Prepared by:Enterpulse15303 Dallas ParkwaySuite 1350Addison, TX 75001
Tel: 972 581 7000Fax: 972 581 7002
www.enterpulse.com
Portlet #:
Title: My Applications
Description: prepopulated with selection of applications the user has access to (launchable)
Type: Links
Application name 1
Another application
This application name
Application number four
This application has a long name
Another application again
My Applications
Notes:Determined by rolePersonalized
Size: Narrow
1
Wireframe(s) Appearing:1. My MIS
Portlet #:
Title: My Reports
Description: user specified links to reports
Type: Links
Notes:Personalized
Size: Narrow
Report name 1
Another report
This report name is fairly long
Report number four
This report has a long name
My Reports
2
Wireframe(s) Appearing:1. My MIS
Portlet #:
Title: Load Forecast vs. Actual
Description: Load – system-wide and by zone. Need an indicator showing when ERCOT manually overrides the automated load forecast.
Type: Dashboard
Notes:Data no more than 10 seconds oldDefault view is system-wide, user can select an individual load zoneDrop-down lets users select a load zoneDefault view is today. Users can select yesterday or tomorrowNo personalization requestedYesterday’s would show three lines, where actual load is completedTomorrow’s would show two lines, since current load is in the future
Size: Wide
Kate Horne: 02/14/07
Load Forecast vs. Actual
3
Last Updated: 02/13/2007 13:10:51 CST
44000
40000
36000
32000
28000
24000
20000
18000
16000
MW
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00Hour Ending
System-wide
Load: 34363 FcstPk: 38002
Day
24 hoursCurrent 2 hours
02/04/200702/05/200702/06/2007
View
Scale
Day Ahead ForecastOperating Load ForecastActual LoadOnline Generation – ActualOnline Generation – COPEvent Causing Manual Override
Legend
Portlet #:
Title: Weather
Description: By city and zone
Type: Dashboard
Notes:Not personalizable
Size: Narrow, maybe
Weather
Kate Horne: 02/22/07
4
Last Updated: 02/13/2007 13:10:51 CST
Dallas 78/48
Austin 80/56 Houston 80/56
Brownsville 90/66
Laredo 90/66
Del Rio 90/66
Maria 80/56
Midland 80/56
Amarillo 80/56
Portlet #:
Title: LMPs
Description: Day Ahead & Real Time By bus, hub, zone, system wide and other published aggregate prices
Type: Dashboard
Notes:This portlet is personalizableCan view time by 2, 4, 8, 12, 16 and 24 hours. Default view is current dayCan view historical information up to 24 hours in the past.Users may select up to four LMPs to monitor.The prices at the right show the current LMP for each of the selected LMPs. Clicking the LMP ID displayed detailed information, like…?Clicking the ID# expands the portlet to show detailed information, including LMPs for hubs, load zones, etc., associated with selected LMP. Displays average, min., max. for eachDetailed area (lower part of screen) may be collapsed.
Size: Wide
Day Ahead and Real-Time LMPs
5
Kate Horne: 02/28/07
EDIT
Last Updated: 02/13/2007 13:10:51 CST
$
Hour Ending
ID#01 $34.54
ID#02 $33.54ID#03 $34.54ID#04 $40.54
Day AheadReal-Time
4 hours
13 14 15 16
02/05/200702/04/2007
Day AheadReal-Time
LMP ID#01
Hub ABC
Load Zone
Avg. Min. Max.
Other
$34.56
$35.56
$36.34
$37.34
$34.56
$35.56
$36.34
$37.34
$34.56
$35.56
$36.34
$37.34
For past 24 hours
Portlet #:
Title: Imports/Exports over DC Ties
Description: Imports/Exports over the DC Ties
Type: Dashboard
Notes:Displays last six hoursDefault display is today. Can view yesterday. Note: how many hours for yesterday? Not personalizable
Size: Wide
DC Ties X
6
Kate Horne: 02/13/07
Inbound Outbound
MW 0
+
-Time Time
Inbound/Outbound Scheduled Net Flow
ScheduledActual
Last Updated: 02/13/2007 13:10:51 CST
02/04/200702/05/2007
Portlet #:
Title: Shadow Prices
Description: Shadow prices (congestion info)
Type: Dashboard
Notes:This is personalizable.Users can select up to 10 LMPs to monitorWhen a constraint causes a shadow price, the row is highlighted and the shadow price is displayed.
Size: Wide
Shadow Prices EDIT
7
Kate Horne: 02/28/07
LMP Constraint Shadow Price
ID#01 Line ABC overloaded $21.60
ID#02 Line ABC overloaded $0.00
ID#03 Line ABC overloaded $0.00
ID#04 Line XYZ overloaded $42.66
ID#05 Line ABC overloaded $0.00
ID#06 Line ABC overloaded $0.00
Last Updated: 02/13/2007 13:10:51 CST
Portlet #:
Title: LMPs Ticker
Description: A scroll bar with LMPs going across the top
Type: Dashboard
Notes:May select up to 50 LMPs for tickerDouble-clicking on an LMP takes you to detail for that LMPThe detailed information can be collapsed to display only the ticker.
Size: Wide
Kate Horne: 02/28/07
LMP Name/ID#DA
RT
$34.67
$35.14LMP Name/ID#2
$34.67
$35.14LMP Name/ID#3
$34.67
$35.14LMP Name/I
8
LMP Name/ID#DA
RT
$34.67
$35.14LMP Name/ID#2
$34.67
$35.14LMP Name/ID#3
$34.67
$35.14LMP Name/I
LMP ID#01
Hub ABC
Load Zone
Avg. Min. Max.
