08 Fall
PREPARED FOR:
CITY OF LAKE OSWEGO
Streetcar Community Attitudes Survey - Community
Development and Transportation Principles
October 2011
PREPARED BY:
DHM RESEARCH
(503) 220-0575 • 203 SW Pine St., Portland, OR 97204 • www.dhmresearch.com
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 2
1. INTRODUCTION & METHODOLOGY
Davis, Hibbitts & Midghall, Inc. (DHM Research) conducted a telephone survey of registered
voters in the City of Lake Oswego. The primary objectives of the survey were to measure
support for bringing streetcar service from Portland to Lake Oswego along Highway 43 and
to assess voter priorities on a range of community development and transportation priorities
involved in such a project.
Research Methodology: Between October 10 and 14, 2011, DHM Research conducted a
12 minute telephone survey of 300 registered voters in the City of Lake Oswego. This is a
sufficient sample size to assess voters’ opinions generally and to review findings by multiple
subgroups, including gender, age, political party, and area of the city.1
Voters were contacted using a list of registered voters. This list included both land line and
cell phone numbers. In gathering the responses, a variety of quality control measures were
used, including questionnaire pre-testing and validation. Quotas were set by age, gender,
zip code, and political party based on the total population of voters living in the city for a
representative sample.
Statement of Limitations: Any sampling of opinions or attitudes is subject to a margin of
error, which represents the difference between a sample of a given population and the total
population (here, registered voters in Lake Oswego). For a sample size of 300, if
respondents answered a particular question in the proportion of 90% one way and 10% the
other way, the margin of error would be +/-3.4%, at the 95% confidence level. If they
answered 50% each way, the margin of error would be +/-5.6%.
These plus-minus error margins represent differences between the sample and total
population at a confidence interval, or probability, calculated to be 95%. This means that
there is a 95% probability that the sample taken for this study would fall within the stated
margins of error if compared with the results achieved from surveying the entire population.
DHM Research: We have been providing opinion research and consultation throughout the
Pacific Northwest and other regions of the United States for over three decades. The firm is
non-partisan and independent and specializes in research projects to support public policy-
making. www.dhmresearch.com
1 Using the voter file, respondents were matched to their zip code and precinct. From this information, it was
possible to analyze the data by area of the city. For east and west comparisons the respondents were grouped by
the 97304 (east) and 97035 (west) zip codes. For north and south comparisons, respondents were grouped
according to their voter precincts.
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 3
2. SUMMARY & OBSERVATIONS
While the streetcar project is important to many, and a priority to some, there are
also many other issues voters in Lake Oswego would like their elected officials to
do something about.
In an open-ended question to start the survey, 18% of voters said the streetcar was
the most important issue they would like their city elected officials to do something
about. This was more than any other single issue, but it also means that a large
marjority (82%) felt that some other issue was more important. Other important
issues were education, taxing, and city finances.
When it came to transportation priorities, 30% of voters said the streetcar was the
most mentioned issue. But, again, this means that a strong majority (70%) gave
priority to some other transportation priority. Other issues mentioned were
imporving bus service, traffic congention, and road repair.
The survey asked voters to rate the priority of addressing six transportation
problems in Lake Oswego. Above all other priorities was repairing and maintaining
exisiting neighborhood roads and streets.
54% said that maintaining and repairing existing roads was a high or urgent priority,
which was the only problem tested to have a majority feel this strongly.
Reducing traffic congestion was rated the next highest priority. However, the overall
results of the survey suggest that there is not consensus among Lake Oswego voters
if this is best addressed by the streetcar project, improved bus service, or widening
Highway 43.
Although some problems were clearly seen as less of a priority – e.g., traffic
congestion in Lake Grove and downtown parking – a majority said that all the issues
tested were at least a medium priority.
For broader community development ideas, voters in the survey said that
restricting additional development so that Lake Oswego maintains its existing
character was the most acceptable.
Although this survey did not test community satisfaction, from the past quantitative
and qualitative studies DHM Research has conducted for Lake Oswego, we know that
residents greatly value living in Lake Owsego and specifically choose the city because
of the charcter of it’s neighborhoods. It is not surprising that without specific
information about the location, design, amenties, and cost of new development that
voters would be find it acceptable to be restrictive.
The second most acceptable development idea tested was encouraging transporation
alternatives to driving, such as public transit, biking, and walking.
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 4
The survey asked voters for their support of the streetcar project twice, once
without providing information about cost and financing, and again after providing
this information. In both tests, a slight majority opposed the project, and about
four in 10 supported it.
In the initial test, 52% said they opposed the project, including 32% who said they
were ―not at all supportive.‖ On the other had, 39% said that they supported the
project, with 18% being ―completely supportive.‖
In the final test, after being provided cost and finance information, 52% opposed
the project and 40% supported it. An equal percertages was ―not at all supportive‖
(32%) and slightly fewer were ―completely supportive‖ (14%).
Voters were presented four statements about the cost and finances of the
streetcar project and asked if they made them more supportive, less supportive, or
made no difference.
The statements that made the most voters relatively more supportive indicated that
the streetcar project would be paid for by fees on new development and not increase
their taxes (37%) and that the funds for existing city services would not be used to
pay for the project (38%).
Statements about specific dollar amonts for the total cost of the project (24%) and
the City’s share of the total cost (31%) moved fewer voters to being supportive of
the project.
The survey concluded by asking voters – open ended – to offer their ideas to
address traffic congestion on Highway 43 if the streetcar project does not go
forward. The most suggested idea was improving bus service (31%).
The next most mentioned ideas were to widen Highway 43 (7%) and add bike paths
(6%).
7% said that traffic congestion on Highway 43 is not a problem.
Overall, this survey indicates that the streetcar project is an important issue, but
voters in Lake Oswego also have many other priorities that they would like their
elected city officals to do something about. When asked directly to rate their
support, more are opposed to the project, but there is a significant support for it
as well. Voters’ opinions appear motivated more by ensuring that funding for
public services will not be cut, and that taxes will not increase, than by the total
cost of the project.
