive of $20,000/day
Interim Completion Milestone for Bridges over Route 17: September 15, 2021 w/30 Day Incentive of $16,666/day
Virginia Department of Transportation
• Approx. Exit 133 to Exit 130
• Rappahannock River Crossing in Median
• Three new GP lanes in median with interchange ramp modifications.
• Replaces existing Structural deficient SB and NB I-95 Bridges over Route 17.
Virginia Department of Transportation
Project Limits and Scope
VTCA DISTRICT DIALOG 2018MICHELLE A. SHROPSHIRE, P.E.ADE - PROJECT DEVELOPMENT
Develop a corridor wide transportation solution that:• Reduces congestion• Provides additional travel choices• Improves travel predictability• Improves roadway safety
Virginia Department of Transportation
I-95 Express Lanes Fredericksburg Extension (Fred Ex) -Purpose and Need
Virginia Department of Transportation
I-95 Express Lanes Fredericksburg Extension (Fred Ex)
Virginia Department of Transportation
I-95 Express Lanes Fredericksburg Extension (Fred Ex) -Scope
• Fully funded by Transurban• Extends I-95 Express Lanes 10 miles south to
Route 17 interchange• Two reversible lanes – tolled facility• Connects with I-95 Rappahannock River Crossing
projects• Replaces American Legion and Truslow Road
overpasses• New access at Route 17, Courthouse Road, and
Russell Road at Quantico interchanges
Virginia Department of Transportation
I-95 Express Lanes Fredericksburg Extension (Fred Ex) -Typical Section
Virginia Department of Transportation
I-95 at US Route 17 (Exit 133)
Virginia Department of Transportation
I-95 at Courthouse Road (Exit 140)
Virginia Department of Transportation
I-95 at Russell Road (Exit 148)
Virginia Department of Transportation
I-95 Express Lanes Fredericksburg Extension (Fred Ex) –Schedule
Milestone DateIssue RFQ January 17, 2018Issue RFP March 27, 2018Anticipated Technical Proposal Due Date
September 2018
Anticipated Price Proposal Due Date October 2018Anticipated Design-Build Contract Execution
January 2019
Anticipated Service Commencement October 2022Anticipated Final Completion April 2023
Virginia Department of Transportation
I-95 Rappahannock River Crossing - Northbound
Type:Design-Build Procurement
Project Budget:$132,000,000
Anticipated RFQ Advertisement:Fall 2018