Other
$34.56
$35.56
$36.34
$37.34
$34.56
$35.56
$36.34
$37.34
$34.56
$35.56
$36.34
$37.34
Portlet #:
Title: ERCOT ACE
Description: ERCOT Area Control Error (ACE)
Type: Dashboard
Notes:Default is current day, current hourCan view ACE for previous weekCan select any hourThis displays raw ACE. Do we also need to display processed ACE as an option?
Size: Wide
ERCOT ACE X
9
Kate Horne: 02/13/07
Last Updated: 02/13/2007 13:10:51 CST
MW
Time
02/13/2007 1400Hr End Show processed ACE
Portlet #:
Title: ERCOT Time
Description: Current ERCOT date and time (for people in other time zones)
Type: Timestamp?
Notes:not really a dashboard portlet… sounds like a line in a different portlet or in the header
Size: N/A
Wireframe(s) Appearing:All pages, in header
Monday, December 12, 2007 : 12:34 PST
Kate Horne: 00/00/07
Portlet #:
Title: Load Forecasts
Description: Load forecasts long term, mid term and short term with actual loads
Type: Dashboard
Notes:Data no more than 10 seconds oldDefault view is system-wide. Drop-down lets users select a load zoneDefault view is today. Users can select yesterday or tomorrow.No personalization requested
Need to verifyLabelsUsing MTLF
Size: Wide
Wireframe(s) Appearing:1. My MIS
Should this live in Market Information area too?
Kate Horne: 00/00/07
Portlet #:
Title: Deployed Ancillaries
Description: Deployed ancillaries
Type: Dashboard
Notes:Default view is current day. Do you need to view previous days? If so, how many? 2 to 3 daysShould these be separate portlets? Yes
Size: Wide
Deployed Ancillaries X
11
Kate Horne: 02/14/07
Last Updated: 02/13/2007 13:10:51 CST
Responsive Reserve
MW
Hour Ending13 14 15 16
GenerationLoad Resources
Non-Spinning Reserve
MW
Hour Ending13 14 15 16
On-line GenerationUndeployed Load ResourcesOff-line GenerationResources w/Output Sched
Undeployed Reg-Up & Reg Down
MW
Hour Ending13 14 15 16
Capacity for Inc/Dec Base Points SCEDSC
ED
Up
Hour Ending13 14 15 1609 10 11 12
SCE
D D
own
Portlet #:
Title: Frequency
Description: Frequency
Type: Dashboard
Notes:Display frequency for last 15 minutesShow lines for thresholdsNeed history? Yes, one day.No personalization
Size: Wide
13
Kate Horne: 02/14/07
Frequency X
Last Updated: 02/13/2007 13:10:51 CST
Hz
Time
02/13/2007 1400Hr End
60.000
59.95
60.05
Freq: 60.061
Portlet #:
Title: Ancillary Service Required
Description: Ancillary service required by hour
Type: Dashboard
Notes:
Size: Narrow
Wireframe(s) Appearing:None
Should this live in Market Information area too?
Kate Horne: 00/00/07
Covered in #12?
Portlet #:
Title: Threat Con Level
Description: Threat Con Level
Type: Dashboard
Notes: Not in protocols – this is from the DOD website. Not in scope of MIS.
Size: Narrow
Threat Con Level XEDIT
15
Kate Horne: 00/00/07
Portlet #:
Title: Data Connection
Description: "We've also had the request to somehow create a visual indicator to show when the system has lost connection, so people don't think they're getting new data."
Type: Dashboard
Notes: Isn’t the time stamp on each portlet enough?
Size: Narrow
Wireframe(s) Appearing:None
Kate Horne: 00/00/07
Not needed, the Last Updated info on each portlet will tell the user how recent the information was refreshed or when the data changed (technical specs TBD)
Portlet #:
Title: Responsive Reserve Capacity
Description: - Generation Resources;
Load Resources excluding- Controllable Load Resources;- Controllable Load Resources;
Type: Dashboard
Notes: tabs
Size: Wide
Ancillary Service Required XEDIT
17
Wireframe(s) Appearing:None
Should this live in Market Information area too?
Kate Horne: 00/00/07
Currently showing 17-20 as a single portlet – see #12. We’ll ask subgroup if they need to be independent, unless there’s a technical reason why they should be.
Portlet #:
Title: Non-Spinning Reserve
Description: - On-Line Generation Resources with Energy Offer Curves;- undeployed Load Resources;- Off-Line Generation Resources;- Resources with Output Schedules;
Type: Dashboard
Notes: tabs
Size: Wide
Ancillary Service Required
18
Wireframe(s) Appearing:None
Should this live in Market Information area too?
Kate Horne: 00/00/07
Portlet #:
Title: Undeployed Reg-Up & Reg-Down
Description: ???
Type: Dashboard
Notes:
Size: Wide
Undeployed Reg-Up & Reg-Down
19
Wireframe(s) Appearing:None
Should this live in Market Information area too?
Kate Horne: 00/00/07
Portlet #:
Title: Available capacity
Description: with Energy Offer Curves- that can be used to increase Base Points in SCED;- that can be used to decrease Base Points in SCED;
without Energy Offer Curves in the ERCOT System- that can be used to increase Base Points in SCED;- that can be used to decrease Base Points in SCED
Type: Dashboard
Notes: 2 tabs?
Size: Wide
Undeployed Reg-Up & Reg-Down
20
Wireframe(s) Appearing:None
Should this live in Market Information area too?
Kate Horne: 00/00/07
PAGES
Portlet #:
Title: IN THIS SECTION
Description: Markets SectionList each page and either the entire list of portlets on that page, or a truncated list.
Type: Informational
Notes:
Size: Full Screen Width
21
Wireframe(s) Appearing:2. Market Information
IN THIS SECTION
MARKETS
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat.
Day Ahead Market This is the description of the Day Ahead Market Page. Description of it.