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 5
3. KEY FINDINGS
3.1 | Most Important Issues
The survey started by asking voters, open ended, what is the most important issue in Lake
Oswego that you would like your elected officials to do something about (Q1)? The open-
ended comments were coded into categories and are summarized in Table 1. At 18%, the
top mentioned issue was the streetcar (or trolley). The next most mentioned issue was
education. When all categories related to education were grouped together (funding,
quality, and general comments), education was mentioned by a total of 12% of the voters.
City taxing, spending, and financing comments were mentioned by 8% of voters. Twelve
percent (12%) could not name any issues and 14% said they did not know what elected
officials should do.
Table 1
Most Important Issue for Elected Officials to Do Something About (Q1)
Response Category N=300
Streetcar/trolley mention 18%
Education funding 6%
Infrastructure (roads, bridges, sidewalks, etc.) 6%
Water and sewage fees 5%
Doing something with the WEB 5%
Education – general 4%
Government spending 3%
Balancing the budget 3%
Education quality 2%
Traffic congestion 2%
Reduce taxes 2%
All other responses 1% or less
Other 8%
Nothing/none 12%
Don’t know 14%
Source: DHM Research, October 2011
Demographic Differences: The most notable difference in the issues mentioned related to
the streetcar. By area, it was brought up as an issue nearly twice as often in the 97034 zip
code area (23%), which is the eastern side of the city, than in 97035 area (12%). It was
also mentioned more by those with children in the household (30%) than those without
(13%), and those ages 35-54 (30%) compared to those ages 18-34 (9%) and 55+ (12%).
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 6
Table 2
Most Important Transportation Issue in Lake Oswego (Q2)
Response Category N=300
Streetcar/trolley mentioned 30%
Improve bus service (bus stops, availability) 10%
Traffic congestion 7%
Road repair 6%
More public transportation 6%
More bike paths 4%
Pedestrian safety 2%
All other responses 1% or less
Other 8%
Nothing/none 19%
Don’t know 4%
Source: DHM Research, October 2011
Next, voters were asked to focus on the transportation issue in Lake Oswego that they
would most like their elected officials to do something about (Q2). Their responses are
presented in Table 2. Again, the streetcar was the most mentioned issue (30%). Next was
improving bus service (10%), and another 6% mentioned bringing more public
transportation service to the city generally. Traffic congestion was mentioned by 7% of the
voters and 6% mentioned road repair. Nineteen percent (19%) said there were no issues to
address and 4% said they did not know.
Demographic Differences: At 43%, voters ages 35-54 were much more likely to mention
the streetcar than those younger (9%) and older (27%). It was also more frequently
mentioned by those with children in the household (40%) than those without children
(25%). There were no statistically significant differences by area of the city.
Table 3
Streetcar Project Suggestions (Q3)
Response Category N=99
Get rid of it/don’t build it 36%
Approve it/build it 20%
Waste of money 14%
Focus on buses 4%
Find funding for streetcar 3%
Use money for more important issues 3%
Complete it quickly 3%
Price availability for everyone 3%
All other responses 2% or less
Nothing/none 1%
Don’t know 27%
DHM Research, October 2011
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 7
Those who mentioned the streetcar in Q1 or Q2 were asked what, specifically, they would
like their elected officials to do about it. Table 3 lists their responses. Thirty-six percent
(36%) said not to build it, and another 14% said that it is a waste of money. Four percent
(4%) wanted elected officials to focus on buses (4%), or use the money for more important
issues (3%). On the other hand, 20% said to build it, and 6% made comments about
finding the necessary funds (3%) and to complete it quickly (3%).
Table 4
Reasons for Streetcar Project Suggestions (Q4)
Response Category N=71
Don’t support the idea 24%
Wasteful spending 22%
Expensive/cost 16%
Good idea/support it 14%
Reduce traffic congestion 11%
Money could be spend elsewhere 11%
Convenience 10%
Improve communities 8%
Generate revenue for city 7%
Lack of ridership 6%
Ruin communities 5%
Alternate means of transportation 5%
Majority disapprove 4%
Focus should be on riding the bus 4%
Against raising taxes 3%
Good for the environment 3%
Keep up with population growth 1%
Nothing/none 6%
Don’t know 0%
DHM Research, October 2011
After asking these voters what they would like their elected officials to do about the
streetcar, a follow-up question asked why they would like their elected officials to act in a
particular way. Table 4 shows the coded responses. Frequently mentioned concerns were
about wasteful spending (22%) and the expense or cost of the streetcar (16%). The most
mentioned comments that were supportive of the streetcar were about reducing traffic
congestion (11%) and increasing convenience (10%).
3.2 | Transportation Project Priorities
The next section of the survey asked the voters about issues that some in Lake Oswego
consider to be transportation problems and to rate each as a low priority, medium priority,
high priority, or urgent priority (Q5-Q11). Because there is a tendency, in exercises like
this, for survey takers to rate each item at the extremes of the scale, and thereby not
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 8
differentiate between the items tested, these voters were instructed to be selective with
their ratings and try not to say ―urgent‖ for all the priorities.
The results are summarized in Chart 1. The issues were sorted into three tiers based on
their combined percentages of high and urgent priority.
Tier 1
One transportation project priority stood out above the rest: repairing and maintaining
existing neighborhood roads and side streets (Q8). This was the only problem tested in
which a majority (54%) said it was a high (47%) or urgent (7%) priority.
Demographic Differences: Among demographic groups, the only statistically significant
difference was by gender, with 61% of females rating this as a high or urgent priority
compared to 47% of males who rated it similarly. Although it was not a statistically
significant difference, it is worth noting that voters in the 97034 area were more likely to
say that this is a high or urgent priority (59%) than those in the 97035 area (48%).
47%
39%
41%
41%
36%
18%
10%
38%
39%
34%
33%
32%
45%
35%
13%
13%
21%
20%
26%
27%
47%
1%
3%
4%
5%
3%
8%
7%
0% 20% 40% 60% 80% 100%
Improve parking in downtown Lake Oswego
Reducing traffic congestion in the Lake Grove
neighborhood
Having more pathways that connect pedestrians
to neighborhoods and shopping areas.
