4
0
5
4
0
4
4
0
3
4
0
2
4
0
1
4
0
0
4
0
1
402
4
0
0
3
9
9
3
9
6
3
9
7
39
7
3
9
7
3
9
6
3
9
5
3
9
4
3
9
3
3
9
2
3
9
1
3
9
0
3
8
9
3
9
7
3
9
6
3
8
6
3
8
5
3
8
4
3
8
3
3
8
2
3
8
1
3
8
0
3
7
9
3
7
8
3
7
4
3
7
5
3
7
1
3
7
2
373
374
3
7
5
376
3
7
6
3
7
5
376
3
7
7
3
7
5
3
7
3
3
7
2
3
7
1
370
369
368
3
6
7
3
6
6
3
6
5
3
6
4
3
6
3
3
6
2
3
6
1
356
3
5
7
3
5
6
355
3
5
4
353
3
5
2
3
5
1
3
5
0
351
352
3
5
3
3
5
4
3
5
5
333
334
333
3
3
2
3
3
1
3
3
0
3
5
5
3
5
0
3
4
5
3
4
0
3
3
5
330
3
2
5
3
2
0
3
1
5
3
1
0
3
0
5
3
0
0
295
3
7
7
MA
JES
TIC
E A
VE
TAR
A S
TRE
ET
HO
WT
H S
TR
EE
T
JOSIAH AVENUE
MA
RG
AR
ET
AV
EN
UE
LOU
ISBU
RG
STR
EET
SA
N M
IGU
EL
ST
RE
ET
CA
INE
AV
EN
UE S
AN
JO
SE
AV
EN
UE
Ridge Lane Parcel 4
Project Name
Ref. North Date
Issues + RevisionsDateNo.
Project Address
Ridge Lane, San Francisco, CA 94112
---
RIDGE
LANE
L0.0
SHEET INDEX
SHEET INDEX, GENERAL NOTES, LEGEND & VICINITY MAP
EXISTING SITE PHOTOS
DEMOLITION PLAN PARCEL 4
HARDSCAPE PLAN PARCEL 4
PLANTING PLAN PARCEL 4
HARDSCAPE DETAILS
HARDSCAPE DETAILS
PARCEL 4 RENDERINGS
L0.0
L0.1
L1.0
L2.0
L3.0
L4.0
L4.1
L5.0
N/A
N/A
3/32"=1'-0"
3/32"=1'-0"
3/32"=1'-0"
AS SHOWN
AS SHOWN
N/A
SHEET TITLESHEET NO. SCALE
VICINITY MAP
NORTH
PROJECT SITE
ABBREVIATION KEY, ALL SHEETSAC ASPHALTIC
CONCRETE
CENTER LINE
CONC CONCRETE
DWG DRAWING
DWGS DRAWINGS
DIA DIAMETER
EJ EXPANSION JOINT
EL ELEVATION
EQ EQUAL
(E) EXISTING
FG FINISH GRADE
FL FLOW LINE
FS FINISH SURFACE
GB GRADE BREAK
HP HIGH POINT
(N) NEWSD STORM DRAINSDS STORM DRAIN SYSTEMSIM SIMILARSPEC SPECIFICATIONSSS STAGGERED SPACINGSQ SQUARETB TOP OF BENCHTBD TO BE DETERMINEDTHK THICKNESSTW TOP OF WALLTYP TYPICALVEJ VERTICAL EXPANSION
JOINTVIF VERIFY IN FIELD
℄
IE INVERT ELEVATION
IN INCH
LOW LIMIT OF WORK
LP LOW POINT
MAX MAXIMUM
MFR MANUFACTURER
MIN MINIMUM
(N) NEW
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
O.C. ON CENTER
PA PLANTING AREA
PERF PERFORATED
R RADIUS
RE RIM ELEVATION
S SLOPE
N.T.S.
SHEET INDEX, GENERALNOTES, LEGEND & VICINITYMAP
NORTHN.T.S.
PARCEL 1 (COMPLETE) PARCEL 2 PARCEL 3PARCEL 5
PROJECT SCOPE
PARCEL 4CURRENTPHASE
Ridge Lane Parcel 4
Project Name
Ref. North Date
Issues + RevisionsDateNo.