Real Time Market This is the description of the Real Time Market Page. Description of the page.
Portlet #:
Title: CRR Auction
Description: Contains links Elements belowE126, E127, E128, E129, E131, E133, E135possibly:E132E134
Type: List of Links
CRR Auction
Notes:Determined by roleMaybe personalized
Size: Narrow
22
Wireframe(s) Appearing:2. Market Information
Flowgates
Valid CRR Auction Offers
Valid CRR Auction Bids
CRR Auction Calendar
CRR Auction Results
PTP Option Values
Outstanding CRRs
CRR Ownership of Record
Settlement Calendar
Settlement Statement
Settlement & Billing Disputes
Day Ahead Market:
DAM Settlement Statements
Day-Ahead Market Invoices
Real Time Market:
RTM Settlement Statements
RTM Invoices
RTM Late Fee Invoices
Settlements
Portlet #:
Title: Settlements
Description: Contains links Elements below:E138, E139, E140, E142, E143, E147, E148, E149, E151, E186
Type: List of Links
Notes:
Size: Narrow
23
Wireframe(s) Appearing:2. Market Information
Portlet #:
Title: Day Ahead Market Useful Links
Description: Contains links Elements below:E59, E61, E64, E65
Type: List of Links
Notes:
Size: Narrow
Wireframe(s) Appearing:2. Market Information2.1 Day Ahead Market
DAM Pre-Validation Data
Capacity Trades
Self Schedules
CRR Offers
Day Ahead Market Useful Links
24
Energy Trades
Energy Offer Curves
DAM Energy-Only Offers
DAM Energy Bids
Energy Offers & Trades
25
Portlet #:
Title: Energy Offers & Trades
Description: Contains links Elements below:E63, E71, E73, E74
Type: List of Links
Notes:
Size: Narrow
Wireframe(s) Appearing:2.1 Day Ahead Market
Portlet #:
Title: Ancillary Service Trades
Description: Contains links Elements below:E67, E69
Type: List of Links
Notes:
Size: Narrow
Wireframe(s) Appearing:2.1 Day Ahead Market
Confirmed Ancillary Service Offers
Confirmed Ancillary Service Trades
Ancillary Service Trades
26
PTP Obligation Bid
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
Portlet #:
Title: PTP Obligation Bid
Description: continuous display of PTP Obligation Bid
Type: Download Table
Notes:
Size: Wide
27
Wireframe(s) Appearing:2.1 Day Ahead Market
> see all
Valid Startup and Minimum-Energy Offers
Portlet #:
Title: Valid Startup and Minimum-Energy Offers
Description: continuous display of valid Startup Offers and Minimum Energy Offers
Type: Download Table
Notes:
Size: Wide
28
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Day Ahead MCPC
Portlet #:
Title: Day-Ahead MCPC
Description: for each type of Ancillary Service for each hour of the operating day
Type: Download Table
Notes:
Size: Wide
29
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Day Ahead Settlement Point Prices
Portlet #:
Title: Day-Ahead Settlement Point Prices
Description: for each settlement point for each hour of the operating day
Type: Download Table
Notes:
Size: Wide
30
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Day Ahead Hourly LMPs
Portlet #:
Title: Day-Ahead Hourly LMPs
Description: for each electrical bus for each hour of the operating day
Type: Download Table
Notes:
Size: Wide
31
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Day Ahead Shadow Prices
Portlet #:
Title: Day-Ahead Shadow Prices
Description: for every binding constraint for each hour of the operating day
Type: Download Table
Notes:
Size: Wide
32
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Day Ahead Ancillary Service Offers
Portlet #:
Title: Day-Ahead Ancillary Service Offers
Description: in MW by AS type for each hour of the operating day
Type: Download Table
Notes:
Size: Wide
33
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Day Ahead Total Energy Bought
Portlet #:
Title: Day-Ahead Total Energy Bought
Description: in MWh by at each setttlement point for each AS type for each hour of the operating day
Type: Download Table
Notes:
Size: Wide
34
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Day Ahead Total Energy Sold
Portlet #:
Title: Day-Ahead Total Energy Sold
Description: in MWh by at each settlement point for each AS type for each hour of the operating day
Type: Download Table
Notes:
Size: Wide
35
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Aggregated Ancillary Service Offer Curve
Portlet #:
Title: Aggregated Ancillary Service Offer Curve
Description: of all AS offers for each type of AS for each hour of the operating day
Type: Download Table
Notes:
Size: Wide
36
Wireframe(s) Appearing:2.1 Day Ahead Market
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Real Time Prices
Total ERCOT System Demand
Shift Schedules
Data Validation Rules
Real Time Market Useful Links X
Portlet #:
Title: Real Time Market Useful Links
Description: Contains links Elements below:E86E88E95E97
Type: List of links
Notes:
Size: Narrow
37
Wireframe(s) Appearing:2. Market Information2.2 Real Time Market
Also shown on My MIS for demo purposes
Portlet #:
Title: Real Time Prices Parameters
Description: Parameters as required by Section 6.4.8
Type: Download Table
Notes:what do the parameters look like?How many to list?
