Phone : +8007771491
SUMIT DEY email :[email protected]
DOB 28th Feb 1983
PROFILE SNAPSHOTPROFILE SNAPSHOT
Having exposure to EPC Project Management of Civil and Structural works in industrial/infrastructure sector
Having professional experience of 8.5 years after post graduation in India’s largest engineering/construction organization L&T (5.5 years), ESSAR (3 years)
A Post Graduate in Construction Management from NICMAR, Pune (India) in year 2007
A Graduate in Civil Engineering from NIT, Raipur (India) in year 2005
FUNCTIONAL AREAFUNCTIONAL AREA
Project Management of Civil and Structural works
WORK EXPERIENCE WORK EXPERIENCE
NOV ’09-TILL DATENOV ’09-TILL DATE LARSEN & LARSEN & TOUBRO POWERTOUBRO POWER
Designation: Manager (Project Management, Civil and Structural works)
Project 3X660 MW TPS expansion project at Koradi, Maharashtra for MSPGCL. L&T
is executing BTG portion of project on EPC basis. Project contract value is 6897 Cr excluding price variation.NTP for project: 23.09.2009, Contractual duration for each Unit is 51 months with defer of 6 months between 2 units.
Job Profile Planning including Client/Vendor coordination
o Coordinating with client for planning, interface issues, billing concerns, general concerns, and setting up timeline and action plan for mitigating all issues
o Coordinating with civil and structural vendor for planning and addressing several techno-commercial issues.
Contracts and Billingo Coordination with client and vendor for all contractual matters o Drafting all contractual correspondences to client in line with the
contractual stipulations for all techno-commercial and contractual issues
o To raise monthly bill to client for civil and structural works contract of 175 Cr. within overall contract of 6897 Cr.
MIS and database management
o Preparing MIS i.e engineering, procurement and construction progress report for civil and structural works inclusive of all techno commercial issues on monthly basis for management review and project appraisal
o Ensuring database management of construction drawing in Tbits software system
Engineering coordination/managemento Scrutinizing technical documents of client for its construction
applicability/suitability and incorporation for technical deviation if required post award of contract
o Checking incorporation of all technical inputs/comments from client engineering consultant (DCPL) for release of drawing to construction agency for construction
o Coordinating with engineering consultant of L&T (L&T S&L) for expediting release of construction drawing
Achievements Maintained profitability all points of time by maintaining client billing more
than contractor billing Received appreciation from internal and external quality audit for MIS and
database management Released all construction drawing for civil and structural works to site
within timeframe
FEB ’07 – NOV ’09 FEB ’07 – NOV ’09 ESSAR ESSAR PROJECTS (I) LTDPROJECTS (I) LTD
Designation: Deputy Manager (Cost analysis and control, SAP PS)
Project 3.9 MTPA ESSAR Steel Expansion Project – Client Essar Steel Hazira Ltd.
Job Profile Cost Control: Keeping track of all the entries in ERP (SAP) right from issue
of orders to subcontractor/vendor to final payment including capitalization of assets, allocation of overheads etc to a project and taking all necessary corrective action in all instances.
Project Valuation report: Development of financial MIS for project in which all financial aspects of project are measured in the form of Project Cost Report, Variation order/Claims report, Earning Matrix, Plant Cost Matrix and Staff Cost Matrix.
Providing all end user PS solution: Study of BOQ and Abstract of contract/Work Order/L.O.I, development of project in SAP with necessary inputs, design of work breakdown structure, allocation of budget and its modification if needed as per contract.
SCHOLASTIC RECORDSSCHOLASTIC RECORDSYear Institution Degree/Examination Performance
2007 NICMAR, Pune PGDACM 8.03/10.002005 N.I.T Raipur B.E ( Civil Engineering) 72 % 2001 Delhi Public School, Korba XIIth CBSE Board 70.2 %
1999 Delhi Public School, Korba Xth CBSE Board 73.6 %
ACADEMIC PROJECTSACADEMIC PROJECTS
Post Grad. (NICMAR)Title: Detailed study of project management technique adopted by Larsen and Toubro in construction of hydroelectric power generation units with further scope for improvement. Case: Parbati Hydroelectric Power Generation Unit (Stage-III), Vill. Aut, Himachal Pradesh, Installed Power Generation Capacity-520 MW
Graduation (NIT, Raipur)Title: Comparative analysis of building framework with different joints condition with material economization perspective.
Case: Residential Apartment Design in Choubey Colony, Raipur.
TRAININGTRAINING
Post Grad. (NICMAR)Company: D.S. Construction, Gurgaon (May’06 to June’06) Area of Training: Study of typical highway BOT construction concession agreement.Case: Concession agreement between NHAI and Lucknow Sitapur Expressway Ltd. for improvement, operation and maintenance including strengthening and widening of existing 2 lane Road to 4 lane dual carriageway of 75 Km stretch of NH-24 on BOT basis.
Graduation (NIT, Raipur)Company: Bharat Aluminum Company Ltd.Title: Study of Construction Technology and design aspects in construction of truck tipper in bauxite yard in Alumina section, BALCO.
COMPUTER COMPETANCECOMPUTER COMPETANCE
Tbits for engineering management SAP Project Systems for project structure creation, cost
allocation, tracking and control Primavera-6. for project schedule management Microsoft-Project. for project schedule management Microsoft Office tools for all general management, statistics and
reports
PERSONAL DETAILSPERSONAL DETAILS
Present address: Flat No. 206, Lily-2, KC Residency, Behind L&T Knowledge City, NH-8, Between Ajwa Waghodia Crossing, Vadodara-390019
Permanent Address: Flat No. Gloria-5002, Sahara’s Sunderban (Phase-I), Mango, Jamshedpur
Father: Asit Kumar Dey: Retired as Manger (HR) from BALCO (Vendanta Group)
Mother: Housewife Wife: Housewife Children: 1 daughter