Project Address
Ridge Lane, San Francisco, CA 94112
---
RIDGE
LANE
L0.1
EXISTING SITE PHOTOS
PARCEL 4 AERIAL PHOTO PARCEL 4 AERIAL PHOTO PARCEL 4 AERIAL PHOTO
PARCEL 4 AERIAL PHOTO
355
3
5
4
333
334
3
5
5
3
5
0
3
4
5
3
4
0
3
3
5
(EX) LUMBER PILESTO BE REMOVED
Ridge Lane Parcel 4
Project Name
Ref. North Date
Issues + RevisionsDateNo.
Project Address
Ridge Lane, San Francisco, CA 94112
---
RIDGE
LANE
L1.0
PROJECT NORTH
TRUE
NORTH
DEMOLITION PLANPARCEL 4
(EX) FENCE TO BEREMOVED
(EX) CONCRETERETAINING WALLTO BE REMOVED
(EX) VEGETATIONTO BE REMOVED
(EX) CONCRETESLAB TO BEREMOVED
(EX) STEEL PIPE TOBE REMOVED
1. STREETS, SIDEWALKS, AND ADJACENT PROPERTY SHALL BE PROTECTEDTHROUGHOUT THE WORK.
2. CONTROL DUST DURING ALL CONSTRUCTION ACTIVITY IN CONFLUENCE WITH THE CITY ANDCOUNTY OF SAN FRANCISCO DUST CONTROL ORDINANCE 176-08.
3. CLEARING AND GRUBBING SHALL REMOVE ALL VEGETATION INCLUDING WEEDS.GRUBBING SHALL INCLUDE REMOVAL OF ALL STUMPS AND ROOT SYSTEMS OF PLANTMATERIAL AND REPLACEMENT WITH IMPORT TOP SOIL AS REQUIRED.
4. DO NOT WILLFULLY PROCEED WITH CONSTRUCTION AS DESIGNED WHEN IT ISOBVIOUS THAT UNKNOWN OBSTRUCTIONS AND / OR GRADE DIFFERENCES EXISTTHAT MAY NOT HAVE BEEN KNOWN DURING DESIGN. SUCH CONDITIONS SHALL BEIMMEDIATELY BROUGHT TO THE ATTENTION OF THE RIDGE LANE NEIGHBORS.
5. ALL PROPERTY LINES, LIMITS OF WORK, AND LOT LINES SHALL BE VERIFIED PRIOR TOCOMMENCING WORK.
6. ALL PLANT MATERIALS ARE TO BE APPROVED AND ACCEPTED BY LANDSCAPEDESIGNER AT THE PROJECT SITE, PRIOR TO PLANT LAYOUT AND INSTALLATION.
7. ALL PLANTING AREAS, TREE AND GROUND COVER AREAS SHALL BE MULCHED WITH ATWO (2) INCH LAYER OF MULCH.
8. PRIOR TO INSTALLATION, TREE AND SHRUB LOCATIONS ARE TO BE VERIFIED IN THEFIELD BY LANDSCAPE DESIGNER.
9. CONTROL SEDIMENT AND POLLUTANT DISCHARGE FROM CONSTRUCTION SITE TO THE CITY'SCOMBINED SEWER SYSTEM, IN ACCORDANCE WITH THE FEDERAL, STATE, AND LOCALREGULATIONS. BEST MANAGEMENT PRACTICES (BMP) MUST BE IMPLEMENTED - SEE PUBLICUTILITIES COMMOTION'S BEST MANAGEMENT PRACTICES HANDBOOK :https://sfwater.org/index.aspx?page=235
10. ALL MATERIALS, INSTALLATION, AND CONSTRUCTION SHALL COMPLY WITH THE APPLICABLEPROVISIONS OF CURRENT LAWS, CODES, SAFETY RULES, AND REGULATIONS OF THE CITYAND COUNTY OF SAN FRANCISCO, THE STATE OF CALIFORNIA, THE FEDERAL GOVERNMENTAND ANY OTHER APPLICABLE AUTHORITIES.
11. PROTECT ALL EXISTING IMPROVEMENTS, UTILITIES, AND PLANTING UNLESS INDICATED FORREMOVAL. DAMAGE TO ANY EXISTING IMPROVEMENTS NOT INDICATED FOR REMOVAL, SHALLBE THE CONTRACTORS EXPENSE.
12. THE SPAN OF THE EXISTING FENCE TO BE REMOVED WILL SERVE AS THE CONTROL POINTFOR DIMENSIONING AND LAYOUT. PRESERVE FENCE LAYOUT WITH MARKERS AFTERREMOVAL.
