Page 1: Water & The Netherlands: A New Relationship

Water & The Netherlands: A new relationship

Anne DonkerConsulate General of the Netherlands

Page 2: Water & The Netherlands: A New Relationship

2

The Netherlands: a delta landscape, penetrated by rivers, subject to sea and river flooding

Page 3: Water & The Netherlands: A New Relationship
Page 4: Water & The Netherlands: A New Relationship
Page 5: Water & The Netherlands: A New Relationship
Page 6: Water & The Netherlands: A New Relationship

70% of Dutch GDP is produced below sea level

Page 7: Water & The Netherlands: A New Relationship

7

Page 8: Water & The Netherlands: A New Relationship

Two major floods per century

Page 9: Water & The Netherlands: A New Relationship
Page 10: Water & The Netherlands: A New Relationship

2% of Dutch GDP

Page 11: Water & The Netherlands: A New Relationship

11

Page 12: Water & The Netherlands: A New Relationship

Living with Water

Page 13: Water & The Netherlands: A New Relationship

13

The Netherlands: a delta landscape, penetrated by rivers, subject to sea and river flooding

Page 14: Water & The Netherlands: A New Relationship
Page 15: Water & The Netherlands: A New Relationship

12-5-2014 15

Page 16: Water & The Netherlands: A New Relationship

Backup Slides

Page 17: Water & The Netherlands: A New Relationship

Thank you.

Anne Donker

Senior Economic Officer

Consulate General of the Netherlands

[email protected]

Page 18: Water & The Netherlands: A New Relationship
Page 19: Water & The Netherlands: A New Relationship

Room for the River

• Design discharge increase (for 2050), from 15.000 m3/s to 16.000 m3/s, is insufficient, given climate change

• Projected need:18,000 – 20,000 m3/s by 2100; – 1995 flood: 12,500 m3/s

• Heightening / reinforcing embankments is costly ($1.7 billion / 2050), and will likely increase overall risk

• From flood resistance to flood accomodation• Reduce projected increase in design discharge levels• Dike heightening only as a last resort• Flood management and spatial quality (enhancing natural and

cultural landscape values); design teams led by local govt.

• RvR began as idea in 1986, gained momentum in 1990s, US projects as inspiration

Page 20: Water & The Netherlands: A New Relationship

Room for the River today

• 700 potential projects identified, 39 selected, 35 being implemented• urban, agricultural/rural, wetland restoration

• 2,3 billion euro budget ($3 billion)

• Implementation 2009-2015: money is committed, not subject to annual appropriations cycle, this yields certainty and cost savings

• Oversight team coordinates feedback / experience between projects

• Info: www.ruimtevoorderivier.nl/meta-navigatie/english

Page 21: Water & The Netherlands: A New Relationship

Waal River / Nijmegen Project• River bottleneck, channel restriction from 1500m width to

450 m width

Options:

• Ag / undeveloped land

available to north

• Northern river bank land targeted

for development

• Key road / rail / harbor

infrastructure

12-5-2014 21

Page 22: Water & The Netherlands: A New Relationship

Dike set-back strategy: safety, increased storage / flow capacity, and new land opportunities

12-5-2014 22

Page 23: Water & The Netherlands: A New Relationship
Page 24: Water & The Netherlands: A New Relationship

Integration with urban development

24

Page 25: Water & The Netherlands: A New Relationship

Room for the river | Ijssel River | Zutphen - Cortenoever