Size: Wide
38
Wireframe(s) Appearing:2.2 Real Time Market
Also show on My MIS page for demo purposes
Real Time Prices Parameters
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Changes in ERCOT System Conditions
Description: Changes in ERCOT System conditions
Type: Download Table
Notes:
Size: Wide
39
Wireframe(s) Appearing:2.2 Real Time Market
Changes in ERCOT System Conditions
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Transmission Facilities Status
Description: Changes or potential changes in the status of transmission facilities
Type: Download Table
Notes:
Size: Wide
40
Wireframe(s) Appearing:2.2 Real Time Market
Transmission Facilities Status
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Adverse Weather Conditions
Description: Adverse Weather Conditions
Type: data
Notes:
Size: Narrow
Wireframe(s) Appearing:2.2 Real Time Market
Adverse Weather Conditions
41
Portlet #:
Title: System-Wide Load Forecasts
Description: System-Wide Load Forecasts
Type: Download Table
Notes:
Size: Wide
42
Wireframe(s) Appearing:2.2 Real Time Market
System-Wide Load Forecasts
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: RMR Services Quantities
Description: for each hour of operating day
Type: Download Table
Notes:
Size: Wide
43
Wireframe(s) Appearing:2.2 Real Time Market
RMR Services Quantities
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Updated Electrical Bus Load Distribution Factors
Description: for each hour of operating day and all hours of next operating day
Type: Download Table
Notes:
Size: Wide
44
Wireframe(s) Appearing:2.2 Real Time Market
Updated Electrical Bus Load Distribution Factors
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: SASM MCPC
Description: for each type of Ancillary Service for each hour, questionable prices are flagged
Type: Download Table
Notes:
Size: Wide
45
Wireframe(s) Appearing:2.2 Real Time Market
SASM MCPC
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Total Ancillary Service
Description: procured in MW by AS type for each hour
Type: Download Table
Notes: duplicate of 45?
Size: Wide
46
Wireframe(s) Appearing:2.2 Real Time Market
Total Ancillary Service
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Aggregated Ancillary Service Offer Curve
Description: procured in MW by AS type for each hour
Type: Download Table
Notes: DUPE of 36
Size: Wide
47
Wireframe(s) Appearing:2.2 Real Time Market
Aggregated Ancillary Service Offer Curve
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Dispatch Instruction Limitations
Description: procured in MW by AS type for each hour
Type: Download Table
Notes:
Size: Wide
48
Wireframe(s) Appearing:2.2 Real Time Market
Dispatch Instruction Limitations
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: IN THIS SECTION
Description: Grid SectionList each page and either the entire list of portlets on that page, or a truncated list.
Type: Informational
Notes:
Size: Full Screen Width
Wireframe(s) Appearing:3. Grid Information
IN THIS SECTION
PAGES
49
GRID
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.
Real Time Operations This is the description of the page named to the left. Description.
Generation This is the description of the page named to the left. Description of the page.
Load This is the description of the page named to the left, to tell what it is. Description of it.
Transmission This is the description of the page named to the left. Description of the page.
Model Information This is the description of the page named to the left. Description of it.
Portlet #:
Title: Responsive Reserve Capacities
Description: - Generation Resources- Load Resources
Type: Data
Notes:Tabs?
Size: Wide
Responsive Reserve Capacities
50
Wireframe(s) Appearing:3.1. Real Time Operations
Portlet #:
Title: Non-Spinning Reserve
Description: - On-Line Generation Resources- Undeployed Load Resources- Off-Line Generation Resources- Resources with Output Schedules
Type: Data
Notes:Tabs?
Size: Wide
Non-Spinning Reserve
51
Wireframe(s) Appearing:3.1. Real Time Operations
Portlet #:
Title: Undeployed
Description: - Undeployed Reg-Up- Undeployed Reg-Down
Type: Data
Notes:Tabs?
Size: Wide
Undeployed
52
Wireframe(s) Appearing:3.1. Real Time Operations
Portlet #:
Title: Available Capacity
Description: - with AND without offer curves- to increase Base Points in SCED- to decrease Base Points in SCED
Type: Data
Notes:Tabs?
Size: Wide
Available Capacity
53
Wireframe(s) Appearing:3.1. Real Time Operations
Portlet #:
Title: Security Violations and Binding Transmission Constraints
Description: describe the limiting element
Type: Download Table
Notes:Tabs?
Size: Wide
Security Violations and Binding Transmission Constraints
Wireframe(s) Appearing:3.1. Real Time Operations
54
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Aggregated Resource Outages
Upcoming Aggregated Resource Outages
Aggregated Resource Outages
Portlet #:
Title: Aggregated Resource Outages
Description: Contains links Elements below:E18, E19
Type: List of links
Notes:
Size: Narrow
55
Wireframe(s) Appearing:3.2 Generation
RMR Information
RMR Agreement Data
RMR Alternatives
RMR Requests for Deviation
RMR Information
Portlet #:
Title: RMR Information
Description: Contains links Elements below:E46, E48, E49, E50
Type: List of links
Notes:
Size: Narrow
56
Wireframe(s) Appearing:3.2 Generation
Portlet #:
Title: Suspension of Operation
Description: - posting of received Notifications of suspension of operation- comments received from MPs- ERCOT's determination- "Part II" Information- links to all existing relevant studies and data Word Docs- also a notice??
Type: Table and list of links??
Notes:
Size: Wide?
Suspension of Operation
Wireframe(s) Appearing:3.2. Generation
57
MP-specific Generation Data
Competitive Constraints
Ancillary Service Plan
WGRPP Forecasts
Resource Capacity Deficiencies
ERCOT Wind Forecasts
Generation Useful Links
Portlet #:
Title: Generation Useful Links
Description: Contains links Elements below:E167, E54. E55, E57, E17, E44
Type: List of links
Notes:
Size: Narrow
58
Wireframe(s) Appearing:3. Grid Information3.2 Generation
Portlet #:
Title: Validated Output Schedules
Description: a QSEs particular validation schedule
Type: Table and list of links??