Having more bicycle routes in Lake Oswego
Having more frequent public transportation
service to and from Lake Oswego
Reducing traffic congestion on Highway 43
between Lake Oswego and Portland
Repairing and maintaining existing neighborhood
roads and side streets
CHART 1: TRANSPORTATION PROJECT PRIORITIES (Q5-Q11)
Low priority Medium priority High priority Urgent priority Don’t know
Source: DHM Research, October 2011
Tie
r 1
Tie
r 2
Tie
r 3
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 9
Tier 2
Four projects fell into the second tier based on their percentages of high and urgent priority
ratings:
Reducing traffic congestion on Highway 43 between Lake Oswego and
Portland (35%) (Q5)
Having more frequent public transportation service to and from Lake
Oswego (29%) (Q9)
Having more bicycle routes in Lake Oswego (24%) (Q11)
Having more pathways that connect pedestrians to neighborhoods and
shopping centers (24%) (Q10)
Demographic Differences: The priority of reducing traffic congestion on Highway 43
differed by area of the city. Forty-two percent (42%) of voters living in the 97034 zip code
area (eastern) said that it is a high or urgent priority compared to 28% of those living in the
97035 zip code area (western). It was also more urgent in northeast voter precincts (52%)
than northwest (29%) or southern (29%) parts of the city.
There was a sharp partisan divide when it came to having more frequent public
transportation service to and from Lake Oswego. Nearly one-half (46%) of Democrats said
it was a high or urgent priority versus just 12% of Republicans and 22% of Independents.
Also, as would be expected, it was a greater priority among streetcar supporters (53%)
than those who were neutral (16%) or opposed (14%) to it.
Having more bicycle routes in Lake Oswego was a greater priority among 35-54 year olds
(37%) and those with household incomes between $75,000 - $149,999 (36%). It was also
a greater priority among Democrats (31%) compared to Republicans (15%) or
Independents (26%).
Voters with children in the household (34%) were more likely to say that having pathways
that connect pedestrians to neighborhoods and shopping areas is a high or urgent priority
than those without children (20%). It was also deemed a greater priority among voters
ages 35-54 (31%).
Tier 3
The two issues that were rated as the lowest priorities were:
Reducing traffic congestion in the Lake Grove neighborhood (16%) (Q6)
Improve parking in downtown Lake Oswego (14%) (Q7)
It is notable that although these problems rated the lowest, a majority (53%-61%) of
voters still rated them as at least a medium priority.
Demographic Differences: The level of priority for reducing traffic congestion in Lake
Grove was consistent across demographic groups and there were no statistically significant
differences.
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 10
When it comes to parking in downtown Lake Oswego, females were more likely to say it is a
high or urgent priority (22%) than males (7%). It was also considered a greater priority
among voters 18-34 (19%) and 55+ years old (18%) than those 35-54 (8%). Despite the
fact that these are location specific issues, there were no statistically significant differences
by areas of the city.
3.3 | Community Planning Principles
Voters who took the survey were asked to rate the acceptability of six principles relating to
the type of development they would like to see used in community planning for Lake
Oswego in the next ten years (Q12-Q17). They rated each principle on a 1-7 scale where 1
meant ―not at all acceptable‖ and 7 meant ―very acceptable.‖ Taking into account both the
average, or mean, response and the percentages of 6-7 reponses (those that are most
acceptable), the principles tested sorted into five tiers. The results are summarized in Chart
2.
In addition to their rank order, it is worth noting that none of the six principles were judged
as unacceptable by a majority of voters. Also, for five of the priciples, the percentage of
voters who rated it as a 6-7 was greater than the percentage who rated it a 1-2.
15%
10%
9%
8%
13%
5%
12%
10%
10%
8%
7%
8%
15%
12%
6%
10%
10%
12%
15%
20%
18%
13%
10%
13%
26%
22%
26%
27%
18%
14%
8%
12%
15%
17%
17%
16%
8%
13%
16%
16%
24%
30%
0% 20% 40% 60% 80% 100%
Mix different development types together, such
as buildings in which people can live above retail shops and offices.
Encourage development that allows people to
shop closer to where they live.
Encourage additional development in
underdeveloped areas of Lake Oswego, but only of the type that maintains the character of our
existing neighborhoods.
Encourage the development of housing that is
affordable to new families, teachers, police officers, and young professionals.
Encourage public transit, biking, and walking as
an alternative to the automobile.
Restrict additional development so that Lake
Oswego maintains its existing character.
CHART 2: ACCEPTABILITY OF PLANNING PRINCIPAL (Q12-Q17) 1-7 scale: 1=not at all, 7=very
1:Not at all 2 3 4 5 6 7: Very Source: DHM Research, October 2011
Tie
r 1
Tie
r 2
Tie
r 3
Tie
r 4
Tie
r 5
Mean
5.0
4.6
4.6
4.5
4.2
3.8
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 11
Tier 1
The most acceptable community planning principle was to restrict additional
development so that Lake Oswego maintains its existing character (Q15). Nearly
one-half (46%) rated this 6-7 and it had a mean rating of 5.0.
Demographic Differences: Voter sentiment about this planning principle was consistent
across demographic groups. There were no statistically significant differences by age,
gender, area of the city, or other subgroup.
Tier 2
The second most acceptable planning principle was encouraging public transit, biking,
and walking as an alternative to the automobile (Q13). Four in 10 (41%) rated this 6-
7 and it had a mean rating of 4.6.