DEMOLITION, CLEARING, AND GRUBBING NOTES
0 2' 4' 8'SCALE 14' =1'-0"
355
333
334
333
3
5
5
3
5
0
3
4
5
3
4
0
3
3
5
AB 7037 LOT 9
438 SAN MIGUEL ST
SA
N M
IGU
EL
ST
RE
ET
Ridge Lane Parcel 4
Project Name
Ref. North Date
Issues + RevisionsDateNo.
Project Address
Ridge Lane, San Francisco, CA 94112
---
RIDGE
LANE
L2.0
PROJECT NORTH
TRUE
NORTH
HARDSCAPE PLANPARCEL 4
0 2' 4' 8'SCALE 14' =1'-0"
LOW
MATERIAL LEGENDSITE ELEMENTSSYMBOL NAME DETAIL
EXPANSION JOINT
SCORE JOINT
PAVING SCHEDULE
SYMBOL NAME DETAIL
C.I.P. CONCRETE PAVING -LIGHT ACID WASH
C.I.P. CONCRETE PAVING -SEEDED AGGREGATE
C.I.P. CONCRETE PAVING -MEDIUM ACID WASH
REDWOOD DECKING
GABION BENCH
TRASH RECEPTACLE
SOLAR LIGHT BOLLARD
9
AREA
AREA
276 SF
245 SF
QTY
5
7
1
DESCRIPTION / MANUFAC. FINISH & COLOR
REDWOOD CAPPED 2'X2' GALVANIZEDSTEEL, WELDED #9 3"X3" MESH
TO MATCH PARCEL 1
R-9810-FL SOLAR LIGHT BOLLARDRELIANCE FOUNDRY
LIGHT ACID WASH
SEEDED AGGREGATE
MEDIUM ACID WASH
SEMI TRANSPARENT OILBASED WOOD STAIN
4" CIP CONCRETE / 4" CLASS II AB
4" CIP CONCRETE / 4" CLASS II AB
4" CIP CONCRETE / 4" CLASS II AB
BLACK TEXTURED
BLACK TEXTURED
2x6 REDWOOD LUMBER ARRANGEDPER PLAN
5
6
7
355
333
334
333
3
5
5
3
5
0
3
4
5
3
4
0
3
3
5
AB 7037 LOT 9
438 SAN MIGUEL ST
SA
N M
IGU
EL
ST
RE
ET
LOL
LOL LOLLOL
LOLLOL LOL
LOLLOL
LOLLOL
LOL
LOL
LOLLOL
LOL
ARD
ARM
ARM
AGAAGA
AGA
AGA
AGA
AGA
AGA
AGAAGA
ALF
ALF
ALF
ALF
ALF
ALN ALN ALNALN
ALN
ALN
ALN
ALNALN
ALNALN ALN
ALNALN
ALNALN
ALN
ALN
ALN ALN
ALN
ALNALN
ALNALN
ALN
ALN
ALN
ALN ALNALNALN
ALN
ALN
ALN
ALNALN
ALN
AEU
AEUAEU
AEU
AEU
AEU AEU
AEU
AEUAEU
AEU
AEU
AEU
AEU
AEU
AEU
AEU
AEU
AEU
AEUALN ALN
ALN ALN
ALN
ALN
ALN
ALN
AEB
AEB
AEB
AEB
AEB
AEBAEB
AEBAEB
AEB
AEB AEB
AEB
AEB
AEB
AEB AEB
AEB
AEB
AEB
AEB
AEB
ACM ACM ACM
ACMACM
ACM
ACMACM
ACMACM ACM ACM
ACM
ACM ACM
ACM
ACMACM
ACMACMACM
ACMACM
ACM ACM
ACM
ACM ACMACM
ECIECI
ECIECI
ECIECIECI
ECIECI ECI
ECIECI
ECIECI
ECIECI
ECI ECIECI
ECIECI
ECIECI
ECI
ECIECI
ECIECI
ECI
ECI
ECI
ECI ECIECI
ECI ECIECI
ECI
ECI
ECI
ECI
ECI
ECI
ECIECI
ECIECI
ECI
ECI
ECI
ECI
ECI ECI ECI
ECI ECI ECI
ECIECI
ECIECI
ECI
ECI
ECI
ECI
ECI ECI ECI
ECI ECIECI
ECI ECI
ECI
SEM
SEM
SEM SEM
SEM
SEM
SEMSEM SEM SEMSEM
SEMSEM
SEMSEM
SEM
SEMSEM
SEMSEM SEM SEM
SEM SEM
SEM
SEMSEM
SEM SEM
SEM
SEMSEMSEM
SEM
SEM
SEMSEMSEM
SEM
SEMSEM SEM SEMSEM
SEMSEM
SEM
SEMSEM
SEMSEM
SEMSEM
SEMSEMSEM
SEMSEMSEM
SEM
SEM
SEM
SEM
SEM SEM
SEM
SEM
SEM
SEM
SEM
SEM
SEM
ARD
EPC
EPC
EPC
EPCEPC
EPC
EPCEPC
EPC
EPCEPC
EPC
EPCEPC
EPC
EPC
ARJARJ
ARJARJ
ARJ ARJ ARJARJ ARJ
ARJARJARJ
ARJARJ
ARJ
ARJ ARJ ARJ ARJ ARJARJ
ARJ
ARJARJ
ARJ
ARJ
ARJ
ARJ
ARJ
ARJ
ARJ
ARJ
ARJ
ARJ
ARJARJ
ARJARJ
ARJ
ARJ
BAP
BAPBAP
BAP
BAP
BAP
BAPBAP BAP
BAP
BAP BAP
BAPBAP
BAP
BAP
BAPBAP BAP
BAP
BAPBAP
BAP
Ridge Lane Parcel 4
Project Name
Ref. North Date
Issues + RevisionsDateNo.