Notes:
Size: Wide
Validated Output Schedules
Wireframe(s) Appearing:3.2. Generation
59
Portlet #:
Title: Total Generation Data
Description: total generation, total AML
Type: Download Table
Notes:
Size: Wide
Total Generation Data
Wireframe(s) Appearing:3.2. Generation
60
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Demand Forecasts
Load Ratio Share
Load Profile ID Tables
IDR Mandatory Installation Threshold Reports
Load Useful Links
Portlet #:
Title: Load Useful Links
Description: Contains links Elements below:E15, E56, E183, E184
Type: List of links
Notes:
Size: Narrow
61
Wireframe(s) Appearing:3. Grid Information3.3 Load
Portlet #:
Title: Mid-Term Load Forecast
Description: Hourly post about forecasted load over next 168 hours, by weather zone
Type: Download Table
Notes:
Size: Wide
Mid-Term Load Forecast
Wireframe(s) Appearing:3.3. Load
62
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Long-Term Load Forecast
Description: Daily post about forecasted load over next 365 days, by weather zone
Type: Graphic?
Notes:
Size: Wide?
Long-Term Load Forecast
Wireframe(s) Appearing:3.3. Load
63
Portlet #:
Title: Load Profiles
Description: - links to load profiles - link to archive
Type: Download Table
Notes:(last week, perhaps, and link to archive)
Size: Wide
Load Profiles
Wireframe(s) Appearing:3.3. Load
64
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Validation Tests
Description: - links to load profiles - link to archive
Type: Download Table
Notes:should this be split in two?
Size: Wide
Validation Tests
Wireframe(s) Appearing:3.3. Load
65
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Buses Information
Transmission Elements
Planning - Transmission Reliability Testing Contingency List
Transmission Useful Links
Portlet #:
Title: Transmission Useful Links
Description: Contains links Elements below:E22, E32, E195
Type: List of links
Notes:
Size: Narrow
66
Wireframe(s) Appearing:3. Grid Information3.4 Transmission
Portlet #:
Title: New Transmission Elements
Description: summary level info about new transmission elements
Type: Links?
Notes:
Size: Wide?
New Transmission Elements
Wireframe(s) Appearing:3.4 Transmission
67
Portlet #:
Title: Planned Transmission Outages
Description: Schedule of maintenance, planned outages
Type: Link?
Notes:show as proposed and approved
Size: Wide?
Planned Transmission Outages
Wireframe(s) Appearing:3.3. Load
68
Portlet #:
Title: Scheduled Transmission Outages
Description: Schedule of maintenance, Scheduled outages
Type: Link?
Notes:show as proposed and approved
Size: Wide?
Scheduled Transmission Outages
Wireframe(s) Appearing:3.3. Load
69
Distribution Loss Factors
Transmission Loss Factors
Loss Factors
Portlet #:
Title: Loss Factors
Description: Contains links Elements below:E170, E171
Type: List of links
Notes:
Size: Narrow
70
Wireframe(s) Appearing:3.4 Transmission
Network Model
Equipment Ratings
Equipment Ratings Methodology
Transformers
SPSs and RAPs
Model Ratings
Transmission Elements List
Electrical Buses per Hub
Network Model Information
Portlet #:
Title: Network Model Information
Description: Contains links Elements below:E23, E24, E25, E33, E35, E27, E39
Type: List of links
Notes:links to network model things
Size: Narrow
71
Wireframe(s) Appearing:3.5 Model Information
Transmission Model
Submittal Schedule
SSWG Procedure Manual (file)
Transmission Model
Portlet #:
Title: Transmission Model
Description: - link to transmission model- submittal schedule for updating transmission info- link to SSWG Procedure Manual
Type: List of links
Notes:what does a transmission model look like
Size: Narrow
72
Wireframe(s) Appearing:3.5 Model Information
CRR Network Model
Document
Document
Document
Document
CRR Network Model
Portlet #:
Title: CRR Network Model
Description: link to CRR Network Model, link to documents relating to SEPS
Type: List of links
Notes:how many documents, and what are they?
Size: Narrow
73
Wireframe(s) Appearing:3.5 Model Information
Prevention of Temperature Rating Adjustment
Estimator Performance Report
Voltage Profiles
Switching Plan
Restoration Plan
Model Information Useful Links
Portlet #:
Title: Model Information Useful Links
Description: Contains links Elements below:E40, E41, E51, E34, E125
Type: List of links
Notes:
Size: Narrow
74
Wireframe(s) Appearing:3. Grid Information3.5 Model Information
Portlet #:
Title: Forecasted ERCOT System Conditions
Description: - link to applications: weather assumptions, ERCOT System, Weather Zone and Load Zone Forecasts- link to files: Network Operations Model topology, weather-related changes to transmission contingency list, load profiles for non-IDR, distribution loss fact
Type: List of links
Notes:confirm the applicationswhat does this look like????
Size: Narrow
Wireframe(s) Appearing:3.5 Model Information
Forecasted ERCOT System Conditions
75
Portlet #:
Title: Dynamic Ratings
Description: dynamic ratings adjusted for the current temperature
Type: Download Table
Notes:
Size: Wide
Dynamic Ratings
Wireframe(s) Appearing:3.5 Model Information
76
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Application Launch Pad
Description: All Applications the user can access
Type: List of links
Notes:Suggestion – subsume ‘Baby Apps’ and present much like the IN THIS SECTION portlets
Size: Full screen width
Wireframe(s) Appearing:4. Applications
77
Application Launch Pad
Link
Link
Link
Link
Link
Link
Link
fdfdfdfdfdfd
Portlet #:
Title: Baby Apps
Description:
Type: List of links
Notes:WHAT TO CALL THIS?Do we present in their own portlet, or one big portlet?
SUGGESTION – remove and add to 77
Size: Narrow
78
Wireframe(s) Appearing:4. Applications
Portlet #:
Title: Report Configurator
Description: configurable report portlet
Type: GUI
Notes:Need much discussion with tech team
Size: Wide?