Demographic Differences: The greatest differences for this priority related to political
party and area of the city. Comparing means, Democrats (5.2) and Independents (5.2)
rated this as more acceptable than Republicans (3.5). It was also rated higher among voters
in the northeast part of the city (5.1) than those in the northwest (4.5) and southern parts
(4.3)
Tier 3
Two planning principles fell into a third tier of acceptability:
Encourage the development of housing that is affordable to new families,
teachers, police officers, and young professionals (6-7: 33%; mean: 4.6)
(Q17)
Encourage additional development in underdeveloped areas of Lake
Oswego, but only of the type that maintains the character of our existing
neighborhoods (6-7: 31%; mean: 4.5) (Q16)
Demographic Differences: Voters who said that the principle of encouraging the
development of housing that is affordable to new families was more acceptable tended to be
women (4.9), Democrats (5.0), and those with household incomes less than $150,000 (4.9-
5.0). It was also judged to be more acceptable by those who were neutral or supportive
about bringing streetcar service to Lake Oswego (5.0-5.2).
Democrats (5.0) and those with household incomes between $75,000 - $149,999 (5.0)
were the demographic groups that rated the principle of encouraging additional
development in underdeveloped areas as acceptable, so long as it maintains the character
of Lake Oswego’s existing neighborhoods. It was also seen as more acceptable in the
northern part of the city (4.7) than in the southern part (4.2).
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 12
Tier 4
In the fourth tier, by itself, was the principle to encourage development that allows
people to shop closer to where they live (6-7: 25%; mean: 4.2) (Q12).
Demographic Differences: Political party affiliation was the only demographic difference
for this planning principle. On average, Democrats rated it 4.8 compared to ratings of 3.5
by Republicans and 4.3 by Independents. It should be noted that one-third (34%) of
Republicans rated this principle 1 or 2 on the seven-point scale.
Tier 5
The least acceptable principle was to mix different development types together, such
as buildings in which people can live above retail shops and offices (6-7: 16%;
mean: 3.8) (Q14). It is important to note that survey respondents were not given any
context about where this development may occur, what it would look like, or what amenities
it could include. In other research projects, DHM Research has found that providing more
detailed information about this type of mixed-use development can make people more
supportive. That does not, however, necessarily mean that the same would be true in Lake
Oswego, and the survey did not have the opportunity to explore the issue more deeply.
Even so, with a mean rating of 3.8, voters on average found this principle more acceptable
than not.
Demographic Differences: Again, the greatest demographic differences were by political
party affiliation. Mean ratings for Democrats (4.1) and Independents (4.3) were significantly
higher than those of Republicans (3.1). Additionally, four out of 10 (41%) Republicans rated
this principle as a 1 or 2, or not at all acceptable.
3.4 | Streetcar: Initial Supportive Level
The final section of the survey assessed voter support for bringing streetcar service to Lake
Oswego. Support levels were measured twice. In the initial test, survey respondents were
not given any information about the projected cost or funding mechanism to fund a
streetcar. After being presented four statements about costs and funding, they were asked
again about their support.
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 13
The language of the initial test was: As you may have heard, the City of Lake Oswego
continues to explore streetcar service between Portland and Lake Oswego
adjacent to Highway 43. This streetcar would connect directly to the existing
streetcar in downtown Portland. Based on what you know, please rate your level
of support for the streetcar project using a 1 to 9 scale, where 1 means ―not at all
supportive‖ and 9 means ―completely supportive‖ (Q18).
Chart 3 displays the results of the initial test. The mean rating was 4.4. Fifty-two percent
(52%) leaned somewhat unsupportive to not at all supportive, while 39% leaned somewhat
supportive to completely supportive. It worth noting the percentage of voters who placed
themselves at the extremes of the scales: 18% were completely supportive (9 on the scale)
and 32% were not at all supportive (1 on the scale).
Demographic Differences: Levels of support (and opposition) to the streetcar were
characterized by area of the city, political affiliation, and having children at home. On
average, voters living in the 97035 zip code– which is farther away from the proposed
streetcar project – were more supportive having a mean of 5.0 than those living in the
97034 zip code where the mean was 3.9. Nearly six in 10 (59%) 97034 voters were
generally not supportive of the streetcar and 40% rated their support as 1, or not at all
supportive. When comparing the northern and southern parts of the city, there was not a
statistically significant difference in the overall average level of support.
Democrats were significantly more supportive of the streetcar (5.1) than Republicans (3.4),
with Independents falling in between (4.5). One-half (51%) of Democrats were at least
somewhat supportive, and 70% of Republicans were at least somewhat unsupportive, with
44% who were completely unsupportive.
32%
8%
6%
6%
9%
7%
9%
5%
18%
0% 10% 20% 30% 40%
1:Not at all supportive
2
3
4
5: Neutral
6
7
8
9: Completely supportive
CHART 3: SUPPORT LEVEL - INITIAL TEST (Q18)
Source: DHM Research, October 2011
39%
52%
Mean: 4.4
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 14
Voters with children in the home were less supportive of the streetcar than those without
children, both on average (4.1 vs. 4.6) and as a percent of those who rated their supportive
level from 1-4 (62% vs. 47%).
After rating their support for the streetcar, the survey respondents were asked, open ended,
why they rated their support the way they did (Q19). The responses were coded based on
level of support. Voters who rated their support from 1-4 were coded as ―not supportive,‖ 6-
9 were ―supportive,‖ and 5 were ―neutral.‖2
Table 5 shows that of those who support the streetcar, 4 in 10 voters (42%) said that they
favor bringing streetcar service to Lake Oswego because they are supportive of public
transportation. Another 20% said it was because they believe that it would help reduce
traffic congestion.
Table 5
Comments Supportive of the Streetcar (Q19)
Comments N=114
Support public transportation 42%
Reduce traffic congestion 20%
Convenience 10%
More people will use it 9%
Cost/expensive 9%
Less dependence on automobiles 8%
Need transportation to Portland 8%
Need more information 6%
Would use it 6%
Good to have alternate forms of transportation 6%
Save on gas 5%
Already have adequate public transportation 5%
Good for the environment 4%
Not enough people will use it 4%
Money can be better used on other projects 4%
Bring in revenue to downtown 3%
All other responses 2% or less
Other 15%
DHM Research, October 2011
2 Some comments may appear contradictory. For example, 4% of people who supported the streetcar commented
that ―not enough people will use it.‖ The reason for this was that survey respondents often qualified their answers
or offered caveats. In this example, a set of participants supported the streetcar despite reservations about the
number of riders.