Project Address
Ridge Lane, San Francisco, CA 94112
---
RIDGE
LANE
L3.0
PROJECT NORTH
TRUE
NORTH
PLANTING PLANPARCEL 4
SYMBOL BOTANICAL NAME COMMON NAME QTY SPACING SIZE WUCOLS BUTTERFLY NOTES
Trees
ARM Arbutus 'marina' Marina Strawberry Tree 24" box Low yes Multi Trunk
Shrubs
AGA Agave attenuata Foxtail Agave 5gal Low
ALF Aloe Ferox Cape Aloe 5gal Low
ALN Aloe nobilis Golden Toothed Aloe 1gal Low
ARD Arctostaphylos densiflora 'Howard Mcminn' Manzanita 15gal Low yes
EPC Epilobium canum California fuchsia 1gal Low yes
Perennials
ACM Achillea millefolium 'Terracotta' Terra Cotta Yarrow 1gal Low yes
AEB Aeonium 'Blushing Beauty' Blushing Aeonium 1gal Low
AEU Aeonium urbicum Salad Bowl Aeonium 5gal Low
ARC Aristolochia californica California Pipevine 1gal Low yes
ECI Echeveria imbricata Hens and Chicks 1gal Low
Grasses
LOL Lomandra longifolia 'Breeze' Dwarf Mat Rush 1gal Low
Ground Covers
ARJ Arctostaphylos 'John Dourley' Manzanita 1gal Low Yes
BAP Baccharis pilularis ssp. Pilularis Coyote brush 1gal Low yes
SEM Senecio mandraliscae Kleinia 1gal Low
Wild Flowers
AST Asclepias tuberosa Butterfly milkweed seed Low Yes
ESC Escholtzia californica California Poppy seed Low yes
LOW
0 2' 4' 8'SCALE 14' =1'-0"
1CONCRETE STEPS & HANDRAIL
TYPICAL SECTIONSCALE:1/2"=1'0 2' 4'1' 8'
EQEQ
1'-0" MIN.
REINFORCED CONCRETE FOOTING
HANDRAIL MOUNT 8" MIN
1 1/2" STEEL FB - POWDERCOATFINISH, EMBED 8" MIN.
HANDRAIL SUPPORT
HANDRAIL EXTENSION
TREAD WIDTH PLUS 1'
REINFORCED CONCRETE STAIRS(CIDP) REFER TO HARDSCAPEPLAN FOR FINISH
1'-1
0"
2'-1
1"
EXPANSION JOINT (TYP)
AGGREGATE BASE
SUBGRADE
6"
NOSING TBD
2'-0" MIN.
1'-0" TYP
6" T
YP
3
WOOD STEPS & HANDRAIL
TYPICAL SECTION
SCALE:1/2"=1'
0 2' 4'1' 8'
1'-0" MIN.
1'-10"
2'-11"
2'-0" MIN.
HANDRAIL
SUPPORT
VA
RIE
S
HANDRAIL
2x6 REDWOOD RISER
2x6 REDWOOD TREAD
CONCRETE FOOTING
GALVANIZED STEEL POST BASE
GALVANIZED STEEL POST
2X8 PRESSURE TREATED JOIST
BOLTED TO GALVANIZED STEEL POST
2X8 PRESSURE TREATED STRINGER
BEDROCK
2'-0" M
IN
EQEQ1'-0" TYP
6" T
YP
2CONCRETE STEPS & HANDRAIL
SECTION ELEVATIONSCALE:1/2"=1'0 2' 4'1' 8'
1 1/2" STEEL FB - POWDERCOATFINISH, EMBED 8" MIN.