Report Configurator
Wireframe(s) Appearing:5. Reports
79
Name of the Market Participant (SubQSE1)PublicAncillary Services ExtractBids and Schedules ExtractCredit ExposureGeneration ExtractLoad Estimation VolumeLoad ExtractParticipant InvoiceResource ID ExtractSettlement Input Data ExtractSettlement Statement
rpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xmlrpt.(02-20-2007 09:03:44).20070210I085824.xml
Settlement and Billing Extract
Report Explorer
Portlet #:
Title: Report Explorer
Description: portlet that presents report explorer in some way
Type: List of links, it would seem
Notes:access to Report Explorer
Size: Narrow
80
Wireframe(s) Appearing:5. Reports
>>>>>>>>>>>>>>>>>>>
Portlet #:
Title: Notices
Description: Notices portlet
Type: GUI
Notes:
Size: Full page width
Wireframe(s) Appearing:6. Notices
81
Notices
DATE TYPE STATUS PRIORITY NOTICEFeb 27, 2007 14:22:46 Operations Active Advisory This is the Notice Title
This is the notice text. It may be a sentence or two in length, but not more.
Feb 27, 2007 14:12:34 Operations Active Advisory This is the Notice TitleThis is the notice text. It may be a sentence or two in length, but not more.
Feb 27, 2007 14:02:34 Settlements This is the Notice TitleThis is the notice text. It may be a sentence or two.
Feb 27, 2007 12:32:29 Trading/Scheduling This is the Notice TitleThis is the notice text. It may be a sentence or two.
Feb 27, 2007 10:12:57 Planning This is the Notice TitleThis is the notice text. It may be a sentence or two. It may also run a line or two.
Feb 27, 2007 09:56:36 Trading/Scheduling This is the Notice TitleThis is the notice text. It may be a sentence or two.
Feb 27, 2007 08:48:14 Settlements This is the Notice TitleThis is the notice text. It may be a sentence or two.
Feb 27, 2007 12:32:29 Trading/Scheduling This is the Notice TitleThis is the notice text. It may be a sentence or two.
Feb 27, 2007 10:12:57 Planning This is the Notice TitleThis is the notice text. It may be a sentence or two. It may also run a line or two.
Feb 27, 2007 09:56:36 Trading/Scheduling This is the Notice TitleThis is the notice text. It may be a sentence or two.
FILTER BY:Show all types
Notice type:From:
To:
Apply Reset
Time Frame:Today
Date Range:02 27 2007
02 27 2007
Notices: 1 – 10 of about 400
1 2 3 4 5 6 7 8 9 10 Next
Portlet #:
Title: IN THIS SECTION
Description: Services SectionList each page and either the entire list of portlets on that page, or a truncated list.
Type: Informational
Notes: = launches an external site, graphic indicator for users
Size: Full Screen Width
Wireframe(s) Appearing:7. Services
IN THIS SECTION
PAGES
82
SERVICES
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat.
Registration This is the description of the page named to the left. Description.
Renewable Energy Credits This is the description of the page named to the left.
List of Qualified Scheduling Entities
Cautionary Statement
Qualified Scheduling Entities
Portlet #:
Title: Qualified Scheduling Entities
Description: - list of all QSEs- cautionary statement
Type: List of links
Notes:links to .com???
Size: Narrow
83
Wireframe(s) Appearing:7. Services
Creditworthiness Disclaimer
ERCOT Creditworthiness standards
Facility Identification
Transaction Flow Diagrams
Services Useful Links
Portlet #:
Title: Services Useful Links
Description:
Type: List of links
Notes:links to .com???
Size: Narrow
84
Wireframe(s) Appearing:7. Services
Agreements & Procedures Documents
Document
Document
Document
Registration Procedures and Forms
Portlet #:
Title: Registration Procedures and Forms
Description: - agreements and procedures documents, see CI for list- info about fees? (ci 151)- forms for all MPs to register
Type: list of links to docs, also maybe to an application
Notes:web or download forms? If too many, maybe this is more than one page, or maybe a series of portlets?
Size: Narrow
85
Wireframe(s) Appearing:7. Services
Fees Information
Registration Forms
Portlet #:
Title: IN THIS SECTION
Description: Committees and Groups SectionList each page and either the entire list of portlets on that page, or a truncated list.
Type: Informational
Notes:
Size: Full Screen Width
Wireframe(s) Appearing:8. Committees and Groups
IN THIS SECTION
PAGESCOMMITTEES AND GROUPS
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat.
Sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat.
Committees and Groups Page This is the description of the page named to the left.
Meeting Calendar This is the description of the page named to the left. Description.
Board of Directors This is the description of the page named to the left.
TAC This is the description of the page named to the left. Description.
COPS This is the description of the page named to the left.
PRS This is the description of the page named to the left. Description.
RMS This is the description of the page named to the left.
ROS This is the description of the page named to the left. Description.
WMS This is the description of the page named to the left.
Other Groups This is the description of the page named to the left. Description.
Market Participants This is the description of the page named to the left. 86
Calendar
Portlet #:
Title: Calendar
Description:
Type: list of links to docs, also maybe to an application
Notes:calendar of meetings - see .com
Size: Narrow
Wireframe(s) Appearing:8. Committees and Groups
Tue 02/27 PWG Meeting AUS
Tue 02/27 Retail Transaction... AUS
Wed 02/28 TPTF Meeting AUS
Wed 02/28 TTPT Meeting AUS
Wed 02/28 TDTWG Meeting AUS
Thu 03/01 TPTF Meeting AUS
Thu 03/01 RTTF Meeting AUS
Mon 03/05 TPTF Meeting AUS
Mon 03/05 Credit Workshop M... AUS
Tue 03/06 TPTF Meeting AUS
Tue 03/06 Readiness Metric S... AUS
Tue 03/06 COPS Communica... AUS
Wed 03/07 TPTF Meeting AUS
Thu 03/08 TAC Meeting AUS
Mon 03/012 CIP Advisory Group... AUS87
Portlet #:
Title: Organization Chart
Description: configurable report portlet
Type: Graphic
Notes:see org chart graphic/html on .com
Size: Wide
Organization Chart
Wireframe(s) Appearing:8. Committees and Groups
88
Portlet #:
Title: IN THIS SECTION
Description: Market Rules SectionList each page and either the entire list of portlets on that page, or a truncated list.
