Transcript
Page 1: TW - University of Birmingham · DO NOT SCALE DRAWINGS. ... TP TP TP TP TP TP TP TP TP TP BT CTV 1 4 5. 8 1 4 5. 8 9 1 4 5. 8 9 1 4 5. 8 3 1 4 5. 7 3 ... Route to the Vale 0 10 20

16/0

3/2

012

Scale

File Name

Date

P:\0504-U

niversity

OfBir

min

gha

m\Z-A

sse

mbly

Data\0

504-A-H

A-2

1-1

03.d

gn

9 HENEAGE STREET, SPITALFIELDS, LONDON, E1 5LJ

NOTE DO NOT SCALE DRAWINGS. ALL DIMENSIONS TO BE CHECKED ON SITE. ERRORS TO BE REPORTED IMMIEDIATELY TO THE ARCHITECT tomasz.fiszer

Drawing No.

Rev Date Description By Chk App

GENERAL NOTES

DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.

STRUCTURAL ENGINEERS DRAWINGS

FOR STRUCTURAL DIMENSIONS AND SETTING OUT SEE

TO BE REPORTED IMMEDIATELY TO THE ARCHITECT

ALL DIMENSIONS TO BE CHECKED ON SITE DISCREPANCIES

APPROVALS BEING OBTAINED

ALL INFORMATION SUBJECT TO STATUTORY

HAN AS DEFINED BY THE DRAWING STATUS

INFORMATION NOT TO BE USED OTHER T

145.5

4145.5

2

145.4

3

145.3

3

145.2

5

145.1

8

145.1

6

145.2

5

145.3

0

145.3

6

145.4

7

145.5

5

145.4

3

145.4

9

145.5

9

145.4

8

145.4

0

145.1

9

145.2

4

145.2

3

145.0

7145.0

6

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

BT

CTV

145.84

145.89

145.89

145.83

145.73

145.67

142.3

4

142.3

2

142.3

0

142.2

9

142.2

7

142.38

142.35

142.38

142.34142.32

142.33

142.31

142.31

142.5

7

142.4

3

142.3

4

CB

GV

GVGV

GV

GV

GV

U/S

U/S

142.81

U/S 145.51

145.38

145.49

146.06

145.98

145.98145.93

145.89

145.82

145.80

145.56

145.58

145.43

145.38

145.26

145.23

145.11

145.16

144.88

144.95

144.76

144.78

144.6

5

144.6

4144.3

7

144.3

1

143.9

0

CANOPY

FO

OT B

RID

GE

FO

OT B

RID

GE

OVERHEAD WALKWAY EXTENT

CANOPY

3 E L M S R O A D

R E S E R V E L I B R A R Y S T O R E

5 2 P R I T C H A T T S R O A D

G I S B E R T K A P P B U I L D I N G

I R C N E T S H A P E L A B O R A T O R Y

OVERHEAD BEAM

U/S 1

43.3

2

CA

NO

PY

O/H B

EA

M

METALLURGY AND

MATERIALS ANNEX

P A R K G R A N G E

N U R S E R Y

S H E D S

S H E D

S H E D

M E T A L L U R G Y A N D M A T E R I A L S

C O M P U T E R C E N T R E

E L M S P L A N T L A B O R A T O R I U M

SUB STATION

G R E E N H O U S E

140.36

139.03

139.91

139.77

140.82

139.04

E L M S R O A D

S O M E

R S E T

R O A D

138.67

138.6

8

138.6

8

138.6

2

138.4

2138.2

5138.2

5

138.1

6

138.0

8

138.0

2

138.0

1

137.9

1

137.8

7

137.7

9

137.6

9

137.5

6

137.4

4

137.2

9

BT

CTV

BT

BT

BT

CTV

CTV

CTV

CTV

CTV

CTV

CTV

CTV

CTV

CTV

BT

BT

BT

BT

BT

BT

BT

BT

TP

TP

TP

TP

3 E L M S R O A D

E U R O P E A N R E S E A R C H

I N S T I T U T E

J G S M I T H

B U I L D I N G

M E T A L L U R G Y A N D M A T E R I A L S

145.3

6

145.4

0

145.2

9

145.3

0

145.2

8

145.2

4

145.62

145.5

8

145.4

4

145.5

2

145.5

5

145.63145.71

BT

TP

P A R K G R A N G E

N U R S E R Y

E L M S P L A N T L A B O R A T O R I U M

G R E E N H O U S E

PP

P

P

P

P

S O M E

R S E T

R O A D

TP

TP

TP

TP

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TW

TWTW

TW

TW

TW

TW

- - - - -B210504

01/02/2012

103Edgbaston Central Campus Development

Hybrid Planning Application

N/A

1:500 @ A1

A HA

0 10 20 30 40 50m

Project 21: Route to the Vale

Demolitions, sheet 2/2

Project 21: Demolitions Block Plan 2 - scale 1:500Plans Key

KEY

4m long, 2m high section of steel security fence removed

(post retained)Section of 0.6-0.8m high masonry wall removed

Modern gate removed

removed6.8m long, 1.2m high section of wooden picket fence

3m long, 1.1m high iron railing removed

6.5m long, 0.6m high section of stone wall removed

6.5m long section of wooden fence and hedge removed

removedEntire length (54m) of 1.4- 1.6m high wooden fence

Undergrowth cleared (approximate extent shown in colour)

and holly hedge5.5m wide opening formed in stone retaining wall

and traffic islandRoad and pavement surface removed at crossing

signalised crossingSurface removed on road and pavement at new

iron railing around pond removedEntire length of 0.9m high picket fence and 1.4m high

6m wide opening made in hedge

link fence and 1.9m high hedgeNew opening, 6.5m long, formed in 1.85m high chain

Plan 2

Plan 1

Existing surface to be removed

project 21)Trees to be lost (69 trees for all the

Ownership BoundaryUniversity of Birmingham Land

Planning Application Site Boundary

09.03.2012A PLANNING ISSUE TF LP LP

15.03.2012B RE- ISSUED FOR PLANNING TF LP LP

Recommended