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 15
“I think a lot of people work in downtown Portland and if there was something that
connected them to the streetcar downtown they would use it.”
“Well there is a ton of traffic on that road and it’s impossible to widen so they need
the streetcar.”
“I think it is an important priority to reduce traffic and give an alternative to driving
to downtown Portland.”
“I think it’s a good idea. A lot of people travel [on] Highway 43, and there’s no
reason to drive in their car.”
As Table 6 summarizes, nearly one-half (48%) of voters generally opposed to the streetcar
said it is because of cost or that it is too expensive. Thirty-seven percent (37%) said that it
is unnecessary and another 15% felt that not enough people will use it. Fifteen percent
(15%) also said that the money needed for the streetcar could be better used on other
projects.
Table 6
Comments Opposed to the Streetcar (Q19)
Not Supportive N=156
Cost/expensive 48%
Unnecessary 37%
Not enough people will use it 15%
Money can be better used on other projects 15%
Already have adequate public transportation 6%
Need more information 3%
Wasteful spending – general 3%
I wouldn’t use it 3%
Affects property values of neighborhoods 3%
Reduces congestion 3%
All other responses 2% or less
Other 20%
Nothing/none 1%
DHM Research, October 2011
“The streetcar project is one that costs a lot of money and I think it is not so
important as the bus service.”
“I just think there is a better way to spend the money in the metro area. It would be
nice and fun, but it isn’t needed.”
“I don't think it would be used. People like us don’t use public transit as much as
other areas.”
“Because it really doesn't affect me. I live on the other side of town, and it seems
that we could use the tax payer dollars on other priorities.”
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 16
Table 7 shows that voters neutral to the streetcar (5 on the 9-point scale) shared many of
the same concerns as those opposed and supportive. On the negative side, 49% said that
cost is a concern and 20% said that not enough people will use it. On the positive side, 24%
commented that they are generally supportive of public transportation. Sixteen-percent
(16%) said that they needed more information before concluding one way or the other.
Table 7
Comments Neutral Towards the Streetcar (Q19)
Neutral N=27
Cost/expensive 49%
Support public transportation 24%
Not enough people will use it 20%
Need more information 16%
Money can be better used on other projects 13%
Unnecessary 12%
Already have adequate public transportation 5%
Bad economy 3%
I wouldn’t use it 3%
Against tax increases 3%
Other 13%
DHM Research, October 2011
“I know there’s a pretty big cost and [it is] questionable how useful it would be.”
“I think it would be great to have better connections to the City of Portland, but the
costs proposed make it a tough choice.”
“I think it might be good for some people but I just don't think many Lake Oswego
residents are going to use it to get to the downtown area.”
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 17
3.5 | Streetcar: Cost Information
Because there are different levels of awareness and knowledge about the streetcar project,
one objective of the survey was to assess if voters’ attitudes changed when they were given
information about the cost and financing of the streetcar project. To that end, the voters
were read four statements about cost and financing and asked, for each, if knowing this
information made them more likely to support the project, less likely, or if it didn’t make
any difference (Q20-Q23). The results are presented in Chart 4.
For each of the four statements, a plurality of voters (41%-48%) said that the information
presented made no difference. However, for three of the four statements, more voters said
the information made them more likely to support the project.
The statement with the highest percentage of ―more likely‖ to support responses was none
of the current funds that pay for police, fire, parks, schools, or any other public
service in Lake Oswego would be used to pay for the streetcar project (Q23).
Thirty-eight percent (38%) said that knowing this makes them more likely to support the
project, 11% said less likely, and 48% said that it makes no difference.
Next was the statement that the City of Lake Oswego’s portion of the streetcar
project costs would be paid for solely from revenues and fees from new
development. Your taxes would not increase to pay for the streetcar project (Q22).
Thirty-seven percent (37%) said that this made them more likely to support the project,
16% said less likely, and 42% said it made no difference.
24%
31%
37%
38%
24%
23%
16%
11%
47%
41%
42%
48%
6%
5%
5%
3%
0% 20% 40% 60% 80% 100%
There have been concerns about the cost of providing streetcar service between Lake Oswego and Portland. The figure often mentioned is $458 million dollars, however, this includes all of the most expensive options, is …
The vast majority of the streetcar costs would be paid for by the federal government, State, Metro, and the City of Portland. The City of Lake Oswego’s portion of the total cost is expected to be about $17 million dollars.
City of Lake Oswego’s portion of the streetcar project costs would be paid for solely from revenues and fees from new development. Your taxes would not increase to pay for the streetcar project.
None of the current funds that pay for police, fire, parks, schools, or any other public service in Lake Oswego would be used to pay for the streetcar project.
CHART 4: EFFECT OF COST INFORMATION (Q20-Q23)
More likely to support Less likely to support No difference Don’t know
Source: DHM Research, October 2011
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 18
The statement that was the third most likely to shift support towards favoring the streetcar
project was the vast majority of the streetcar costs would be paid for by the federal
government, state, Metro, and the City of Portland. The City of Lake Oswego’s
portion of the total cost is expected to be about $17 million dollars (Q21). Three in
ten (31%) said that this made them more likely to support the project, while 23% said it
made them less likely, and 41% said it made no difference.
The statement that moved the least people was there have been concerns about the
cost of providing streetcar service between Lake Oswego and Portland. The figure
often mentioned is $458 million dollars, however, this includes all of the most
expensive options, is in 2017 dollars, and includes the value of railroad right of
way donated to the project. Engineers are in the process of reworking the project
and believe that the actual cost of the project could be half as much, or between
$200 and $250 million dollars (Q20). Just 24% of the voters said that knowing this
about the project made them more likely to support it, while an equal percent (24%) said it
would make them less likely, and 47% said it would make no difference.