Type: Informational
Notes:
Size: Full Screen Width
Wireframe(s) Appearing:9. Market Rules
IN THIS SECTION
PAGESMARKET RULES
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat.
Sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat.
Protocols This is the description of the page named to the left. Description.
Guides This is the description of the page named to the left.
System Changes This is the description of the page named to the left. Description.
Compliance This is the description of the page named to the left.
89
ERCOT Fee Schedule
Portlet #:
Title: ERCOT Fee Schedule
Description: Contains the links elements below:E153, E155, E156, maybe E164 if link
Type: list of links to docs, also maybe to an application
Notes:
Size: Narrow
90
Wireframe(s) Appearing:9. Market Rules
Charge Type Matrix
Billing Determinants
Allowed Expenses Summary
Other Binding Documents
Portlet #:
Title: Other Binding Documents
Description: list of other binding documents
Type: List of links
Notes:“Ancillary Services Test” - does this belong???Need rest of title for link 5
Size: Narrow
91
Wireframe(s) Appearing:9. Market Rules
Guides
SCRs
OGRR
Ancillary Services Test
Draft ERCOT Power System Planning Charter and (??)
Texas Market Test Plan Guide
Data Transport Guides
Texas SET Guides
ERCOT Creditworthiness Standards
Recent Audit Reports
Portlet #:
Title: Recent Audit Reports
Description: Audit reports created in the last time period, link to page of all
Type: List of links
Notes:- what time period?
Size: Narrow
92
Wireframe(s) Appearing:9.3 Compliance
Link
Link
Link
Link
Link
Link
Link
Link
Dashboard Portlets
Portlet #:
Title: Recent Audit Reports
Description: Audit reports created in the last time period, link to page of all
Type: List of links
Notes:
Size: Narrow
Wireframe(s) Appearing:4. Applications
Explanation of Dashboard portlets, describing the kinds of things you and do and see. Leads into the list of them below, of which you see static versions and add to the My Page.
Dashboard portlet 1
Dashboard portlet 2
Dashboard portlet 3
Dashboard portlet 4
Dashboard portlet 5
view
view
view
view
view
add to My Page
add to My Page
add to My Page
add to My Page
add to My Page93
Dashboard portlet 6
Dashboard portlet 7
Dashboard portlet 8
Dashboard portlet 9
Dashboard portlet 10
view
view
view
view
view
add to My Page
add to My Page
add to My Page
add to My Page
add to My Page
Portlet #:
Title: Advanced Search/Search Results
Description: Notices portlet
Type: GUI
Notes:
Size: Full page width
Wireframe(s) Appearing:U1 Search (Advanced Search)U1.1. Search Results
Search Results: 1 – 10 of about 12700
This is the name of the item identifiedConceptualizing random endpoints in a access matrix provides reach extensions enterprise wide. Respective divisions historically.
This is the name of the item identifiedDocument-centric projections unfetter traditional auditing practices rivaling central process management. Advanced functionality, easy administration, proclaim the hallmarks of unprecedented opportunity.
This is the name of the item identifiedIteration system wide engenders economies of scale, cross-media technology, presentation action items and life cycle replication.
This is the name of the item identifiedEnterprise engenderment accelerates initiative platforms, reducing staffing components, integration of technical accessibility, resulting in bottom line pluralisms, benefit-wise. Incidental re-sizing staff requirements through attrition can be accelerated by paradigm shifts.
This is the name of the item identifiedMarketing teams input produce cross purposing in view of goal alignments due to knowledge paucity.
This is the name of the item identifiedImaging through ideals rather than real world branding, is a perilous undertaking with negative results. Branding strategies generating.
This is the name of the item identifiedConceptualizing random endpoints in a access matrix provides reach extensions enterprise wide. Respective divisions.
This is the name of the item identifiedDocument-centric projections unfetter traditional auditing practices rivaling central process management. Advanced functionality, easy administration, proclaim the hallmarks of unprecedented opportunity.
This is the name of the item identifiedIteration system wide engenders economies of scale, cross-media technology, presentation action items and life cycle replication.
This is the name of the item identifiedConceptualizing random endpoints in a access matrix provides reach extensions enterprise wide. Respective divisions historically.
All documents
Search
Sort by: Date / Relevance
1 2 3 4 5 6 7 8 9 10 Next 94
Find Results: with all of the words
with the exact phrase
with at least one of the words
without the words
within
All documentsGridMarketOperating GuidesProtocolsNodal
date anytime
anytimepast 3 monthspast 6 monthspast year
Reset
Search
Current Protocols
Portlet #:
Title: Current Protocols
Description: Links to various Protocols information
Type: List of links
Notes:New portlet
Size: Narrow
95
Wireframe(s) Appearing:9. Market Rules
Current Protocols
Protocols Library
PRRs
PRR Submission Process
Posting Requirements
Compliance
Portlet #:
Title: Compliance
Description: Links to various Compliance information
Type: List of links
Notes:New portlet
Size: Narrow
96
Wireframe(s) Appearing:9. Market Rules
Compliance Program
ERCOT Event Investigations
ERCOT Performance Metrics
ERCOT Protocol-Specific Compliance Program
NERC Compliance Enforcement Program
Operations Performance Report
Particulate Generation Data
Portlet #:
Title: Change Requests
Description: E28 below, maybe otherslist of linksanything else need to live in here???E28 = NOMCRs- the NOMCR and the incremental change- show current status- mirror test results
Type: ??
