Ahmed Mohammed Baioume Shaheen
Adress : 193B GARDINIA ST. HADABET AL-AHRAM KHOFO ENTRANCE -GIZA -
EGYPT
Phone : +2 (02) 33800370
Mobile: +2 (0128) 1701708
Mobile: +2 (0100) 0624162
[email protected]: 1 Mail-E
[email protected]: 2 Mail-E
PPeerrssoonnaall DDaattaa
Nationality: Egyptian.
Gender: Male
Date of Birth: May. 5th
1963.
Place of Birth: Cairo, Egypt.
Marital Status: Married.
aattiioonnEEdduucc
High School: Tawfikia Secondary School.
-SHOBRAFaculty of Engineering -Engineering. Bachelor of Civil - 1986 :Degree
Zagazig University
.Reinforced Concrete Project Graduation project:
Grade: Good.
(no. 2005 sinceineers Syndicate Egyptian Eng :of Consultant engineer certificate
1\5107).
(no. 18717) embership since 2005M :Kuwait society of engineers
and Supported by Kuwait Municipality to supervise projects.
:CCoommppuutteerr SSkkiillllss
Excellent Command of all MS Office applications.
Excellent Knowledge of using Internet and Networks.
AutoCAD 2013 2D
Primavera P6.
Presentation skills.
LLaanngguuaaggee::
Arabic: Mother tongue.
Excellent command of English language both written and spoken.
TTrraaiinniinnggss::
Professional Supervisor program by MADA consulting outsourcing.
Effective Communication and Business Writing Workshop.
Course preparation schedules by Primavera P6.
PMP Preparation Course By Advanced Project Management Academy.
Professional Experiences (From latest to oldest)
. Eng. Hussein Sabbour consulting bureau – current
rSupervision Department Manage :PPoossiittiioonn
MMaaiinn RReessppoonnssiibbiilliittiieess::
Follow-up fees, claims and make sure debts with financial management.
Contributing with financial management in the follow-up work at delayed
claims.
Mode expected cash flow plans for the claims office fees for projects
implemented neighbor with site managers.
Supervising the progress of the program implemented projects and approve
project managers reports.
Work-monthly report complex projects.
Visits for ongoing projects to monitor the progress of the work and the
level of quality.
Dependence of modification requested by the client in coordination with
the site supervisor of the implementation and sector head manager.
Dependence of prices and analysis of emerging from the Contractors items
prices in coordination with the site supervisor of the implementation and
sector head director.
Accreditation As Built drawings and all the closing documents for the
project.
Preparation of lists of contractors / suppliers to enter candidates in the
tender.
Duration: Feb. 2015 - Current
PPoossiittiioonn: Project Manager
MMaaiinn RReessppoonnssiibbiilliittiieess::
Supervise, manage Project team and monitor progress & productivity on site.
Ensure Projects Management System, Quality and Safety system requirements
are implemented.
Liaise with Client on technical, contractual and commercial matters.
Initiate Cost/Value comparison and maintain regular updates.
Materials inspection & testing and variation orders.
Coordinate with the Time schedule and Solve all problems to keep progress
Assures that the project is completed within cost, schedule and technical
parameters outlined in the contract.
Manage all meetings needed with the Owners, contractors, and Designer
consultant to ensure efficient Implementation and project performance of
construction .
Prepare periodically reports to be submitted to the top management
Manage/encourage site staff to achieve and maintain good morale and team
spirit.
Duration: Oct 2008 - Feb. 2015
1- Platinum Sports Club in New Cairo on an area of 110,832 square meters - cost
of 350 million LE.
Components:
Standard soccer field – Olympic, Children and Women's swimming pools - the
administrative Building - horse stable - equestrian building - 2 Basketball
Stadium - 3 court Pentathlon – 3 Handball Stadium - 7 tennis courts - green areas
– recreations areas –Food court – Retaining walls by reinforced soil -All
networks(elec.-water-waste water-irrigation-fire.. etc.) – Roads .
2- Mega project Amwaj – (sidi abd elrahman) – north coast - cost of 1000 million
LE.
Components:
First Stage
1360 Apartments – 2 Luxury hotel – recreation area
Tennis Playground - 18 Swimming Pools – Gardens - Fences – Roads- All MEP
inside and outside -Electricity Rooms - Water Reservoir - Sewage Pump Station -
Irrigation Tank - Sludge Tank - Sewage Water Treatment Plant.
3- Sharm Heights – (Sharm El-Sheikh) cost of 40 million LE.
Components:
49 Apartments – 196 Luxury Flats (Concrete & Finishing)
Tennis Playground – Swimming Pools - Gardens - Fences – Roads- Electricity
Rooms - Water Reservoir - Sewage Pump Station
Irrigation Tank - Sludge Tank - Sewage Water Treatment Plant.
4 - Sharm lagoon – (Sharm El-Sheikh) cost of 100 million LE.
Components:
87 Apartments – 329 Luxury Flats (Concrete & Finishing)
Tennis Playground – Swimming Pools – Gardens - Fences – Roads- Electricity
Rooms - Water Reservoir - Sewage Pump Station - Irrigation Tank - Sludge Tank
- Sewage Water Treatment Plant.
Eng. Abdullah Al-Abbar Engineering Consultant Office in Kuwait
Belongs to: Oriental Constructions Co. (O.C.C.).
Director of Supervision: PPoossiittiioonn
MMaaiinn RReessppoonnssiibbiilliittiieess::
Supervise, manage Project team and monitor progress & productivity on
site.
Ensure Projects Management System, Quality and Safety system
requirements are implemented.