REINFORCED CONCRETE STAIRS(CIDP) REFER TO HARDSCAPE PLANFOR FINISH
REINFORCED CONCRETE FOOTING
4x4 PRESSURE TREATED
2'-1
1"6"
CONCRETE PAVING
FINISH PER PLAN
AGGREGATE BASE
SUBGRADE
SIDEWALK
5'-6"
4
WOOD STEPS & HANDRAIL
SECTION ELEVATION
SCALE:1/2"=1'
0 2' 4'1' 8'
HANDRAIL
2x6 REDWOOD RISER
2x6 REDWOOD TREAD
2'-1
1"
6"
4'-11 1/2"
VA
RIE
S
HANDRAIL EXTENSION
2X8 PRESSURE TREATED JOIST
2x6 REDWOOD DECKING
GALVANIZED STEEL POST
GALVANIZED STEEL POST BASE
CONCRETE FOOTING
2X8 PRESSURE TREATED JOIST
BOLTED TO GALVANIZED STEEL POST
BEDROCK
Ridge Lane Parcel 4
Project Name
Ref. North Date
Issues + RevisionsDateNo.
Project Address
Ridge Lane, San Francisco, CA 94112
---
RIDGE
LANE
L4.0
MATERIAL DETAILS
6
CONCRETE PAVING DETAIL
TYPICAL SECTION
SCALE:1 1/2"=1'-0"
0 1' 2'6"
REINFORCING WIRE MESH
4"
4"
8"
8"
AGGREGATE BASE
CONCRETE PAVING, FINISH
PER PLAN
SUBGRADE
9
GABION BENCH
TYPICAL SECTION
2'
SCALE:1"=1'-0"
0 1' 3'
SUBGRADE
18" M
IN
RECYCLED CONCRETE
GREATER THAN 5"
2'x2' GALVANIZED GABION
CAGE, 3" WELDED WIRE
MESH, 9 GAUGE
CONCRETE FOOTING
REINFORCING
WIRE MESH
AGGREGATE BASE
CONCRETE PAVING
FINISH PER PLAN
4"
2"
4"
2x4 PRESSURE
TREATED
4x4 PRESSURE
TREATED
2x4 REDWOOD
5
SOLAR BOLLARD LIGHT
TYPICAL SECTION
SCALE:1 1/2"=1'-0"
0 1' 2'6"
1'-0
"
R-9810-FL SOLAR LIGHTBOLLARD
CONCRETE
FOOTING
10"
1'-0" MIN
7
WOOD & CONCRETE DETAIL
TYPICAL SECTION
2'
SCALE:1"=1'-0"
0 1' 3'
ANCHOR BOLTS INTO
CONCRETE
CONCRETE PAVING
FINISH PER PLAN
2x6 REDWOOD
FINISHED PER PLAN
GALVANIZED STEEL JOIST
HANGER
SUBGRADE
SCREW FLUSH WITH
SURFACE OF WOOD
AGGREGATE BASE
GALVANIZED STEEL ANGLE
BOLTED TO CONCRETE
2x6 PRESSURE TREATED
STRINGER
18" MIN
18" MIN
8
WOOD & CONCRETE DETAIL
TYPICAL PLAN
2'
SCALE:1"=1'-0"
0 1' 3'
2x8 PRESSURE TREATED RIM JOIST
2x6 REDWOOD FINISHED PER PLAN
4x4 PRESSURE TREATED POST
2x8 PRESSURE TREATED STRINGER
2x8 PRESSURE TREATED STRINGER
HANDRAIL ATTACHMENT TBD
5'-0"
Ridge Lane Parcel 4
Project Name
Ref. North Date
Issues + RevisionsDateNo.
Project Address
Ridge Lane, San Francisco, CA 94112
---
RIDGE
LANE
L4.1
MATERIAL DETAILS
Ridge Lane Parcel 4
Project Name
Ref. North Date
Issues + RevisionsDateNo.
Project Address
Ridge Lane, San Francisco, CA 94112
---
RIDGE
LANE
L5.2
PARCEL 4 RENDERINGS
PARCEL 4 FROM SAN MIGUEL STREET PARCEL 4 LOOKING NORTH PARCEL 3-4 ENTRY AT CAINE AVENUE
PARCEL 3 PLAN