Notes:
Size: Wide
Change Requests
Wireframe(s) Appearing:3.5 Model Information
97
> This is a page
> This is the current page
> This is another page
> This is page number four
> This is the last page
Portlet #:
Title:
Type:
Notes:
Size:
Wireframe(s) Appearing:U1 Search (Advanced Search)U1.1. Search Results
PAGES IN THIS SECTION
Dynamic portlet that shows the pages in the section.The current page is shown by the lack of interactivity and TBD overall graphic treatmentCANNOT be added to MyPage
Menu (dynamic)
Narrow
Description:
PAGES IN THIS SECTION
98
Nodal Protocols
Portlet #:
Title: Nodal Protocols
Description: Links to various Nodal Protocols information
Type: List of links
Notes:New portlet
Size: Narrow
99
Wireframe(s) Appearing:9. Market Rules
Nodal Protocols Revision Requests
PIR Submission Process
Posting Requirements
McCamey Area Maps
Portlet #:
Title: McCamey Area Maps
Description: maps for wind data of a particular area in Texas
Type: List of links
Notes:New portlet
Size: Narrow
100
Wireframe(s) Appearing:3.5. Model Information
Link
Link
Link
Link
Link
Link
Link
Contingencies
Portlet #:
Title: Contingencies
Description: maps for wind data of a particular area in Texas
Type: List of links
Notes:New portlet
Size: Narrow
101
Wireframe(s) Appearing:2.2. Real Time Market
Standard contingency list
Temporarily removed contingencies and reason
Deselected contingencies and reasons for removal
Active SCED Contingencies
Portlet #:
Title: Changes to RUC Committed Resources
Description: Changes to RUC Committed Resources
Type: Download Table
Notes:
Size: Wide
Changes to RUC Committed Resources
Wireframe(s) Appearing:3.1 Real Time Operations
102
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Verifiable Costs Processes
Portlet #:
Title: Verifiable Costs Processes
Description: Process for determining verifiable and actual verifiable costs
Type: List of links
Notes:New portlet
Size: Narrow
103
Wireframe(s) Appearing:2. Markets
Verifiable costs process
Verifiable actual costs process
Portlet #:
Title: Transmission Outage Statistics
Description: Transmission Outage Statistics
Type: Download Table
Notes:
Size: Wide
Transmission Outage Statistics
Wireframe(s) Appearing:3.4 Transmission
104
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Resource Outage Statistics
Description: Resource Outage Statistics
Type: Download Table
Notes:
Size: Wide
Resource Outage Statistics
Wireframe(s) Appearing:3.2 Generation
105
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Dynamic Rating Report
Description: Dynamic Rating Report
Type: Download Table
Notes:
Size: Wide
Dynamic Rating Report
Wireframe(s) Appearing:3.4 Transmission
106
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Breaker and Switch Status
Description: Breaker and Switch Status
Type: Download Table
Notes:
Size: Wide
Breaker and Switch Status
Wireframe(s) Appearing:3.5. Model Information
107
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Transmission Flows and Voltages
Description: Transmission Flows and Voltages
Type: Download Table
Notes:
Size: Wide
Transmission Flows and Voltages
Wireframe(s) Appearing:3.5. Model Information
108
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Transformer Flows, Voltages and Tap Position
Description: Transformer Flows, Voltages and Tap Position
Type: Download Table
Notes:
Size: Wide
Transformer Flows, Voltages and Tap Position
Wireframe(s) Appearing:3.5. Model Information
109
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Voltage Schedules
Description: Voltage Schedules
Type: Download Table
Notes:
Size: Wide
Voltage Schedules
Wireframe(s) Appearing:3.5. Model Information
110
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Binding Transmission Constraints
Description: Binding Transmission Constraints
Type: Download Table
Notes:
Size: Wide
Binding Transmission Constraints
Wireframe(s) Appearing:3.4 Transmission
111
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Shadow Prices on Binding Transmission Constraints
Description: Shadow Prices on Binding Transmission Constraints
Type: Download Table
Notes:
Size: Wide
Shadow Prices on Binding Transmission Constraints
Wireframe(s) Appearing:2. Markets
112
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Average of Loads
Description: Average of Loads
Type: Download Table
Notes:
Size: Wide
Average of Loads
Wireframe(s) Appearing:2. Markets
113
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Portlet #:
Title: Total Amount of Regulation Service
Description: Total Amount of Regulation Service
Type: Download Table
Notes:
Size: Wide
Total Amount of Regulation Service
Wireframe(s) Appearing:3.1 Real Time Operations
114
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Weather Responsiveness Data
Portlet #:
Title: Weather Responsiveness Data
Description: - annual data- monthly update (how many to show?)
Type: List of links
Notes:New portlet
Size: Narrow
115
Wireframe(s) Appearing:3. Grid
Link
Link
Link
Link
Link
Portlet #:
Title: Unaccounted For Energy
Description: Unaccounted For Energy
Type: Download Table
Notes:
Size: Wide
Unaccounted For Energy
Wireframe(s) Appearing:2. Markets
116
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all
Weather Zone Assignments
Portlet #:
Title: Weather Zone Assignment
Description: Weather Zone Assignment
Type: List of links
Notes:New portletNo idea what this looks like yet
Size: Narrow
117
Wireframe(s) Appearing:2. Markets
Link
Link
Link
Link
Portlet #:
Title: RMR Orders
Description: RMR Orders
Type: Download Table??
Notes:
Size: Wide
RMR Orders
Wireframe(s) Appearing:3.2 Generation
118
File
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
Lorem ipsum dolor sit amet elit sed amet elit sed dolor
FT1
download
download
download
download
FT2
download
download
download
download
> see all