Liaise with Client on technical, contractual and commercial matters.
Initiate Cost/Value comparison and maintain regular updates.
Materials inspection & testing and variation orders.
Coordinate with the Time schedule and Solve all problems to keep progress
Assures that the project is completed within cost, schedule and technical
parameters outlined in the contract.
Manage all meetings needed with the Owners, contractors, and Designer
consultant to ensure efficient Implementation and project performance of
construction .
Prepare periodically reports to be submitted to the top management
Manage/encourage site staff to achieve and maintain good morale and team
spirit.
Duration: Dec. 2006 – Oct. 2008
B.O.T. PROJECT (CONSTRUCTION, COMPLETION & MAINTENANCE OF ROADS, STORM
WATER, SANITARY SEWER AND OTHER SERVICES) FOR WEST ABU FUTAIRA
PUBLIC AMENITIE
(Foot print area 125, 000 m2, and cost of 45 million KD).
MAIN CONTRACTOR: THE KUWAIT COMPANY FOR PROCESS PLANT
CONSTRUCTION & CONTRACTING.
Burhan International Construction Co.W.L.L- in Kuwait
Project MANAHI AL- OSAMY Medical Center For Benefactor Oriental
Constructions Co. (O.C.C.)
ManagerProject : : PPoossiittiioonn
MMaaiinn RReessppoonnssiibbiilliittiieess::
Management & coordination.
Make sure the supply of raw materials, according to the activities schedule
Contracting with subcontractors specialized in business according to the
schedule of the project.
Preparation of progress reports.
Problem solving during project period.
Review monthly invoices and approval from consultant.
Variation orders claim.
Assures that the project is completed within cost, schedule and technical
parameters outlined in the contract.
Manage all meetings needed to ensure efficient Implementation and
project performance of construction.
Duration: Dec.. 2004 – Dec. 2006
MANAHI AL-OSAIMI SPECIALIZED MEDICAL CENTER
(Foot prints area18, 000 m2, and cost of 6 million KD) At kheitan.
Owner: MINISTRY OF HEALTH
MAIN CONTRACTOR: BURHAN INTERNATIONAL CONSTRUCTION CO. W.L.L.
El-Fath for construction and building
PPoossiittiioonn: Project manager than Deputy Head of Construction execution
MMaaiinn RReessppoonnssiibbiilliittiieess::
Management & coordination.
Make sure the supply of raw materials, according to the activities schedule
Contracting with subcontractors specialized in business according to the
schedule of the project.
Preparation of progress reports.
Problem solving during project period.
Review monthly invoices and approval from consultant.
Variation orders claim.
Assures that the project is completed within cost, schedule and technical
parameters outlined in the contract.
Manage all meetings needed to ensure efficient Implementation and project
performance of construction
Duration : Sep. 1997 – Dec 2004
1-Cairo International Airport:
* Terminal no. (1) Extension and rehabilitation Luxury finishing.
* Terminal no. (2) Extension and rehabilitation Luxury Finishing.
* Landscape between terminals no. (2) And terminal no. (3) And
Great mosque.
* Administrative and technical facilities of building stores.
2-Air force house:
* Social building LA REINE.
* Restaurants L’ETOILE.
* Bowling hall game and swimming pool.
3-Air force Almaza airport:
* Main Press Home to the Air Force.
* VIP Lavish palace and its landscape and swimming pool on an area of
10 acres front of Sheraton airport hotel.
* All rest houses soldiers including outside landscape.
4-Third army in Suez:
* Special building for chemical war group.
* Administration building for technical defense group.
5-Army public services:
* Playing stadium area in Mubarak Olympic center in Smoohaa at Alexandria
governorate.
6-Air Force Academy in Belubas:
* Hard Soft escape and Coordination for all locations in the Air Force Academy.
Al-araby Office for Engineering Consultancy
Al_ Hamadan consulting engineers _ Jeddah _ Saudi Arabia
PPoossiittiioonn: Structure and supervision sector manager
MMaaiinn RReessppoonnssiibbiilliittiieess::
Management of Structural design team
Structural design calculations.
Preparation of Tender Documents
Supervision services.
Duration : May. 1994 – Sep. 1997
1- AL-Gedaaniy hospital in Jeddah.
2- Hamra Commercial Center in Jeddah.
3- A lot of privet villas, V.I.P. palaces, compounds and malls in Jeddah and
Aubhor beach.
Barden & Associates Consulting engineers Office
For (L * A PWT WORLDWIDE – USA CONTRACTOR)
IN US AID EGYPTION PROJECTS.
PPoossiittiioonn: Resident Engineer Construction Supervision Services
MMaaiinn RReessppoonnssiibbiilliittiieess::
Site management.
Site works administration.
Site works coordination.
Supervision of execution works.
Quality control.
Materials inspection & testing.
Review contractor’s proposal for design modification.
Preparation of progress reports.
Duration: Oct. 1991 – May 1994
Five wastewater pumping station and three water treatment plants for
L&A WATER TREATMENT CORPRATION (AMIRICAN CONTRACTOR)
In minia, bany swaif, fayom cities as apart of 60 million dollar US aid funded.
The industrial metallic CO. (I.M.C.) associated to the ministry
of industry
Duration: Mar. 1987 – Oct. 1991
* Design and supervision for rest house and administration building to Abo
Tartor phosphate project in west desert El-kharga city.
Duration: June. 1986 – Mar. 1987
* Improving English Language course at the American University .
* Training with a French company to set up automated slaughterhouse at
Elbasateen area.
RReeffeerreenncceess::
All certificates and references can be represented when request.