It may seem odd to hear that when voters learned that the streetcar project may cost less
than is often discussed one-fourth of voters became less supportive. However, it is likely
that the survey call was the first time that many voters learned about the cost projections of
the streetcar. Learning of a cost may have made them less supportive of the idea, even if
the cost is less than the original estimate.
Looking at these four statements as a group, it is notable that the statements that specified
the overall costs of the project had the least impact on voter attitudes. Rather, what
mattered most was learning that bringing streetcar service to Lake Oswego would not
increase their taxes or affect funding for public services.
Demographic Differences: There were few subgroup variations for these cost and
financing statements. The only consistent difference was that, for each statement, more
Democrats than Republicans or Independents said that they would be more likely to support
the streetcar project based on the information presented. For example, for the four
statements, Democrats were 9-13 percentage points more likely to support the streetcar
project, while Republicans were 3-12 percentage points less likely to support it.
To further understand the influence of these costs and financing statements, the results
were analyzed by how voters initially rated their support for the streetcar project. The
voters were divided into three categories: ―Strong Opposers‖ who rated their initial support
from 1-3, ―Fence Sitters‖ from 4-6, and ―Strong Supporters‖ from 7-9. Chart 5 shows that
the statement that most influenced Fence Sitters was that the streetcar project would be
paid for by revenues and fees from new development and that their taxes would not
increase. Fifty-five percent (55%) said that this made them more likely to support the
project, which was eight percentage points higher than the 47% of Fence Sitters who said
they were more likely to support the project because none of the current funds that pay for
other city services would be used to pay for the streetcar.
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 19
Interestingly, statements that have the most effect differed for voters who were initially
Strong Supporters of the streetcar. Sixty-four percent (64%) of this group said they were
more likely to support the streetcar because funds for other city services would not be used
compared to 57% who said they were more likely to support the streetcar because it would
be paid for by new development revenues and fees and that their taxes would not increase.
56%
57%
57%
64%
20%
41%
55%
47%
4%
8%
15%
16%
0% 20% 40% 60% 80% 100%
There have been concerns about the cost of providing streetcar service between Lake Oswego and Portland. The figure often mentioned is $458 million dollars, however....the actual cost of the project could be half as much, or between $200 and $250 million
The vast majority of the streetcar costs would be paid for by the federal government, State, Metro, and the City of Portland. The City of Lake Oswego’s portion of the total cost is expected to be about $17 million dollars.
City of Lake Oswego’s portion of the streetcar project costs would be paid for solely from revenues and fees from new development. Your taxes would not increase to pay for the streetcar project.
None of the current funds that pay for police, fire, parks, schools, or any other public service in Lake Oswego would be used to pay for the streetcar project.
CHART 5: MORE LIKELY TO SUPPORT, BY INITIAL SUPPORT LEVEL
(Q24)
Strong opposers (1-3) Fence sitters (4-6) Strong supporters (7-9)
Source: DHM Research, October 2011
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 20
3.6 | Streetcar: Final Test
After presenting the survey respondents with cost and finance information about providing
streetcar service between Portland and Lake Oswego, the respondents were asked again to
rate their level of support from 1 (not at all supportive) to 9 (completely supportive). The
results are displayed in Chart 6.
There was very little change from the initial test to the final test, with the averages going
from 4.4 in the initial test to 4.3 in the final test.
In the final test, 40% said they were generally supportive (rating=6-9), compared to 38%
in the initial test who were supportive. The percentage of voters that were completely
supportive (rating=9) fell from 18% in the initial test to 14% in the final test. In both tests,
52% were generally not supportive (rating=1-4) and 32% said that they were not at all
supportive (rating=1).
Demographic Differences: On average, Democrats still rated their support higher (5.3)
than Republicans (3.1) or Independents (4.3). In the final test, there were no longer any
statistically significant differences by area of the city, with the average support declining in
97035 to 4.7 (from 5.0) and rising in 97034 to 4.0 (from 3.9).
32%
9%
5%
6%
7%
9%
12%
5%
14%
0% 10% 20% 30% 40%
1:Not at all
2
3
4
5: Neutral
6
7
8
9: Completely
CHART 6: SUPPORT LEVEL - POST-TEST (Q24)
Source: DHM Research, October 2011
40%
52%
Mean: 4.3
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 21
3.7 | Streetcar Alternatives
The survey concluded by asking if the streetcar did not come to Lake Oswego, what
alternatives would you recommend to City leaders to address traffic congestion
along Highway 43 from Lake Oswego to Portland (Q25). The coded responses are
presented in Table 8.
Table 8
Suggested Alternatives to Address Traffic Congestion (Q25)
Alternative Suggestion N=300
Improving bus service (frequency/hours of
service/routes) 31%
Widen Highway 43 and other streets 7%
Traffic congestion isn’t a problem 7%
Bike paths 6%
Promote bus ridership 4%
Road repair 4%
Water taxi/ferry 3%
All other responses 2% or less
Other3 14%
Nothing/none 15%
Don’t know 10%
Source: DHM Research, October 2011
“I supposed enhanced bus service, and encouraging a true city plan for carpooling.”
“Bike paths and maybe increased bus service or walking and bike paths.”
“Add a lane to highway 43, and if that’s not possible then have bus service.”
“People always talk about how bad it is but I drive on it all the time and it's not that
bad.”
Mentioned by 31% of the voters, improved bus service was the most suggested alternative
to the streetcar project. Another 4% said that the city should do more public outreach and
promotion to encourage bus ridership.
Other responses were to widen Highway 43 and other streets (7%), add bicycle paths (6%),
and develop a water taxi service (4%). Seven percent (7%) specifically said that traffic
congestion is not a problem and 15% said that nothing should be done. Another 10% said
that they did not know.
3 These comments were typically not related to congestion, traffic, the streetcar, or were not applicable to the
question. For example, two responses coded as ‖other‖ were: “keep it affordable” and “improving cell phone
reception.”
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 22
LAKE OSWEGO TRANSPORTATION SURVEY
October 2011; N=300; City of Lake Oswego voters
12 minutes; margin of error +/-5.7%
DHM Research
Hello, this is ______ of DHM Research, a public opinion research firm in Oregon. We are
doing research about issues in your community. We are not trying to sell anything. May I
please speak to (Must speak to name on list; if unavailable, schedule callback).
WARM-UP
1. What is the most important issue in Lake Oswego you would like your elected city
officials to do something about? (Open. Enter first response given.)
Response Category N=300
Streetcar/trolley mention 18%
Education funding 6%
Infrastructure (roads, bridges, sidewalks, etc.) 6%
Water and sewage fees 5%
Doing something with the WEB 5%
Education – general 4%
Government spending 3%
Balancing the budget 3%
Education quality 2%
Traffic congestion 2%
Reduce taxes 2%
All other responses 1% or less
Other 8%
Nothing/none 12%
Don’t know 14%
2. Now I’d like to focus on transportation issues in Lake Oswego. What is the most
important transportation issue in Lake Oswego you would like your elected city officials
to do something about? (Open. Enter first response given.)
Response Category N=300
Streetcar/trolley mentioned 30%
Improve bus service (bus stops, availability) 10%
Traffic congestion 7%
Road repair 6%
More public transportation 6%
More bike paths 4%
Pedestrian safety 2%
All other responses 1% or less
Other 8%
Nothing/none 19%
Don’t know 4%
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 23
3. (IF STREET CAR MENTIONED TO Q1-2) You mention the streetcar. What do you want
your elected city officials to do about it? (Open. Accept multiple responses.)
Response Category N=99
Get rid of it/don’t build it 36%
Approve it/build it 20%
Waste of money 14%
Focus on buses 4%
Find funding for streetcar 3%
Use money for more important issues 3%
Complete it quickly 3%
Price availability for everyone 3%
All other responses 2% or less
Nothing/none 1%
Don’t know 27%
4. (IF STREET CAR MENTIONED TO Q1-2) Why? (Open. Accept multiple responses.)
Response Category N=71
Don’t support the idea 24%
Wasteful spending 22%
Expensive/cost 16%
Good idea/support it 14%
Reduce traffic congestion 11%
Money could be spend elsewhere 11%
Convenience 10%
Improve communities 8%
Generate revenue for city 7%
Lack of ridership 6%
Ruin communities 5%
Alternate means of transportation 5%
Majority disapprove 4%
Focus should be on riding the bus 4%
Against raising taxes 3%
Good for the environment 3%
Keep up with population growth 1%
Nothing/none 6%
Don’t know 0%
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 24
TRANSPORTATION PROJECT PRIORITIES
I’m going to read to you a list of items that some Lake Oswego residents consider to be
transportation problems. Over the next 10 years, the City of Lake Oswego will be facing
many difficult issues and competing demands. With limited resources, they won’t be able to
do everything and must establish priorities. Knowing that financial resources are limited,
what priority should Lake Oswego give to each possible transportation project: low priority,
medium priority, high priority, or urgent priority? Try not to say urgent for all the projects.
Be selective in your rating. Also, remember that we’re talking about projects to address
over the next ten years. You may have other problems or projects in mind, but please limit your answers for now to just the projects I’m going to read you. (Rotate Q5-Q11)
Response Category N=300 Low
priority Medium priority
High priority
Urgent priority
Don’t know
5. Reducing traffic congestion on Highway 43 between Lake Oswego and Portland
18% 45% 27% 8% 2%
6. Reducing traffic congestion in the Lake Grove neighborhood
39% 39% 13% 3% 6%
7. Improve parking in downtown Lake Oswego
47% 38% 13% 1% 1%
8. Repairing and maintaining existing neighborhood roads and side streets
10% 35% 47% 7% 1%
9. Having more frequent public
transportation service to and from Lake Oswego
36% 32% 26% 3% 4%
10. Having more pathways that connect
pedestrians to neighborhoods and
shopping areas. 41% 34% 21% 4% 1%
11. Having more bicycle routes in Lake Oswego
41% 33% 20% 5% 1%
COMMUNITY DEVELOPMENT VALUES
I’m going to read you some general principles or ideas that might be used in planning for
Lake Oswego in the next 10 years. Some of these you may consider to be qualities of a
place to live. After I read each one, tell me how acceptable it is to you that the principle or
idea guide planning for your city government. Please use a scale of 1 to 7, where 1 means
―not at all acceptable‖ and 7 means ―very acceptable.‖ Remember you can choose any
point on the scale. (Rotate Q12-Q17)
Response Category
1—
Not at all 2 3 4 5 6
7 Very Mean
Don’t know
12. Encourage development
that allows people to
shop closer to where
they live.
10% 10% 12% 20% 22% 12% 13% 4.2 1%
13. Encourage public
transit, biking, and
walking as an
alternative to the automobile.
13% 7% 10% 10% 18% 17% 24% 4.6 1%
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 25
Response Category
1—Not at all 2 3 4 5 6
7 Very Mean
Don’t know
14. Mix different
development types
together such as
buildings in which
people can live above retail shops and offices.
15% 12% 15% 15% 26% 8% 8% 3.8 1%
15. Restrict additional
development so that
Lake Oswego maintains
its existing character.
5% 8% 12% 13% 14% 16% 30% 5.0 2%
16. Encourage additional
development in
underdeveloped areas
of Lake Oswego, but
only of the type that
maintains the character
of our existing neighborhoods.
9% 10% 6% 18% 26% 15% 16% 4.5 1%
17. Encourage the
development of housing
that is affordable to
new families, teachers,
police officers, and young professionals.
8% 8% 10% 13% 27% 17% 16% 4.6 2%
STREETCAR SUPPORT INITIAL TEST
18. As you may have heard, the City of Lake Oswego continues to explore streetcar service
between Portland and Lake Oswego adjacent to Highway 43. This streetcar would
connect directly to the existing streetcar in downtown Portland. Based on what you
know, please rate your level of support for the streetcar project using a 1 to 9 scale where 1 means ―not at all supportive‖ and 9 means ―completely supportive.‖
Response Category N=300
1—Not at all supportive 32%
2 8%
3 6%
4 6%
5--Neutral 9%
6 7%
7 9%
8 5%
9—Completely supportive 18%
8+9 23%
Mean 4.4
Don’t know 1%
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 26
19. Why did you give it a rating of (rating from Q18)? (Open; code responses based on
rating from Q18 ―Not Supportive‖=1-4, ―Neutral‖=5, ―Supportive‖=6-9, ―Don’t
know‖)
Not Supportive N=156
Cost/expensive 48%
Unnecessary 37%
Not enough people will use it 15%
Money can be better used on other projects 15%
Already have adequate public transportation 6%
Need more information 3%
Wasteful spending—general 3%
I wouldn’t use it 3%
Affects property values of neighborhoods 3%
Reduces congestion 3%
All other responses 2% or less
Other 20%
Nothing/none 1%
Neutral N=27
Cost/expensive 49%
Support public transportation 24%
Not enough people will use it 20%
Need more information 16%
Money can be better used on other projects 13%
Unnecessary 12%
Already have adequate public transportation 5%
Bad economy 3%
I wouldn’t use it 3%
Against tax increases 3%
Other 13%
Supportive N=114
Support public transportation 42%
Reduce traffic congestion 20%
Convenience 10%
More people will use it 9%
Cost/expensive 9%
Less dependence on automobiles 8%
Need transportation to Portland 8%
Need more information 6%
Would use it 6%
Good to have alternate forms of transportation 6%
Save on gas 5%
Already have adequate public transportation 5%
Good for the environment 4%
Not enough people will use it 4%
Money can be better used on other projects 4%
Bring in revenue to downtown 3%
All other responses 2% or less
Other 15%
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 27
STREETCAR COST INFORMATION
Now I would like to give you some information about the streetcar project. After each
statement, please tell me if the information makes you more likely to support the project,
less likely, or it doesn’t make any difference in how you feel. Again, if you don’t know or
are unsure, just let me know. Let’s start with this statement: (Rotate Q20-Q23). Does this
information make you more likely to support the streetcar project, less likely, or it doesn’t
make any difference in how you feel.
Response Category
More likely to support
Less likely to support
No difference
Don’t know
20. There have been concerns about the cost of
providing streetcar service between Lake
Oswego and Portland. The figure often
mentioned is $458 million dollars, however,
this includes all of the most expensive options,
is in 2017 dollars, and includes the value of
railroad right of way donated to the project.
Engineers are in the process of reworking the
project and believe that the actual cost of the
project could be half as much, or between
$200 and $250 million dollars.
24% 24% 47% 6%
21. The vast majority of the streetcar costs would
be paid for by the federal government, State,
Metro, and the City of Portland. The City of
Lake Oswego’s portion of the total cost is expected to be about $17 million dollars.
31% 23% 41% 5%
22. City of Lake Oswego’s portion of the streetcar
project costs would be paid for solely from
revenues and fees from new development.
Your taxes would not increase to pay for the streetcar project.
37% 16% 42% 5%
23. None of the current funds that pay for police,
fire, parks, schools, or any other public service
in Lake Oswego would be used to pay for the streetcar project.
38% 11% 48% 3%
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 28
STREETCAR SUPPORT POST-TEST
24. Now that you’ve heard a little more about the cost of providing streetcar service
between Portland and Lake Oswego, I’d like to ask you again to rate your level of
support for the streetcar project using a 1 to 9 scale where 1 means ―not at all supportive‖ and 9 means ―completely supportive.‖
Response Category N=300
1—Not at all supportive 32%
2 9%
3 5%
4 6%
5--Neutral 7%
6 9%
7 12%
8 5%
9—Completely supportive 14%
8+9 19%
Mean 4.3
Don’t know 1%
25. If streetcar service did not come to Lake Oswego, what alternatives would you
recommend to city leaders to address traffic congestion along Highway 43 from Lake
Oswego to Portland? (Open)
Response Category N=300
Improving bus service (frequency/hours of
service/routes) 31%
Widen Highway 43 and other roads 7%
Traffic congestion isn’t a problem 7%
Bike paths 6%
Promote bus ridership 4%
Road repair 4%
Water taxi/ferry 3%
All other responses 2% or less
Other4 14%
Nothing/none 15%
Don’t know 10%
4 These comments typically were not related to congestion, traffic, the streetcar, or were not applicable to the
question. For example, two responses coded as other were: “keep it affordable” and “improving cell phone
reception.”
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 29
DEMOGRAPHICS
26. What is your age?
Response Category N=300
18-24 7%
25-34 9%
35-54 36%
55-64 14%
65+ 34%
Refused 1%
27. Gender (BY OBSERVATION)
Response Category N=300
Male 50%
Female 50%
28. Party Registration Party (DO NOT ASK—RECORD FROM SAMPLE)
Response Category N=300
Democrat 45%
Republican 36%
Independent/other 20%
29. Area of Lake Oswego by Zip Code (DO NOT ASK—RECORD FROM SAMPLE)
Response Category N=300
97034 (eastern area of city) 53%
97035 (western area of city) 46%
All others 1%
30. Area of Lake Oswego: Voter Precinct (DO NOT ASK—RECORD FROM SAMPLE)
Response Category N=300
Northeast area precincts 28%
Northwest area precincts 33%
Southern area precincts 39%
31. Do any children in K-12 School live in your home?
Response Category N=300
Yes 31%
No 67%
Refused 2%
32. Vote History Voting history (FROM SAMPLE)
Response Category N=300
0/1 of 4 9%
2 of 4 17%
3 of 4 25%
4 of 4 49%
DHM Research | Lake Oswego Streetcar Community Attitudes Survey, October 2011 30
33. Which category best describes your 2010 gross household income, before taxes?
Remember to include everyone living in your household. Your best estimate will do.
Response Category N=300
Less than $24,999 4%
$25,000-$49,999 13%
$50,000-$74,999 14%
$75,000-$99,999 17%
$100,000-$149,999 12%
$150,000+ 14%
Refused 26%